Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

NASA Conference on Thermal Radiation Problems in Space Technology: A Compilation of Summaries of the Papers Presented

This document contains summaries of the talks presented at a small NASA Conference on Thermal Radiation Problems in Space Technology held at the Langley Research Center on September 12 and 13, 1960. The conferees were NASA members and NASA contractors directly concerned with radiation characteristics of materials and with thermal problems of spacecraft. The purpose of the conference was not only to present significant research information but also to provide an opportunity for the conferees to become aware of each other's fields of interest, activities, techniques, and problems. As arranged herein, the first set of talks, mostly by the contractors, is concerned with surfaces and surface coatings, and with the determination of their pertinent characteristics. The second set of talks, mostly by NASA personnel, is concerned with spacecraft and their thermal problems.

Source record↗

Advanced Stirling Convertor (ASC) Technology Maturation

The Advanced Stirling Convertor (ASC) development effort was initiated by NASA Glenn Research Center (GRC) with contractor Sunpower Inc. to develop high efficiency thermal-to-electric power conversion technology for NASA Radioisotope Power Systems. Early successful performance demonstrations led to the expansion of the project as well as adoption of the technology by the Department of Energy (DOE) and system integration contractor Lockheed Martin Space Systems Company as part of the Advanced Stirling Radioisotope Generator (ASRG) flight project. The ASRG integrates a pair of ASCs to convert the heat from a pair of General Purpose Heat Source (GPHS) modules into electrical power. The expanded NASA ASC effort included development of several generations of ASC prototypes or Engineering Units to help prepare the ASC technology and Sunpower for flight implementation. Sunpower later had two parallel contracts allowing the last of the NASA Engineering Units called ASC-E3 to serve as pathfinders for the ASC-F flight convertors being built for DOE. The ASC-E3 convertors utilized the ASC-F flight specifications and were built using the ASC-F design and process documentation. Shortly after the first ASC-F Pair achieved initial operation, due to budget constraints, the DOE ASRG flight development contract was terminated. NASA continues to invest in the development of Stirling RPS technology including continued production of the ASC-E3 convertors, seven of which have been delivered with one additional unit in production. Starting in FY2015, Stirling Convertor Technology Maturation has been reorganized as an element of the RPS Stirling Cycle Technology Development (SCTD) Project and long-term plans for continued Stirling technology advancement are in reformulation. This paper provides a status on the ASC project, an overview of advancements made in the design and production of the ASC at Sunpower, and a summary of acceptance tests, reliability tests, and tactical tests at NASA GRC that demonstrate the capabilities of the ASC.

radioisotope↗

Ensuring Payload Safety in Missions with Special Partnerships

The National Aeronautics and Space Administration (NASA) Expendable Launch Vehicle (ELV) payload space flight missions involve cooperative work between NASA and partners including spacecraft (or payload) contractors, universities, nonprofit research centers, Agency payload organization, Range Safety organization, Agency launch service organizations, and launch vehicle contractors. The role of NASA's Safety and Mission Assurance (SMA) Directorate is typically fairly straightforward, but when a mission's partnerships become more complex, to realize cost and science benefits (e.g., multi-agency payload(s) or cooperative international missions), the task of ensuring payload safety becomes much more challenging. This paper discusses lessons learned from NASA safety professionals working multiple-agency missions and offers suggestions to help fellow safety professionals working multiple-agency missions.

Agency launch service organizations↗

Advanced Stirling Convertor (ASC) Technology Maturation

The Advanced Stirling Convertor (ASC) development effort was initiated by NASA Glenn Research Center with contractor Sunpower, Inc., to develop high-efficiency thermal-to-electric power conversion technology for NASA Radioisotope Power Systems (RPSs). Early successful performance demonstrations led to the expansion of the project as well as adoption of the technology by the Department of Energy (DOE) and system integration contractor Lockheed Martin Space Systems Company as part of the Advanced Stirling Radioisotope Generator (ASRG) flight project. The ASRG integrates a pair of ASCs to convert the heat from a pair of General Purpose Heat Source (GPHS) modules into electrical power. The expanded NASA ASC effort included development of several generations of ASC prototypes or engineering units to help prepare the ASC technology and Sunpower for flight implementation. Sunpower later had two parallel contracts allowing the last of the NASA engineering units called ASC-E3 to serve as pathfinders for the ASC-F flight convertors being built for DOE. The ASC-E3 convertors utilized the ASC-F flight specifications and were built using the ASC-F design and process documentation. Shortly after the first ASC-F pair achieved initial operation, due to budget constraints, the DOE ASRG flight development contract was terminated. NASA continues to invest in the development of Stirling RPS technology including continued production of the ASC-E3 convertors, seven of which have been delivered with one additional unit in production. Starting in fiscal year 2015, Stirling Convertor Technology Maturation has been reorganized as an element of the RPS Stirling Cycle Technology Development (SCTD) Project and long-term plans for continued Stirling technology advancement are in reformulation. This paper provides a status on the ASC project, an overview of advancements made in the design and production of the ASC at Sunpower, and a summary of acceptance tests, reliability tests, and tactical tests at NASA Glenn that demonstrate the capabilities of the ASC.

Stirling cycle↗

Supplier Assessment System (SAS)

Background: Sponsored by NASA Headquarters; Charter - provide information to assist the quality assurance community in evaluating and determining supplier risk; Comprehensive on-line repository of supplier information; Available to approved civil service personnel from all NASA Centers, other U.S. Government Agencies, Prime Contractors, and NASA direct support contractors; User access to specific data types or documents is controlled as needed.

Dietrich, Kristen↗

Computer Programming Resources 2018

The document is a compilation of Computer Programming resources. It is geared toward front-end and back-end web development. It specializes on an ongoing project to create a website for the Safety and Mission Assurance Directorate. The Quality Assurance System (QAS) is intended to improve the overall quality and efficiency of communication among NASA Quality Assurance Engineers and Contractors. The use of QAS software will be limited to NASA Kennedy Space Center and Contractors. It is accessible through the KSC network.

Confluence↗

Gateway Lunar Habitat Modules as the Basis for a Modular Mars Transit Habitat

This paper provides a summary of the results from a recent concept study of various configurations for a Mars Transit Habitat. The designs considered are composed of modules based on published contractor concepts proposed for the lunar Gateway through NASA’s NextSTEP program. Using these Gateway concepts as a starting point for the design of a Mars Transit Habitat has potential advantages. Both Gateway and Mars Transit Habitats will have similar requirements for long-term operations in deep space, autonomous and remote operations when the crew is not onboard, and similar requirements for transferring crew to and from a planetary surface—the Moon and Mars respectively. The contractor designs for Gateway were traded against a monolithic transit habitat previously proposed by NASA’s Mars Integration Group. In addition, these concepts were considered for a “shakedown” mission for the transit habitat hardware in cislunar space to build confidence in new systems, including the advanced environmental control and life support systems needed for Mars missions. The results presented include overall vehicle configurations, mass, and volume estimates for the selected design concepts. Two concepts using large expandable modules are identified as leading candidates for a Mars Transit Habitat and the remaining elements are identified as representative of the habitable pressure vessels needed for safe haven configurations, logistics modules, surface habitats, rovers, and descent and ascent crew cabins in the overall Mars Architecture.

Smitherman, David↗

NASA's Space Launch System Begins Moving To The Launch Site

NASA is accelerating plans for a human return to the Moon. NASA was directed by the White House in 2019 to land the first woman and next man on the Moon by 2024. NASA’s backbone for future deep space exploration is the Space Launch System (SLS), as well as the Orion crew spacecraft, Gateway outpost, and Human Landing System as part of the Artemis program. While the SLS upper stage, the Interim Cryogenic Propulsion Stage (ICPS), based on an existing commercial stage was shipped to Kennedy Space Center (KSC) in 2017, major completed components of SLS will soon begin their eastward journey that will see them at KSC in 2020 to be integrated for their history-making launch back to the Moon. Core Stage prime contractor Boeing completed the Artemis I core stage in 2019 at NASA’s Michoud Assembly Facility (MAF) and shipped it to NASA Stennis Space Center (SSC) for stage green run testing in 2020 and then to KSC. Northrop Grumman, prime contractor for the 5-segment solid rocket boosters, is scheduled to begin overland shipment of the Artemis I motor segments from Utah to KSC in 2020 to await integration. This paper will discuss SLS progress to date and planned 2020 milestones.

Bruce R Askins↗

Orion Meteoroid and Debris Analysis with a Single Kevlar® Layer Enhancement to the Propulsion Tank Multi-Layer Insulation: Comparison of the Observed Data and the Adjusted Ballistic Models

In a continual mass optimization effort for the Orion vehicle by NASA and its prime contractor Lockheed Martin Space, along with the European Space Agency (ESA) and its contractors Airbus and Thales Alenia Space-Italy (TAS-I), a series of shield characterization shots have been performed to quantify the ballistic enhancement of a single-layer of Kevlar® in multi-layer insulation (MLI). This enhanced MLI is part of Orion’s propulsion subsystem, and it is planned to replace a double-layer Kevlar® configuration starting at the Artemis IV mission. This effort has included fifty-two shield characterization shots for five different shield configurations over the four Orion propellant storage vessels. These storage vessels are located in the European Service Module (ESM). This shield characterization has been managed by the Hypervelocity Impact Technology (HVIT) group in NASA Astromaterials Research and Exploration Sciences at Johnson Space Center (JSC) for the NASA Engineering and Safety Center (NESC) and the Multi-Purpose Crew Vehicle (MPCV) program office in coordination with Lockheed Martin Space and Thales Alenia Space-Italy (TAS-I). The shield characterization has used the two-stage, light-gas-gun at the Remote Hypervelocity Test Laboratory (RHTL) of NASA JSC White Sands Test Facility (WSTF) for acceleration of projectiles to representative orbital impact speeds. From this shield characterization effort, a revised ballistic limiting equation (BLE) has been developed for each of the five representative shielding configurations of the ESM pressure vessels. This document provides a brief description of the shield configurations considered for the Orion program and the shield characterization findings. These results are compared to the assumed BLE for each configuration going into the Artemis missions that utilize this version of ballistic enhanced MLI. The models are integrated into a fourteen day High Lunar Orbit (HLO) mission as a representative reliability prediction impact for Orion, and it has been found that the predicted risk of a loss-of-crew (LOC) event is actually a little less than half of the assumed value that launched this design modification opportunity.

Joshua E Miller↗

Investigation into High Power Converter Topologies

The NESC commissioned NASA Glenn Research Center (GRC) to perform a study of high-power DC-DC converter topologies Why perform the study? • Several past contractor-led converter development programs have been plagued with development delays and cost overruns due to: • Poor initial design decisions • Complex requirements driving designs • Better inform government engineers about strengths and weaknesses of various topologies, learn about new topologies/design strategies. • Allow NASA to be better prepared for upcoming high power/high voltage power conversion systems work, such as Lunar and Martian surface missions, high power electric propulsion, as well as terrestrial systems, such as electrified aircraft. • Contractors often do not have the option to restart poor decisions – allows NASA to be better informed at the start of programs.

Power Converter↗

The Trash Compaction Processing System (TCPS) Technology Demonstrations Science Objectives and Requirement Definitions

Throughout the Next STEP Phase A and Phase B, the Trash Compaction Processing System (TCPS) is being developed for a technology demonstration (TD) on the International Space Station (ISS) in 2025. For Phase A, two contractors built proof-of-concept hardware. One contractor was chosen to build the TD hardware for Phase B. Both Phase A lessons learned and risk reduction activities at Ames Research Center (ARC) were used to write the TD science objectives, scope, and requirements. The work at ARC aims to retire technical risks and provide design data to TCPS developers and the ISS system integrators. This paper will summarize the lessons learned from the proof-of-concept hardware, the risk reduction activities, and how these lessons learned form the basis of the TD requirement matrix.

TCPS↗

Atmospheric Research 2020 Technical Highlights

Welcome to the 2020 Atmospheres Highlights report. Here we summarize research and scientific communication/outreach accomplishments from the portion of atmospheric science activities at NASA’s Goddard Space Flight Center (GSFC) that comprises the Earth Science Division’s Atmospheres organization. As in previous years, this report is intended for a broad audience, including colleagues within NASA, scientists outside the Agency, science graduate students, and members of the public. Organizationally, the report covers research activities under the Office of Deputy Organizationally, the report covers research activities under the Office of Deputy Director for Atmospheres (610AT), which is within Earth Sciences Division (Code Director for Atmospheres (610AT), which is within Earth Sciences Division (Code 610) in the Sciences and Exploration Directorate (600). Laboratories and office within 610) in the Sciences and Exploration Directorate (600). Laboratories and office within 610AT include: Mesoscale Atmospheric Processes Laboratory (612), Climate and 610AT include: Mesoscale Atmospheric Processes Laboratory (612), Climate and Radiation Laboratory (613), Atmospheric Chemistry and Dynamics Laboratory (614), Radiation Laboratory (613), Atmospheric Chemistry and Dynamics Laboratory (614), and the Wallops Field Support Office (610.W). As of this writing, the 277 personnel and the Wallops Field Support Office (610.W). As of this writing, the 277 personnel in Code 610AT consist of 53 civil servants and 224 cooperative agreement associates, in Code 610AT consist of 53 civil servants and 224 cooperative agreement associates, postdoctoral fellows and contractors, postdoctoral fellows and contractors.

Annual Report↗

Key Design Trades for a Near-term Lunar Fission Surface Power System

NASA and DOE have been developing concepts for lunar and Mars Fission Surface Power (FSP) systems for decades and have considered many different technologies and system variations. In 2023, three contractor teams completed Phase 1 conceptual design studies on a 40 kWe lunar FSP system in response to a modest set of NASA requirements and goals. A government team consisting of NASA Glenn Research Center (GRC), Los Alamos National Laboratory (LANL), and Idaho National Laboratory (INL) was formed to develop an independent design approach that adhered to the same requirements and goals posed to the contractor teams. GRC provided expertise, analysis, and design decisions for the power conversion, heat rejection, power management & distribution (PMAD), and mission integration. LANL and INL provided expertise, analysis, and design decisions for the reactor and shielding. The goal of the government study was to develop representative concepts that could be used in NASA architecture studies, guide government technology investments, and inform Phase 2 requirements definition. This paper provides a summary of the key technology options, system-level trades, and mission-level concept-of-operations.

99 - GENERAL AND MISCELLANEOUS↗

Resources for Homeowners: Home Efficiency Upgrades

A fact sheet to support small business building contractors in communicating with homeowners about potential benefits of home efficiency strategies and suggestions for navigating home upgrades. This work was developed under the Building Business Network (B-Biz) program, which aims to improve adoption of high-performance building technology solutions by collaborating with organizations that support small business contractors that provide and service high-performance building technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Enhancing the ATR Primary Coolant System: A 3D Modeling Approach

The project consisted in system inspections to the ATR Primary Coolant System involving welds, fittings, motors, pumps, flanges, and heat exchangers to enhance Inservice Inspection program as required by DOE orders. NOTE: This article is to be published as "DOE & DOE Contractors Only" in the OPEXShare application, which means it will be available for viewing to DOE & DOE Contractor registered users only. This article can also be used by CAES for their training and safety meetings.

42 - ENGINEERING↗

SPC-70796 Rev 2 MetCar M-312 Bearings Procurement Specification

A. Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. This procurement specification defines the requirements for fabrication of the MARVEL MetCar M-312 bearings. B. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-71260 Rev 0 MARVEL Heat Extraction Subsystem Secondary Coolant Equipment (SCE) Design/Build

A. The Microreactor Applications Research Validation and Evaluation (MARVEL) reactor will offer experimental capabilities that are not currently available at DOE’s national laboratories. Idaho National Laboratory (INL), operated for the U.S. Department of Energy (DOE) by Battelle Energy Alliance, LLC (BEA) (Contractor hereafter) is procuring services for the design, analysis, fabrication, testing and delivery of a Secondary Coolant Equipment system (SCE). This specification contains the requirements for design, analysis, fabrication, testing and delivery of the SCE as described herein. The MARVEL reactor is a microreactor which uses eutectic sodium-potassium alloy (NaK) as a primary coolant. The primary coolant is circulated through four primary loops by natural convection of the coolant. In each loop is a closed well which will accommodate an intermediate heat exchanger (IHX) for extracting heat from the loop. These wells will be referred to in this specification as the “IHX wells.” It is intended for the IHX containment to also be filled with NaK. The MARVEL design team has determined that a Heat Extraction System (HES) using pumped NaK will be used to extract heat from the IHXs and deliver it to a downstream system for power generation or alternate process heat users. This Heat Extraction System will enable MARVEL operations including the ability to test, demonstrate, and address issues related to installation, startup, and operations. In addition, it will allow down-stream utilization of process heat for various uses. The objective of this specification is to develop the final design for the HES Secondary Coolant Equipment system (SCE) that will be used as the core of the HES. This system provides control of the NaK circulation between the MARVEL reactor and the subsequent process heat utilization systems. It does not include design of the Intermediate Heat Exchangers and piping inside the T-REXc pit in which the reactor is located. B. The MARVEL microreactor will be installed in the Transient Reactor Test Facility (TREAT) building in the Transient Reactor Test (TREAT) Micro-Reactor Experiment Cell (T-REXc) C. An INL Subcontractor has developed a conceptual design for this system per SPC-71145, referred to in that specification as the Process Heat Extraction System. SPC-71260 is based on the pumped NaK loop concept developed under SPC-71145. D. The SCE system design and (as option scope) fabrication shall be provided by the awardee of the subcontract (Subcontractor hereafter) pertaining to this Specification. Prior to shipment, the SCE will be fabricated, assembled, and tested at the Subcontractor’s facility. After successful completion of acceptance testing, the SCE and associated equipment will be shipped to the Materials and Fuels Complex (MFC) at the INL (Contractor’s Facility hereafter) to be installed by others in TREAT/T-REXc.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

SPC-70525 Rev 2 Beryllium Metal Procurement Specification

Idaho National Laboratory (INL) is developing a microreactor to produce electrical power utilizing a small nuclear core under the Microreactor Application Research Validation and Evaluation (MARVEL) program. Key to this design are neutron reflector components constructed of Beryllium Metal (S-65) which is a structural grade of hot-pressed beryllium block. MARVEL will be located at the Transient Reactor Test (TREAT) facility. Any conflict between this specification and referenced Codes and Standards, or any supplementary specifications in the procurement documents requires written clarification from the Contractor prior to proceeding with any work. Any deviation from the procurement documents requires approval by the Contractor with the change request process.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗