Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launcher”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Spaceliner Class Operability Gains Via Combined Airbreathing/ Rocket Propulsion: Summarizing an Operational Assessment of Highly Reusable Space Transports

In discussing a new NASA initiative in advanced space transportation systems and technologies, the Director of the NASA Marshall Space Flight Center, Arthur G. Stephenson, noted that, "It would use new propulsion technology, air-breathing engine so you don't have to carry liquid oxygen, at least while your flying through the atmosphere. We are calling it Spaceliner 100 because it would be 100 times cheaper, costing $ 100 dollars a pound to orbit." While airbreathing propulsion is directly named, rocket propulsion is also implied by, "... while you are flying through the atmosphere." In-space final acceleration to orbital speed mandates rocket capabilities. Thus, in this informed view, Spaceliner 100 will be predicated on combined airbreathing/rocket propulsion, the technical subject of this paper. Interestingly, NASA's recently concluded Highly Reusable Space Transportation (HRST) study focused on the same affordability goal as that of the Spaceliner 100 initiative and reflected the decisive contribution of combined propulsion as a way of expanding operability and increasing the design robustness of future space transports, toward "aircraft like" capabilities. The HRST study built on the Access to Space Study and the Reusable Launch Vehicle (RLV) development activities to identify and characterize space transportation concepts, infrastructure and technologies that have the greatest potential for reducing delivery cost by another order of magnitude, from $1,000 to $100-$200 per pound for 20,000 lb. - 40.000 lb. payloads to low earth orbit (LEO). The HRST study investigated a number of near-term, far-term, and very far-term launch vehicle concepts including all-rocket single-stage-to-orbit (SSTO) concepts, two-stage-to-orbit (TSTO) concepts, concepts with launch assist, rocket-based combined cycle (RBCC) concepts, advanced expendable vehicles, and more far term ground-based laser powered launchers. The HRST study consisted of preliminary concept studies, assessments and analysis tool development for advanced space transportation systems, followed by end-to-end system concept definitions and trade analyses, specific system concept definition and analysis, specific key technology and topic analysis, system, operational and economics model development, analysis, and integrated assessments. The HRST Integration Task Force (HITF) was formed to synthesize study results in several specific topic areas and support the development of conclusions from the study: Systems Concepts Definitions, Technology Assessment, Operations Assessment, and Cost Assessment. This paper summarizes the work of the Operations Assessment Team: the six approaches used, the analytical tools and methodologies developed and employed, the issues and concerns, and the results of the assessment. The approaches were deliberately varied in measures of merit and procedure to compensate for the uncertainty inherent in operations data in this early phase of concept exploration. In general, rocket based combined cycle (RBCC) concepts appear to have significantly greater potential than all-rocket concepts for reducing operations costs.

Nix, Michael B.↗

Macroeconomic Benefits of Low-Cost Reusable Launch Vehicles

The National Aeronautics and Space Administration (NASA) initiated its Reusable Launch Vehicle (RLV) Technology Program to provide information on the technical and commercial feasibility of single-stage to orbit (SSTO), fully-reusable launchers. Because RLVs would not depend on expendable hardware to achieve orbit, they could take better advantage of economies of scale than expendable launch vehicles (ELVs) that discard costly hardware on ascent. The X-33 experimental vehicle, a sub-orbital, 60%-scale prototype of Lockheed Martin's VentureStar SSTO RLV concept, is being built by Skunk Works for a 1999 first flight. If RLVs achieve prices to low-earth orbit of less than $1000 US per pound, they could hold promise for eliciting an elastic response from the launch services market. As opposed to the capture of existing market, this elastic market would represent new space-based industry businesses. These new opportunities would be created from the next tier of business concepts, such as space manufacturing and satellite servicing, that cannot earn a profit at today's launch prices but could when enabled by lower launch costs. New business creation contributes benefits to the US Government (USG) and the US economy through increases in tax revenues and employment. Assumptions about the costs and revenues of these new ventures, based on existing space-based and aeronautics sector businesses, can be used to estimate the macroeconomic benefits provided by new businesses. This paper examines these benefits and the flight prices and rates that may be required to enable these new space industries.

Shaw, Eric J.↗

Advanced Electric Propulsion for Space Solar Power Satellites

The sun tower concept of collecting solar energy in space and beaming it down for commercial use will require very affordable in-space as well as earth-to-orbit transportation. Advanced electric propulsion using a 200 kW power and propulsion system added to the sun tower nodes can provide a factor of two reduction in the required number of launch vehicles when compared to in-space cryogenic chemical systems. In addition, the total time required to launch and deliver the complete sun tower system is of the same order of magnitude using high power electric propulsion or cryogenic chemical propulsion: around one year. Advanced electric propulsion can also be used to minimize the stationkeeping propulsion system mass for this unique space platform. 50 to 100 kW class Hall, ion, magnetoplasmadynamic, and pulsed inductive thrusters are compared. High power Hall thruster technology provides the best mix of launches saved and shortest ground to Geosynchronous Earth Orbital Environment (GEO) delivery time of all the systems, including chemical. More detailed studies comparing launch vehicle costs, transfer operations costs, and propulsion system costs and complexities must be made to down-select a technology. The concept of adding electric propulsion to the sun tower nodes was compared to a concept using re-useable electric propulsion tugs for Low Earth Orbital Environment (LEO) to GEO transfer. While the tug concept would reduce the total number of required propulsion systems, more launchers and notably longer LEO to GEO and complete sun tower ground to GEO times would be required. The tugs would also need more complex, longer life propulsion systems and the ability to dock with sun tower nodes.

Oleson, Steve↗

Single Step to Orbit; a First Step in a Cooperative Space Exploration Initiative

At the end of the Cold War, disarmament planners included a recommendation to ease reduction of the U.S. and Russian aerospace industries by creating cooperative scientific pursuits. The idea was not new, having earlier been suggested by Eisenhower and Khrushchev to reduce the pressure of the "Military Industrial Complex" by undertaking joint space exploration. The Space Exploration Initiative (SEI) proposed at the end of the Cold War by President Bush and Premier Gorbachev was another attempt to ease the disarmament process by giving the bloated war industries something better to do. The engineering talent and the space rockets could be used for peaceful pursuits, notably for going back to the Moon and then on to Mars with human exploration and settlement. At the beginning of this process in 1992 staff of the Stanford Center for International Cooperation in Space attended the International Space University in Canada, met with Russian participants and invited a Russian team to work with us on a joint Stanford-Russian Mars Exploration Study. A CIA student and Airforce and Navy students just happened to join the Stanford course the next year and all students were aware that the leader of the four Russian engineers was well versed in Russian security. But, as long as they did their homework, they were welcome to participate with other students in defining the Mars mission and the three engineers they sent were excellent. At the end of this study we were invited to give a briefing to Dr. Edward Teller at Stanford's Hoover Institution of War and Peace. We were also encouraged to hold a press conference on Capitol Hill to introduce the study to the world. At a pre-conference briefing at the Space Council, we were asked to please remind the press that President Bush had asked for a cooperative exploration proposal not a U.S. alone initiative. The Stanford-Russian study used Russia's Energia launchers, priced at $300 Million each. The mission totaled out to $71.5 Billion, to send a six-person crew to establish a Mars base and return. It was an on going international venture with plans for new crews, base expansion, and extended exploration at every two year opportunity. The $71.5 Billion international approach contrasted with NASA's own 90-day U.S. - alone study that proposed a package topping $500 Billion by some admissions. NASA's approach was also challenged by an internal D.O.E. proposal at much lower cost, described to the Mars Society last year by Lowell Wood and, of course, by Bob Zubrin's "Mars Direct" proposal.

Lusignan, Bruce↗

Manufacturing and NDE of Large Composite Aerospace Structures at MSFC

NASA's vision for transportation to orbit calls for new vehicles built with new materials technology. The goals of this new launch system development are to improve safety, dramatically reduce cost to orbit, and improve vehicle turn around time. Planned Space Shuttle upgrades include new reusable liquid propellant boosters to replace the solid propellant boosters. These boosters are to have wings and return to the launch site for a horizontal landing on an airport runway. New single and two stages to orbit concepts are being investigated. To reduce weight and improve performance composite materials are proposed for fuel and oxidizer tanks, fuel feedlines, valve bodies, aerostructures, turbomachinery components. For large composite structures new methods of fabrication are being proposed and developed. Containment of cryogenic fuel or oxidizer requires emphases on composite material densification and chemical compatibility. Ceramic matrix and fiber composites for hot rotating turbomachinery have been developed with new fabrication processes. The new requirements on the materials for launcher components are requiring development of new manufacturing and inspection methods. This talk will examine new and proposed manufacturing methods to fabricate the revolutionary components. New NDE methods under consideration include alternative X-ray methods, X-ray laminagraphy, advanced CT, Thermography, new ultrasonic methods, and imbedded sensors. The sizes, complexity, use environment, and contamination restrictions will challenge the inspection process. In flight self-diagnosis and rapid depot inspection are also goals of the NDE development.

Whitaker, Ann↗

Finite Element Modeling of a Semi-Rigid Hybrid Mirror and a Highly Actuated Membrane Mirror as Candidates for the Next Generation Space Telescope

Advanced space telescopes, which will eventually replace the Hubble Space Telescope (HTS), will have apertures of 8 - 20 n. Primary mirrors of these dimensions will have to be foldable to fit into the space launcher. By necessity these mirrors will be extremely light weight and flexible and the historical approaches to mirror designs, where the mirror is made as rigid as possible to maintain figure and to serve as the anchor for the entire telescope, cannot be applied any longer. New design concepts and verifications will depend entirely on analytical methods to predict optical performance. Finite element modeling of the structural and thermal behavior of such mirrors is becoming the tool for advanced space mirror designs. This paper discusses some of the preliminary tasks and study results, which are currently the basis for the design studies of the Next Generation Space Telescope.

Craig, Larry↗

First-Generation Jet Propulsion Laboratory "Hockey-Puck" Free-Flying Magnetometers for Distributed In-Situ Multiprobe Measurement of Current Density Filamentation in the Northern Auroral Zone: Enstrophy Mission

The sub-orbital rocket mission was a collaborative project between the University of New Hampshire, Cornell University, and the Jet Propulsion Laboratory (JPL) to study filamentation phenomena in the northern Auroral zone. The Enstrophy mission test flies the JPL Free-Flying Magnetometer (FFM) concept. The FFM technology development task has been funded by NASA develop miniaturized, low-power, integrated "sensorcrafts". JPL's role was to design, integrate, test, and deliver four FFMs for deployment from the sounding rocket, allowing a unique determination of curl-B. This provides a direct measurement of magnetic-field-aligned current density along the rocket trajectory. A miniaturized three-axis fluxgate magnetometer was integrated with a 4-channel 22-bit sigma-delta Analog to Digital Converter (ADC), four temperature sensors, digital control electronics, seven (Li-SOCl2) batteries, two (4 deg x 170 deg field of view) sun-sensors, a fan-shaped-beam laser diode beacon, a (16 MHz) stable Temperature Compensated Crystal Oscillator (TCXO) clock, Radio Frequency (RF) communication subsystem, and an antenna for approximately 15 minutes of operation where data was collected continuously and transmitted in three (3) bursts (approximately 26 seconds each) to ground station antennas at Poker Flat, Alaska. FFMs were stowed within two trays onboard the rocket during the rocket launch and were released simultaneously using the spinning action of the rocket at approximately 300 km altitude (approximately 100 sec. into the flight). FFMs were deployed with spin rate of approximately 17 Hz and approximately 3 m/sec linear velocity with respect to the rocket. For testing purposes while the rocket was in the launch pad and during flight prior to release of FFMs from the rocket, commands (such as "power on", "test", "flight", "power off', and clock "Reset" signal) were transmitted via a infrared Light Emitting Diode to an infrared detector in the FFM. Special attention was paid to low magnetic signature electronic design and choice of materials in packaging. The miniaturized fluxgate magnetometers had a range of 1-60000 nT with 0.1% full-scale linearity. The frequency range of interest for magnetic measurement was 10 mHz - 50 Hz. Digital data from the magnetometer's three axes were placed in a 4MB Static Random Access Memory (SRAM) in data packages (frames) formatted together with time tags and frame ID. After a specified time was elapsed, the data were Viterbi encoded and transmitted at a rate of 100 kbps (BPSK). Each of the four FFMs transmitted at different frequency. These carrier frequencies were in the range of 2200-2300 MHz. The antenna was a single patch on a high dielectric constant substrate covering one end-plate of the hockey-puck-sized unit. The local clocks aboard the FFMs were reset at the start of the mission and stayed synchronized within 3 msec during the mission. Position of each FFM with respect to the rocket is calculated by the knowledge of its release velocity (measured at exit point of the FFM launcher tract) providing an accuracy of 1 m over the maximum range of 3 km. Spatial and temporal nature of observants can be separated to within 3 m in space or 3 msec time interval.

Javadi, H.↗

Ways to Increase Launch Velocities of 2-Stage Gas Guns

The amount of space debris is rapidly increasing and the debris is distributed over a wide variety of orbits. Satellites, manned space vehicles and space stations will have to pay increasing attention to the dangers of impacts with space debris. Various armoring techniques (i.e., double or triple layer armor) will have to tested extensively to determine the most effective armor per unit weight. Intersecting near-earth orbits can lead to impact velocities up to 15 km/sec. Conventional two-stage light gas guns can launch intact, controlled-shape projectiles with a density of 1.2 gm/cc and length- to-diameter ratios of 0.5-1.0 at velocities up to 8-9 km/sec. Higher velocities (10-11 km/sec) can be obtained' for very light projectiles. The higher launch velocities tend to be very severe on the high pressure coupling and barrel of the gun and lead to short component lifetimes. Clearly, the ability to raise the launch velocity of a gun (for reasonably massive projectile shapes) from 8-9 km/sec to 11-13 km/sec (or higher), without reduction of component lifetimes, would have significant benefits. This would allow much better simulation of the higher velocity debris impacts as well as better simulation of high speed re-entry into planetary atmospheres. Several techniques for increasing the launcher muzzle velocity above 8-9 km/sec have been studied using CFD simulations and appear to offer the potential for significant gains. The first technique is to use multiple compressions, instead of a single compression, in the pump tube of the light gas gun. In a sense, this is a kind of pre-heating of the gas in the pump tube; other types of pre-heating have yielded disappointing results in the past. The dynamics of the multiple compression pump tube is very different, however, from the earlier techniques, where the pump tube was typically heated ohmically before the gun 2 cycle was started. In this paper, we present CFD calculations that show that significant increases in muzzle velocity can be obtained with multiple compressions in the pump tube. With a conventional two-stage gun, an important limitation to obtaining higher velocities is friction and heat transfer to the barrel, which typically has a length- to- diameter ratio of 200-400. These viscous losses greatly reduce the effectiveness of the regions of the barrel far removed from the second stage breech. We have studied computationally the effect of adding an additional breech (or breeches) along the barrel to reduce these viscous losses. Velocity increases from 6.5 to 7.2 km/sec have been obtained using the main breech and one additional breech. In these results, both breeches were operated with hydrogen, heated electrothermally. We have also studied a gun geometry where the main breech is operated in the conventional manner, using piston compression. The additional breech is operated either with electrothermal heating or heating by using a high explosive charge in a novel geometry. The latter option provides very effective compression, heating and acceleration of the hydrogen working gas and is fully reusable. Calculations are presented which show that very substantial increases in muzzle velocity can be obtained this way, without overstressing the projectile or the 'gun. The third technique studied is to add a section of ram accelerator tube after the barrel to further accelerate the projectile. The ram accelerator used here is not the conventional premixed gas ram accelerator, but a new technique using high explosive as the energy source and pure hydrogen as the working gas in a geometry which can be made fully reusable. Preliminary results with this new rain accelerator geometry were presented and showed that stable ram accelerator drive can be established. Herein, detailed calculations axe presented which show that substantial velocity increases can be obtained using this ram accelerator technique in tandem with a conventional light gas gun.

Bogdanoff, David W.↗

Overview of TPS Tasks

The objectives of the project summarized in this viewgraph presentation are the following: (1) Develop a lightweight and low cost durable Thermal Protection System (TPS) for easy application to reusable launch vehicle payload launchers; (2) Develop quickly processed composite TPS processing and repair techniques; and (3) Develop higher temperature capability tile TPS. The benefits of this technology include reduced installation and operations cost, enhanced payload capability resulting from TPS weight reduction, and enhanced flight envelope and performance resulting from higher temperature capability TPS which can result in improved safety.

Johnson, Sylvia M.↗

A Fully Redundant On-Line Mass Spectrometer System Used to Monitor Cryogenic Fuel Leaks on the Space Shuttle

An on-line gas monitoring system was developed to replace the older systems used to monitor for cryogenic leaks on the Space Shuttles before launch. The system uses a mass spectrometer to monitor multiple locations in the process, which allows the system to monitor all gas constituents of interest in a nearly simultaneous manner. The system is fully redundant and meets all requirements for ground support equipment (GSE). This includes ruggedness to withstand launch on the Mobile Launcher Platform (MLP), ease of operation, and minimal operator intervention. The system can be fully automated so that an operator is notified when an unusual situation or fault is detected. User inputs are through personal computer using mouse and keyboard commands. The graphical user interface is very intuitive and easy to operate. The system has successfully supported four launches to date. It is currently being permanently installed as the primary system monitoring the Space Shuttles during ground processing and launch operations. Time and cost savings will be substantial over the current systems when it is fully implemented in the field. Tests were performed to demonstrate the performance of the system. Low limits-of-detection coupled with small drift make the system a major enhancement over the current systems. Though this system is currently optimized for detecting cryogenic leaks, many other gas constituents could be monitored using the Hazardous Gas Detection System (HGDS) 2000.

Griffin, Timothy P.↗

Science Rationale for a Micro-Met Mission to Augment InterMarsNet

The 2003 opportunity has the potential to carry out for the first time in Mars exploration history, coordinated measurements from the surface and from orbit that can address fundamental issues associated with the Martian global circulation and climate system. Coordinated measurements are defined here to mean collecting meteorological data from a network of 12-16 globally distributed surface stations simultaneously with an orbiter carrying an atmospheric sounder. With such measurements it is possible to define the horizontally varying (barotropic) and vertically varying (baroclinic) components of the global circulation from which the full 3-dimensional horizontal wind field can be reconstructed. It is also possible to precisely define the CO2 cycle, the main component of the current climate system. InterMarsNet, as currently envisioned, consists of 3-4 landers with a supporting communications orbiter that may carry some instrumentation. The landers are likely to touch down in low latitudes and will probably be configured to optimize seismological objectives. We propose to augment the InterMarsNet meteorological objectives by flying an additional 10-15 "MicroMet" landers equipped to measure surface pressure and nothing else. Surface pressure is the most fundamental meteorological parameter and it is the easiest to measure. The sensors are light, operate with minimal power, and do not require orientation or deployment. Consequently the landers can be very small (< 10 kg) and 10-15 of them can be delivered by a Med-lite launcher. This would enable global network science for meteorology and, when combined wAh the more sophisticated measurements from the InterMarsNet landers and the simultaneous temperature and dust profiling measurements from an atmospheric sounder aboard the orbiter, it would enable us to reconstruct global scale circulation patterns.

Haberle, Robert M.↗

A Fully Redundant On-Line Mass Spectrometer System Used to Monitor Cryogenic Fuel Leaks on the Space Shuttle

An on-line gas monitoring system was developed to replace the older systems used to monitor for cryogenic leaks on the Space Shuttles before launch. The system uses a mass spectrometer to monitor multiple locations in the process, which allows the system to monitor all gas constituents of interest in a nearly simultaneous manner. The system is fully redundant and meets all requirements for ground support equipment (GSE). This includes ruggedness to withstand launch on the Mobile Launcher Platform (MLP), ease of operation, and minimal operator intervention. The system can be fully automated so that an operator is notified when an unusual situation or fault is detected. User inputs are through personal computer using mouse and keyboard commands. The graphical user for detecting cryogenic leaks, many other gas constituents could be monitored using the Hazardous Gas Detection System (HGDS) 2000.

Griffin, Timothy P.↗

Automated CFD Parameter Studies on Distributed Parallel Computers

The objective of the current work is to build a prototype software system which will automated the process of running CFD jobs on Information Power Grid (IPG) resources. This system should remove the need for user monitoring and intervention of every single CFD job. It should enable the use of many different computers to populate a massive run matrix in the shortest time possible. Such a software system has been developed, and is known as the AeroDB script system. The approach taken for the development of AeroDB was to build several discrete modules. These include a database, a job-launcher module, a run-manager module to monitor each individual job, and a web-based user portal for monitoring of the progress of the parameter study. The details of the design of AeroDB are presented in the following section. The following section provides the results of a parameter study which was performed using AeroDB for the analysis of a reusable launch vehicle (RLV). The paper concludes with a section on the lessons learned in this effort, and ideas for future work in this area.

Rogers, Stuart E.↗

Legacy and Emergence of Spaceport Technology Development at the Kennedy Space Center

Kennedy Space Center (KSC) has a long and successful legacy in the checkout and launch of missiles and space vehicles. These operations have become significantly more complex, and their evolution has driven the need for many technology developments. Unanticipated events have also underscored the need for a local, highly responsive technology development and testing capability. This evolution is briefly described, as well as the increasing level of technology capability at KSC. The importance of these technologies in achieving past national space goals suggests that the accomplishment of low-cost and reliable access to space will depend critically upon KSC's future success in developing spaceport technologies. This paper concludes with a description KSC's current organizational approach and major thrust areas in technology development. The first phase of our historical review focuses on the development and testing of field- deployable short- and intermediate-range ballistic missiles (1953 to 1958). These vehicles are later pressed into service as space launchers. The second phase involves the development of large space lift vehicles culminating in the Saturn V launches (1959 to 1975). The third phase addresses the development and operations of the partially reusable launch vehicle, Space Shuttle (1976 to 2000). In the current era, KSC is teaming with the U.S. Air Force (AF), industry, academia, and other partners to identify and develop Spaceport and Range Technologies necessary to achieve national space goals of lower-cost and higher-reliability space flight.

Starr, Stanley↗

In-Space Propulsion: Where We Stand and What's Next

The focus of this paper will be on the three stages of in-space transportation propulsion systems, now commonly referred to as in-space propulsion (ISP); i.e., the transfer of payloads from low-Earth orbits into higher orbits or into trajectories for planetary encounters, including planetary landers and sample return launchers, if required. Functions required at the operational location where ISP must provide thrust for orbit include maintenance, position control, stationkeeping, and spacecraft altitude control; i.e., proper pointing and dynamic stability in inertial space; and the third function set to enable operations at various planetary locations, such as atmospheric entry and capture, descent to the surface and ascent, back to rendezvous orbit. The discussion will concentrate on where ISP stands today and some observations of what might be next in line for new ISP technologies and systems for near-term and future flight applications. The architectural choices that are applicable for ISP will also be described and discussed in detail.

Sackheim, Robert L.↗

Automated Euler and Navier-Stokes Database Generation for a Glide-Back Booster

The past two decades have seen a sustained increase in the use of high fidelity Computational Fluid Dynamics (CFD) in basic research, aircraft design, and the analysis of post-design issues. As the fidelity of a CFD method increases, the number of cases that can be readily and affordably computed greatly diminishes. However, computer speeds now exceed 2 GHz, hundreds of processors are currently available and more affordable, and advances in parallel CFD algorithms scale more readily with large numbers of processors. All of these factors make it feasible to compute thousands of high fidelity cases. However, there still remains the overwhelming task of monitoring the solution process. This paper presents an approach to automate the CFD solution process. A new software tool, AeroDB, is used to compute thousands of Euler and Navier-Stokes solutions for a 2nd generation glide-back booster in one week. The solution process exploits a common job-submission grid environment, the NASA Information Power Grid (IPG), using 13 computers located at 4 different geographical sites. Process automation and web-based access to a MySql database greatly reduces the user workload, removing much of the tedium and tendency for user input errors. The AeroDB framework is shown. The user submits/deletes jobs, monitors AeroDB's progress, and retrieves data and plots via a web portal. Once a job is in the database, a job launcher uses an IPG resource broker to decide which computers are best suited to run the job. Job/code requirements, the number of CPUs free on a remote system, and queue lengths are some of the parameters the broker takes into account. The Globus software provides secure services for user authentication, remote shell execution, and secure file transfers over an open network. AeroDB automatically decides when a job is completed. Currently, the Cart3D unstructured flow solver is used for the Euler equations, and the Overflow structured overset flow solver is used for the Navier-Stokes equations. Other codes can be readily included into the AeroDB framework.

Chaderjian, Neal M.↗

Comparing NASA and ESA Cost Estimating Methods for Human Missions to Mars

To compare working methodologies between the cost engineering functions in NASA Marshall Space Flight Center (MSFC) and ESA European Space Research and Technology Centre (ESTEC), as well as to set-up cost engineering capabilities for future manned Mars projects and other studies which involve similar subsystem technologies in MSFC and ESTEC, a demonstration cost estimate exercise was organized. This exercise was a direct way of enhancing not only cooperation between agencies but also both agencies commitment to credible cost analyses. Cost engineers in MSFC and ESTEC independently prepared life-cycle cost estimates for a reference human Mars project and subsequently compared the results and estimate methods in detail. As a non-sensitive, public domain reference case for human Mars projects, the Mars Direct concept was chosen. In this paper the results of the exercise are shown; the differences and similarities in estimate methodologies, philosophies, and databases between MSFC and ESTEC, as well as the estimate results for the Mars Direct concept. The most significant differences are explained and possible estimate improvements identified. In addition, the Mars Direct plan and the extensive cost breakdown structure jointly set-up by MSFC and ESTEC for this concept are presented. It was found that NASA applied estimate models mainly based on historic Apollo and Space Shuttle cost data, taking into account the changes in technology since then. ESA used models mostly based on European satellite and launcher cost data, taking into account the higher equipment and testing standards for human space flight. Most of NASA's and ESA s estimates for the Mars Direct case are comparable, but there are some important, consistent differences in the estimates for: 1) Large Structures and Thermal Control subsystems; 2) System Level Management, Engineering, Product Assurance and Assembly, Integration and Test/Verification activities; 3) Mission Control; 4) Space Agency Program Level activities.

Hunt, Charles D.↗

Advanced Technology Lifecycle Analysis System (ATLAS)

Developing credible mass and cost estimates for space exploration and development architectures require multidisciplinary analysis based on physics calculations, and parametric estimates derived from historical systems. Within the National Aeronautics and Space Administration (NASA), concurrent engineering environment (CEE) activities integrate discipline oriented analysis tools through a computer network and accumulate the results of a multidisciplinary analysis team via a centralized database or spreadsheet Each minute of a design and analysis study within a concurrent engineering environment is expensive due the size of the team and supporting equipment The Advanced Technology Lifecycle Analysis System (ATLAS) reduces the cost of architecture analysis by capturing the knowledge of discipline experts into system oriented spreadsheet models. A framework with a user interface presents a library of system models to an architecture analyst. The analyst selects models of launchers, in-space transportation systems, and excursion vehicles, as well as space and surface infrastructure such as propellant depots, habitats, and solar power satellites. After assembling the architecture from the selected models, the analyst can create a campaign comprised of missions spanning several years. The ATLAS controller passes analyst specified parameters to the models and data among the models. An integrator workbook calls a history based parametric analysis cost model to determine the costs. Also, the integrator estimates the flight rates, launched masses, and architecture benefits over the years of the campaign. An accumulator workbook presents the analytical results in a series of bar graphs. In no way does ATLAS compete with a CEE; instead, ATLAS complements a CEE by ensuring that the time of the experts is well spent Using ATLAS, an architecture analyst can perform technology sensitivity analysis, study many scenarios, and see the impact of design decisions. When the analyst is satisfied with the system configurations, technology portfolios, and deployment strategies, he or she can present the concepts to a team, which will conduct a detailed, discipline-oriented analysis within a CEE. An analog to this approach is the music industry where a songwriter creates the lyrics and music before entering a recording studio.

O'Neil, Daniel A.↗