Search NASA⌕ Search

SEARCH · Search NASA

Results for “HAZARD”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Series of semi-Markov processes to model infrastructure resilience under multihazards

Civil infrastructure systems are subjected to multiple hazards, including natural and anthropogenic, that disrupt their function or the level of service offered. Estimating the function recovery of these systems (or how soon normalcy of operations will be restored) when subjected to repeated hazard events by considering the inter-event dependencies is an important problem in multihazard infrastructure resilience. However, this problem has been less addressed in the field. This paper proposes a series of semi-Markov processes model to capture the inter-event dependencies in infrastructure recovery when subjected to successive hazard events. Recovery after each new hazard event is represented by a unique semi-Markov process that models the reduced recovery rates and the increased recovery times caused by the system’s incomplete recovery from the preceding event. Two novel formulations of the inter-event dependency modeling, namely Maximal Effects Dependency (considers the worst impact of two successive hazard events) and Cumulative Effects Dependency (considers the aggregated impacts of two successive hazard events), are proposed and discussed. The model is demonstrated by considering the following applications: Three-state system subjected to deterministic and random occurrences of identical hazard events; and Multihazard resilience of a building in Charleston, SC, considering earthquake and hurricane hazards. Results indicate that considering inter-event dependencies in recovery modeling can lead to lesser-predicted resilience, thereby affecting resilience-based decision-making.

42 ENGINEERING↗

A Markov framework for generalized post-event systems recovery modeling: From single to multihazards

State-dependent models can be used to represent the system recovery process as a series of stochastic transitions from lower to higher functional states. However, the applications of these models have been limited in scope and there is a lack of a generalized recovery modeling framework. A generalized framework would permit a robust forecasting of systems and system-of-systems recovery under multiple hazards, and more broadly, would contribute to community disaster preparedness. This paper develops a generalized post hazard-event recovery modeling framework based on state-dependent Markov-type processes. We then apply the proposed framework to solve a spectrum of problems that range from hind-casting single-system recovery following a single hazard event to forecasting post-event trajectories under multiple hazards and modeling the recovery of a system-of-systems. First, Markov chains are used to hind-cast the observed recovery for a portfolio of buildings affected by the 2014 South Napa, California, earthquake. Next, Markov processes are used to formulate a parametric post hazard-event recovery model, which can be updated using Bayesian statistics when relevant datasets become available. Semi-Markov processes are then used to develop a more general model of single hazard recovery, which accounts for the intensity of the loading and level of damage caused by the event. Semi-Markov processes with non-renewal features are then used to account for multihazard interactions in a post-event recovery model, and applied to a case study that involves a community in Charleston, South Carolina. Lastly, Markov-type processes are combined with Bayesian networks to model the recovery of residential, commercial, educational, and industrial buildings (system-of-systems) following a hazard event. Overall, these applications demonstrate the versatility of the Markov framework towards handling recovery problems with varying levels of complexity.

42 ENGINEERING↗

The Challenges of Troubleshooting

Troubleshooting work presents electrical and other workers with a challenging combination of physical hazards, working conditions, and time pressure, which can lead to unwanted outcomes if not carefully managed.Summaries of several incidents in which workers were injured or at risk of injury while performing troubleshooting work are presented, identifying organizational weaknesses and error precursors that contributed to each incident.The primary challenges include:Deranged equipment. Equipment that needs troubleshooting is not in a normal operating condition. Actions that are safe when the equipment is in a normal state may not be safe in the deranged state.Work planning and control. The steps taken in troubleshooting are most often determined by the results of the immediately previous diagnostic test, making effective work planning challenging.Multiple types of hazards. Most equipment will present a troubleshooting worker with several types of hazards, including hazardous energy as defined in 29 CFR 1910.147. Portions of the troubleshooting activity may be infeasible without these hazards present.Time pressure. Restoring operation of failed equipment often involves an explicit or implicit sense of urgency.Equipment design and construction. The physical construction of the equipment in large part will determine to which hazards troubleshooters may be exposed. It will also determine which hazards may be encountered while performing the servicing needed to restore the equipment or system to operation.There are effective methods for addressing each challenge, most of which require a combination of advance preparation and management commitment.

Mertz, David E.↗

Geographic, sectoral, and constituent characteristics of US off‐site manufacturing wastewater disposal

This study employs recent US Environmental Protection Agency off-site manufacturing wastewater disposal data and a socioenvironmental assessment tool for the United States to understand the characteristics of such disposal in terms of geography, major contributing sectors and pollutants, and environmental impacts. Environmental impact analyses of manufacturing are insufficient without encompassing the extended physical boundary of waste management. Our analysis reveals that off-site manufacturing wastewater disposal occurs disproportionately in populations residing in census tracts already negatively impacted by environmental hazards (impacted populations, or IPs) with 44% of transfers and 55% of Risk Screening Environmental Indicators (RSEI) Hazard going to these areas, compared to their national share of 37%. Disposal hazard is concentrated in a small number of populations, with a Gini coefficient of 0.99 for RSEI Hazard. Four manufacturing sub-sectors are significant generators: Chemicals, Fabricated Metals, Primary Metals, and Transportation Equipment, with Chemicals off-site wastewater disposal largely occurring in IPs. For individual contaminants, chromium compounds and chromium represent more than 85% of the hazard but less than 10% of transfers. We explore transfer distances and waste generation and disposal hotspots, finding that the Midwest hosts a disproportionate share of off-site wastewater disposal. Further, RSEI Hazard steeply rises at shorter distances and plateaus over distances >500 miles, revealing opportunities to reduce hazard by reducing 20–500-mile transfers. Our findings strongly support targeted mitigation strategies like process substitutions, control technologies, on-site recycling and treatment, and minimizing transfer distances. This article met the requirements for a gold-gold JIE data openness badge described at http://jie.click/badges.

Fuchs, Heidi [Lawrence Berkeley National Laborator↗

Hybrid Power Plants for Energy Resilience: A Case Study

As renewable energy technologies are increasingly adopted, they pose an opportunity to improve the sustainability and resilience of distributed grids, especially when their design and operation is coordinated as a hybrid power plant. When included in hybrid power plants, distributed wind turbines in particular have the potential to enhance the resilience of distributed grids in areas with good wind resource, due to their ability to provide more consistent generation and ancillary services as compared to photo-voltaic (PV) solar panels. Despite this benefit, U.S. distributed wind adoption is lower than other comparable renewable energy technologies. In this study, we seek to demonstrate how hybrid power plants that include distributed wind turbines can contribute to distribution grid resilience by meeting loads (especially critical loads) more consistently, increasing reserve capacity, and providing value to customers during outages. To demonstrate these contributions, we integrate three separate frameworks and apply them to a case study in a rural electric cooperative in Iowa. Through this case study, we simulate and compare hybrid power plant design and operation during two hazard events: a tornado that causes a 48-hour distribution outage and a winter weather event that causes a 6-hour generation outage. The inclusion of a hybrid power plant that leverages 1) increased battery duration and 2) advanced forecasting and dispatch strategies that reserve capacity leading up to a hazard event best reduce lost loads as well as diesel consumption that would otherwise be used to meet those loads during short- and long-duration hazard events. Depending on the hybrid power plant capacity and operation, we find that the outage mitigation value of a hybrid power plant (measured in value to customers to avoid an outage and avoided lost revenues for the utility) is significant in both hazard events; adding wind, solar, and battery assets to the existing system adds about $50-$100M in avoided lost load and at least $4-$8k in utility value in the tornado hazard event, and $570k-$2.2M in avoided lost load and at least $220-$650 in utility value in the winter hazard scenario. In both the tornado and winter hazard scenarios, optimizing the operation of the hybrid system for resilience can lend similar value as increasing battery duration by 5 MWh for the lower capacity systems considered.

17 WIND ENERGY↗

Assessing United States County-Level Exposure for Research on Tropical Cyclones and Human Health

Tropical cyclone epidemiology can be advanced through exposure assessment methods that are comprehensive and consistent across space and time, as these facilitate multiyear, multistorm studies. Further, an understanding of patterns in and between exposure metrics that are based on specific hazards of the storm can help in designing tropical cyclone epidemiological research. a) Provide an open-source data set for tropical cyclone exposure assessment for epidemiological research; and b) investigate patterns and agreement between county-level assessments of tropical cyclone exposure based on different storm hazards. We created an open-source data set with data at the county level on exposure to four tropical cyclone hazards: peak sustained wind, rainfall, flooding, and tornadoes. The data cover all eastern U.S. counties for all land-falling or near-land Atlantic basin storms, covering 1996–2011 for all metrics and up to 1988–2018 for specific metrics. We validated measurements against other data sources and investigated patterns and agreement among binary exposure classifications based on these metrics, as well as compared them to use of distance from the storm’s track, which has been used as a proxy for exposure in some epidemiological studies. Our open-source data set was typically consistent with data from other sources, and we present and discuss areas of disagreement and other caveats. Over the study period and area, tropical cyclones typically brought different hazards to different counties. Therefore, when comparing exposure assessment between different hazard-specific metrics, agreement was usually low, as it also was when comparing exposure assessment based on a distance-based proxy measurement and any of the hazard-specific metrics. Our results provide a multihazard data set that can be leveraged for epidemiological research on tropical cyclones, as well as insights that can inform the design and analysis for tropical cyclone epidemiological research.

60 APPLIED LIFE SCIENCES↗

Lessons Learned from Demolition of Hanford's Plutonium Finishing Plant - 20507

U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC), a Jacobs owned company, is making significant progress demolishing the Plutonium Finishing Plant (PFP), which has long been known as one of the most hazardous buildings in the DOE Environmental Management Complex (DOE Complex). The facility is located on the Hanford Site and produced plutonium metal during the Cold War. Production was stopped in 1989, the facility was formally shut down in 1996, and material processing was completed in 2004. After approximately 25 years of demolition preparations, open-air demolition of the main portions of the Hazard Category II nuclear facility began in November 2016. To prepare the PFP for demolition, CHPRC employees performed some of the most hazardous work across the DOE Complex. In addition to extensive demolition preparations, including a wide-reaching communication strategy across the Hanford Site, CHPRC implemented robust controls and monitoring during demolition, and when necessary, adjusted demolition practices and sequence to maintain employee safety and project efficiency. Demolition of the main PFP building began in November 2016. The technical complexity, high hazards and radiological concerns have all led to a difficult demolition environment. Following a spread of contamination at the project site beyond the radiological boundaries in December 2017, work was halted and a recovery plan was generated to allow the demolition work to continue. After the implementation of additional controls and concurrence from regulatory agencies and DOE, the demolition was ready to resume work and reinitiated in August 2018. There are a number of lessons learned from the demolition activities and recovery plan process. This paper allows CHPRC and DoE's Richland Operations Office (RL) to share lessons learned and progress to date with other challenging and hazardous projects across the DOE Complex. Understanding the risk acceptance level is critical to execution of any open-air demolition project and is unique to each facility. Four key lessons learned from this project include: 1) plan execution issues, 2) stakeholder communication issues, 3) watching for summit fever and 4) minimizing exposed contaminated surfaces during demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Integration and Regulatory Considerations for a Nuclear Power Plant Colocated with Industrial Facilities: Colocation Studies for a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 HYDROGEN↗

Site Integration and Regulatory Considerations for an NPP Colocated with a Petroleum Refinery, Methanol Plant, and Wood Pulp Plant

This research explores the colocation of nuclear power plants (NPPs) with industrial applications. Three existing industrial sites were considered to demonstrate the siting process and illuminate technological gaps for future work. The three applications demonstrated for colocation here are a petroleum refinery, a methanol production plant, and a pulp and paper plant. This study uses a modified version of the EPRI siting criteria to explore the geological and demographic characteristics of the location of the current industrial site, as well as exploring external hazards from the industrial plant and its surrounding land use. Data was collected from public databases to estimate site characteristics. We then discuss how the site characteristics may impact the ability to colocate an NPP with an industrial application. The application site and 5 additional sites were explored for each application to give a general indication of the siting implications for an NPP in each area. The hazards for each industrial application was also explored to determine how colocation may impact reactor safety. The following gaps have been identified and should be explored in future research on colocation of NPPs with petroleum refineries, methanol plants, and pulp and paper plants: - There is a variety of industrial use, hazards, and pipelines in the surrounding area. A more thorough review of these hazards should be considered for colocation. - In general, the whole region around some applications seems to have softer soil, with implications for large site preparation costs. Further site investigations should prioritize looking into the geotechnical conditions. - Applications along coastlines are susceptible to flooding and hurricanes. The benefits of colocation should be weighed against the potential design implications. - The benefits of natural gas pipeline infrastructure in place should be explored further. If heat supply from the NPP is not required or not feasible due to the distance between the NPP and the application, there may be an opportunity to supply hydrogen to the plant through an existing pipeline. - Because there are several collocated industrial plants in the regions for the refinery and methanol plant, the benefits of sharing resources from the NPP should be explored further. This may open up additional sites for colocation. The following knowledge gaps were identified for the colocation of NPPs with these three industries, and industrial applications in general. These gaps are: - While the STAND tool contains many important characteristics for the reactor siting process, it is not calibrated for the colocation of NPPs with industrial facilities. - There are aspects of both the NPP and industrial application that need to be quantified for a siting analysis. Particularly, we need to understand the water intake requirements for NPPs and each application. - Further work may focus on adapting the STAND site comparison methodology to comparison of sites for co-location. This will involve using the data documented in this report as a starting point and performing a comprehensive and quantitative comparison. - Without spending significant resources, it would be impossible to gather data for each site to evaluate all aspects of siting. One approach to finding data and understanding its implications to siting is looking at FSARs for existing plants. For example, most sites considered in this study have small Vs30 values, indicating soft soil. However, there are NPPs located in the vicinity of most of the sites (e.g., Waterford Steam Electric Station near New Orleans) and reviewing available site characteristics and geotechnical data for these NPPs, might provide further information for siting. - The siting analysis in this study indicates that colocation of the NPP with the industrial site could be difficult based on external hazards, cooling requirements, weather, or population. We need to determine the impact of distance between the two facilities on cost and quality of energy transport. - This study did not touch on socioeconomic impacts for NPP colocation with industrial facilities. The input-output analysis methodology could be applied to the communities referenced in this study to determine the socioeconomic impact of these projects. - Similarly, the impacts of colocation on emergency planning was not explored in this study. The impacts on emergency planning infrastructure are somewhat related to the socioeconomic impacts, and could be explored using a similar methodology. - This study also did not address physical and cybersecurity, which will be important aspects of co-location [ref] . Cybersecurity will be important, regardless of the distance, but physical security will be important if the facilities are located very closely. Physical security might also be important for the steam lines between the plants, unless they are determined to be non-safety significant. - In many site l

08 - HYDROGEN↗

A Prefire Approach for Probabilistic Assessments of Postfire Debris‐Flow Inundation

Increases in wildfire activity and rainfall intensification are driving more postfire debris flows (PFDF) in many regions around the world. PFDFs are most common in the first postfire year and may even occur before a fire is fully controlled. This underscores the importance of assessing postfire hazards before a fire starts. Evaluation of PFDF hazards prior to fire can help strategize interventions lessening the negative effects of future fires. However, debris-flow runout and inundation analyses are not routine in PFDF hazard assessments, partially due to time constraints and substantial uncertainties in boundary conditions. Here, we propose a prefire PFDF inundation assessment framework using a debris-flow runout model based on the Herschel-Bulkley (HB) rheology (HEC-RAS v6.1). We constrain model inputs and parameters using Bayesian posterior analysis, rainfall-runoff simulations, and a debris-flow volume model. We use observations from recent PFDF incidents in northern Arizona, USA, to calibrate model components and then apply our prefire inundation assessment framework in a nearby unburned area. Specifically, we (a) identify yield stress as the most influential factor on inundation extent and arrival time in a HB model, (b) establish posterior distributions for model parameters suitable for forward modeling by leveraging uncertainties in field observations, and (c) implement a predictive forward analysis in an area that has not burned recently to evaluate PFDF inundation under several future fire scenarios. This study improves our ability to assess postfire debris-flow hazards before a fire begins and provides guidance for future applications of single-phase rheological models when assessing PFDF hazards.

54 ENVIRONMENTAL SCIENCES↗

Adaptive Anomaly Detection for Dynamic Clinical Event Sequences

Over the past decade, health information technology (IT) has enabled the amount of digital information stored in electronic health records (EHRs) to expand greatly. However, according to some studies, hazards in health IT can lead to changes in clinical decisions, care processes, and care outcomes, as well as other issues. Thus, the effects of health IT hazards on patient safety have been at the forefront of recent patient safety research. Nonetheless, hazard detection in health IT remains a challenge. In this paper, the authors assume that safety-related issues in health IT would exhibit anomalous characteristics in EHR data. Although all hazards will exhibit some anomalous characteristics, not all anomalies can be regarded as hazards. The authors hypothesize that errors in health IT could lead to interruptions in the sequence of clinical actions. To this end, the problem of detecting anomalous sequences in big EHR data is considered. This paper focuses on dynamic event sequences, which are a series of clinical actions in motion. The authors propose an adaptive anomaly detection approach that uses higher-order network representation to detect anomalous sequences. Furthermore, the authors propose a contiguous subsequence anomaly detection approach that identifies abnormal subsequences in the detected anomalous sequences. The proposed approaches are tested by using synthetic and real-world EHR data. The proposed methods outperform existing state of the art anomaly detection techniques. To reduce the computational complexity associated with the operational implementation of the proposed approaches, the Apache Spark environment was leveraged, and a much shorter run time together with improved performance were achieved, especially for data with more than 60,000 sequences.

Niu, Haoran↗

Hydrogen Fuel Cell Vehicles in Tunnels

There are numerous vehicles which utilize alternative fuels, or fuels that differ from typical hydrocarbons such as gasoline and diesel, throughout the world. Alternative vehicles include those running on the combustion of natural gas and propane as well as electrical drive vehicles utilizing batteries or hydrogen as energy storage. Because the number of alternative fuels vehicles is expected to increase significantly, it is important to analyze the hazards and risks involved with these new technologies with respect to the regulations related to specific transport infrastructure, such as bridges and tunnels. This report focuses on hazards presented by hydrogen fuel cell electric vehicles that are different from traditional fuels. There are numerous scientific research and analysis publications on hydrogen hazards in tunnel scenarios; however, compiling the data to make conclusions can be a difficult process for tunnel owners and authorities having jurisdiction over tunnels. This report provides a summary of the available literature characterizing hazards presented by hydrogen fuel cell electric vehicles, including light-duty, medium and heavy-duty, as well as buses. Research characterizing both worst-case and credible scenarios, as well as risk-based analysis, is summarized. Gaps in the research are identified to guide future research efforts to provide a complete analysis of the hazards and recommendations for the safe use of hydrogen fuel cell electric vehicles in tunnels.

33 ADVANCED PROPULSION SYSTEMS↗

Waste Compliance and Tracking System (WCATS) Version 3 Requirements Document

This document describes the end-user requirements for the Waste Compliance and Tracking System (WCATS) project in accordance with the WCATS Software Quality Management Plan, EPC-WMP-WCATSPLAN-001. The WCATS application shall support the generation, characterization, processing, and shipment of LANL radioactive, hazardous, and industrial waste. Regulatory drivers include RCRA hazardous waste, DOT shipping, NNSA nuclear material control and accountability, DOE nuclear safety, TSDF permit, and transuranic waste certification requirements. The system will utilize a task-based architecture that supports the spectrum of treatment, storage, disposal, administrative, and characterization based unit operations necessary to manage waste from cradle to grave. The application design shall readily accommodate new facilities, processes, workflow, signature requirements, and so forth, via end-user established metadata. WCATS will provide support for representing waste storage and disposal facilities, buildings, rooms, and grid layouts (x, y, z) to support waste and radioactive material inventory management. Nuclear material at risk (MAR), DOE hazard rating (e.g., Category II facility) compliance per DOE-STD-1027, and permit inventory requirements will be configurable for any storage or disposal facility, or waste operation, and the system will automatically evaluate and enforce those requirements. In addition, the application will support the characterization and management of the entire range of hazardous and radioactive wastes (TRU, MTRU, LLW, MLLW, hazardous waste, etc.) that might be colocated or processed at a permitted facility. Some capabilities not found in traditional systems include user-defined tank systems for liquid waste, user-defined work paths (i.e., sequence of operations), and an equipment subsystem for tracking the calibration, maintenance, and inspection of tools used to process waste, such as torque wrenches, scales, pH probes, etc. The application incorporates a desktop and mobile user interface as shown in Figure 1. The mobile interface supports field operations, such as waste item characterization, intra-facility transfers, internal and external audits, and shipment preparation and receipt.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fragility Functions Resource Report: Documented Sources for Electricity and Water Resilience Valuation

Fragility curves provide the vulnerability between hazard intensity and an asset. Federal installations may include many different electricity and water infrastructure types (or assets) such as generators, wind turbines, solar PV, switch yards, substations and power lines as well as water distribution systems that could be affected by different hazards. The vulnerability of each asset is a function of its age, type of materials and maintenance. In addition, the vulnerability changes with the hazards intensity and has a probability distribution function associated with it. The fragility functions are used in conjunction with hazard probability and consequence valuations to determine the values at risk for examination of investment grade analyses of alternative mitigation strategies. This document provides examples of fragility functions and links to their sources for different electricity and water infrastructure assets by hazard type.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Prefire Approach for Probabilistic Assessments of Postfire Debris-Flow Inundation

Increases in wildfire activity and rainfall intensification are driving more postfire debris flows (PFDF) in many regions around the world. PFDFs are most common in the first postfire year and may even occur before a fire is fully controlled. This underscores the importance of assessing postfire hazards before a fire starts. Evaluation of PFDF hazards prior to fire can help strategize interventions lessening the negative effects of future fires. However, debris-flow runout and inundation analyses are not routine in PFDF hazard assessments, partially due to time constraints and substantial uncertainties in boundary conditions. Here, we propose a prefire PFDF inundation assessment framework using a debris-flow runout model based on the Herschel-Bulkley (HB) rheology (HEC-RAS v6.1). We constrain model inputs and parameters using Bayesian posterior analysis, rainfall-runoff simulations, and a debris-flow volume model. We use observations from recent PFDF incidents in northern Arizona, USA, to calibrate model components and then apply our prefire inundation assessment framework in a nearby unburned area. Specifically, we (a) identify yield stress as the most influential factor on inundation extent and arrival time in a HB model, (b) establish posterior distributions for model parameters suitable for forward modeling by leveraging uncertainties in field observations, and (c) implement a predictive forward analysis in an area that has not burned recently to evaluate PFDF inundation under several future fire scenarios. This study improves our ability to assess postfire debris-flow hazards before a fire begins and provides guidance for future applications of single-phase rheological models when assessing PFDF hazards.

54 ENVIRONMENTAL SCIENCES↗

The Challenges of Safe Troubleshooting Work

Troubleshooting work presents electrical and other workers with a challenging combination of physical hazards, working conditions, and time pressure, which can lead to unwanted outcomes if not carefully managed. Summaries of several incidents in which workers were injured or at risk of injury while performing troubleshooting work are presented, identifying organizational weaknesses and error precursors that contributed to each incident. The primary challenges include: Deranged equipment. Equipment that needs troubleshooting is not in a normal operating condition. Actions that are safe when the equipment is in a normal state may not be safe in the deranged state. Work planning and control. The steps taken in troubleshooting are most often determined by the results of the immediately previous diagnostic test, making effective work planning challenging. Multiple types of hazards. Most equipment will present a troubleshooting worker with several types of hazards, including hazardous energy as defined in 29 CFR 1910.147. Portions of the troubleshooting activity may be infeasible without these hazards present. Time pressure. Restoring operation of failed equipment often involves an explicit or implicit sense of urgency. There are effective methods for addressing each challenge, most of which require a combination of advance preparation and management commitment.

Mertz, David E.↗

Current Practices in Distribution Utility Resilience Planning for Hurricanes and Non-Winter Storms

This report is part of a series of hazard-focused case studies examining common practices in electric utility resilience planning. We use standard terminology defining resilience as the ability to anticipate, withstand, absorb, and recover from hazards that cause long duration outages. We distinguish between reliability and resilience using IEEE 1366-2022, which defines "major events" as "an event that exceeds reasonable design and/or operational limits of the electric power system." Resilience planning is focused on "major event days" and reliability planning is focused on non-major event days. Utility resilience plans are assessed according to common recommended resilience components that we have identified in existing resilience frameworks. The focus of this report is on hurricanes and severe storms in which the primary hazards are precipitation or high winds. We exclude winter storms with primary hazards of ice and extreme cold, as they are a unique set of hazards with different resilience considerations. Standalone reports focusing on wildfires and winter storms have been published in parallel with this report. This report can be used as a starting point for understanding potential investment prioritization processes and investment options. This report is intended to improve utility resilience planning by supporting constructive dialogue among utilities, regulators, and other stakeholders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Microgrid Hardening Design Toolkit User Guide: Software v0.29

Microgrid Hardening Design Toolkit helps microgrid stakeholders assess community-specific natural hazard risks to microgrid components and provides mitigation strategies to reduce those risks. Using census tract location inputs and the Federal Emergency Management Agency (FEMA) Risk Index dataset, the tool provides a ranked list of the highest risk hazards for a selected community and hazard-specific mitigation options for microgrid components. It also provides risk twin communities with similar hazard risk profiles and includes a radar-chart to visually compare risk profiles across communities. The toolkit is expected to help users quickly understand community-specific hazard risks and make decisions for microgrid hardening.

24 POWER TRANSMISSION AND DISTRIBUTION↗