Options, Initial Design Requirements, Estimated Costs, Reactor Commitments, and Potential Uses of a Graphite Leadout Type Experiment Supporting Various Commercial HTR Vendors

Multiple commercial High Temperature Reactor (HTR) vendors and nuclear graphite suppliers would benefit by collaborating on a new irradiation capsule(s) that would include graphite grades not included within the AGC Experiment. This new irradiation capsule(s) would provide data to answer vendor graphite licensing issues. Rather than spending money (and especially) time in designing separate irradiation capsules for each designer, the capsule(s) would be used for multiple graphite and composite designs to maximize efficiency and promote multiple HTR designs. However, the primary motivation for assisting vendors with this new irradiation capsule(s) is lack of availability in the existing Material Test Reactors (MTRs). Cost reduction is a secondary goal. A common, collaborative, capsule design can be achieved for graphite and composites due to the similarity of different grades. Irradiation, disassembly, shipping, and PIE costs would be cost-shared by all users. It is anticipated that interest would extend across all DOE campaigns (micro-Rx, SMR, GCR, MSR, etc.) due to the similar requirements for all graphite grades.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NASA Human Spaceflight Scenarios - Do All Our Models Still Say No?

Historically, NASA human spaceflight planning has included healthy doses of life cycle cost analysis. Planners put projects and their cost estimates in a budget context. Estimated costs became expected budgets. Regardless, real budgets rarely matched expectations. So plans would come and go as NASA canceled projects. New projects would arise and the cycle would begin again. Repeatedly, NASA schedule and performance ambitions come up against costs growing at double-digit rates while budgets barely rise a couple of percent a year. Significant skepticism greets proposed NASA programs at birth, as cost estimates for new projects are traditionally very high, and worse, far off the mark for those carried forward. In this environment the current "capability driven framework" for NASA human spaceflight evolved, where long term life cycle cost analysis are even viewed as possibly counter-productive. Here, a space exploration project, for example the Space Launch System, focuses on immediate goals. A life cycle is that of a project, not a program, and for only that span of time to a near term milestone like a first test launch. Unfortunately, attempting to avoid some pitfalls in long-term life cycle cost analysis breeds others. Government audits have noted that limiting the scope of cost analysis "does not provide the transparency necessary to assess long-term affordability" making it difficult to understand if NASA "is progressing in a cost-effective and affordable manner." Even in this short-term framework, NASA realizes the importance of long-term considerations, that it must "maximize the efficiency and sustainability of the Exploration Systems development programs", that this is "critical to free resources for re-investment...such as other required deep space exploration capabilities." Assuming the value of long-term life cycle cost analysis, where due diligence meets reconnaissance, and accepting past shortcomings, the work here approaches life cycle cost analysis for human spaceflight differently. 1) If costs have traditionally been so high that adding them up is discouraging, are there any new facts on the ground offering paths to significantly lower costs? 2) If NASA's spaceflight budget and process is an over-arching constraint, with its planning limitations favoring short-term outlooks, is there a way to step outside the budget box? 3) If life cycle answers have historically been too uncertain to be useful, is there a process where stakeholders gain valuable insights merely from emphasizing a common understanding around questions? We analyze the potential life cycle cost of assorted NASA human spaceflight architectures - an architecture as a sum of individual systems, working together. With the prior questions of high costs, limited budgets and uncertainties in mind, public private partnerships are central in these architectures. The cost data for current commercial public private partnerships is encouraging, as are cost estimates for future partnership approaches beyond low Earth orbit. Private capital, directly or indirectly, an ingredient of public private partnerships, may be a significant factor in finding a path around the limits of the NASA spaceflight budget. Also, understanding and reviewing the pros, cons and uncertainties of assorted architectures can assist in developing a common understanding around key questions as important if not more so than the numbers and answers. Lastly, a scenario planning technique is briefly explored that can mature a common understanding about the agencies situation at hand and how diverse stakeholders can go forward together. Scenario planning, rather than focusing on answers, places emphasis on stakeholders developing a common understanding about the future. Putting aside costs, this is especially true of questions about sustainability and growth, results, benefits and expectations. While efficiency exercises or analysis look to reduce resources in one place to apply them elsewhere, moving around slices in a pie, scenario planning can get at the heart of the matter, growing the pie, transforming it, and making the pieces relevant. Especially important is the question of sustainability for different scenarios in the broad sense of the word - not just the narrow ability to survive or continue, but also the ability to adapt, prosper and grow.

space systems life cycle costs↗

Offshore Wind Plant Balance-of-Station Cost Drivers and Sensitivities (Poster)

With Balance of System (BOS) costs contributing up to 70% of the installed capital cost, it is fundamental to understanding the BOS costs for offshore wind projects as well as potential cost trends for larger offshore turbines. NREL developed a BOS model using project cost estimates developed by GL Garrad Hassan. Aspects of BOS covered include engineering and permitting, ports and staging, transportation and installation, vessels, foundations, and electrical. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and soil type. Based on the new BOS model, an analysis to understand the non-turbine costs associated with offshore turbine sizes ranging from 3 MW to 6 MW and offshore wind plant sizes ranging from 100 MW to 1000 MW has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of offshore wind project BOS, and explores the sensitivity of the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrates the potential impact of turbine size and project size on the cost of energy from US offshore wind plants.

17 WIND ENERGY↗

U.S. Balance-of-Station Cost Drivers and Sensitivities (Presentation)

With balance-of-system (BOS) costs contributing up to 70% of the installed capital cost, it is fundamental to understanding the BOS costs for offshore wind projects as well as potential cost trends for larger offshore turbines. NREL developed a BOS model using project cost estimates developed by GL Garrad Hassan. Aspects of BOS covered include engineering and permitting, ports and staging, transportation and installation, vessels, foundations, and electrical. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and soil type. Based on the new BOS model, an analysis to understand the non‐turbine costs has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of offshore wind project BOS, and explores the sensitivity of the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrates the potential impact of turbine size and project size on the cost of energy from U.S. offshore wind plants.

17 WIND ENERGY↗

Land-Based Wind Plant Balance-of-System Cost Drivers and Sensitivities (Poster)

With Balance of System (BOS) costs contributing up to 30% of the installed capital cost, it is fundamental to understand the BOS costs for wind projects as well as potential cost trends for larger turbines. NREL developed a BOS model using project cost estimates developed by industry partners. Aspects of BOS covered include engineering and permitting, foundations for various wind turbines, transportation, civil work, and electrical arrays. The data introduce new scaling relationships for each BOS component to estimate cost as a function of turbine parameters and size, project parameters and size, and geographic characteristics. Based on the new BOS model, an analysis to understand the non‐turbine wind plant costs associated with turbine sizes ranging from 1-6 MW and wind plant sizes ranging from 100-1000 MW has been conducted. This analysis establishes a more robust baseline cost estimate, identifies the largest cost components of wind project BOS, and explores the sensitivity of the capital investment cost and the levelized cost of energy to permutations in each BOS cost element. This presentation shows results from the model that illustrate the potential impact of turbine size and project size on the cost of energy from US wind plants.

17 WIND ENERGY↗

Estimating The Cost Of Developing Software

Software Cost Estimation Model program, SOFTCOST, developed to provide consistent automated resource-and-schedule mathematical model more formalized than guesswork model. Combines several software-cost models found in open literature into one comprehensive set of algorithms compensating for nearly 50 implementation factors relative to size of task, inherited baseline, organizational and system environment, and difficulty of task. Produces mean and variance estimates of software size, implementation productivity, recommended staff level, probable duration, amount of computer resources required, and amount and cost of software documentation. Written in Microsoft BASIC.

Tausworthe, Robert C.↗

Initial Engineering Design of a Post-Combustion CO 2 Capture (PCC) System for Duke Energy’s East Bend Station Using Membrane-Based Technology

The Electric Power Research Institute (EPRI) led a U.S. Department of Energy (DOE) funded study for a membrane-based post-combustion CO 2 capture (PCC) system retrofit to an existing U.S. coal power plant. EPRI teamed with technology suppliers, Membrane Technology and Research (MTR), engineering consultants Nexant, Trimeric Corporation and Bechtel Power Corporation, to develop a first-of-a-kind initial design and cost estimate for a PCC system at Duke Energy’s East Bend Station (EBS) in Kentucky. This project provides a comprehensive overview of the plant design proposed and develops estimated costs to within +/- 30% accuracy for retrofitting the existing EBS coal-fired power plant with the latest MTR’s second-generation Polaris™ membrane technology for CO 2 flue gas removal. The projects primary objective was to develop a design for Duke Energy that will require “minimally invasive surgery” on their existing 600-MWe coal-fired power plant, located on the Ohio River in Boone County, Kentucky. Unlike the current commercially available solvent-based capture systems that require a reliable source of steam to operate, the MTR membrane-based capture system is driven primarily by electric power. This direct, bolt-on approach to retrofitting carbon capture could potentially reduce the impact on the existing power plant, by minimal disruption of the existing facility’s infrastructure and operating procedures. This may also reduce the amount of retrofit downtime before the power plant can resume normal operations. A second objective was to reduce the cost of each ton of captured CO 2 while maintaining the existing 600 MW net output of the East Bend Station. With this aim in mind, various options to provide the necessary auxiliary power for the capture system were evaluated for the site. The full report describes in detail the overall design, layout and components of the entire EBS membrane capture system. The equipment and sizes, the capital cost estimate encompassing both engineering design and construction for the carbon capture process and balance of plant systems is presented. A detailed techno-economic analysis is also undertaken to examine the business case for capture.

01 COAL, LIGNITE, AND PEAT↗

Space-based power conversion and power relay systems: Preliminary analysis of alternate systems

The results are presented of nine months of technical study of non-photovoltaic options for the generation of electricity for terrestrial use by satellite power stations (SPS). A concept for the augmentation of ground-based solar power plants by orbital sunlight reflectors was also studied. Three SPS types having a solar energy source and two which used nuclear reactors were investigated. Data derived for each included: (1) configuration definition, including mass statement; (2) information for use in environmental impact assessment; (3) energy balance (ratio of energy produced to that required to achieve operation), and (4) development and other cost estimates. Cost estimates were dependent upon the total program (development, placement and operation of a number of satellites) which was postulated. This postulation was based upon an analysis of national power capacity trends and guidelines received from MSFC.

Source record↗

Design of an expert system for estimating the cost of new knowledge in high energy astrophysics

The High Energy Astrophysics Costing Tool (HEACT) is a combined Expert System/Numerical Simulation to evaluate sensors and experiments proposed for space platforms in order to determine their expected performance and to assess the amount and quality of scientific information likely to be gathered by such experiments. The end product of this tool will be both a cost estimate for the experiment package as deployed and also an estimate of the amount of new scientific knowledge (both new data and reductions in the uncertainties of previous measurements) which would result from the actual deployment and operation of that experiment package. The numerical simulation part of HEACT will contain components to: (1) calculate the high energy signatures of both actual and proposed classes of astrophysical objects, and (2) model the response and resolution of the candidate sensors for observing those objects. The rule based part of the HEACT will be based on knowledge in the areas of experiment design, instrument selection, and system integration developed from experience with existing high energy astrophysics observatories, both orbiting and lofted by rockets or balloons. This paper presents mainly results from the design of the rule-based part of HEACT. It focuses on the structure of the rules and the structures used to represent the knowledge related to the design and integration of such experiments. Methods for integrating the results from numerical simulations into the expert system will also be discussed.

Bosworth, Edward L., Jr.↗

Estimating the Cost of NASA's Space Launch Initiative: How SLI Cost Stack Up Against the Shuttle

NASA is planning to replace the Space Shuttle with a new completely reusable Second Generation Launch System by approximately 2012. Numerous contracted and NASA in-house Space Transportation Architecture Studies and various technology maturation activities are proceeding and have resulted in scores of competing architecture configurations being proposed. Life cycle cost is a key discriminator between all these various concepts. However, the one obvious analogy for costing purposes remains the current Shuttle system. Are there credible reasons to believe that a second generation reusable launch system can be accomplished at less cost than the Shuttle? The need for a credible answer to this question is critical. This paper reviews the cost estimating approaches being used by the contractors and the government estimators to address this issue and explores the rationale behind the numbers.

Hamaker, Joseph H.↗

Drilling and Production Testing the Methane Hydrate Resource Potential Associated with the Barrow Gas Fields

In November of 2008, the Department of Energy (DOE) and the North Slope Borough (NSB) committed funding to develop a drilling plan to test the presence of hydrates in the producing formation of at least one of the Barrow Gas Fields, and to develop a production surveillance plan to monitor the behavior of hydrates as dissociation occurs. This drilling and surveillance plan was supported by earlier studies in Phase 1 of the project, including hydrate stability zone modeling, material balance modeling, and full-field history-matched reservoir simulation, all of which support the presence of methane hydrate in association with the Barrow Gas Fields. This Phase 2 of the project, conducted over the past twelve months focused on selecting an optimal location for a hydrate test well; design of a logistics, drilling, completion and testing plan; and estimating costs for the activities. As originally proposed, the project was anticipated to benefit from industry activity in northwest Alaska, with opportunities to share equipment, personnel, services and mobilization and demobilization costs with one of the then-active exploration operators. The activity level dropped off, and this benefit evaporated, although plans for drilling of development wells in the BGF's matured, offering significant synergies and cost savings over a remote stand-alone drilling project. An optimal well location was chosen at the East Barrow No.18 well pad, and a vertical pilot/monitoring well and horizontal production test/surveillance well were engineered for drilling from this location. Both wells were designed with Distributed Temperature Survey (DTS) apparatus for monitoring of the hydrate-free gas interface. Once project scope was developed, a procurement process was implemented to engage the necessary service and equipment providers, and finalize project cost estimates. Based on cost proposals from vendors, total project estimated cost is $17.88 million dollars, inclusive of design work, permitting, barging, ice road/pad construction, drilling, completion, tie-in, long-term production testing and surveillance, data analysis and technology transfer. The PRA project team and North Slope have recommended moving forward to the execution phase of this project.

03 NATURAL GAS↗

Streamlining the Design Tradespace for Earth Imaging Constellations

Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

Science Data Processing↗

Satellite Constellation Cost Modeling: An Aggregate Model

Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth scientists seeking to leverage the capabilities of multiple spacecraft working in support of a common goal.

Science Data Processing↗