Search NASA⌕ Search

SEARCH · Search NASA

Results for “Contingency Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

ICAROUS - Integrated Configurable Algorithms for Reliable Operations Of Unmanned Systems

NASA's Unmanned Aerial System (UAS) Traffic Management (UTM) project aims at enabling near-term, safe operations of small UAS vehicles in uncontrolled airspace, i.e., Class G airspace. A far-term goal of UTM research and development is to accommodate the expected rise in small UAS traffic density throughout the National Airspace System (NAS) at low altitudes for beyond visual line-of-sight operations. This paper describes a new capability referred to as ICAROUS (Integrated Configurable Algorithms for Reliable Operations of Unmanned Systems), which is being developed under the UTM project. ICAROUS is a software architecture comprised of highly assured algorithms for building safety-centric, autonomous, unmanned aircraft applications. Central to the development of the ICAROUS algorithms is the use of well-established formal methods to guarantee higher levels of safety assurance by monitoring and bounding the behavior of autonomous systems. The core autonomy-enabling capabilities in ICAROUS include constraint conformance monitoring and contingency control functions. ICAROUS also provides a highly configurable user interface that enables the modular integration of mission-specific software components.

Consiglio, María↗

The Challenge of Achieving Site Closure of a Complex Groundwater Plume - 20531

Over the last three decades, DOE has made substantial progress in nearly every area of nuclear waste cleanup and has closed and transitioned 91 of the 107 sites in the EM complex. Several of the remaining groundwater plumes at Hanford, Los Alamos, Paducah, Oak Ridge, and Savannah River are complex and tend to have unique site or contaminant characteristics which provide an almost impossible challenge to remediate to regulatory levels. As a result, these complex sites will require a large investment to remediate. In order for DOE to achieve regulatory closure, a technically sound case must be developed and presented to regulators and stakeholders that clearly demonstrates that remedial goals have been or will be irreversibly achieved or that there is an alternate acceptable end-state. Five lines of evidence are required: - A conceptual site model that is as complete as possible, with the knowledge that it may continue to evolve with time; - Demonstration that trends in contaminant concentrations, or flux, versus time indicate that remedial goals will be achieved on schedule or within a reasonable time thereafter and that trends that deviate from this path are explainable by the conceptual model; - Demonstration that remobilization of attenuated contaminants is unlikely to occur in the future; - Explicit consideration of remedial contingencies, should deviations in the path toward remedial goals occur; - Development of an effective long-term monitoring plan to detect any conditions that might alter the path toward remedial goals. SRS has made significant progress in the remediation of contamination associated with the F-area and H-Area Seepage Basins, and it is currently developing a strategic closure path that addresses each of these lines of evidence and identifies both basic and applied scientific issues that will need to be addressed in order to obtain regulatory closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a serviceoriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building. This paper presents the HPOC architecture and lessons learned during testing and the planned maiden operational commissioning. Additionally, this paper documents the necessity of an HPOC capability given the unplanned HOSC Facility power outage on April 27th, 2011, as a result of the tornado outbreak that damaged the electrical grid to such a degree that significantly inhibited the Tennessee Valley Authority's ability to transmit electricity throughout the North Alabama region.

Montgomery, Patty↗

Designing an Alternate Mission Operations Control Room

The Huntsville Operations Support Center (HOSC) is a multi-project facility that is responsible for 24x7 real-time International Space Station (ISS) payload operations management, integration, and control and has the capability to support small satellite projects and will provide real-time support for SLS launches. The HOSC is a service-oriented/ highly available operations center for ISS payloads-directly supporting science teams across the world responsible for the payloads. The HOSC is required to endure an annual 2-day power outage event for facility preventive maintenance and safety inspection of the core electro-mechanical systems. While complete system shut-downs are against the grain of a highly available sub-system, the entire facility must be powered down for a weekend for environmental and safety purposes. The consequence of this ground system outage is far reaching: any science performed on ISS during this outage weekend is lost. Engineering efforts were focused to maximize the ISS investment by engineering a suitable solution capable of continuing HOSC services while supporting safety requirements. The HOSC Power Outage Contingency (HPOC) System is a physically diversified compliment of systems capable of providing identified real-time services for the duration of a planned power outage condition from an alternate control room. HPOC was designed to maintain ISS payload operations for approximately three continuous days during planned HOSC power outages and support a local Payload Operations Team, International Partners, as well as remote users from the alternate control room located in another building.

Montgomery, Patty↗

Quarterly Management Document – FY22, 3rd Quarter, Multi-pass Hybrid Laser Arc Welding of Alloy 740H

During the 3rd quarter of FY22, progress was made on modeling and simulation of deep penetration laser welding of Alloy 740H. Advances in the modeling of residual stress development arising from the calculated temperature field of the solidifying weld pool were made to understand the development of solidification cracking. Additionally, preliminary modeling of the temperature field within the weld pool of a wobbling laser heat source was performed. The maximum temperature of the weld pool was found to vary with time. These result will allow modeling of deep penetration laser welding using a wobbling laser to mitigate weld defects and cracking. Also, additional characterization of hybrid laser arc welds indicated that these welds were not defect-free as originally thought and the current HLA welds would not be acceptable under criteria outlined in the ASME Boiler and Pressure Vessel Code, Section IX. Therefore, additional welding trails with variation of the welding parameters and HLA welding configurations are required to produce welds acceptable under the Section IX criteria. It was shown that considerable reduction of HLAW defects had been achieved with each successive welding campaign. Therefore additional variation of HLAW parameters may still yield the desired defect-free welds, however, options for alternate HLAW configurations as well as plate preheating are outlined as contingency plans to obtain suitable welds. These additional (unplanned) HLAW trial may prevent subsequent milestones from being achieved within the original budget.

36 MATERIALS SCIENCE↗

On-demand Command and Control of ASTERIA with Cloud-based Ground Station Services

ASTERIA (Arcsecond Space Telescope Enabling Research in Astrophysics) was a 6-unit CubeSat technology demonstration mission that deployed from the International Space Station on November 20th, 2017. After successfully completing its 90-day primary mission that demonstrated arcsecond-level line-of-sight pointing and focal plane thermal stability for exoplanet detection, it entered an extended mission performing onboard software demonstrations to mature technology both in space and on the ground. One of the technologies was a completely cloud-based ground system leveraging Amazon Web Services (AWS) Ground Station service.Announced in December 2018 and launched in May 2019, AWS Ground Station is a fully managed ground station service that aims to reduce the overhead associated with developing and maintaining ground system infrastructure throughout the mission lifecycle. AWS Ground Station makes available the suite of features required for any ground system in support of low-Earth orbit (LEO) and medium-Earth Orbit (MEO) satellite operations on-demand and without setting up or maintaining long-term contracts. Charges are incurred on a per-minute basis for antenna usage during scheduled tracks. Support is available for S-band uplink and downlink, along with X-band narrowband and wideband downlink. Missions that use the service may reserve tracks with any licensed AWS Ground Station antennas located across each service region and have direct access to any AWS services in support of mission operations.The cloud-based architecture built around the AWS Ground Station service greatly enhanced ASTERIA mission operations by enabling end-to-end pass automation, on-demand contact scheduling and contingency planning, along with more efficient data downlink through station availability and station-to-station handovers. It incorporated open-source software, particularly NASA's AMMOS Instrument Toolkit (AIT) and Open Mission Control Technologies (OpenMCT), along with the AWS application programming interfaces (API) to the Ground Station, Elastic Compute Cloud (EC2) and Simple Storage Service (S3) services. After showcasing operability in August 2019, the team continued using and improving this novel ground system architecture until the end of mission in December 2019. This paper describes the cloud-based ground system, how it was designed, tested, and evaluated with an in-orbit spacecraft, the operational capabilities that it enabled, along with lessons learned and recommendations for future missions.

Fesq, Lorraine↗

On-demand Command and Control of ASTERIA with Cloud-based Ground Station Services

ASTERIA (Arcsecond Space Telescope Enabling Research in Astrophysics) was a 6-unit CubeSat technology demonstration mission that deployed from the International Space Station on November 20th, 2017. After successfully completing its 90-day primary mission that demonstrated arcsecond-level line-of-sight pointing and focal plane thermal stability for exoplanet detection, it entered an extended mission performing onboard software demonstrations to mature technology both in space and on the ground. One of the technologies was a completely cloud-based ground system leveraging Amazon Web Services (AWS) Ground Station service. Announced in December 2018 and launched in May 2019, AWS Ground Station is a fully managed ground station service that aims to reduce the overhead associated with developing and maintaining ground system infrastructure throughout the mission lifecycle. AWS Ground Station makes available the suite of features required for any ground system in support of low-Earth orbit (LEO) and medium-Earth Orbit (MEO) satellite operations on-demand and without setting up or maintaining long-term contracts. Charges are incurred on a per-minute basis for antenna usage during scheduled tracks. Support is available for S-band uplink and downlink, along with X-band narrowband and wideband downlink. Missions that use the service may reserve tracks with any licensed AWS Ground Station antennas located across each service region and have direct access to any AWS services in support of mission operations. The cloud-based architecture built around the AWS Ground Station service greatly enhanced ASTERIA mission operations by enabling end-to-end pass automation, on-demand contact scheduling and contingency planning, along with more efficient data downlink through station availability and station-tostation handovers. It incorporated open-source software, particularly NASA's AMMOS Instrument Toolkit (AIT) and Open Mission Control Technologies (OpenMCT), along with the AWS application programming interfaces (API) to the Ground Station, Elastic Compute Cloud (EC2) and Simple Storage Service (S3) services. After showcasing operability in August 2019, the team continued using and improving this novel ground system architecture until the end of mission in December 2019. This paper describes the cloud-based ground system, how it was designed, tested, and evaluated with an inorbit spacecraft, the operational capabilities that it enabled, along with lessons learned and recommendations for future missions.

Fesq, Lorraine↗

Mitigating Data Center Impact on Grid Stability: A Coordinated Control Strategy Using Verrus StabiliGrid Architecture

Large data centers, which now represent a significant and growing share of the total U.S. grid load, can inadvertently destabilize the electrical grid when they disconnect simultaneously during brief voltage disturbances. The July 10, 2024, Eastern Interconnection incident, in which a sub-100-millisecond transmission fault triggered the cascading loss of approximately 1,500 MW of data center load, illustrates this vulnerability. While commercial battery energy storage systems (BESS) deployed in data centers provide device-level fault ride-through per IEEE 1547, they lack coordination with facility protection logic and uninterruptible power supplies (UPS), limiting their effectiveness as grid-stabilizing assets. This report presents the Verrus StabiliGrid architecture, a coordinated control framework that integrates BESS, UPS, and point-of-interconnection (POI) protection settings to enable data centers to ride through both undervoltage and overvoltage grid contingencies without disconnecting. The four-step strategy encompasses: (1) high-resolution power quality monitoring to detect the grid state during events such as undervoltage, overvoltage, underfrequency, and overfrequency; (2) POI protection settings that allow for extended ride-through and grid-connected operation during grid contingencies; (3) grid state-driven autonomous dispatch of assets to improve grid resilience by reducing power draw during undervoltage or absorbing more power during overvoltage events; and (4) coordinated post-recovery dispatch of data center assets to restore firm load to pre-contingency levels. Validated through controller-hardware-in-the-loop (C-HIL) simulations at the National Laboratory of the Rockies, results show grid import restoration to pre-fault levels within 100 milliseconds of voltage recovery. This work advances the ability of data centers to transition from passive, disturbance-sensitive loads to active participants in grid stability, a capability increasingly required by emerging NERC and ERCOT regulatory frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

Soil Moisture Data Assimilation to Estimate Irrigation Water Use

Knowledge of irrigation is essential to support food security, manage depleting water resources, and comprehensively understand the global water and energy cycles. Despite the importance of understanding irrigation, little consistent information exists on the amount of water that is applied for irrigation. In this study, we develop and evaluate a new method to predict daily to seasonal irrigation magnitude using a particle batch smoother data assimilation approach, where land surface model soil moisture is applied in different configurations to understand how characteristics of remotely sensed soil moisture may impact the performance of the method. The study employs a suite of synthetic data assimilation experiments, allowing for systematic diagnosis of known error sources. Assimilation of daily synthetic soil moisture observations with zero noise produces irrigation estimates with a seasonal bias of 0.66% and a correlation of 0.95 relative to a known truth irrigation. When synthetic observations were subjected to an irregular overpass interval and random noise similar to the Soil Moisture Active Passive satellite (0.04 cm(exp 3) cm(exp -3)), irrigation estimates produced a median seasonal bias of <1% and a correlation of 0.69. When systematic biases commensurate with those between NLDAS‐2 land surface models and Soil Moisture Active Passive are imposed, irrigation estimates show larger biases. In this application, the particle batch smoother outperformed the particle filter. The presented framework has the potential to provide new information into irrigation magnitude over spatially continuous domains, yet its broad applicability is contingent upon identifying new method(s) of determining irrigation schedule and correcting biases between observed and simulated soil moisture, as these errors markedly degraded performance.

R Abolafia-Rosenzweig↗

Certifying the Performance of Fixative Technologies under Open Air Demolition Activities for D and D - 20096

Department of Energy (DOE) facilities undergoing deactivation and decommissioning (D and D) activities struggle with safety concerns of residual radioactive contamination leftover after gross decontamination efforts have concluded. The positive effects of implementing fixative technologies for decommissioning and maintenance is known across the DOE complex. However, there is no standardized metric in place that quantifies the performance of these technologies such as incombustible fixative platforms that immobilize the contamination in a solid polymer material under normal operating conditions or when exposed to stressors. The primary focus of this research is to provide the empirical data necessary to properly characterize the effects of implementing fixative technologies on mitigating the release of contamination. In addition, this effort has been used to identify and establish uniform testing protocols to quantify operational parameters of fixating platforms and properly credit such systems under a variety of operational conditions and stressors that can arise during open air demolition efforts (e.g. impact, water, thermal, etc.). The established protocols will be provided to the ASTM International E10.03 Subcommittee on Radiological Protection for Decontamination and Decommissioning of Nuclear Facilities and Components for the potential of formal standardization. Attributes to be addressed during testing are material compromise from impact stress, thermal stress for incombustible fixative materials, and immobilization factors (how well an immobilizing platform is capable of retaining fixated material during thermal and impact stressors). In developing these test methods, a greater understanding of the material's behavior under anticipated and unanticipated events, such as decommissioning activities and contingency events as outlined in the Basis of Interim Operations (BIO), can be successfully characterized. There are several key components of the experimental methodology that is essential in empirically certifying fixative technologies. A surrogate contaminant with a unique signature has been utilized with the implementation of a uniform contamination process of test coupons that is quantifiable and replicable for direct fixative comparisons. A modular test chamber has also been used to apply the various stressors of interest. Collection of released contamination that includes airborne and resettled contaminant particles and analyzed using mass spectrometry. This research directly supports DOE complex-wide concerns in terms of final disposition of nuclear facilities and the considerations made during their time between ceasing facility operation and final disposition. The results of this effort aims to provide a standardized road map and logical decision flow to better facilitate fixative technologies into D and D activities required to achieve the desired facility end state. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Short Circuiting the Controller – Missteps in Maintenance and Inspection of Process and Wiring in STS-93

The primary objective of the Space Transportation System mission 93 (STS-93) was to deploy the Chandra X-Ray Observatory. Chandra, the world's most powerful X-Ray telescope, allowed scientists from around the world to study some of the most distant and dynamic objects in the universe. Stripped of nearly 7,000 pounds of its own gear to make room for the payload, the orbiter assigned to this mission was Space Shuttle Columbia. Prior to STS-93, Columbia had flown 25 flights and was NASA's oldest and heaviest orbiter. On July 23, 1999, after two prior launch scrubs, Eileen Collins and her crew of four launched from Kennedy Space Center. About five seconds after launch, Mission Control at Johnson Space Center detected a voltage drop on one of Columbia's electrical buses. As a result of this power fluctuation, a primary and back-up Main Engine controller dropped offline. Given design redundancy, the two remaining controllers supported all three engines. If there had been any other AC bus issues, one engine of the three on the Orbiter would have shut down. The redundant set of digital computer units in each engine controller saved Columbia and her crew from a very risky contingency abort. Post-flight inspection revealed soot on a screw head and a hole in an adjacent Kapton insulated wire. The single strand of polyimide wire was located nearly half-way down the payload bay. The Shuttle Independent Assessment Team (SIAT) reported that the wire had rubbed and chaffed against a burred screw head. The burr was later determined to be the result of overtightening of the screw by a technician during a maintenance refurbishment. Alone, the burr may not have been problematic, but later, during another ground processing event, possibly years after, someone inadvertently stepped on the wiring harness. With the pressure and motion of unintended contact, some of the Kapton insulation rubbed off against the burred screw head. The SIAT suspected the wire damage was pre-existing and was caused 4 or 5 years prior to the flight. Finally, the intense vibrations during the launch sequence allowed contact between the exposed conductor and exposed metal area on the burred screw head, resulting in the arcing and shorting of the wire. Due to the quick turnaround times of Space Shuttle Orbiters, wiring issues caused from multiple maintenance events were often overlooked. Additionally, failing to incorporate thorough and early inclusion of human systems integration (HSI) applications as a crucial part of the decision process can result in these types of misshaps. In order to reduce human error associated with integrated manufacturing, maintenance, refurbishment and flight preparations, wire inspection criteria should be refined and standardized, visual inspection processes should be quantified, and technicians should be certified by specially trained instructors. This case, among many others, unveils why human error management and development of safety metrics is a vital piece in the development of complex systems, and why it should be supported aggressively and implemented program wide.

Human Systems Integration↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

Testing of Advanced Capabilities to Enable In-time Safety Management and Assurance for Future Flight Operations

In order to refine an initial Concept of Operations, explore Concepts of Use, and expose/validate requirements for future In-Time Aviation Safety Management Systems (IASMS), testing architectures were created, along with a set of capabilities and underlying information exchange protocols. These systems were conceived and developed based on hazards associated with two envisioned urban area flight domains: (1) highly autonomous small uncrewed aerial systems (sUAS) operating at low altitudes, and (2) highly autonomous air taxis. The initial scope of this development is described in [1]; this report provides an update, focusing on the subsequent developments and test activities. As stated in [1], it is important to note that there are many capabilities already in use by the industry (or soon to be in use) that will play critical roles in future IASMS designs. Those reported here were developed to address a gap in the current state-of-the-art regarding specific hazards/risks, and/or to allow for investigation of the interplay between and across hazard types — particularly regarding how overall safety risk can be reduced or managed effectively. Results of testing and development activities are organized by the operational phase wherein a particular capability would be employed (i.e., preflight, in-flight, and post-flight/off-line). Pre-flight: A set of capabilities were developed to help mitigate safety risk prior to flight (e.g., during flight and mission planning). Results of testing summarize (1) validation activities to raise the Technology Readiness Level (TRL) and (2) evaluation activities where the capabilities were applied to flight/mission planning procedures and used by operators/pilots. For the latter, flight plans were automatically assessed, and operators/pilots were notified of hazardous flight segments so as to enable adjustment of the flight plan and re-evaluation, and/or to better inform go/no-go decisions. Capabilities addressed hazards associated with power consumption, third-party risk, wind, navigation system performance, radiofrequency interference, and proximity to geo-spatial threats (e.g., buildings, trees, and no-fly zones). In-flight: Flight experiments tested capabilities that detect and respond to hazards encountered during flight. In the first series, safety hazards were monitored and assessed onboard, and system-generated mitigation maneuvers were recorded (but not acted upon by the vehicle). In the second series, mitigation maneuver commands directed the aircraft in response to safety hazards (i.e., auto-mitigation). The sUAS used for testing is described in full, as is the test architecture, which included commercial avionics, research avionics, and onboard software designed to detect, assess, and respond to hazards. The onboard system was designed as a run-time assurance framework, consistent with [2] and supportive of both supervisory and automated modes. The primary functions included: real-time risk assessment (RTRA), auto-pilot monitoring, constraint monitoring, and contingency select/triggering. RTRA performs integrated risk assessment considering data from several hazard-related monitors (e.g., battery, motors, navigation, communications, population density, and loss-of-control). Post-flight/off-line: Data monitored and recorded during flights can enable IASMS capabilities that execute after flights have completed (or “off-line”). These include: (1) the ability to identify anomalies and trends that may only be observable when comparing data spanning a number of similar flights; (2) the ability to update and validate pre-flight and in-flight capabilities and any underlying models to improve their performance; (3) the ability to report anomalies/off-nominals that may indicate design changes or maintenance actions are needed; and (4) the ability for humans involved in operations to report safety-relevant observations to help in understanding the flight data and/or the operational context of a flight. Progress on three such capabilities is summarized; the first investigates anomaly detection given a limited set of flight logs and applies an approach previously used for space operations. The second explores what could be identified using a larger set of flight logs, including from web-based forums where flight logs are posted by sUAS autopilot users. The third creates a new means of collecting information on UAS incidents and accidents via the Aviation Safety Reporting System (ASRS).

sUAS↗

Feasibility and strategic implications of deploying nuclear power reactors in Africa

This report assesses the feasibility and strategic implications of deploying nuclear power reactors, including large-scale plants, advanced small modular reactors (SMRs), and microreactors, in African countries. Case studies focus on South Africa, Egypt, Kenya, Ghana, and Nigeria, examining nuclear energy’s role in Africa’s rapidly evolving energy landscape, marked by fast-growing demand, significant electricity access gaps, increasing renewable penetration, and strong policy commitments to industrialization and energy security. Several U.S. reactor technologies and designs are considered based on their development status and readiness for deployment. The analysis finds that nuclear power can provide reliable, clean baseload and flexible generation, as well as high-temperature process heat for desalination, hydrogen production, and industrial applications. However, suitability is highly country-specific, depending on grid size and stability, transmission capacity, cooling water availability, regulatory readiness, and fuel supply chains. Near-term deployment opportunities are strongest for light-water reactors (such as NuScale, BWRX-300, AP300, and SMR-300) that use low-enriched uranium and build on proven technology. More advanced concepts, including gas-cooled, sodium-cooled, molten-salt cooled reactors, and microreactors, will likely be relevant for African deployment in the 2030s or later, contingent on demonstration projects, high-assay low-enriched uranium (HALEU) fuel availability, and mature international licensing frameworks. Economic analysis shows that SMRs are capital-intensive, with projected overnight costs for 300 MWe units in 2025 ranging from approximately 1.4 to 2.6 billion USD per module. The levelized cost of electricity (LCOE) is highly sensitive to the weighted average cost of capital (WACC). Given typically higher financing costs and utility balance-sheet weaknesses in many African countries, bankable project structures will require sovereign guarantees, robust offtake arrangements, and layered financing from export credit agencies, development finance institutions, and vendor nations. Comparisons with recent large nuclear projects in the United Arab Emirates (UAE) and Egypt underscore the central role of state-backed loans, long tenors, and concessional terms. Country case studies illustrate a spectrum of readiness and opportunity. South Africa operates two 920 MWe pressurized light water reactors (totaling 1,840 MWe) at Koeberg and has the most mature regulatory and industrial base, positioning it as a prime candidate for both large reactors and SMRs to replace coal, support desalination, and anchor industrial hubs. Egypt is constructing four VVER-1200 units at El Dabaa with strong state leadership and could later complement this fleet with SMRs for coastal and industrial applications. Kenya and Ghana are advancing through IAEA Milestones with growing institutional capacity and clear interest in SMRs that match their smaller grids and industrialization plans. Nigeria has the largest demand potential but faces acute constraints in grid reliability, project bankability, and regulatory capacity; targeted deployments of large reactors and SMRs near coastal or industrial sites could have high impact if accompanied by major grid upgrades and institutional reforms. The report identifies cross-cutting challenges such as financing, political continuity, public acceptance, nonproliferation and security, waste and back-end management, regulatory capacity, grid adequacy, and long deployment timelines for first-of-a-kind designs, and ANL/NSE-26/3 ii proposes broad directions for resolution. These include stronger multifaceted financing for nuclear, long-term national energy strategies that transcend electoral cycles, proactive stakeholder engagement, strengthened regional and national regulators, and systematic workforce development through centers of excellence and expanded training. The United States should develop partnerships with African countries and offer end-to-end nuclear package similar to those used effectively by competitors: coordinated project development, state-backed financing, long-term fuel services, and durable in-country support through regional offices and sustained workforce/regulatory training. With timely planning, sustained political commitment, and appropriate financing and institutional support, nuclear energy, both large reactors and advanced SMRs, can become a meaningful, though not dominant, pillar of Africa’s future power mix, enhancing energy security, enabling industrial growth, and supporting climate goals.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan

The Pantex Plant Ogallala Aquifer and Perched Groundwater Contingency Plan has been developed in accordance with the requirements identified in the: • Interagency Agreement for the Pantex Superfund Site, Article 8.5 Work to be Performed, • Compliance Plan Provision of Hazardous Waste Permit No. 50284, and • Record of Decision for Groundwater, Soil, and Associated Media, Pantex Plant. A Long‐Term Monitoring System Design has been designed to monitor conditions in the perched groundwater including changes in the perched aquifer as a result of implementing the response actions. Monitoring is required for verifying the effectiveness of perched groundwater response actions (i.e., conditions in the perched aquifer are being affected as intended) and for confirming that the perched aquifer and Ogallala Aquifer characterization as defined in the Resource Conservation and Recovery Act Facility Investigation Report and the Corrective Measure Studies/Feasibility Study remains accurate. If monitoring results obtained through the monitoring network identify an unexpected condition or deviation, contingent actions will be considered and implemented as necessary to ensure continued protection of the Ogallala Aquifer and human health and the environment. Potential deviations to expected technology performance may be encountered for each of the four primary response actions that compose the selected remedy for perched groundwater; Playa 1 Pump and Treat System, Southeast Area Pump and Treat System, Southeast Area In‐Situ Bioremediation System (comprised of the Southeast In‐Situ Bioremediation System Original System, Southeast Area In‐Situ Bioremediation System Extension System, Offsite In‐Situ Bioremediation System, Perchlorate/Chromium ISB, Northeast ISB and County Road 8 ISB), and Zone 11 In‐Situ Bioremediation System. Monitoring will also be conducted to determine if there are deviations to the expected characterization, e.g., contaminants not expected as a result of the RCRA Facility Investigation characterization. Deviations to expected conditions in the Ogallala Aquifer could also be encountered if the response actions in the perched groundwater are not performing as expected, i.e., preventing contaminants from migrating to the Ogallala Aquifer. Currently, Pantex has begun investigation of detections of high explosives above groundwater protection standards in wells on the Texas Tech University property and a plume that is moving to the northeast from that area. Due to those detections, this Plan recognizes the fact that future detections in the Ogallala will be focused on first‐ time detections of analytes. After a remedy is determined, this Plan will require modification to address-deviations and contingent actions. This Plan was developed to identify the contingent actions necessary to mitigate impacts resulting from deviations to site conditions or response action performance. The Plan defines the environmental problem being addressed by the response actions, clarifies the expected conditions and objectives of the response actions, and identifies the potential deviations to the response actions (due to site conditions or technology performance) that could be encountered. The deviations were evaluated to determine the likelihood of occurrence, potential impact, and time to respond to avoid impact. The Plan also identifies the monitoring outlined in the Long‐Term Monitoring System Design Report (Consolidated Nuclear Security, 2024) and Sampling Analysis Plan (PanTeXas Deterrence, 2024) that will be used to detect the deviations. Lastly, the Plan specifies the contingent actions that could be implemented in response to the deviations. Because each response focuses on a discrete portion of the perched aquifer and contaminant plume, each response action has a different set of expected conditions, and therefore differing impacts from deviations to the site and technology expectations. As a result, the contingent actions are identified for each response action and potential deviation including specific constituents, location, and conditions. If deviations are encountered that impact the ability of the response action to meet performance objectives, the contingent actions will be focused on ensuring the response action can meet the performance objective. Contingent actions may be implemented as interim actions (ISMs/removal actions) in accordance with the Record of Decision, Interagency Agreement, and Hazardous Waste Permit‐50284, if warranted by the specific circumstances. For deviations to site characterization expected conditions, the contingent action will focus on determination of the source of the deviation, determination of the appropriate response, and evaluation of additional work to be completed. However, if the deviation to characterization impacts the performance of the response action, the contingent action will again focus on ensuring performance objectives can be met. Early source term removals and cleanup actions have been implemented to protect the Ogallala Aquifer. Because of these actions and based on modeling results, the expected conditions in the Ogallala Aquifer are that constituents of concern will not be detected above the Groundwater Protection Standards (GWPSs) nor will they reach potential points of exposure above the GWPS. The primary deviation of concern for the Ogallala is if constituents are detected in the Ogallala Aquifer near or above GWPSs. If it occurs, this change in expected conditions would require further evaluation of site and contaminant characteristics to determine an appropriate course of action. The evaluation would include additional monitoring, source identification, implementation of interim protective measures (if necessary), and delineation of extent. These evaluations are necessary to determine an appropriate response action for the Ogallala. The primary goal of the Plan is to provide for the continued protection of the Ogallala Aquifer and the health of its consumers. In recognition, this Plan presents a flexible and rational approach for making future decisions associated with confirming the change in perched and Ogallala aquifer conditions and identifying a response (technical activities, changes to response actions, regulatory oversight, and public involvement).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluations of the Fates of Alkali Metals, Actinides, Mercury, and Iodine During DWPF Recycle Diversion

The fates of alkali metals, actinides, mercury, and iodine in the Defense Waste Processing Facility Recycle Diversion process (as currently conceptualized) have been evaluated through paper studies based on available knowledge of the chemistry, physical properties, solubility, and volatility of the various species involved. The effect of pH in the range from 9 to 13 has been discussed. Recommendations for additional studies to close technology gaps have been provided, many of which are contingent upon the results of pending testing and sample characterization efforts. There is uncertainty in the amounts of soluble actinides passing through the process filter, though the bulk of the actinides should be captured on the filter with the Recycle Collection Tank solids and the total amounts of actinides should be relatively low. The Recycle Collection Tank pH could impact the fraction of actinides reaching the evaporator, but the primary factors determining the actinide fate are expected to be the amount of CO 2 sorption from air sparging or, for certain actinides (such as plutonium), oxidation and/or sorption to MnO 2 solids from permanganate additions to destroy the glycolate anion. Process optimization could minimize the amounts of actinides passing the filter. Depending upon the levels of mercury observed in recycle stream samples and because of the volatility of mercury, the evaporator should be designed with the capability to remove dense mercury phases from the condensate to avoid exceeding ETP WAC limits. The facility design must be adequate to transfer dense mercury phases and testing to confirm mercury transfer is needed. Simulant containing mercury is recommended for both filtration and evaporation testing. OLI Modeling of the various recycle streams is recommended to provide insight on the fate of iodine. Iodine-spiked simulants are recommended for upcoming evaporation tests. The pro) ect should consider the likelihood and impact of NAS scale formation in the evaporators. Process optimization may be needed to minimize the accumulation of NAS scale and possibly the sorption of actinides in the evaporator. Actual waste testing of the Recycle Diversion filtration and evaporation should include the analysis of actinides, mercury, and iodine to determine their partitioning.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗