Search NASA⌕ Search

SEARCH · Search NASA

Results for “Hourly Load”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

CELCAP: A Computer Model for Cogeneration System Analysis

A description of the CELCAP cogeneration analysis program is presented. A detailed description of the methodology used by the Naval Civil Engineering Laboratory in developing the CELCAP code and the procedures for analyzing cogeneration systems for a given user are given. The four engines modeled in CELCAP are: gas turbine with exhaust heat boiler, diesel engine with waste heat boiler, single automatic-extraction steam turbine, and back-pressure steam turbine. Both the design point and part-load performances are taken into account in the engine models. The load model describes how the hourly electric and steam demand of the user is represented by 24 hourly profiles. The economic model describes how the annual and life-cycle operating costs that include the costs of fuel, purchased electricity, and operation and maintenance of engines and boilers are calculated. The CELCAP code structure and principal functions of the code are described to how the various components of the code are related to each other. Three examples of the application of the CELCAP code are given to illustrate the versatility of the code. The examples shown represent cases of system selection, system modification, and system optimization.

Source record↗

Galileo probe battery systems design

NASA's Galileo mission to Jupiter will consist of a Jovian orbiter and an atmospheric entry probe. The power for the probe will be derived from two primary power sources. The main source is composed of three Li-SO2 battery modules containing 13 D-size cell strings per module. These are required to retain capacity for 7.5 years, support a 150 day clock, and a 7 hour mission sequence of increasing loads from 0.15 to 9.5 amperes for the last 30 minutes. This main power source is supplemented by two thermal batteries (CaCrO4-Ca) for use in firing the pyrotechnic initiators during the atmospheric staging events. This paper describes design development and testing of these batteries at the system level.

Dagarin, B. P.↗

Compression creep of graphite/epoxy laminates monitored using moire interferometry

Uniaxial compressive creep loadings were applied for ten hours to various graphite/epoxy laminates with a hole. All tests were performed at room temperatures. In-plane displacements were monitored using moire interferometry. Moire fringe patterns were reduced to in-plane strain fields numerically. The fiber-dominated laminates tested exhibited little or no viscoelastic behavior during the ten hour period. Conversely, the matrix-dominated laminates tested did exhibit viscoelastic behavior during the ten hour test time.

Tuttle, M. E.↗

Finite Element Modeling of a Cylindrical Contact Using Hertzian Assumptions

The turbine blades in the high-pressure fuel turbopump/alternate turbopump (HPFTP/AT) are subjected to hot gases rapidly flowing around them. This flow excites vibrations in the blades. Naturally, one has to worry about resonance, so a damping device was added to dissipate some energy from the system. The foundation is now laid for a very complex problem. The damper is in contact with the blade, so now there are contact stresses (both normal and tangential) to contend with. Since these stresses can be very high, it is not all that difficult to yield the material. Friction is another non-linearity and the blade is made out of a Nickel-based single-crystal superalloy that is orthotropic. A few approaches exist to solve such a problem and computer models, using contact elements, have been built with friction, plasticity, etc. These models are quite cumbersome and require many hours to solve just one load case and material orientation. A simpler approach is required. Ideally, the model should be simplified so the analysis can be conducted faster. When working with contact problems determining the contact patch and the stresses in the material are the main concerns. Closed-form solutions for non-conforming bodies, developed by Hertz, made out of isotropic materials are readily available. More involved solutions for 3-D cases using different materials are also available. The question is this: can Hertzian1 solutions be applied, or superimposed, to more complicated problems-like those involving anisotropic materials? That is the point of the investigation here. If these results agree with the more complicated computer models, then the analytical solutions can be used in lieu of the numerical solutions that take a very long time to process. As time goes on, the analytical solution will eventually have to include things like friction and plasticity. The models in this report use no contact elements and are essentially an applied load problem using Hertzian assumptions to determine the contact patch dimensions.

Knudsen, Erik↗

Applying Model-based Diagnosis to a Rapid Propellant Loading System

The overall objective of the US Air Force Research Laboratory (AFRL) Rapid Propellant Loading (RPL) Program is to develop a launch vehicle, payload and ground support equipment that can support a rapid propellant load and launch within one hour. NASA Kennedy Space Center (KSC) has been funded by AFRL to develop hardware and software to demonstrate this capability. The key features of the software would be the ability to recognize and adapt to failures in the physical hardware components, advise operators of equipment faults and workarounds, and put the system in a safe configuration if unable to fly. In December 2008 NASA KSC and NASA Ames Research Center (ARC) demonstrated model based simulation and diagnosis capabilities for a scaled-down configuration of the RPL hardware. In this paper we present a description of the model-based technologies that were included as part of this demonstration and the results that were achieved. In continuation of this work we are currently testing the technologies on a simulation of the complete RPL system. Later in the year, when the RPL hardware is ready, we will be integrating these technologies with the real-time operation of the system to provide live state estimates. In future years we will be developing the capability to recover from faulty conditions via redundancy and reconfiguration.

Goodrich, Charlie H.↗

Thermal Vacuum Test of Ice as a Phase Change Material Integrated with a Radiator

Water may be used as radiation shielding for Solar Particle Events (SPE) to protect crewmembers in the Lunar Electric Rover (LER). Because the water is already present for radiation protection, it could also provide a mass efficient solution to the vehicle's thermal control system. This water can be frozen by heat rejection from a radiator and used as a Phase Change Material (PCM) for thermal storage. Use of this water as a PCM can eliminate the need for a pumped fluid loop thermal control system as well as reduce the required size of the radiator. This paper describes the testing and analysis performed for the Rover Engineering Development Unit (REDU), a scaled-down version of a water PCM heat sink for the LER. The REDU was tested in a thermal-vacuum chamber at environmental temperatures similar to those of a horizontal radiator panel on the lunar surface. Testing included complete freeze and melt cycles along with scaled transient heat load profiles simulating a 24-hour day for the rover.

Lee, Steve↗

Thermal Vacuum Test of Ice as a Phase Change Material Integrated with a Radiator

Water may be used as radiation shielding for Solar Particle Events (SPE) to protect crewmembers in the Lunar Electric Rover (LER). Because the water is already present for radiation protection, it could also provide a mass efficient solution to the vehicle's thermal control system. This water can be frozen by heat rejection from a radiator and used as a Phase Change Material (PC1V1) for thermal storage. Use of this water as a PCM can eliminate the need for a pumped fluid loop thermal control system as well as reduce the required size of the radiator. This paper describes the testing and analysis performed for the Rover Engineering Development Unit (REDU), a scaled-down version of a water PCM heat sink for the LER. The REDU was tested in a thermal-vacuum chamber at environmental temperatures similar to those of a horizontal radiator panel on the lunar surface. Testing included complete freeze and melt cycles along with scaled transient heat load profiles simulating a 24-hour day for the rover.

Lee, Steve A.↗

Rocketdyne - SE-7 and SE-8 Engines

The 70-pound SE-7 engine is very similar with its two valves, ablative material, a silicon carbide liner, a silicon carbide throat, and overall configuration. There were different wraps. One had a ninety-degree ablative material orientation. That is important because it caused problems with the SE-8, but not for this application. It was not overly stressed. It was a validation of the off-the-shelf application approach. There were two SE-7 engines located on the stage near the bottom. They had their own propellant tanks. That was the application. All it did was give a little bit of gravity by firing to push the propellants to the bottom of the tanks for start or restart. It was not a particularly complicated setup. (See Slides 6 and 7, Appendix F) What had we learned? This was a proven engine in a space environment. There weren't any development issues. Off-the-shelf seemed to work. There were no operational issues, which made the SE-7 very cost-effective. Besides NASA, the customer for this application was the Douglas Aircraft Company. Douglas decided the off-the-shelf idea was cost-effective. With the Gemini Program, the company was McDonnell Aircraft Corporation, which was part of the reason the off-the-shelf idea was applied to the Apollo. (See Slide 8, Appendix F) However, here are some differences between Apollo and Gemini vehicles. For one thing, the Apollo vehicle was really moving at high speed when it re-entered the atmosphere. Instead of a mere 17,000 miles per hour, it was going 24,000 miles per hour. That meant the heat load was four times as high on the Apollo vehicle as on the Gemini craft. Things were vibrating a little more. We had two redundant systems. Apollo was redundant where it could be as much as possible. That was really a keystone or maybe an anchor point for Apollo. We decided to pursue the off-the-shelf approach. However, the prime contractor was a different entity - the North American Space Division. They thought they ought to tune up this off-the-shelf setup. It was a similar off-the-shelf application, but at a higher speed. They wanted to improve it. What they wanted to improve was the material performance of silicon carbide. They were uncomfortable with the cracks they were seeing. They were uncomfortable with the cracks in the throat, and feeling that the environment was a little tougher, that maybe it was going to rattle, perhaps something would fall out, and they would have a problem. They wanted to eliminate the ceramic liner, and they wanted a different throat material. (See Slides 9 and 10, Appendix F) The Rocketdyne solutions were to replace silicon carbide material with a more forgiving ceramic material. Also, due to the multiple locations within the vehicle, the shape of the nozzles varied. Some nozzles were long, and some nozzles were short. We came up with a single engine design with variable nozzle extensions and configurations to fit particular vehicle locations. (See Slides 10 and 11, Appendix F)

Harmon, Tim↗

Incomplete Data in Smart Grid: Treatment of Values in Electric Vehicle Charging Data

In this paper, five imputation methods namely Constant (zero), Mean, Median, Maximum Likelihood, and Multiple Imputation methods have been applied to compensate for missing values in Electric Vehicle (EV) charging data. The outcome of each of these methods have been used as the input to a prediction algorithm to forecast the EV load in the next 24 hours at each individual outlet. The data is real world data at the outlet level from the UCLA campus parking lots. Given the sparsity of the data, both Median and Constant (=zero) imputations improved the prediction results. Since in most missing value cases in our database, all values of that instance are missing, the multivariate imputation methods did not improve the results significantly compared to univariate approaches.

Majipour, Mostafa↗

H2@Scale: Economic Potential of Hydrogen as an Energy Intermediate

The H2@Scale concept envisions hydrogen as an energy intermediate across multiple energy sectors. The concept is motivated both by the opportunity to produce hydrogen from low-cost energy resources, and by the many potential applications of hydrogen, including as energy for transportation - used directly in fuel cell electric vehicles (FCEVs), as a feedstock for synthetic fuels, and to upgrade oil and biomass - feedstock for industry (e.g., for ammonia production, metals refining, and other end uses), heat for industry and buildings, and electricity storage. A key hydrogen production opportunity is using variable renewable electricity (i.e., electricity generated by wind turbines or solar photovoltaic panels) during hours when generation exceeds the load on the grid as a source of low-cost, dispatch constrained electricity (LDE). In addition to producing low-cost hydrogen, electrolysis can also serve as a form of responsive load on the electric grid, which can enhance grid stability, reduce curtailment, and create a supplementary revenue stream for generators. The future use and adoption of hydrogen across end-use applications depends both the cost of hydrogen production and on each application's threshold price (i.e., the maximum price each application will pay for hydrogen - above that price, the application has an alternative that is more economic). We estimate economic potential of the hydrogen market - the quantity of hydrogen at an equilibrium price at which suppliers are willing to produce and consumers are willing to buy the same quantity of hydrogen - by developing supply and demand curves for hydrogen production and use. The demand curves are based on the threshold price for various quantities of hydrogen in each market, which is affected by projected prices for alternatives that could provide the same service (e.g., fuel for vehicles, feedstock for metals refining). The supply curves include hydrogen produced via natural gas steam methane reforming, high-temperature electrolysis coupled with nuclear power plants, biomass gasification, and low-temperature electrolysis using LDE. We use a range of market and technology-advancement assumptions to estimate the economic potential for five scenarios in the mid 21st century timeframe, and the corresponding impacts on energy use and emissions. We estimate hydrogen's economic potential to be 14-48 MMT/yr in the contiguous United States - corresponding to 1.5-5 times current annual consumption - depending on key assumptions about the future market conditions and the success of hydrogen production research and development (R&D) in our five scenarios. As a result of the estimated economic potential markets, we also approximate that grid-integrated electrolysis can increase the penetration of wind generation in the electricity market by providing a value stream for LDE, and that total U.S. fossil fuel use could decline below a scenario with high renewable penetration on the grid. We find that hydrogen has potential to provide technical and economic synergies when integrated across multiple sectors of the U.S. energy system, but continued R&D, infrastructure, and market development for LDE are required.

08 HYDROGEN↗

A Simulation Framework for Analyzing the Impact of Stochastic Occupant Behaviors on Demand Flexibility in Typical Commercial Buildings

As one of the primary users of the electric grid, buildings and building equipment, including heating, ventilation, and air conditioning (HVAC) systems, can be leveraged to provide the flexible demand needed to balance the grid. Typical strategies to achieve demand flexibility are to reduce electricity use during peak or critical periods by shutting down equipment or relaxing system setpoints, which will inevitably impact the occupants’ comfort. When occupants feel uncomfortable, they may take actions to regain their comfort, and some of those actions (such as turning on a personal fan) may have a negative impact on meeting the demand response goal. Therefore, it is important to incorporate occupant behaviors into the assessment ofthe building demand flexibility potential. In this study, a simulation framework that includes simulation of zone thermal loads, an HVAC system, and occupant behaviors, was developed to investigate the impact of occupant behaviors on demand flexibility. A case study was conducted using a small office model from the U.S. Department of Energy (DOE) Commercial Prototype Building Models to simulate the building envelope and zone loads. An agent-based occupant thermal behavior model was adapted to forecast occupants’ thermal comfort and their resulting thermal behaviors. An artificial neural network (ANN) based airflow model trained from a computational fluid dynamics (CFD) model of the zone was adopted to better predict the ambient environment of each occupant. An air-source heat pump simulation model that was calibrated from a real two-stage air-source heat pump system was used as the HVAC system. A typical load shedding event during peak hours was studied. Repeated simulations were conducted to capture the stochastic effects of occupant behaviors. The interplay between the demand flexibility, occupant comfort and behavior were analyzed by evaluating key performance indicators, including the energy use, occupant discomfort duration, and occupant behavior duration during the peak period. The results suggest that this framework can be used to analyze typical commercial buildings and their HVAC systems in terms ofdemand flexibility potential under the impact of occupant behaviors.

Chen, Zhelun↗

Day-of-Launch I-load Updates for the Space Shuttle

Approximately one hour prior to the September 1991 launch of the Space Shuttle Discovery on STS-48, new guidance commands were uplinked to the onboard computers, allowing the vehicle to fly safely through unusually strong upper atmosphere winds. The capability to update the vehicle guidance commands known as Day-of-Launch I-load Update (DOLILU), had been developed by a NASA/industry team, and was certified for flight use in August 1991 following an extensive testing regime. The DOLILU capability presents several benefits to the Space Shuttle Program. Not only does it reduce the possibility of a launch scrub due to unexpected wind profiles at high altitude, it is also a major first step toward standardization of the ascent flight profile, and which will reduce the cost of flight software verification commit-to-flight trajectory analysis, and flight crew training.

Norbraten, G. L.↗

Comparative Study of Corn Stover Pretreated by Dilute Acid and Cellulose Solvent-Based Lignocellulose Fractionation: Enzymatic Hydrolysis, Supramolecular Structure, and Substrate Accessibility

Liberation of fermentable sugars from recalcitrant biomass is among the most costly steps for emerging cellulosic ethanol production. Here we compared two pretreatment methods (dilute acid, DA, and cellulose solvent and organic solvent lignocellulose fractionation, COSLIF) for corn stover. At a high cellulase loading [15 filter paper units (FPUs) or 12.3 mg cellulase per gram of glucan], glucan digestibilities of the corn stover pretreated by DA and COSLIF were 84% at hour 72 and 97% at hour 24, respectively. At a low cellulase loading (5 FPUs per gram of glucan), digestibility remained as high as 93% at hour 24 for the COSLIF-pretreated corn stover but reached only {approx}60% for the DA-pretreated biomass. Quantitative determinations of total substrate accessibility to cellulase (TSAC), cellulose accessibility to cellulase (CAC), and non-cellulose accessibility to cellulase (NCAC) based on adsorption of a non-hydrolytic recombinant protein TGC were measured for the first time. The COSLIF-pretreated corn stover had a CAC of 11.57 m{sup 2}/g, nearly twice that of the DA-pretreated biomass (5.89 m{sup 2}/g). These results, along with scanning electron microscopy images showing dramatic structural differences between the DA- and COSLIF-pretreated samples, suggest that COSLIF treatment disrupts microfibrillar structures within biomass while DA treatment mainly removes hemicellulose. Under the tested conditions COSLIF treatment breaks down lignocellulose structure more extensively than DA treatment, producing a more enzymatically reactive material with a higher CAC accompanied by faster hydrolysis rates and higher enzymatic digestibility.

09 BIOMASS FUELS↗

Precursor Evolution and Stress Corrosion Cracking Initiation of Cold-Worked Alloy 690 in Simulated Pressurized Water Reactor Primary Water

Stress corrosion crack initiation of two thermally-treated, cold-worked (CW) alloy 690 (UNS N06690) materials was investigated in 360oC simulated PWR primary water using constant load tensile (CLT) tests and blunt notch compact tension (BNCT) tests equipped with direct current potential drop (DCPD) for in-situ detection of cracking. SCC initiation was not detected by DCPD for either the 21% or 31%CW CLT specimens loaded at their yield stress after ~9,220 hours, however intergranular (IG) precursor damage and isolated surface cracks were observed on the specimens. The two 31%CW BNCT specimens loaded at moderate stress intensity after several cyclic loading ramps showed DCPD-indicated crack initiation after 10,400 hours of exposure at constant stress intensity, which was resulted from significant growth of IG cracks. The 21%CW BNCT specimens only exhibited isolated small IG surface cracks and showed no apparent DCPD change throughout the test. Post-test cross-section examinations revealed many grain boundary (GB) nano-cavities in the bulk of all the CLT and BNCT specimens particularly for the 31%CW materials. Cavities were also found along GBs extending to the surface suggesting an important role in crack nucleation. This paper provides an overview of the evolution of GB cavities and discusses their effects on crack initiation in CW alloy 690.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Applying Graph Partitioning Methods in Measurement-Based Dynamic Load Balancing

Load imbalance can lead to wasted CPU hours especially when running on a large number of processors. Achieving the best parallel efficiency for a program requires optimal load balancing which is a NP-hard problem. Charm++, a migratable objects based programming model, provides a measurement-based dynamic load balancing frame work. This paper explores the use of graph partitioning algorithms, traditionally used for partitioning physical domains/meshes, for measurement based dynamic load balancing of parallel applications. In particular, we present repartitioning methods developed in a graph partitioning toolbox called Scotch that consider the previous mapping to minimize migration costs. We also discuss a new imbalance reduction algorithm for graphs with irregular load distributions. We compare several load balancing algorithms using a micro-benchmark and the NAS BT multi-zone bench mark. New algorithms developed in Scotch lead to better performance compared to other existing partitioners, both in terms of the application execution time and fewer number of objects migrated.

97 MATHEMATICS AND COMPUTING↗

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

14 SOLAR ENERGY↗

Absorbing the Sun: Operational Practices and Balancing Reserves in Florida's Municipal Utilities

The Florida Reliability Coordinating Council (FRCC) power system is comprised of multiple balancing authorities ranging in size from Gainesville Regional Utilities (GRU) with a 2019 summer net firm demand of 429 MW to Florida Power & Light with a 2019 summer net firm demand of 22,510 MW; and including cooperative, municipal, and investor-owned utilities. As all of these balancing authorities are and have plants to continue installing significant quantities of utility-scale solar photovoltaics, one relevant question is how much operating reserves they will need to hold as solar penetrations increase. While there are estimates of how regulating and flexibility reserve requirements change with solar penetration, the literature almost exclusively focuses on large balancing authorities with sub-hourly dispatch. In this work we analyze how reserve needs change not only with solar photovoltaic penetration, but also balancing authority size and operational practices. We find that, measured as a fraction of load, smaller balancing authorities with less frequent load and solar forecasts and less frequent dispatch need more reserves. Such utilities' reserve needs also increase more with increasing solar deployment as compared to larger or more frequently dispatched balancing authorities. These impacts are most acute for GRU. We find that moving from day-ahead to hour-ahead load and solar forecasting and system dispatch could enable GRU to incorporate 32% solar generation with median reserves at 20% instead of 60% of load; and that median reserve needs could drop further to about 10% of load if Florida's municipal utilities formed a reserve sharing group and moved to sub-hourly dispatch.

balancing authority↗

Field Demonstration of Residential DER Service-Oriented Load Participation

Amidst a concerning surge in power consumption during peak hours, coupled with heightened power grid instability, and driven by a growing demand for electricity, aggregations of Distributed Energy Resource are becoming a viable means for providing essential reliability services.Electric utility companies have proactively implemented Demand Response programs for decades. These programs employ Direct Load Control methods to enhance power grid stability, achieved by controlling customers’ Distributed Energy Resource during peak hours to reduce power consumption. However, a notable drawback of Direct Load Control has been high unenrollment rates of DR program participants due to customer discomfort.Therefore, the underlying issue of over-consumption persists. To address these concerns, this paper introduces a Service-Oriented Load Participation approach to providing grid services such as Demand Response. Leveraging a Service-Oriented Architecture, this method offers the advantage of efficient service management and provisioning within the system. The SOLP approach not only aims to reduce power consumption but also to maintain customer satisfaction by ensuring a comfortable grid service experience.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗