Search NASA⌕ Search

SEARCH · Search NASA

Results for “Design Verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Added-mass effects on a horizontal-axis tidal turbine using FAST v8

Added mass on tidal turbine blades has the potential to alter the blade dynamic response, such as natural frequencies and vibration amplitudes, as a response to blade acceleration. Currently, most aeroelastic design tools do not consider such effects as they are complex and expensive to model, and they are not an intrinsic part of most blade-element momentum theory codes, which are commonly used in the tidal energy industry. This article outlines the addition of added-mass effects to the National Renewable Energy Laboratory's design tool FAST v8. A verification is presented for a spring-mass system with an initial displacement, and a case study is performed for the Reference Model 1 20-m-diameter tidal turbine. For the 20-m-diameter turbine, it was shown that the natural frequency of vibration is reduced by 65% when added mass is considered. Further, the thrust loads are increased by 2.5% when the blades are excited by a 5% step increase in inflow velocity when added mass is considered. This decrease can have a significant impact on the overall turbine design, as it is important to design the blades with a natural frequency so that they are not excited by the rotor speed and its harmonics, wherein aerodynamic excitation can lead to fatigue damage. However, it was shown that when turbulent inflow with an intensity of 20% was modeled, there was almost no impact on the loads and blade displacement with added-mass effects except for a small difference in the fatigue response of the blade to turbulent load fluctuations.

13 HYDRO ENERGY↗

BWR modernization project: installation of a new digital feedwater control system - 295

A European BWR plant carried out a relevant and pioneering modernization project regarding the Feedwater and Feed Pump Turbine Control System, replacing the legacy analogic control with the new General Electric MarkVIe digital system. This digital instrumentation and control modernization, motivated by obsolescence, had a great impact on the main control room and on the plant operation. Tecnatom collaborated with the nuclear power plant in the project performing the following activities: early installation of the system in the full scope and classroom simulators, Human Factors Engineering (HFE) Verification and Validation (V and V), Simulation Assisted Engineering (SAE), design and implementation of cyber secure communication with the Plant Process Computer (PPC), operating procedures modification and plant operators training. Those activities contributed to the success of the project that was completed during the refueling outage as planned. Scheduling HFE verification before the design freeze allowed the plant to modify the Human Machine Interface (HMI) to comply with the standards and increase safety without overcharging the project. SAE resulted in the reduction of costs and time during the system commissioning through the detection of discrepancies and improvements in the control, covering different plant scenarios. All the activities carried out in the simulators before the implementation of the system in the plant contributed to validate it and to build confidence in the new control among the plant personnel. New digital system communication interfaces with the PPC saved cable laying works and allowed future expansions. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Reusable Verification Components for High-Energy Physics readout ASICs

Verification is a critical aspect of designing front-end (FE) readout ASICs for High-Energy Physics (HEP) experiments. These ASICs share several similar functional features, resulting in similar verification objectives, which can be addressed using comparable verification strategies. This contribution presents a set of re-usable verification components for addressing common verification tasks, such as clock generation, reset handling, configuration, as well as hit and fault injections. The components were developed as part of the CHIPS initiative and they have been successfully used in the verification of multiple HEP ASICs.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PELICAN Design, Test Planning, and Commissioning Results

To support design efforts for the Versatile Test Reactor (VTR) core assemblies, an experimental facility has been designed and constructed at Argonne National Laboratory to match the hydraulic flow conditions within the VTR’s primary heat transport system (PHTS). This facility, the Pressure drop Experimental Loop for Investigations of Core Assemblies in advanced Nuclear reactors, PELICAN, provides the ability to measure pressure drop across a full-scale fuel assembly containing prototypic axial reflectors, fuel, and plena components. The PELICAN facility was designed and built to offer maximum flexibility, allowing testing from short sub-sections all the way to the full-length core fuel assemblies. The report presents the high-level program objectives, a summary of the facility design, instrumentation, and control systems, and the testing procedure. The outcomes from facility characterization efforts and first test matrix results are then presented and then, finally, the conclusion contains a summary of the future work to be performed. This test facility was designed to match the hydraulic conditions of the flowing sodium in the VTR using water as a surrogate fluid. To do so, the water is elevated to a temperature of 110°C where its viscosity matches that of sodium, and with a 50-HP centrifugal pump, is capable of generating full scale flow rates to achieve prototypic Reynolds and Euler number flow conditions. To prevent boiling, the system is maintained at elevated pressure of at least 2.7-3.0 bar (40-44 psig). A set of 15 tests have been used to perform checkout activities in order to commission the device, survey the capabilities of PELICAN, and generate experimental data at isothermal conditions and over a range of flow rates up to 44 kg/s (700 GPM) to produce datasets used in the verification and validation of VTR design and modeling efforts. Initial testing focused on facility characterization, which assessed the operational capabilities of various control systems. The thermal control system was qualified, including the thermal response of the loop to the heat added by self- and auxiliary heaters, the chiller and heat exchanger systems for removing excess heat, and their coupled ability to maintain steady-state isothermal conditions as desired. Additionally, the pressure control system was verified to ensure necessary operating environments that promote pump health and prevent boiling of loop inventory at high temperatures could be met. With these systems in place, the first set of matrix tests have been carried out using orifice plates with inner diameters of 2.25-inches and 2.5-inches. Orifice plate flow behavior is well covered in scientific literature, and the results find good agreement with the measured pressure drop vs flow rate and those of theoretical predictions. This initial testing not only helps to validate the experiment, but it also produces a high quality data set for a geometry that is easily reproducible for simulations. Finally, the report is concluded with a discussion of the work to come and provides a snapshot of the test articles in the experimental pipeline whose designs are being inspired by the current designs from the VTR.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

AVNG as a Test Case for Cooperative Design

Designing a measurement system that might be used in a nuclear facility is a challenging, if not daunting, proposition. The situation is made more complicated when the system needs to be designed to satisfy the disparate requirements of a monitoring and a host party - a relationship that could prove to be adversarial. The cooperative design of the elements of the AVNG (Attribute Verification with Neutrons and Gamma Rays) system served as a crucible that exercised the possible pitfalls in the design and implementation of a measurement system that could be used in a host party nuclear facility that satisfied the constraints of operation for both the host and monitoring parties. Some of the issues that needed to be addressed in the joint design were certification requirements of the host party and the authentication requirements of the monitoring party. In this paper the nature of the problem of cooperative design will be introduced. The details of cooperative design revolve around the idiosyncratic nature of the adversarial relationship between the parties involved in a possible measurement regime, particularly if measurements on items that may contain sensitive information are being pursued. The possibility of an adversarial interaction is more likely if an information barrier is required for the measurement system. The origin of the antagonistic elements of the host party and hosted party relationship will be considered. In addition, some of the conclusions will be presented that make cooperative design (and development) proceed more efficiently. Finally, some lessons learned will be presented as a result of this expedition into cooperative design.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

CPLOAS_2 V2.10 verification report.

A series of test cases designed to verify the correct implementation of several features of the CPLOAS_2 program are documented. CPLOAS_2 is used to calculate the probability of loss of assured safety (PLOAS) for a weak link (WL)/strong link (SL) system. CPLOAS_2 takes physical properties (e.g., temperature, pressure, etc.) of a WL/SL system and uses these properties and definitions of link failure properties in probabilistic calculations to determine PLOAS. The features being tested include (i) six aleatory distribution forms, (ii) five numerical procedures for the determination of PLOAS (i.e., one quadrature procedure, two simple random sampling procedures, and two importance sampling procedures), and (iii) time and environmental margin calculations. All tests were performed with CPLOAS_2 version 2.10.

97 MATHEMATICS AND COMPUTING↗

ITER CENTRAL SOLENOID COIL INSULATION QUALIFICATION

An insulation system for ITER Central Solenoid must have sufficiently high electrical and structural strength. Design efforts to bring stresses in the turn and layer insulation within allowables failed. It turned out to be impossible to eliminate high local tensile stresses in the winding pack. When high local stresses can not be designed out, the qualification procedure requires verification of the acceptable structural and electrical strength by testing. We built two 4 x 4 arrays of the conductor jacket with two options of the CS insulation and subjected the arrays to 1.2 million compressive cycles at 60 MPa and at 76 K. Such conditions simulated stresses in the CS insulation. We performed voltage withstand tests and after end of cycling we measured the breakdown voltages between in the arrays. After that we dissectioned the arrays and studied micro cracks in the insulation. We report details of the specimens preparation, test procedures and test results.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advancements in Multiphysics Microdepletion Analysis of an eVinci TM -like Microreactor Leveraging OpenMC-CRAB Workflow

Nuclear microreactors (MRs) are a class of nuclear reactor technology, characterized by reduced dimensions, modular design, and reduced power output in contrast to conventional Light Water Reactors (LWRs). MRs are proposed for supplying electricity and eventual process heat to remote locations, such as military installations and disaster-affected areas. Current research work sponsored by the US Department of Energy Microreactor Program (MRP) is devoted to the development of novel modeling and simulation tools to better support MR vendors and regulatory bodies. Notably, the NRC is projected to utilize the CRAB multiphysics software driver for executing both design and beyond-design-basis accident analyses. Furthermore, the NRC has been utilizing the MELCOR code to calculate mechanistic source terms during accidents. Since MELCOR relies on isotopic inventory and reactor temperature/power profiles under accident conditions, which theoretically can be derived from CRAB, the goal is to establish a comprehensive CRAB-MELCOR computational framework. Past work was focused on testing and demonstrating CRAB's capability to generate results that can be used to inform mechanistic source term calculations in MELCOR. In particular, a computational workflow leveraging OpenMC-generated microscopic cross sections and CRAB was first applied to perform multiphysics microscopic depletion calculation followed by an accident scenario for a stylized microreactor problem. In fiscal year 2024, the research work has been focused on applying the OpenMC-CRAB workflow, which was first tested in fiscal year 2023, to a realistic 3D heat-pipe cooled MR problem representative of the eVinci TM design. The latter computational problem was developed with inputs from WEC to conserve selected neutronic and thermal characteristics of the eVinci TM design without releasing proprietary data. The results of this simulation, encompassing isotopic inventory, power density distribution, and kinetic parameters, will inform both MELCOR and the WEC-developed FATE code for mechanistic source terms calculations. The results from the two codes will then be compared for code verification purposes. This report contains the design characteristics of the realist heat pipe cooled microreactor developed as a use-case for the verification exercise, and the current results for the multiphysics microscopic depletion performed with the OpenMC-CRAB workflow. The results include eigenvalue as a function of time, power distribution at EOL, in addition to nuclides inventory's time evolution and spatial distribution. Finally, we report improvements to the workflow efficiency achieved through a collaboration with the NEAMS programs. Through this collaborative effort, we were able to strongly decrease the computational time for the multiphysics microdepletion calculation (i.e., from 17.4 hours to 5.7 hours on 280 processors) in addition to simplifying the interface to generate isotopics spatial distribution utilizable by FATE and MELCOR. Future work, including the improvement of the current microscopic cross-sections' library and the simulation of an accident scenario at EOL, is also discussed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Fast Modular Reactor (FMR) Pre-Application Regulatory Engagement Plan

The Fast Modular Reactor (FMR) is a 50 MWe Gascooled Fast Reactor (GFR) being developed by General Atomics Electromagnetic Systems (GA-EMS) under U.S. Department of Energy’s (DOE’s) Advanced Reactor Demonstration Program (ARDP), specifically Advanced Reactor Concepts 2020 (ARC-20). The 3-year conceptual design of the FMR is being conducted with verifications of key metrics in fuel, safety, and operational performance. GAEMS is pursuing design, licensing, and commercialization of the proposed reactor, with demonstration by 2030 and deployment by the mid-2030s. The U.S. Nuclear Regulatory Commission (NRC) recommends the pre-application regulatory engagement to provide for early identification of regulatory requirements for advanced reactors and to provide all interested parties with a timely, independent assessment of the safety and security characteristics of advanced reactor designs. As such, GAEMS is developing a pre-application regulatory engagement plan (REP) of the FMR.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analytical estimation of emission zone mean position and width in organic light-emitting diodes from emission pattern image-source interference fringes

We present an analytical method for evaluating the first and second moments of the effective exciton spatial distribution in organic light-emitting diodes (OLED) from measured emission patterns. Specifically, the suggested algorithm estimates the emission zone mean position and width, respectively, from two distinct features of the pattern produced by interference between the emission sources and their images (induced by the reflective cathode): the angles in which interference extrema are observed, and the prominence of interference fringes. The relations between these parameters are derived rigorously for a general OLED structure, indicating that extrema angles are related to the mean position of the radiating excitons via Bragg's condition, and the spatial broadening is related to the attenuation of the image-source interference prominence due to an averaging effect. The method is applied successfully both on simulated emission patterns and on experimental data, exhibiting a very good agreement with the results obtained by numerical techniques. We investigate the method performance in detail, showing that it is capable of producing accurate estimations for a wide range of source-cathode separation distances, provided that the measured spectral interval is large enough; guidelines for achieving reliable evaluations are deduced from these results as well. As opposed to numerical fitting tools employed to perform similar tasks to date, our approximate method explicitly utilizes physical intuition and requires far less computational effort (no fitting is involved). Hence, applications that do not require highly resolved estimations, e.g., preliminary design and production-line verification, can benefit substantially from the analytical algorithm, when applicable. This introduces a novel set of efficient tools for OLED engineering, highly important in the view of the crucial role the exciton distribution plays in determining the device performance.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Studying visual search without an eye tracker: an assessment of artificial foveation

Abstract Eye tracking is a useful tool for studying human cognition, both in the laboratory and in real-world applications. However, there are cases in which eye tracking is not possible, such as in high-security environments where recording devices cannot be introduced. After facing this challenge in our own work, we sought to test the effectiveness of using artificial foveation as an alternative to eye tracking for studying visual search performance. Two groups of participants completed the same list comparison task, which was a computer-based task designed to mimic an inventory verification process that is commonly performed by international nuclear safeguards inspectors. We manipulated the way in which the items on the inventory list were ordered and color coded. For the eye tracking group, an eye tracker was used to assess the order in which participants viewed the items and the number of fixations per trial in each list condition. For the artificial foveation group, the items were covered with a blurry mask except when participants moused over them. We tracked the order in which participants viewed the items by moving their mouse and the number of items viewed per trial in each list condition. We observed the same overall pattern of performance for the various list display conditions, regardless of the method. However, participants were much slower to complete the task when using artificial foveation and had more variability in their accuracy. Our results indicate that the artificial foveation method can reveal the same pattern of differences across conditions as eye tracking, but it can also impact participants’ task performance.

47 OTHER INSTRUMENTATION↗

Project to Develop and Demonstrate an Advanced Low Temperature Heat Recovery Absorption Chiller Module at a Distributed Data Center

The proposed Low Temperature Absorption chiller project was to test and apply standard design operating strategies that will significantly enhance the single stage hot water fired absorber performance for CHP applications. The project was terminated because the host site required to serve at the basis of design and where measurement and verification testing was to be undertaken could not support the project in a manner consistent with the project delivery schedule.

Sweetser, Richard↗

Neutron Generator Production Facility (NGPF), Building 870: Structural Fire Protection Analysis and Basis of Design Report

This report was prepared to provide an explanation of the prescriptive-based code approach for the Neutron Generator Production Facility’s (NGPF) structural fire protection and construction classification determinations based upon the original code-of-record (1991-UBC) and current International Building Code (2012-IBC) requirements. The code approach presented in this report included a determination of the required construction type in accordance with the 2012-IBC. Through the evaluation of the record design drawings and subsequent site surveys, a determination was made of the existing types of materials used to construct the columns, beams, floor assemblies, roof assembly, and exterior and interior walls and partitions. A summary is provided for the fire resistance requirements of the different elements of the building. In addition, a determination was made in regards to the fire resistance hourly ratings of the columns, beams, floor assemblies, roof assembly, exterior walls, interiors walls and partitions, door openings, joints and penetrations. Through design evaluation, site survey, code verification, and review of record documents, the actual construction classification (Type II-B) was confirmed to be compliant with the 2012-IBC.

42 ENGINEERING↗

Rythmos: Solution and Analysis Package for Differential-Algebraic and Ordinary-Differential Equations

Time integration is a central component for most transient simulations. It coordinates many of the major parts of a simulation together, e.g., a residual calculation with a transient solver, solution with the output, various operator-split physics, and forward and adjoint solutions for inversion. Even though there is this variety in these transient simulations, there is still a common set of algorithms and procedures to progress transient solutions for ordinary-differential equations (ODEs) and differential-alegbraic equations (DAEs). Rythmos is a collection of these algorithms that can be used for the solution of transient simulations. It provides common time-integration methods, such as Backward and Forward Euler, Explicit and Implicit Runge-Kutta, and Backward-Difference Formulas. It can also provide sensitivities, and adjoint components for transient simulations. Rythmos is a package within Trilinos, and requires some other packages (e.g., Teuchos and Thrya) to provide basic time-integration capabilities. It also can be coupled with several other Trilinos packages to provide additional capabilities (e.g., AztecOO and Belos for linear solutions, and NOX for non-linear solutions). The documentation is broken down into three parts: Theory Manual, User's Manual, and Developer's Guide. The Theory Manual contains the basic theory of the time integrators, the nomenclature and mathematical structure utilized within Rythmos, and verification results demonstrating that the designed order of accuracy is achieved. The User's Manual provides information on how to use the Rythmos, description of input parameters through Teuchos Parameter Lists, and description of convergence test examples. The Developer's Guide is a high-level discussion of the design and structure of Rythmos to provide information to developers for the continued development of capabilities. Details of individual components can be found in the Doxygen webpages.

97 MATHEMATICS AND COMPUTING↗

AEDAM: Whole Program Adaptive Error Detection and Mitigation—Year 3 Report

In Year 3, MIT was primarily responsible for the effort on Software Characterization, with the following milestones: 1. Completed design of domain-specific language for fault models 2. Completed design of program logic for verification 3. Completed evaluation of relational verification system for jacobi, steepest descent, and conjugate gradient 4. Completed development of relational verification system 5. Completed evaluation of relational verification system

97 MATHEMATICS AND COMPUTING↗

Systematic Literature Review: How is Model-Based Systems Engineering Justified?

The genesis for this systematic literature review was to search for industry case studies that could inform a decision of whether or not to support the change process, investment, training, and tools needed to implement an MBSE approach across the engineering enterprise. The question asked was, how the change from a document - based systems engineering approach (DBSE) to a model-based systems engineering approach (MBSE) is justified? The methodology employed for this systematic literature review was to conduct a document search of electronically published case studies by authors from the defense, space, and complex systems product engineering industries. The 67 case studies without metrics mainly attributed success to completeness, consistency, and communication of requirements. The 21 case studies with metrics on cost and schedule primarily attributed success to the ability of an MBSE approach to improve defect prevention strategies. The primary conclusion is that there is a significant advantage to project performance by applying an MBSE approach. An MBSE approach made the engineering processes on a complex system development effort more efficient by improving requirements completeness, consistency, and communication. These were seen in engineering processes involved in requirements management, concept exploration, design reuse, test and qualification, Verification and Validation, and margins analyses. An MBSE approach was most effective at improving defect prevention strategies. The approach was found to enhance the capability to find defects early in the system development life cycle (SDLC), when they could be fixed with less impact and prevented rework in later phases, thus mitigating risks to cost, schedule, and mission. However, if a program only employed an MBSE approach for requirements management, advantages from finding defects early could not be leveraged in later phases, where the savings in cost and schedule from rework prevention is realized. Significant performance success was achieved when the systems engineer (SE) held a leadership role over engineering process es. A number of the case studies addressed a general lack of skilled MBSE engineers as a major hindrance to implementing an MBSE approach successfully.

42 ENGINEERING↗