Search NASA⌕ Search

SEARCH · Search NASA

Results for “Integrated Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

The MELISSA pilot plant facility as as integration test-bed for advanced life support systems

The different advances in the Micro Ecological Life Support System Alternative project (MELISSA), fostered and coordinated by the European Space Agency, as well as in other associated technologies, are integrated and demonstrated in the MELISSA Pilot Plant laboratory. During the first period of operation, the definition of the different compartments at an individual basis has been achieved, and the complete facility is being re-designed to face a new period of integration of all these compartments. The final objective is to demonstrate the potentiality of biological systems such as MELISSA as life support systems. The facility will also serve as a test bed to study the robustness and stability of the continuous operation of a complex biological system. This includes testing of the associated instrumentation and control for a safe operation, characterization of the chemical and microbial safety of the system, as well as tracking the genetic stability of the microbial strains used. The new period is envisaged as a contribution to the further development of more complete biological life support systems for long-term manned missions, that should be better defined from the knowledge to be gained from this integration phase. This contribution summarizes the current status of the Pilot Plant and the planned steps for the new period. c2004 COSPAR. Published by Elsevier Ltd. All rights reserved.

Waste Management/instrumentation/methods↗

Integration and Test (I&T) Horror Stories and the Lessons Learned

I've been asked to be a presenter along with a panel of fellow NASA Electromagnetic Compatibility (EMC) engineers at this year's IEEE EMC & Signal and Power Integrity (SIPI) 2019 symposium. The topic I am asked to cover is in regards to I&T horror stories because of my 15 years of personal experience as an EMC test engineer with Code 549. I am planning on only having slides with photos of test methods we no longer use as well as cover some mishaps that have happened over the years both within my organization and throughout the space industry. Highlighting the mistakes that were made, the lessons learned from those incidents and how they've effected how we test today.

EMI↗

A Modular Instrumentation System for NASA's Habitat Demonstration Unit

NASA's human spaceflight program is focused on developing technologies to expand the reaches of human exploration and science activities beyond low earth orbit. A critical aspect of living in space or on planetary surfaces is habitation, which provides a safe and comfortable space in which humans can live and work. NASA is seeking out the best option for habitation by exploring several different concepts through the Habitat Demonstration Unit (HDU) project. The purpose of this HDU is to develop a fully autonomous habitation system that enables human exploration of space. One critical feature of the HDU project that helps to accomplish its mission of autonomy is the instrumentation system that monitors key subsystems operating within a Habitat configuration. The following paper will discuss previous instrumentation systems used in analog habitat concepts and how the current instrumentation system being implemented on the HDU1-PEM, or pressurized excursion module, is building upon the lessons learned of those previous systems. Additionally, this paper will discuss the benefits and the limitations of implementing a wireless sensor network (WSN) as the basis for data transport in the instrumentation system. Finally, this paper will address the experiences and lessons learned with integration, testing prior to deployment, and field testing at the JSC rock yard. NASA is developing the HDU1-PEM as a step towards a fully autonomous habitation system that enables human exploration of space. To accomplish this purpose, the HDU project is focusing on development, integration, testing, and evaluation of habitation systems. The HDU will be used as a technology pull, testbed, and integration environment in which to advance NASA's understanding of alternative mission architectures, requirements, and operations concepts definition and validation. This project is a multi-year effort. In 2010, the HDU1-PEM will be in a pressurized excursion module configuration, and in 2011 the module will be reconfigured for a pressurized core module configuration. Each year the HDU configurations will undergo testing at NASA's Desert Research and Technology Studies (D-RaTS) in Arizona [1]. As part of this project, a modular instrumentation system is developed to meet the monitoring needs of the HDU subsystems and to integrate with the current command and data handling infrastructure that has been developed for the project. The main objective of this study is to provide for the monitoring needs of the HDU. The requirements necessary to meet this objective are developed by working with the subsystem managers of the HDU to understand their monitoring needs. Additionally, the instrumentation system design leverages knowledge and lessons learned from previous studies, such as the inflatable habitat health monitoring system that was deployed in Antarctica [2], the integrated health monitoring system developed for NASA's Microhab [3], and the JSC Lunar Habitat Wireless Testbed to demonstrate a "standardsbased" approach to a wireless instrumentation system [4]. The HDU also requires flexibility in reconfiguration options, and it is necessary to demonstrate and evaluate a modular approach to an instrumentation system. Thus, the instrumentation system is designed in two parts: the primary system employs a standard WSN configuration, and the secondary system employs a wired USB hub. The WSN design provides for reconfiguration or replacement of sensors due to malfunctions or upgrades by using a wireless node that accepts ten instrument inputs and wirelessly transmits the data to the command and data handling system. The USB hub is necessary for those instruments that operate using a wired USB connection, although the design attempts to limit the amount of sensors that need to be wired connections.

Rojdev, Kristina↗

Overview of Integrated Random Vibration Testing of the NASA Orion Crew Survival Suit

The launch ascent and abort random vibration environments from NASA’s Orion spacecraft drove the need to test the NASA Orion Crew Survival Suit as an integrated system with exposure to the design levels. In order to properly characterize component responses, a series of integrated tests were designed to incorporate the interaction between a crew member, suit, seat, and the attenuation system. The first Development Test (2017) included human subjects, and was performed with early development seat and suit components, and low level inputs. It provided a baseline for frequency response and behavior of the integrated system. The next two tests, Development Test (2019) and Qualification Test (2020), used manikin surrogates to represent the crew member and increasing levels of component hardware fidelity in order to test to higher input levels. Testing was performed at NASA Johnson Space Center (JSC) and Kennedy Space Center (KSC) Vibration Labs and provided the input levels required to represent the ascent and abort vehicle profiles as well as recorded component response behavior from accelerometer instrumentation and high speed cameras. Inspection of the suit and related components showed that for all seat orientations, and input environments, no damage occurred. Additional pre and post-test checks confirmed the functionality of all suited hardware. Response data of the suited components generally showed heavy attenuation across most of the tested frequency range. Transmissibility plots showed some amplification of components at lower frequency ranges. Overall this series of integrated tests showed that 1) the use of surrogate manikins in the tests were adequate for representing crew in a vibration environment, 2) full vibration levels for ascent and abort were heavily attenuated in the suit components and were non-damaging, and 3) the suit and related components are qualified for the Orion random vibration environments.

Jeffrey D Suhey↗

Overview of Integrated Random Vibration Testing of the NASA Orion Crew Survival Suit

The launch ascent and abort random vibration environments from NASA’s Orion spacecraft drove the need to test the NASA Orion Crew Survival Suit as an integrated system with exposure to the design levels. In order to properly characterize component responses, a series of integrated tests were designed to incorporate the interaction between a crew member, suit, seat, and the attenuation system. The first Development Test (2017) included human subjects, and was performed with early development seat and suit components, and low level inputs. It provided a baseline for frequency response and behavior of the integrated system. The next two tests, Development Test (2019) and Qualification Test (2020), used manikin surrogates to represent the crew member and increasing levels of component hardware fidelity in order to test to higher input levels. Testing was performed at NASA Johnson Space Center (JSC) and Kennedy Space Center (KSC) Vibration Labs and provided the input levels required to represent the ascent and abort vehicle profiles as well as recorded component response behavior from accelerometer instrumentation and high speed cameras. Inspection of the suit and related components showed that for all seat orientations, and input environments, no damage occurred. Additional pre and post-test checks confirmed the functionality of all suited hardware. Response data of the suited components generally showed heavy attenuation across most of the tested frequency range. Transmissibility plots showed some amplification of components at lower frequency ranges. Overall this series of integrated tests showed that 1) the use of surrogate manikins in the tests were adequate for representing crew in a vibration environment, 2) full vibration levels for ascent and abort were heavily attenuated in the suit components and were non-damaging, and 3) the suit and related components are qualified for the Orion random vibration environments.

Jeffrey Suhey↗

Integration Time Required to Extract Accurate Data from Transonic Wind-Tunnel Tests

Because the forces and pressures on wind-tunnel models tested at transonic speeds are not steady, even for static aerodynamic tests, integration time is required to obtain data of acceptable accuracy. The integration time required for both static and dynamic tests is evaluated analytically and confirmed by experimental measurements. It is shown that, for static and dynamic tests, the accuracy obtained is a function of integration time, frequency of the signal, and the ratio of the dynamic amplitude to the full signal of interest. In addition, for the dynamic case, the frequency bandwidth used in analysis is important. Results of this study indicate that, for typical data accuracy desired from models in a large transonic wind tunnel (11- by 11-ft), up to the following integration times are required: static force and moment tests, 0.5 s; static pressure tests, 1 s; flutter tests, 30 to 60 s; and random-dynamic tests, 10 s.

Muhlstein, Lado, Jr.↗

Space Launch System Base Aerodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2022. The integrated test flight was composed of launch and ascent of SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2022. The SLS total thrust of 8,800,000 lbf was powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, the base flow field had highly complex phenomena and regimes. SLS base aerodynamics covers vehicle base pressure and integrated axial force during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This was the first time in-depth base aerodynamics flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Base Aerodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2022. The integrated test flight was composed of launch and ascent of SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2022. The SLS total thrust of 8,800,000 lbf was powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, the base flow field had highly complex phenomena and regimes. SLS base aerodynamics covers vehicle base pressure and integrated axial force during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This was the first time in-depth base aerodynamics flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Modernization of B-2 Data, Video, and Control Systems Infrastructure

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA s third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.

Cmar, Mark D.↗

Modernization of B-2 Data, Video, and Control Systems Infrastructure

The National Aeronautics and Space Administration (NASA) Glenn Research Center (GRC) Plum Brook Station (PBS) Spacecraft Propulsion Research Facility, commonly referred to as B-2, is NASA's third largest thermal-vacuum facility with propellant systems capability. B-2 has completed a modernization effort of its facility legacy data, video and control systems infrastructure to accommodate modern integrated testing and Information Technology (IT) Security requirements. Integrated systems tests have been conducted to demonstrate the new data, video and control systems functionality and capability. Discrete analog signal conditioners have been replaced by new programmable, signal processing hardware that is integrated with the data system. This integration supports automated calibration and verification of the analog subsystem. Modern measurement systems analysis (MSA) tools are being developed to help verify system health and measurement integrity. Legacy hard wired digital data systems have been replaced by distributed Fibre Channel (FC) network connected digitizers where high speed sampling rates have increased to 256,000 samples per second. Several analog video cameras have been replaced by digital image and storage systems. Hard-wired analog control systems have been replaced by Programmable Logic Controllers (PLC), fiber optic networks (FON) infrastructure and human machine interface (HMI) operator screens. New modern IT Security procedures and schemes have been employed to control data access and process control flows. Due to the nature of testing possible at B-2, flexibility and configurability of systems has been central to the architecture during modernization.

Cmar, Mark D.↗

Space Launch System Base Aerothermodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2023. The integrated test flight is composed of launch and ascent of the SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2023. The SLS total thrust of 8,800,000 lbf is powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, base flow environments for this vehicle are highly complex and extreme. SLS base aerothermodynamics covers rocket plume-induced convection and radiation of the vehicle’s aft region during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This is the first time in-depth base heating flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Space Launch System Base Aerothermodynamics Post-Flight Reconstruction for Artemis I

Artemis I was the first uncrewed integrated test flight of the NASA heavy-lift, human-rated, exploration-class launch vehicle, Space Launch System (SLS), and Orion spacecraft. Artemis I successfully launched from Pad39B at NASA Kennedy Space Center on November 16th, 2023. The integrated test flight is composed of launch and ascent of the SLS vehicle from lift-off to RS-25 main engine cut-off (MECO), interim cryogenic propulsion stage (ICPS) in-space flight and Orion’s trajectory around the moon and landing in the Pacific Ocean which occurred on December 11th, 2023. The SLS total thrust of 8,800,000 lbf is powered by four LOX/LH2 RS-25 engines and two 5-segment solid rocket boosters. As a result, base flow environments for this vehicle are highly complex and extreme. SLS base aerothermodynamics covers rocket plume-induced convection and radiation of the vehicle’s aft region during powered flight from lift-off to MECO. This work discusses the SLS base flow physics observed during Artemis I and comparisons of post-flight reconstruction with pre-flight models and Space Shuttle data. This is the first time in-depth base heating flight reconstruction has been investigated for an exploration-class launch vehicle since the Saturn V Program.

aerothermodynamics↗

Flexible Rover Architecture for Science Instrument Integration and Testing

At NASA Ames Research Center, the Intelligent Robotics Group (IRG) fields the K9 and K10 class rovers. Both use a mobile robot hardware architecture designed for extensibility and reconfigurability that allows for rapid changes in instrumentation and provides a high degree of modularity. Over the past ssveral years, we have worked with instrument developers at NASA centers, universities, and national laboratories to integrate or partially integrate their instruments onboard the K9 and K10 rovers. Early efforts required considerable interaction to work through integration issues such as power, data protocol and mechanical mounting. These interactions informed the design of our current avionics architecture, and have simplified more recent integration projects. In this paper, we will describe the IRG extensible avionics and software architecture and the effect it has had on our recent instrument integration efforts, including integration of four Mars Instrument Development Program devices.

Bualat, Maria G.↗

Systems Engineering and Integration for Advanced Life Support System and HST

Systems engineering (SE) discipline has revolutionized the way engineers and managers think about solving issues related to design of complex systems: With continued development of state-of-the-art technologies, systems are becoming more complex and therefore, a systematic approach is essential to control and manage their integrated design and development. This complexity is driven from integration issues. In this case, subsystems must interact with one another in order to achieve integration objectives, and also achieve the overall system's required performance. Systems engineering process addresses these issues at multiple levels. It is a technology and management process dedicated to controlling all aspects of system life cycle to assure integration at all levels. The Advanced Integration Matrix (AIM) project serves as the systems engineering and integration function for the Human Support Technology (HST) program. AIM provides means for integrated test facilities and personnel for performance trade studies, analyses, integrated models, test results, and validated requirements of the integration of HST. The goal of AIM is to address systems-level integration issues for exploration missions. It will use an incremental systems integration approach to yield technologies, baselines for further development, and possible breakthrough concepts in the areas of technological and organizational interfaces, total information flow, system wide controls, technical synergism, mission operations protocols and procedures, and human-machine interfaces.

Kamarani, Ali K.↗

Rocket Testing and Integrated System Health Management

Integrated System Health Management (ISHM) describes a set of system capabilities that in aggregate perform: determination of condition for each system element, detection of anomalies, diagnosis of causes for anomalies, and prognostics for future anomalies and system behavior. The ISHM should also provide operators with situational awareness of the system by integrating contextual and timely data, information, and knowledge (DIaK) as needed. ISHM capabilities can be implemented using a variety of technologies and tools. This chapter provides an overview of ISHM contributing technologies and describes in further detail a novel implementation architecture along with associated taxonomy, ontology, and standards. The operational ISHM testbed is based on a subsystem of a rocket engine test stand. Such test stands contain many elements that are common to manufacturing systems, and thereby serve to illustrate the potential benefits and methodologies of the ISHM approach for intelligent manufacturing.

Figueroa, Fernando↗