Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

NASA's Space Launch System: Positioning Assets for Tele-Robotic Operations

The National Aeronautics and Space Administration (NASA) is designing and developing America's most capable launch vehicle to support high-priority human and scientific exploration beyond Earth's orbit. The Space Launch System (SLS) will initially lift 70 metric tons (t) on its first flights, slated to begin in 2017, and will be evolved after 2021 to a full 130-t capability-larger than the Saturn V Moon rocket. This superior lift and associated volume capacity will support game-changing exploration in regions that were previously unattainable, being too costly and risky to reach. On the International Space Station, astronauts are training for long-duration missions to asteroids and cis-martian regions, but have not had transportation out of Earth's orbit - until now. Simultaneously, productive rovers are sending scientists - and space fans - unprecedented information about the composition and history of Mars, the planet thought to be most like Earth. This combination of experience and information is laying the foundation for future missions, such as those outlined in NASA's "Mars Next Decade" report, that will rely on te1e-robotic operations to take exploration to the next level. Within this paradigm, NASA's Space Launch System stands ready to manifest the unique payloads that will be required for mission success. Ultimately, the ability to position assets - ranging from orbiters, to landers, to communication satellites and surface systems - is a critical step in broadening the reach of technological innovation that will benefit all Earth's people as the Space Age unfolds. This briefing will provide an overview of how the Space Launch System will support delivery of elements for tele-robotic operations at destinations such as the Moon and Mars, which will synchronize the human-machine interface to deliver hybrid on-orbit capabilities. Ultimately, telerobotic operations will open entirely new vistas and the doors of discovery. NASA's Space Launch System will be a safe, affordable, and sustainable platform for these purposes and more.

May, Todd A.↗

The Enduring Legacy of Saturn V Launch Vehicle Flight Dynamics and Control Design Principles and Practices

It has been over 50 years since the first launch of the Saturn V launch vehicle, Apollo 4, on November 9th,1967. Developed at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, the Saturn V was a massive multistage liquid-fuel expendable rocket used by NASA’s Apollo and Skylab programs. It safely flew 24 American astronauts to the Moon, blazing the trail for all American heavy-lift launch vehicles to follow. The Saturn V remains the only launch vehicle to carry humans beyond low Earth orbit. Nearly fifty years after the final May 1973 flight of the Saturn V, an enduring technical legacy of launch vehicle technologies still supports the United States space launch capabilities, particularly with respect to flight dynamics and control. The structured refinement of GN&C technologies during the Saturn program, leveraging the incremental advancements of the Jupiter, Redstone, and Saturn I/IB, systematically reduced risk and resulted in the most advanced and reliable launch vehicle flight control systems to have been developed before the advent of the Space Shuttle.

Jeb S Orr↗

Development and Qualification of the Primary Structure of the Orion European Service Module

This paper presents an overview of the development and qualification test campaign for the primary structure of the European Service Module of ORION, the NASA spacecraft which will serve the future human exploration missions to the Moon, Mars and beyond. Under an agreement between NASA and ESA, the ORION will be powered by a European Service Module (ESM), providing also water and oxygen for astronauts' life sustainability. The development and qualification of the European Service Module (ESM) is under ESA responsibility with Airbus Defense and Space as the prime contractor. Thales Alenia Space Italia is responsible for design development, manufacturing, assembly and qualification of the Structure subsystem. The European Service Module, installed onto the launch adapter, shall support the crew module with its adapter and a launch abort system. It shall sustain: - A combination of global and local launch loads during lift off and ascent phases, - On orbit loads induced by engine firing for orbital transfers and attitude control. The ESM structure is based on a core made of Composite Fiber Reinforced Polymer (CFRP) sandwich panels complemented by aluminum alloy platforms, longerons and secondary structures. A development campaign has been implemented in order to define and validate composite parts' strength allowable values for design: coupon tests at material level, test at component level up to breadboards tests performed on main structural components (composite to metallic joints, and at panels' discontinuities). An incremental approach as defined in [1] has been followed. A qualification static test campaign at primary structure assembly level has been implemented in order to validate the design against static stiffness and ultimate strength as well as to correlate the structural Finite Element Model (FEM) used for sizing and confirm the margins of safety. The tests have been performed successfully by Thales Alenia Space Italia (TAS-I) on two flight representative structural models (STA1, STA2), in Turin facilities (Italy) between August 2015 and March 2017, with engineering support of technical representatives from Airbus, ESA, NASA and LMCO. The main development and qualification test activities and associated results are presented and discussed in the paper

Structural Testing↗

DSN support of Mars Observer

This article provides a summary of the DSN prelaunch, launch, and cruise support of the Mars Observer through Trajectory Correction Maneuver 2 (TCM-2) on 8 Feb. 1993. This summary includes planning, implementation, testing, DSN special configurations and DSN operational problems, and successes and challenges to date.

Traxler, M. R.↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Compilation of Abstracts for SC12 Conference Proceedings

1 A Breakthrough in Rotorcraft Prediction Accuracy Using Detached Eddy Simulation; 2 Adjoint-Based Design for Complex Aerospace Configurations; 3 Simulating Hypersonic Turbulent Combustion for Future Aircraft; 4 From a Roar to a Whisper: Making Modern Aircraft Quieter; 5 Modeling of Extended Formation Flight on High-Performance Computers; 6 Supersonic Retropropulsion for Mars Entry; 7 Validating Water Spray Simulation Models for the SLS Launch Environment; 8 Simulating Moving Valves for Space Launch System Liquid Engines; 9 Innovative Simulations for Modeling the SLS Solid Rocket Booster Ignition; 10 Solid Rocket Booster Ignition Overpressure Simulations for the Space Launch System; 11 CFD Simulations to Support the Next Generation of Launch Pads; 12 Modeling and Simulation Support for NASA's Next-Generation Space Launch System; 13 Simulating Planetary Entry Environments for Space Exploration Vehicles; 14 NASA Center for Climate Simulation Highlights; 15 Ultrascale Climate Data Visualization and Analysis; 16 NASA Climate Simulations and Observations for the IPCC and Beyond; 17 Next-Generation Climate Data Services: MERRA Analytics; 18 Recent Advances in High-Resolution Global Atmospheric Modeling; 19 Causes and Consequences of Turbulence in the Earths Protective Shield; 20 NASA Earth Exchange (NEX): A Collaborative Supercomputing Platform; 21 Powering Deep Space Missions: Thermoelectric Properties of Complex Materials; 22 Meeting NASA's High-End Computing Goals Through Innovation; 23 Continuous Enhancements to the Pleiades Supercomputer for Maximum Uptime; 24 Live Demonstrations of 100-Gbps File Transfers Across LANs and WANs; 25 Untangling the Computing Landscape for Climate Simulations; 26 Simulating Galaxies and the Universe; 27 The Mysterious Origin of Stellar Masses; 28 Hot-Plasma Geysers on the Sun; 29 Turbulent Life of Kepler Stars; 30 Modeling Weather on the Sun; 31 Weather on Mars: The Meteorology of Gale Crater; 32 Enhancing Performance of NASAs High-End Computing Applications; 33 Designing Curiosity's Perfect Landing on Mars; 34 The Search Continues: Kepler's Quest for Habitable Earth-Sized Planets.

HPC↗

Pre-Launch Algorithms and Risk Reduction in Support of the Geostationary Lightning Mapper for GOES-R and Beyond

The Geostationary Lightning Mapper (GLM) is a single channel, near-IR imager/optical transient event detector, used to detect, locate and measure total lightning activity over the full-disk as part of a 3-axis stabilized, geostationary weather satellite system. The next generation NOAA Geostationary Operational Environmental Satellite (GOES-R) series with a planned launch in 2014 will carry a GLM that will provide continuous day and night observations of lightning from the west coast of Africa (GOES-E) to New Zealand (GOES-W) when the constellation is fUlly operational. The mission objectives for the GLM are to 1) provide continuous, full-disk lightning measurements for storm warning and nowcasting, 2) provide early warning of tornadic activity, and 3) accumulate a long-term database to track decadal changes of lightning. The GLM owes its heritage to the NASA Lightning Imaging Sensor (1997-Present) and the Optical Transient Detector (1995-2000), which were developed for the Earth Observing System and have produced a combined 13 year data record of global lightning activity. Instrument formulation studies were completed in March 2007 and the implementation phase to develop a prototype model and up to four flight models is expected to be underway in the latter part of 2007. In parallel with the instrument development, a GOES-R Risk Reduction Team and Algorithm Working Group Lightning Applications Team have begun to develop the Level 2 ground processing algorithms and applications. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) satellite and regional test beds (e.g., Lightning Mapping Arrays in North Alabama and the Washington DC Metropolitan area)

Goodman, Steven J.↗

Pre-Launch Algorithms and Risk Reduction in Support of the Geostationary Lightning Mapper for GOES-R and Beyond

The Geostationary Lightning Mapper (GLM) is a single channel, near-IR optical transient event detector, used to detect, locate and measure total lightning activity over the full-disk as part of a 3-axis stabilized, geostationary weather satellite system. The next generation NOAA Geostationary Operational Environmental Satellite (GOES-R) series with a planned launch in 2014 will carry a GLM that will provide continuous day and night observations of lightning from the west coast of Africa (GOES-E) to New Zealand (GOES-W) when the constellation is fully operational. The mission objectives for the GLM are to 1) provide continuous,full-disk lightning measurements for storm warning and Nowcasting, 2) provide early warning of tornado activity, and 3) accumulate a long-term database to track decadal changes of lightning. The GLM owes its heritage to the NASA Lightning Imaging Sensor (1997-Present) and the Optical Transient Detector (1995-2000), which were developed for the Earth Observing System and have produced a combined 13 year data record of global lightning activity. Instrument formulation studies were completed in March 2007 and the implementation phase to develop a prototype model and up to four flight units is expected to begin in latter part of the year. In parallel with the instrument development, a GOES-R Risk Reduction Team and Algorithm Working Group Lightning Applications Team have begun to develop the Level 2B algorithms and applications. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) satellite and regional test beds (e.g., Lightning Mapping Arrays in North Alabama and the Washington DC Metropolitan area) are being used to develop the pre-launch algorithms and applications, and also improve our knowledge of thunderstorm initiation and evolution. Real time lightning mapping data provided to selected National Weather Service forecast offices in Southern and Eastern Region are also improving our understanding of the application of these data in the severe storm warning process and help to accelerate the development of the pre-launch algorithms and Nowcasting applications.

Goodman, Steven↗

Pre-Launch Algorithms and Risk Reduction in Support of the Geostationary Lightning Mapper for GOES-R and Beyond

The Geostationary Lightning Mapper (GLM) is a single channel, near-IR optical transient event detector, used to detect, locate and measure total lightning activity over the full-disk as part of a 3-axis stabilized, geostationary weather satellite system. The next generation NOAA Geostationary Operational Environmental Satellite (GOES-R) series with a planned launch in 2014 will carry a GLM that will provide continuous day and night observations of lightning from the west coast of Africa (GOES-E) to New Zealand (GOES-W) when the constellation is fully operational.The mission objectives for the GLM are to 1) provide continuous,full-disk lightning measurements for storm warning and Nowcasting, 2) provide early warning of tornadic activity, and 3) accumulate a long-term database to track decadal changes of lightning. The GLM owes its heritage to the NASA Lightning Imaging Sensor (1997-Present) and the Optical Transient Detector (1995-2000), which were developed for the Earth Observing System and have produced a combined 13 year data record of global lightning activity. Instrument formulation studies were completed in March 2007 and the implementation phase to develop a prototype model and up to four flight units is expected to begin in latter part of the year. In parallel with the instrument development, a GOES-R Risk Reduction Team and Algorithm Working Group Lightning Applications Team have begun to develop the Level 2B algorithms and applications. Proxy total lightning data from the NASA Lightning Imaging Sensor on the Tropical Rainfall Measuring Mission (TRMM) sate]lite and regional test beds (e.g., Lightning Mapping Arrays in North Alabama and the Washington DC Metropolitan area) are being used to develop the pre-launch algorithms and applications, and also improve our knowledge of thunderstorm initiation and evolution. Real time lightning mapping data provided to selected National Weather Service forecast offices in Southern and Eastern Region are also improving our understanding of the application of these data in the severe storm warning process and help to accelerate the development of the pre-launch algorithms and Nowcasting applications. Abstract for the 3 rd Conference on Meteorological

Goodman, Steven↗

NASA Supportability Engineering Implementation Utilizing DoD Practices and Processes

The Ares I design and development program made the determination early in the System Design Review Phase to utilize DoD ILS and LSA approach for supportability engineering as an integral part of the system engineering process. This paper is to provide a review of the overall approach to design Ares-I with an emphasis on a more affordable, supportable, and sustainable launch vehicle. Discussions will include the requirements development, design influence, support concept alternatives, ILS and LSA planning, Logistics support analyses/trades performed, LSA tailoring for NASA Ares Program, support system infrastructure identification, ILS Design Review documentation, Working Group coordination, and overall ILS implementation. At the outset, the Ares I Project initiated the development of the Integrated Logistics Support Plan (ILSP) and a Logistics Support Analysis process to provide a path forward for the management of the Ares-I ILS program and supportability analysis activities. The ILSP provide the initial planning and coordination between the Ares-I Project Elements and Ground Operation Project. The LSA process provided a system engineering approach in the development of the Ares-I supportability requirements; influence the design for supportability and development of alternative support concepts that satisfies the program operability requirements. The LSA planning and analysis results are documented in the Logistics Support Analysis Report. This document was required during the Ares-I System Design Review (SDR) and Preliminary Design Review (PDR) review cycles. To help coordinate the LSA process across the Ares-I project and between programs, the LSA Report is updated and released quarterly. A System Requirement Analysis was performed to determine the supportability requirements and technical performance measurements (TPMs). Two working groups were established to provide support in the management and implement the Ares-I ILS program, the Integrated Logistics Support Working Group (ILSWG) and the Logistics Support Analysis Record Working Group (LSARWG). The Ares I ILSWG is established to assess the requirements and conduct, evaluate analyses and trade studies associated with acquisition logistic and supportability processes and to resolve Ares I integrated logistics and supportability issues. It established a strategic collaborative alliance for coordination of Logistics Support Analysis activates in support of the integrated Ares I vehicle design and development of logistics support infrastructure. A Joint Ares I - Orion LSAR Working Group was established to: 1) Guide the development of Ares-I and Orion LSAR data and serve as a model for future Constellation programs, 2) Develop rules and assumptions that will apply across the Constellation program with regards to the program's LSAR development, and 3) Maintain the Constellation LSAR Style Guide.

Smith, David A.↗

Bantam System Technology Project Ground System Requirements Document

The Low Cost Booster Project (LCBP), also known as Bantam, is an element of the Advanced Space Transportation Program focused on Low Cost Booster Technologies. During FY 99 flight demonstrations are planned to demonstrate the feasibility of producing a booster capable of inserting a 150 kg payload into low earth orbit. The ground support system is an element of the full launch system. The ground support system provides for integration of the payload with the launch vehicle, preparation of the vehicle for launch (including maintenance, integration and test of the vehicle flight software), monitor and control of the launch sequence, range safety during launch, and collection of telemetry during the flight up to payload release. The ground support system is intended to make the maximum possible use of Government Off-the-Shelf (GOTS) or Commercial Off-the-Shelf (COTS) hardware and software to obtain the best value in terms of development operations support and ultimate life cycle cost for the launch system.

Moon, J. M.↗

Current Status of NASA's Heavy Lift Plans

Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of - and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA's most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA's Constellation Program. It s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA's priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch Numerous studies since the Apollo Program of the 1960s have highlighted the benefits of and the need for - a national heavy lift launch capability to support human exploration, science, national security, and commercial development of space. NASA s most recent and most refined effort to develop that heavy lift capability is the Ares V. Ares V is a key element of NASA s Constellation Program. It s overall goal s part of approved national space policy is to retire the Space Shuttle and develop its successor, complete the International Space Station, and resume human exploration beyond low Earth orbit (LEO), beginning with exploration of the Moon as a step to other destinations in the Solar System. Ares V s first role is that of cargo vehicle to carry a lunar lander into Earth orbit, rendezvous with astronauts launched on the smaller Ares I crew launch vehicle, and perform the trans lunar injection (TLI) mission to send the mated crew and lander vehicles to the Moon. The design reference missions (DRMs) envisioned for it also include direct lunar cargo flights and a human Mars mission. Although NASA s priority from the start of the Constellation Program to the present has been development of the Ares I and Orion crew vehicle to replace the retiring Shuttle fleet, the Ares team has made significant progress in understanding the performance, design trades, technology needs, mission scenarios, ground and flight operations, cost, and other factors associated with heavy lift development. The current reference configuration was selected during the Lunar Capabilities Concept Review (LCCR) in fall 2008. That design has served since then as a point of departure for further refinements and trades among five participating NASA field centers. Ares V development to date has benefited from progress on the Ares I due to commonality between the vehicles. The Ares I first stage completed a successful firing of a 5-segment solid rocket motor. The Ares I-X launch successfully demonstrated in suborbital flighhe ability to assemble, prepare, launch, control and recover the Ares I configuration and compare performance to computer models. Component tests continue on the J-2X engine, which will put both the Ares I and Ares V upper stages into orbit. In addition, more than 100,000 parts have been manufactured or on the assembly line for the first J-2X powerpack and the first two development engines, with hot fire tests to begin in 2011. This paper will further detail the progress to date on the Ares V and planned activities for the remainder of 2010. In addition, the Ares V team has continued its outreach to potential user communities in science and national security. Through the Constellation Program, NASA has amassed an enormous knowledge base in the design, technologies, and operations of heavy lift launch vehicles that will be a national asset for any future launch vehicle decision. This early phase of the design presents the best opportunity to incorporate where possible the insights and needs of other users.

Creech, Steve↗

Multi-Mission Suitability of the NASA Ames Modular Common Bus

The obvious advantages of small spacecraft - their lower cost structure and the rapid development schedule - have enabled a large number of missions in the past. However, most of these missions have been focused on Earth observation from low Earth orbits. In 2006, the Small Spacecraft Division at the NASA Ames Research Center began the development of the Modular Common Bus, a spacecraft capable of delivering scientifically and technically useful payloads to a variety of destinations within 0.1 AU around the Earth. The core technologies used in the Common Bus design are a composite structure with body-mounted solar cells, an integrated avionics unit, and a high performance bipropellant propulsion system. Due to its modular approach, the Common Bus can be adapted to fit specific mission needs while still using a standardized and qualified set of components. Additionally a number of low cost launch vehicles are supported, resulting in overall mission costs of around $150M including the launch vehicle but excluding the science payloads. This significant reduction in cost and the shorter development time would enable NASA to conduct more frequent exploration missions within its budget and timeframe constraints, compared to the status quo. In this paper the suitability of the Common Spacecraft Bus for four different exploration scenarios is analyzed. These scenarios include a lunar orbiter, a lunar lander, a mission to a Sun-Earth Libration Point, and a rendezvous mission to a Near Earth Object. For each scenario, a preliminary design reference mission is developed and key design parameters for the spacecraft are determined.

Tietz, Sascha↗

Orbit-on-demand vehicles - Mission possible, but one-day turnaround?

The next generation launch-on-demand manned orbital vehicles will ideally be able to perform plane change maneuvers for rendezvous. Plane-changes of, e.g., 11 deg, will require a 3000 fps on-orbit maneuver velocity. Any plane-change capabilities beyond 800 fps rapidly increase the necessary vehicle weight. Sensitivity studies of the payload weight/vehicle weight, the presence or absence of air-breathing engines, high acceleration, etc., indicated that advances are required in the payload stowage pallet, thermal protection system, fault detection electronics, line-replaceable units, and accessibility to realize one-day turnaround. The spacecraft would also need autonomous systems checks and launch from minimum support sites reached by air ferry. A horizontal take-off, two-stage subsonic launch vehicle so far offers the lowest weight, maximum flexibility and minimum support combination of all configurations under consideration.

Talay, T. A.↗