Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

An Objective Verification of the North American Mesoscale Model for Kennedy Space Center and Cape Canaveral Air Force Station

The 45th Weather Squadron (45 WS) Launch Weather Officers use the 12-km resolution North American Mesoscale (NAM) model (MesoNAM) text and graphical product forecasts extensively to support launch weather operations. However, the actual performance of the model at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) has not been measured objectively. In order to have tangible evidence of model performance, the 45 WS tasked the Applied Meteorology Unit to conduct a detailed statistical analysis of model output compared to observed values. The model products are provided to the 45 WS by ACTA, Inc. and include hourly forecasts from 0 to 84 hours based on model initialization times of 00, 06, 12 and 18 UTC. The objective analysis compared the MesoNAM forecast winds, temperature and dew point, as well as the changes in these parameters over time, to the observed values from the sensors in the KSC/CCAFS wind tower network. Objective statistics will give the forecasters knowledge of the model's strength and weaknesses, which will result in improved forecasts for operations.

Bauman, William H., III↗

Hydrologic Baseline Conditions and Projected Trends for Kennedy Space Center and the Cape Canaveral Barrier Island Complex

The purpose of this document is the creation of a comprehensive collection of data, information and knowledge on the eco-hydrologic setting, and current and predicted (2030 -2080) hydrologic conditions that will directly and indirectly influence the Kennedy Space Center (KSC) industrial and ecological system. Focus is on identification of existing data sources (web based, published, in-house) and identification of future possible needs. The document will aid in assessment of risks to the National Aeronautics and Space Administration (NASA) and stakeholder missions associated with changing local, regional and global conditions. This living document will allow for rapid updates as new data and improved spatial data (LiDAR elevations, land use, land cover, runoff coefficients, etc.) are accumulated by the Environmental Management Branch (EMB), stakeholders, and supporting staff from the NASA Environmental and Medical Contract (NEMCON) currently managed by Herndon Solutions Group LLC. (HSG).The report summarizes and visualizes hydrologic conditions supporting long-term trends monitoring, management and regulatory compliance needs, climate risk mitigation, and achievement of KSC and stakeholder’s sustainability goals. Future utility may extend to implementation actions of the KSC future development plan, KSC updates to future KSC Environmental Resource Documents (ERD), and the regional multi-agency Indian River Lagoon Health Initiative.

Carlton Hall↗

Launch Complex 39A, SWMU 008 and Launch Complex 39B, SWMU 009 Performance Monitoring and Air Sparge Expansion Construction Completion Report Kennedy Space Center, Florida

This Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for air sparging (AS) operations and sitewide groundwater monitoring for Launch Complex 39A (LC39A), Solid Waste Management Unit (SWMU) 008, and Launch Complex 39B (LC39B), SWMU 009, at Kennedy Space Center (KSC), Florida. Results from direct push technology (DPT) sampling and AS system expansion activities at LC39A are also included in this report. The reporting period covered under this PM-CCR is from January 1, 2021, to December 31, 2021.

Andrew M Walters↗

Hydrocarbon Burn Facility SWMU 007 Interim Groundwater Monitoring Report Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings of IGWM activities completed in November 2021 along with an October 2021 direct push technology (DPT) investigation to confirm plume stability for the Volatile Organic Compound (VOC) Area of the Hydrocarbon Burn Facility (HBF) at Kennedy Space Center (KSC), Florida. HBF has been designated as Solid Waste Management Unit 007 under the KSC Resource Conservation and Recovery Act Corrective Action Program.

Jennifer Buel↗

Launch Complex 39 Observation Gantry Area (SWMU# 107) Annual Long-Term Monitoring Report (Year 1) Kennedy Space Center, Florida

This document has been prepared by Geosyntec Consultants, Inc. (Geosyntec) to present and discuss the findings of the 2014 and 2015 Long-Term Monitoring (LTM) activities that were completed at the Launch Complex 39 (LC39) Observation Gantry Area (OGA) located at the John F. Kennedy Space Center (KSC), Florida (Site). The remainder of this report includes: (i) a description of the Site location; (ii) summary of Site background and previous investigations; (iii) description of field activities completed as part of the annual LTM program at the Site; (iv) groundwater flow evaluation; (v) presentation and discussion of field and analytical results; and (vi) conclusions and recommendations. Applicable KSC Remediation Team (KSCRT) Meeting minutes are included in Attachment A. This Annual LTM Letter Report was prepared by Geosyntec Consultants (Geosyntec) for NASA under contract number NNK12CA13B, Delivery Order NNK13CA39T project number PCN ENV2188.

Long Term Monitoring↗

An Objective Verification of the North American Mesoscale Model for Kennedy Space Center and Cape Canaveral Air Force Station

The 45th Weather Squadron (45 WS) Launch Weather Officers (LWO's) use the 12-km resolution North American Mesoscale (NAM) model (MesoNAM) text and graphical product forecasts extensively to support launch weather operations. However, the actual performance of the model at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station (CCAFS) has not been measured objectively. In order to have tangible evidence of model performance, the 45 WS tasked the Applied Meteorology Unit (AMU; Bauman et ai, 2004) to conduct a detailed statistical analysis of model output compared to observed values. The model products are provided to the 45 WS by ACTA, Inc. and include hourly forecasts from 0 to 84 hours based on model initialization times of 00, 06, 12 and 18 UTC. The objective analysis compared the MesoNAM forecast winds, temperature (T) and dew pOint (T d), as well as the changes in these parameters over time, to the observed values from the sensors in the KSC/CCAFS wind tower network shown in Table 1. These objective statistics give the forecasters knowledge of the model's strengths and weaknesses, which will result in improved forecasts for operations.

Bauman, William H., III↗

NCERA-101 Station Report from Kennedy Space Center, FL, USA

This is our annual report to the North Central Extension Research Activity, which is affiliated with the USDA and Land Grant University Agricultural Experiment Stations. I have been a member of this committee for 25 years. The presentation will be given by Dr. Gioia Massa, Kennedy Space Center

Plant Physiology↗

2019 Corrective Measures Implementation and Intermim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from May 2019 through December 2019 at the Mobile Launch Platform/Vehicle Assembly Building (MLPV) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida.

MOBILE LAUNCH PLATFORM / VEHICLE ASSEMBLY BUILDING↗

A Custom Robotic System for Inspecting HEPA Filters in the Payload Changeout Room at the NASA Kennedy Space Center

In this paper, the prime objective is to describe a custom 4-dof (degree-of-freedom) robotic arm capable of autonomously or telerobotically performing systematic HEPA filter inspection and certification in the Shuttle Launch Pad Payload Changeout Rooms (PCR's) on pads A and B at the Kennedy Space Center, Florida. This HEPA filter inspection robot (HFIR) has been designed to be easily deployable and is equipped with the necessary sensory devices, control hardware, software and man-machine interfaces needed to implement HEPA filter inspection reliably and efficiently without damaging the filters or colliding with existing PCR structures or filters. The main purpose of the HFIR is to implement an automated positioning system to move special inspection sensors in pre-defined or manual patterns for the purpose of verifying filter integrity and efficiency. This will ultimately relieve NASA Payload Operations from significant problems associated with time, cost and personnel safety, impacts realized during non-automated PCR HFIR filter certification.

Spencer, James E., Jr.↗

Base Support Building and Kennedy Athletic, Recreation, and Social Park II, SWMU 014 and SWMU 118 PFAS 2023 Site Assessment Progress Report, Kennedy Space Center, Florida

This Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS) 2023 Site Assessment Progress Report presents the findings from the 2023 investigation activities, completed between October 12, 2022, and January 24, 2024, at the Base Support Building, Solid Waste Management Unit (SWMU) 014 and at the Kennedy Athletic, Recreation, and Social (KARS) Park II SWMU 118 located within Kennedy Space Center, Florida.

Richard G Smith↗

Hypergol Maintenance Facility North, SWMU 090, Air Sparge System Construction Completion and Performance Monitoring Report, Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion and Performance Monitoring Report (CC-PMR) presents field implementation activities, as well as Year 1 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) at the Hypergol Maintenance Facility North (HMFN) at Kennedy Space Center (KSC), Florida. The timeframe for activities included in this report extends from December 2019 to August 2021.

Christopher A Hook↗

Interim Measure Report South Water Pump Station Potential Release Location 213 – Location of Concern 2 Kennedy Space Center, Florida

This report presents a summary of the polychlorinated biphenyl (PCB) interim measure (IM) activities that occurred in December 2022 and March 2023 at Location of Concern (LOC) 2 – Electrical Equipment Area associated with the South Water Pump Station (SWPS) Potential Release Location (PRL) 213, located at the John F. Kennedy Space Center (KSC), Florida. The SWPS site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at six SWPS LOCs identified during a Solid Waste Management Unit assessment in 2013. Based on the data collected during these assessments, it was determined that IM activities would be completed at one of the LOCs, LOC 2 – Electrical Equipment Area, and an IM Work Plan was prepared and approved. In 2019, demolition of the SWPS buildings and structures was completed, allowing for additional assessment at LOC 2, and it was determined that soil excavation to remove PCB-impacted soils was no longer required for LOC 2. The IM activities conducted following demolition are presented in this report and include shallow soil sample collection, conducted in December 2022, and monitoring well installation and groundwater sampling, both conducted in March 2023. AECOM Technical Services, Inc. (AECOM) personnel collected two soil samples from two boring locations, SWPS-SB0005 and SWPS-SB0018. The samples were collected at 0 to 0.5 feet below land surface (bls). AECOM also conducted oversight of one monitoring well installation, SWPS-MW0001 screened from 4 to 14 feet bls, and then subsequently collected one groundwater sample from SWPS-MW0001. The samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. There were no detections of PCBs in soil or groundwater during the reporting period.

Chadwick Sloan Lee↗

Aircraft measurements of electrified clouds at Kennedy Space Center

The space-vehicle launch commit criteria for weather and atmospheric electrical conditions in us at Cape Canaveral Air Force Station and Kennedy Space Center (KSC) have been made restrictive because of the past difficulties that have arisen when space vehicles have triggered lightning discharge after their launch during cloudy weather. With the present ground-base instrumentation and our limited knowledge of cloud electrification process over this region of Florida, it has not been possible to provide a quantitative index of safe launching conditions. During the fall of 1988, a Schweizer 845 airplane equipped to measure electric field and other meteorological parameters flew over KSC in a program to study clouds defined in the existing launch restriction criteria. All aspects of this program are addressed including planning, method, and results. A case study on the November 4, 1988 flight is also presented.

Jones, J. J.↗

Assessment and forecasting of lightning potential and its effect on launch operations at Cape Canaveral Air Force Station and John F. Kennedy Space Center

Lightning plays a pivotal role in the operation decision process for space and ballistic launches at Cape Canaveral Air Force Station and Kennedy Space Center. Lightning forecasts are the responsibility of Detachment 11, 4th Weather Wing's Cape Canaveral Forecast Facility. These forecasts are important to daily ground processing as well as launch countdown decisions. The methodology and equipment used to forecast lightning are discussed. Impact on a recent mission is summarized.

Weems, J.↗

Launch Complex 39A, SWMU 008, Operations, Maintenance, and Monitoring Report, Kennedy Space Center, FL

This Operations, Maintenance, and Monitoring Report (OMMR) presents the findings, observations, and results from Year 1 operation of the air sparging (AS) groundwater interim measure (IM) for High-Concentration Plumes (HCPs) and Low-Concentration Plumes (LCPs) within the perimeter fence line at Launch Complex 39A (LC39A) located at Kennedy Space Center (KSC), Florida. The objective of the LC39A groundwater IM is to actively decrease concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), and vinyl chloride (VC) in groundwater in the HCP and LCP within the pad perimeter fence line via AS to levels less than Florida Department of Environmental Protection (FDEP) Groundwater Cleanup Target Levels (GCTLs). The objective was developed because LC39A is currently being leased to Space Exploration Technologies (SpaceX), and the original IM for monitored natural attenuation (MNA) over an extended period of time was not suitable for future planned site use.

Operations↗

2021 Corrective Measures Implementation and Interim Measures Annual Status Report: Summary of Biosparge System Operation and Maintenance, and Interim Groundwater Monitoring Mobile Launch Platform Rehabilitation Sites / Vehicle Assembly Building Area (SWMU 056) Kennedy Space Center, Florida

This report presents a summary of the Corrective Measures Implementation (CMI) and Interim Measure (IM) implementation activities that occurred from January 2021 through December 2021 at the Mobile Launch Platform Rehabilitation Sites (MLP)/Vehicle Assembly Building (VAB) Area, Solid Waste Management Unit 056 (SWMU 056), located at the John F. Kennedy Space Center, Florida. The following summaries briefly describe areas within SWMU 056 identified by historical site investigation activities where groundwater monitoring and remedial actions have been implemented to date.

Randall K. Sillan↗