Nevada National Security Site E-Tunnel Wastewater Disposal System Quarterly Monitoring Report, Water Pollution Control Permit NEV 96021 (First Quarter Calendar Year 2020)
This report includes the results of monthly inspections and monitoring for January, February, and March 2020. Monthly inspections and monitoring were conducted on January 15, February 12, and March 17, 2020. Inspections include a visual assessment of the berms, ponding, water levels relative to the overflow pipes, tunneling or burrowing into the berms, soil conditions on and around the berms, erosion or sloughing of the slopes of the berms, seeps at the toe of the berms, deep-rooting botanicals on the berms, and fencing. Monthly monitoring includes measurements of the instantaneous flow rate, hydrogen ion activity (pH), and specific conductance of the E-Tunnel Wastewater Disposal System discharge.