Results for “Demonstration Projects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

New England Aqua Ventus I: 100% Hull Design (Final Technical Report)

This report serves as the final technical report for the US Department of Energy (DOE) award DE-EE0006713 (Award 6713). The project is titled “New England Aqua Ventus I Offshore Wind Advanced Technology Demonstration Project 100% Front-End Engineering and Design (FEED)”. The New England Aqua Ventus I (NEAV) project demonstrates a unique prestressed concrete semi-submersible floating hull technology, called VolturnUS. The technology is applicable to harness nearly 60% of the US offshore wind resource within 50 miles of the coast. The hull will be demonstrated at full-scale with a commercial scale wind turbine connected to the grid in the Northeast US off Monhegan Island, Maine for 20 years.

17 WIND ENERGY↗

Central atlantic regional ecological test site: A prototype regional environmental information system, volume 1

The Central Atlantic Regional Ecological Test Site (CARETS) project was a demonstration project for introducing data from Landsat and high-altitude aircraft sensors into regional land planning and management. This report summarizes the CARETS project results and describes its output of maps, reports, computer tapes, and other products. CARETS used a geographic information system model under which land use maps were prepared from sensor data, then digitized, processed, and linked to other environmental and social data sets, and to environmental consequences such as air pollution, stream runoff, local climatic factors, and coastal erosion. Landsat data showed the test region in 1972 to be nine percent urban and built-up land, 38 percent agriculture, 50 percent forest, three percent nonforested wetlands, and less than one percent barren land, exclusive of water-covered areas. User surveys, conferences, and workshops involving 65 agencies facilitated widespread distribution of data products and produced evaluations concerning their usefulness. We found a heterogeneous user community with diverse information needs largely preferring aerial photographs rather than satellite multispectral scanner data. Among project recommendations are establishment of a network of regional land resource information centers, working toward improved compatibility of Federal, State and local information programs supportive of land use decisions.

Land use↗

The Little Engine That Could: No Project is too Small for Sustainable Remediation Moab Uranium Mill Tailings Removal Project - 16427

Executive Order 13693, 'Planning for Federal Sustainability in the Next Decade', mandates the reduction of energy use and cost and greenhouse gas emissions, and the search for renewable or alternative energy solutions. DOE EM manages the Moab Uranium Mill Tailings Remedial Action Project in Utah that involves relocating a 16-million-ton uranium mill tailings pile and associated contaminated materials at the former Atlas mill site to a permanent disposal cell constructed near Crescent Junction, Utah, predominantly by rail. Project personnel strive to support the Executive Order in making preparations for the impacts of climate change. Meeting the goals of the Executive Order in light of the remote location and limited resources of the Project sites often requires an innovative approach and perseverance. The Moab Project is a 'Small Site' within EM and has a comparatively short-term completion date. As a result, large-scale sustainability projects, such as retrofits or remodels, do not offer a cost benefit over this period. Instead, less dramatic process changes are achievable. The Project purchases renewable wind energy through the local power provider to reduce Scope 2 (purchased electricity) greenhouse gas emissions. Toward its ambitious goal of achieving zero landfill waste, the Project has diverted over 50 percent of its nonhazardous solid waste from the local landfill through composting and recycling efforts. In particular, electronics must meet various sustainable criteria prior to purchase, and be recycled through donations and certified recyclers, diverting it from the waste stream. The Project has received multiple Green Buy Awards from DOE by reaching leadership goals for purchasing energy-efficient, water-efficient, bio-based, and recycled-content products. In fiscal year 2014, in response to President Obama's June 2014 memorandum, 'Sustainable Practices for Designed Landscapes and Supporting Pollinators on Federal Landscapes', the Project decided to take a proactive approach and work with a local pollinator group, hosting two beehives in a revegetation area on the Moab site. An increase in plant growth and blossoming plants in the revegetation area has been observed and is believed to be related to the added pollinators. The Project has previously seeded disturbed areas mainly with native drought-resistant species to reduce water usage. Storm water collected in sediment basins at the Crescent Junction site is used for dust control and compaction of mill tailings in the disposal cell. The Project worked with the U.S. Army Corps of Engineers and the U.S. Fish and Wildlife Service to gain support for re-contouring a remediated area adjacent to the Colorado River, which borders the Moab site on the east, to allow the area to flood at a lower river stage. This re-contouring promotes more varied vegetation growth and river water that tops the west bank brings soil nutrients to inundated areas of the site. Ponded floodwater has been pumped into revegetation plots for irrigation, reducing freshwater usage. Innovation in sustainable practices comes in many different fashions. The Moab Project demonstrates that no project is too small to implement sustainable practices. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transforming Public Housing with Deep Energy Retrofits

Open Market ESCO’s (OME) Transforming Public Housing through Deep Energy Retrofits project demonstrated new design and financing solutions for implementing deep energy retrofits (DERs) in occupied low-income multifamily housing. The Project performed an integrated project delivery process, including designing low-carbon retrofit solution packages, construction pricing, and financing. The Project developed a constructible and financeable DER scope for a 102-unit extremely low-income multifamily property in Boston. This Project demonstrated a replicable approach for streamlining and implementing DER projects in occupied housing, including real solutions for overcoming design complexities and cost barriers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Habitat Demonstration Unit Project: A Modular Instrumentation System for a Deep Space Habitat

NASA is focused on developing human exploration capabilities in low Earth orbit (LEO), expanding to near Earth asteroids (NEA), and finally to Mars. Habitation is a crucial aspect of human exploration, and a current focus of NASA activities. The Habitation Demonstration Unit (HDU) is a project focused on developing an autonomous habitation system that enables human exploration of space by providing engineers and scientists with a test bed to develop, integrate, test, and evaluate habitation systems. A critical feature of the HDU is the instrumentation system, which monitors key subsystems within the habitat. The following paper will discuss the HDU instrumentation system performance and lessons learned during the 2010 Desert Research and Technology Studies (D-RaTS). In addition, this paper will discuss the evolution of the instrumentation system to support the 2011 Deep Space Habitat configuration, the challenges, and the lessons learned of implementing this configuration. In 2010, the HDU was implemented as a pressurized excursion module (PEM) and was tested at NASA s D-RaTS in Arizona [1]. For this initial configuration, the instrumentation system design used features that were successful in previous habitat instrumentation projects, while also considering challenges, and implementing lessons learned [2]. The main feature of the PEM instrumentation system was the use of a standards-based wireless sensor node (WSN), implementing an IEEE 802.15.4 protocol. Many of the instruments were connected to several WSNs, which wirelessly transmitted data to the command and data handling system via a mesh network. The PEM instrumentation system monitored the HDU during field tests at D-RaTS, and the WSN data was later analyzed to understand the performance of this system. In addition, several lessons learned were gained from the field test experience, which fed into the instrumentation design of the next generation of the HDU.

Rojdev, Kristina↗

Battleground Energy Recovery Project

In October 2009, the project partners began a 36-month effort to develop an innovative, commercial-scale demonstration project incorporating state-of-the-art waste heat recovery technology at Clean Harbors, Inc., a large hazardous waste incinerator site located in Deer Park, Texas. With financial support provided by the U.S. Department of Energy, the Battleground Energy Recovery Project was launched to advance waste heat recovery solutions into the hazardous waste incineration market, an area that has seen little adoption of heat recovery in the United States. The goal of the project was to accelerate the use of energy-efficient, waste heat recovery technology as an alternative means to produce steam for industrial processes. The project had three main engineering and business objectives: Prove Feasibility of Waste Heat Recovery Technology at a Hazardous Waste Incinerator Complex; Provide Low-cost Steam to a Major Polypropylene Plant Using Waste Heat; and Create a Showcase Waste Heat Recovery Demonstration Project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Generation of virtual monochromatic CBCT from dual kV/MV beam projections

Purpose: To develop a novel on-board imaging technique which allows generation of virtual monochromatic (VM) cone-beam CT (CBCT) with a selected energy from combined kilovoltage (kV)/megavoltage (MV) beam projections. Methods: With the current orthogonal kV/MV imaging hardware equipped in modern linear accelerators, both MV projections (from gantry angle of 0°–100°) and kV projections (90°–200°) were acquired as gantry rotated a total of 110°. A selected range of overlap projections between 90° to 100° were then decomposed into two material projections using experimentally determined parameters from orthogonally stacked aluminum and acrylic step-wedges. Given attenuation coefficients of aluminum and acrylic at a predetermined energy, one set of VM projections could be synthesized from two corresponding sets of decomposed projections. Two linear functions were generated using projection information at overlap angles to convert kV and MV projections at nonoverlap angles to approximate VM projections for CBCT reconstruction. The contrast-to-noise ratios (CNRs) were calculated for different inserts in VM CBCTs of a CatPhan phantom with various selected energies and compared with those in kV and MV CBCTs. The effect of overlap projection number on CNR was evaluated. Additionally, the effect of beam orientation was studied by scanning the CatPhan sandwiched with two 5 cm solid-water phantoms on both lateral sides and an electronic density phantom with two metal bolt inserts. Results: Proper selection of VM energy [30 and 40 keV for low-density polyethylene (LDPE), polymethylpentene, 2 MeV for Delrin] provided comparable or even better CNR results as compared with kV or MV CBCT. An increased number of overlap kV and MV projection demonstrated only marginal improvements of CNR for different inserts (with the exception of LDPE) and therefore one projection overlap was found to be sufficient for the CatPhan study. It was also evident that the optimal CBCT image quality was achieved when MV beams penetrated through the heavy attenuation direction of the object. Conclusions: A novel technique was developed to generate VM CBCTs from kV/MV projections. This technique has the potential to improve CNR at selected VM energies and to suppress artifacts at appropriate beam orientations.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Oxy-Combustion Burner and Integrated Pollutant Removal Research and Development Test Facility

A high flame temperature oxy-combustion test facility consisting of a 5 MWe equivalent test boiler facility and 20 KWe equivalent IPR® was constructed at the Hammond, Indiana manufacturing site. The test facility was operated natural gas and coal fuels and parametric studies were performed to determine the optimal performance conditions and generated the necessary technical data required to demonstrate the technologies are viable for technical and economic scale-up. Flame temperatures between 4930-6120F were achieved with high flame temperature oxy-natural gas combustion depending on whether additional recirculated flue gases are added to balance the heat transfer. For high flame temperature oxy-coal combustion, flame temperatures in excess of 4500F were achieved and demonstrated to be consistent with computational fluid dynamic modeling of the burner system. The project demonstrated feasibility and effectiveness of the Jupiter Oxygen high flame temperature oxy-combustion process with Integrated Pollutant Removal process for CCS and CCUS. With these technologies total parasitic power requirements for both oxygen production and carbon capture currently are in the range of 20% of the gross power output. The Jupiter Oxygen high flame temperature oxy-combustion process has been demonstrated at a Technology Readiness Level of 6 and is ready for commencement of a demonstration project.

36 MATERIALS SCIENCE↗

Demonstration of Essential Reliability Services by a 300-MW Solar Photovoltaic Power Plant

The California Independent System Operator (CAISO), First Solar, and the National Renewable Energy Laboratory (NREL) conducted a demonstration project on a large utility-scale photovoltaic (PV) power plant in California to test its ability to provide essential ancillary services to the electric grid. With increasing shares of solar- and wind-generated energy on the electric grid, traditional generation resources equipped with automatic governor control (AGC) and automatic voltage regulation controls -- specifically, fossil thermal -- are being displaced. The deployment of utility-scale, grid-friendly PV power plants that incorporate advanced capabilities to support grid stability and reliability is essential for the large-scale integration of PV generation into the electric power grid, among other technical requirements. A typical PV power plant consists of multiple power electronic inverters and can contribute to grid stability and reliability through sophisticated 'grid-friendly' controls. In this way, PV power plants can be used to mitigate the impact of variability on the grid, a role typically reserved for conventional generators. In August 2016, testing was completed on First Solar's 300-MW PV power plant, and a large amount of test data was produced and analyzed that demonstrates the ability of PV power plants to use grid-friendly controls to provide essential reliability services. These data showed how the development of advanced power controls can enable PV to become a provider of a wide range of grid services, including spinning reserves, load following, voltage support, ramping, frequency response, variability smoothing, and frequency regulation to power quality. Specifically, the tests conducted included various forms of active power control such as AGC and frequency regulation; droop response; and reactive power, voltage, and power factor controls. This project demonstrated that advanced power electronics and solar generation can be controlled to contribute to system-wide reliability. It was shown that the First Solar plant can provide essential reliability services related to different forms of active and reactive power controls, including plant participation in AGC, primary frequency control, ramp rate control, and voltage regulation. For AGC participation in particular, by comparing the PV plant testing results to the typical performance of individual conventional technologies, we showed that regulation accuracy by the PV plant is 24-30 points better than fast gas turbine technologies. The plant's ability to provide volt-ampere reactive control during periods of extremely low power generation was demonstrated as well. The project team developed a pioneering demonstration concept and test plan to show how various types of active and reactive power controls can leverage PV generation's value from being a simple variable energy resource to a resource that provides a wide range of ancillary services. With this project's approach to a holistic demonstration on an actual, large, utility-scale, operational PV power plant and dissemination of the obtained results, the team sought to close some gaps in perspectives that exist among various stakeholders in California and nationwide by providing real test data.

14 SOLAR ENERGY↗

Puget Sound Tidal Energy In-Water Testing and Development Project (Final Technical Report)

Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

16 TIDAL AND WAVE POWER↗

Demonstration Assessment of Light Emitting Diode (LED) Commercial Garage Lights In the Providence Portland Medical Center, Portland, Oregon

This U.S. Department of Energy GATEWAY Demonstration project studied the applicability of light-emitting diode (LED) luminaires for commercial parking garage applications. High-pressure sodium (HPS) area luminaires were replaced with new LED area luminaires. The project was supported under the U.S. Department of Energy (DOE) Solid State Lighting Program. Other participants in the demonstration project included Providence Portland Medical Center in Portland, Oregon, the Energy Trust of Oregon, and Lighting Sciences Group (LSG) Inc. Pacific Northwest National Laboratory (PNNL) conducted the measurements and analysis of the results. PNNL manages GATEWAY demonstrations for DOE and represents their perspective in the conduct of the work. Quantitative and qualitative measurements of light and electrical power were taken at the site for both HPS and LED light sources. Economic costs were estimated and garage users’ responses to the new light sources were gauged with a survey. Six LED luminaires were installed in the below-ground parking level A, replacing six existing 150W HPS lamps spread out over two rows of parking spaces. Illuminance measurements were taken at floor level approximately every 4 ft on a 60-ft x 40-ft grid to measure light output of these LED luminaires which were termed the “Version 1” luminaires. PNNL conducted power measurements of the circuit in the garage to which the 6 luminaires were connected and determined that they drew an average of 82 W per lamp. An improved LED luminaire, Version 2, was installed in Level B of the parking garage. Illuminance measurements were not made of this second luminaire on site due to higher traffic conditions, but photometric measurements of this lamp and Version 1 were made in an independent testing laboratory and power usage for Version 2 was also measured. Version 1 was found to produce 3600 lumens and Version 2 was found to produce 4700 lumens of light and to consume 78 Watts. Maximum and minimum light levels were measured for the HPS and LED Version 1 luminaires and projected for the Version 2 luminaires. Maximum light levels were 23.51 foot candles, 20.54 fc, and 26.7 fc respectively and minimum light levels were 1.49 fc, 1.45 fc, and 1.88 fc. These results indicate very similar or even slightly higher light levels produced by the LED lamps, despite the higher lumen output of the HPS lamp. The LED lamps provide higher luminaire efficacy because all of the light is directed down and out. None of it is “lost” in the fixture. Also the HPS luminaire had poorly designed optics and a plastic covering that tended to get dirty and cracked, further decreasing the realized light output.[is this an accurate way to say this?] Consumer perceptions of the Version 2 LED were collected via a written survey form given to maintenance and security personnel. More than half felt the LED luminaires provided more light than the HPS lamps and a majority expressed a preference for the new lamps when viewing the relamped area through a security camera. Respondents commented that the LED luminaires were less glary, created less shadows, had a positive impact on visibility, and improved the overall appearance of the area. PNNL conducted an economic analysis and found that the Version 1 lamp produced annual energy savings of 955 kWh and energy cost savings of $76.39 per lamp at electricity rates of 6.5 cents per kWh and $105.03 at 11 cents per kWh. PNNL found that the Version 2 lamp produced annual energy savings of 991 kWh and energy cost savings of $79.26 per lamp at electricity rates of 6.5 cents per kWh and $108.98 at 11 cents per kWh. PNNL also calculated simple payback and found that Version 1 showed paybacks of 5.4 yrs at 6.5c/kWh and 4.1 yrs at 11c/kWh while Version 2 showed paybacks of 5.2 yrs at 6.5c/kWh and 3.9 yrs at 11c/kWh.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Postclosure Safety Assessment for the Nuclear Power Demonstration Closure Project - 19158

Following 30 years in a safe shutdown state, Canadian Nuclear Laboratories (CNL) is proposing the final decommissioning of the Nuclear Power Demonstration Waste Facility (NPDWF). A Postclosure Safety Assessment (PostSA) has been prepared as part of this process. The present PostSA represents the second assessment, following an iterative approach. The PostSA considered Normal Evolution of the facility, as well as several Disruptive Events and other cases to show robustness and account for uncertainties. The results of the PostSA show that the NPDWF is a robust design that will contain and limit release of contaminants long into the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Potential Research and Development Opportunities for Light Water Reactor Spent Nuclear Fuel at INL

This report documents the commercial spent nuclear fuel currently in storage at Idaho National Laboratory with a specific focus on the potential research and development (R&D) opportunities for this material. Commercial spent nuclear fuel is stored in dry casks on the INL site at the Idaho Nuclear Technology and Engineering Center (INTEC, formerly the Idaho Chemical Processing Plant or ICPP). This spent fuel was part of the DOE-industry cooperative dry cask demonstration project that began in 1983 and from historical fuel testing and treatment activities that had been performed at the Test Area North (TAN)-607 facility. Most of the fuel is “low burnup,” but given that it was removed from the respective reactors between 1970 and 1985, it was representative for its time. The majority of the fuel is of the 15×15 Westinghouse PWR variety, though additional fuel types (e.g., TN-BRP) and configurations are also stored. Potential R&D opportunities identified are (1) the REA-2023 cask, (2) the TN-BRP cask, and (3) the Castor V/21 cask. Fuel from the TN-24P may be an alternative to the intact assemblies in the Castor V/21. Specifically, the REA-2023 cask contains 9 rods that have been exposed to air since 2005. These rods have a detailed pre-loading characterization and thus any changes in corrosion or geometry can most likely be attributed to the storage environment. In addition, similar rods to the nine in REA-2023 reside in the Castor V/21 cask whose environment has been maintained with inert nitrogen. The Castor V/21 cask also contains intact PWR assemblies that could be used to perform limited confirmation of the pyroprocessing approach. An alternative to the use of the Castor assemblies for pyroprocessing is the consolidated fuel that is stored in the TN-24P, which would not require removal from the assembly grid since it has already been packaged in accessible two-piece shell strongback containers. The TN-BRP cask contains a number of Gd-doped, low burnup assemblies that could be of use to validate code packages used to justify burnup-up credit for boiling water reactors (BWRs). The INL dry casks are stored on the CPP-2707 pad at INTEC, adjacent to the CPP-603 Irradiated Fuel Storage Facility, which incorporates a dry hot cell that has the potential to receive a full scale commercial cask of the types identified. Several evaluations have been made regarding this task, including full scale mockup testing of the physical clearances required to remove and handle fuel assemblies and components. A proposed schedule of 14 months and cost of $5.3 million was the outcome of analysis performed by Fluor Idaho and is included as Appendix A & B. In addition to the spent fuel at INL, there is also a full-scale mockup assembly that was fabricated for the Protypical Consolidation Demonstration Project to validate fuel rod consolidation approaches. The assembly was fabricated by Westinghouse as a 15 x 15 PWR, using Zircaloy-4 tubing and steel end fittings in accordance with product specifications. The only departure from specification is the use of copper metal in lieu of uranium oxide pellets to achieve a weight that is within 10% of the standard.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TEXSYS

The Systems Autonomy Demonstration Project has recently completed a major test and evaluation of TEXSYS, a knowledge-based system (KBS) which demonstrates real-time control and FDIR for the Space Station Freedom thermal control system test-bed. TEXSYS is the largest KBS ever developed by NASA and offers a unique opportunity for the study of technical issues associated with the use of advanced KBS concepts including: model-based reasoning and diagnosis, quantitative and qualitative reasoning, integrated use of model-based and rule-based representations, temporal reasoning, and scale-up performance issues. TEXSYS represents a major achievement in advanced automation that has the potential to significantly influence Space Station Freedom's design for the thermal control system. An overview of the Systems Autonomy Demonstration Project, the thermal control system test-bed, the TEXSYS architecture, preliminary test results, and thermal domain expert feedback are presented.

Bull, John↗

Detroit Commuter Hydrogen Project

This project was undertaken to demonstrate the viability of using hydrogen as a fuel in an internal combustion engine vehicle for use as a part of a mass transit system. The advantages of hydrogen as a fuel include renew-ability, minimal environmental impact on air quality and the environment, and potential to reduce dependence on foreign energy sources for the transportation sector. Recognizing the potential for the hydrogen fuel concept, the Southeast Michigan Congress of Governments (SEMCOG) determined to consider it in the study of a proposed regional mass transit rail system for southeast Michigan. SEMCOG wanted to evaluate the feasibility of using hydrogen fueled internal combustion engine (H2ICE) vehicles in shuttle buses to connect the Detroit Metro Airport to a proposed, nearby rail station. Shuttle buses are in current use on the airport for passenger parking and inter-terminal transport. This duty cycle is well suited to the application of hydrogen fuel at this time because of the ability to re-fuel vehicles at a single nearby facility, overcoming the challenge of restricted fuel availability in the undeveloped hydrogen fuel infrastructure. A cooperative agreement between SEMCOG and the DOE was initiated and two H2ICE buses were placed in regular passenger service on March 29, 2009 and operated for six months in regular passenger service. The buses were developed and built by the Ford Motor Company. Wayne County Airport Authority provided the location for the demonstration with the airport transportation contractor, Metro Cars Inc. operating the buses. The buses were built on Ford E450 chassis and incorporated a modified a 6.8L V-10 engine with specially designed supercharger, fuel rails and injectors among other sophisticated control systems. Up to 30 kg of on-board gaseous hydrogen were stored in a modular six tank, 350 bar (5000 psi) system to provide a 150 mile driving range. The bus chassis and body were configured to carry nine passengers with luggage. By collecting fuel use data for the two H2ICE buses, with both written driver logs and onboard telemetry devices, and for two conventional propane-gasoline powered buses in the same service, comparisons of operating efficiency and maintenance requirements were completed. Public opinion about the concept of hydrogen fuel was sampled with a rider survey throughout the demonstration. The demonstration was very effective in adding to the understanding of the application of hydrogen as a transportation fuel. The two 9 passenger H2ICE buses accumulated nearly 50,000 miles and carried 14,285 passengers. Data indicated the H2ICE bus fuel economy to be 9.4 miles/ gallon of gasoline equivalent (m/GGE) compared to the 10 passenger propane-gasoline bus average of 9.8 m/GGE over 32,400 miles. The 23- passenger bus averaged 7.4 m/GGE over 40,700 miles. Rider feedback from 1050 on-board survey cards was overwhelmingly positive with 99.6% indicating they would ride again on a hydrogen powered vehicle. Minimal maintenance was required for theses buses during the demonstration project, but a longer duration demonstration would be required to more adequately assess this aspect of the concept.

08 HYDROGEN↗

3D Integration of Sensors and Electronics

A three dimensional integrated circuit is composed of multiple tiers of integrated electronics and sensors integrated vertically by wafer bonding, thinning and insertion of through-silicon-vias. The technologies associated with three dimensional integrated circuits can provide new capabilities for high energy physics and x-ray imaging experiments. These include finer pixel pitch, lower interconnect capacitance, the ability to separate analog and digital functions, and better power distribution and connectivity. In this paper we review the status of 3DIC demonstration projects at Fermilab, discuss several possible applications, and summarize the current availability of commercial processes. Results of a three-tier demonstration project that includes designs for x-ray imaging, CMS track triggering, and ILC vertex are described. We discuss the status of several ongoing 3D projects and prospects for future evolution of the technology.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗