Search NASA⌕ Search

SEARCH · Search NASA

Results for “ORBITAL ASSEMBLY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

PROBE (Precision Reflector Orbital Build Experiment): A proposed flight experiment to study EVA assembly of precision segmented reflectors

PROBE (Precision Reflector Orbital Build Experiment) is a Shuttle flight demonstration experiment designed to study extravehicular activity (EVA) assembly of precision segmented reflectors. PROBE will support missions being considered for NASA's Global Change Technology Initiative as well as other missions in astrophysics and spacecraft optical communications requiring large precision reflectors. Such reflectors are envisioned to consist of a low-mass backup truss to which the optical surface is attached. Because of their large size, these reflectors will be constructed on-orbit from smaller pieces which can be packaged in the launch vehicle. The technology to be developed with PROBE also has application for construction of solar dynamic collectors which are planned for the enhanced configuration of Space Station Freedom. Viewgraphs of PROBE are presented.

Heard, Walter↗

Centaur capabilities for communications satellite launches

The configurations, payload capabilities, and payload envelopes for Centaur in various applications are presented. The Centaur launch record is summarized and the Atlas/Centaur launch schedule is shown. Improvements in capability are reported on, and current and proposed vehicles are depicted. Dual Delta class spacecraft will be flown using a tandem adapter or large direct broadcast satellites in a single launch model. Shuttle/Centaur will permit spacecraft weights of up to 14,000 lb to be put into orbit, including payload lengths up to 40 ft. A new capability to transfer large deployed space systems from the Shuttle to high-altitude orbits at low thrusts will be available. Spacecraft lengths requiring the full, 60-foot cargo bay and weighing 20,000 lb could be placed in geosynchronous orbit with on-orbit rendezvous and assembly of the Centaur and spacecraft in low earth orbit.

Rector, W. F., III↗

Modeling Effort of TriTruss Modular Structure for In-Space Assembled Telescope Foundational Structure

The TriTruss is a novel and innovative structural module developed by researchers at the NASA Langley Research Center to construct modular structures which can be assembled on-orbit for future persistent missions, including in-space assembled telescopes and platforms for science and communications. The TriTruss offers unique modular structural features including compact packaging for launch, the possibility of staged packaging, simple robotic deployment and assembly, and design versatility for specific space mission applications. This paper presents the modeling and analysis procedure for the TriTruss modular structure and the predicted frequency response of an In-Space Assembled Telescope’s (iSAT) primary reflector.

Structural Modeling↗

TriTruss Packaging and Deployment Trade Study

An architecture and feasibility study of next generation In-Space Assembled Telescopes (iSAT) concluded that robotic in-space assembly of modular components is necessary to enable large (>15-meter diameter) primary apertures. The iSAT study recommended that the foundational structure be assembled from modular TriTruss modules that are packaged for launch, deployed on-orbit and robotically assembled into the final configuration. This paper will describe and summarize the results of a trade study that investigated viable concept of operations (ConOps) for the packaging and deployment (P&D) of individual planar TriTruss modules that could be assembled to form a large aperture iSAT. The ideal TriTruss P&D concept is defined as one that: allows for efficient packaging; has sufficient geometric versatility to be launch vehicle independent; provides a stiff and lightweight structure; has low mechanical complexity; and has component modularity. The P&D concept should allow for prelaunch subsystem or utility integration if required. The concept would be kinematically simple and be robotically deployed using a minimum number of specialized tools. In this first phase of an ongoing more comprehensive trade study, concepts were proposed and then evaluated based on initial metrics representing features of an ideal P&D concept. The P&D concepts evaluated are categorized as: core collapse, face collapse, and erectable structures. Sub-scale models were constructed to help understand the kinematics and mechanical complexity required to enable P&D. Based on a weighting scale, the most promising candidate P&D concepts have selected and will undergo more rigorous structural design, analysis, and testing in the study’s next phase. The ultimate goal of the comprehensive trade study will be to recommend a single TriTruss design and associated P&D concept that will be built and evaluated at NASA Langley Research Center’s In-Space Assembly Laboratory.

in-space assembly (ISA)↗

Noncoplanar minimum delta V two-impulse and three-impulse orbital transfer from a regressing oblate earth assembly parking ellipse onto a flyby trans-Mars asymptotic velocity vector.

Comparison of two-impulse and three-impulse orbital transfer, using data from a 63-case numerical study. For each case investigated for which coplanarity of the regressing assembly parking ellipse was attained with the target asymptotic velocity vector, a two-impulse maneuver (or a one-impulse equivalent) was found for which the velocity expenditure was within 1% of a reference absolute minimum lower bound. Therefore, for the coplanar cases, use of a minimum delta-V three-impulse maneuver afforded scant improvement in velocity penalty. However, as the noncoplanarity of the parking ellipse and the target asymptotic velocity vector increased, there was a significant increase in the superiority of minimum delta-V three-impulse maneuvers for slowing the growth of velocity expenditure. It is concluded that a multiple-impulse maneuver should be contemplated if nonnominal launch conditions could occur.

Bean, W. C.↗

Launch and Assembly Reliability Analysis for Mars Human Space Exploration Missions

NASA s long-range goal is focused upon human exploration of Mars. Missions to Mars will require campaigns of multiple launches to assemble Mars Transfer Vehicles in Earth orbit. Launch campaigns are subject to delays, launch vehicles can fail to place their payloads into the required orbit, and spacecraft may fail during the assembly process or while loitering prior to the Trans-Mars Injection (TMI) burn. Additionally, missions to Mars have constrained departure windows lasting approximately sixty days that repeat approximately every two years. Ensuring high reliability of launching and assembling all required elements in time to support the TMI window will be a key enabler to mission success. This paper describes an integrated methodology for analyzing and improving the reliability of the launch and assembly campaign phase. A discrete event simulation involves several pertinent risk factors including, but not limited to: manufacturing completion; transportation; ground processing; launch countdown; ascent; rendezvous and docking, assembly, and orbital operations leading up to TMI. The model accommodates varying numbers of launches, including the potential for spare launches. Having a spare launch capability provides significant improvement to mission success.

Cates, Grant R.↗

Shuttle-C utilization for assembly of the rephased Freedom configuration

The utilization of the Shuttle-C Heavy Lift Launch Vehicle (HLLV) to augment the Shuttle orbiter to deliver to earth orbit elements for assembly of a rephased definition of Space Station Freedom is assessed. A past history of previous HLLV studies performed with respect to Freedom launch and assembly is reviewed and conclusions extrapolated that are appropriate to consider for the new rephased Freedom definition. The rephased Freedom definition is explained, two utilization scenarios are developed and related assessments are provided for Shuttle-C utilization early in the assembly sequence or utilization later in theon-orbit build up phase.

Deryder, Leonard J.↗

Space Shuttle Program Progress Report

A status report is presented on progress in the design, manufacturing and testing of components of the space transportation system (STS), and primarily the Space Shuttle vehicles. Project landmarks from 1969 to 1981 are indicated, fabrication of the Shuttle Orbiter and rollout of the first prototype are described, fabrication and assembly of some Orbiter parts are sketched, and some of the subsystems (thermal protection, avionics, maneuvering aids, reaction control, remote manipulator) are described. Also discussed are: Orbiter carrier aircraft, Shuttle main engine and tests, external fuel tank, solid rocket booster, launch and landing facilities. A separate section is devoted to ground tests (vibration, propulsion, electronics, avionics integration), trainers and simulators, and flight tests (captive flight, free flight, landing and approach, orbital flight).

Thompson, R. F.↗

Launch and Assembly Reliability Analysis for Human Space Exploration Missions

NASA's future human space exploration strategy includes single and multi-launch missions to various destinations including cis-lunar space, near Earth objects such as asteroids, and ultimately Mars. Each campaign is being defined by Design Reference Missions (DRMs). Many of these missions are complex, requiring multiple launches and assembly of vehicles in orbit. Certain missions also have constrained departure windows to the destination. These factors raise concerns regarding the reliability of launching and assembling all required elements in time to support planned departure. This paper describes an integrated methodology for analyzing launch and assembly reliability in any single DRM or set of DRMs starting with flight hardware manufacturing and ending with final departure to the destination. A discrete event simulation is built for each DRM that includes the pertinent risk factors including, but not limited to: manufacturing completion; ground transportation; ground processing; launch countdown; ascent; rendezvous and docking, assembly, and orbital operations leading up to trans-destination-injection. Each reliability factor can be selectively activated or deactivated so that the most critical risk factors can be identified. This enables NASA to prioritize mitigation actions so as to improve mission success.

Cates, Grant↗

Application of Solar Electric Propulsion to the Low Thrust Lunar Transit of the Gateway Power and Propulsion Element

NASA has committed to returning to the moon, landing the first woman and the next man on its surface. To support a sustained lunar presence, NASA is designing an orbital platform to be assembled in a semi-stable orbit near the moon called the Near Rectilinear Halo Orbit (NRHO). This platform is known as the Gateway and its purpose it to support missions primarily to the lunar south pole. As NASA continues to study ways to reduce the cost of lunar exploration, a simplification implemented in 2020 was combining the first two elements of the Gateway together onto a single commercial launch vehicle (CLV). When launched together, the Power and Propulsion Element (PPE) and NASA’s Habitation and Logistics Outpost (HALO) make up the Co-Manifested Vehicle (CMV). The PPE, a high-power Solar Electric Propulsion (SEP) Stage, will propel the combined stack from a low elliptical orbit to a semi stable orbit near the moon known as a Near Rectilinear Halo Orbit (NRHO). A transit of such a large mass, delivered to the moon from a single launch vehicle is only made possible by the use of the highly efficient SEP low thrust propulsion system. Delivering the same mass via more traditional chemical propulsion systems would require multiple launches and significantly more propellant. This paper captures an overview of the PPE’s SEP system, the lunar transit it will perform to deliver these first two elements of NASA’s Gateway to the NRHO with a comparison of a chemical system performing the same lunar transit to illustrate how SEP enables NASA’s Gateway.

electric propulsion↗

Commercial Application of In-Space Assembly

In-Space assembly (ISA) expands the opportunities for cost effective emplacement of systems in space. Currently, spacecraft are launched into space and deploy into their operational configuration through a carefully choreographed sequence of operations. The deployment operation dictates the arrangement of the primary systems on the spacecraft, limiting the ability to take full advantage of launch vehicles volume and mass capability. ISA enables vastly different spacecraft architectures and emplacement scenarios to be achieved, including optimal launch configurations ranging from single launch and assembly to on-orbit aggregation of multiple launches at different orbital locations and times. The spacecraft can be visited at different orbital locations and times to effect expansion and maintenance of an operational capability. To date, the primary application of ISA has been in large programs funded by government organizations, such as the International Space Station. Recently, Space Systems Loral (SSL) led a study funded by the Defense Advanced Research Projects Agency (DARPA), called Dragonfly, to investigate the commercial applicability and economic advantages of ISA. In the study, it was shown that ISA enables SSL to double the capability of a commercial satellite system by taking advantage of alternate packaging approaches for the reflectors. The study included an ultra-light-weight robotic system, derived from Mars manipulator designs, to complete assembly of portions of the antenna system using a tool derived from DARPA orbital express and National Aeronautics and Space Administration (NASA) automated structural assembly experience. The mechanical connector that enables robotic ISA takes advantage of decades of development by NASA from the 1970's to 1980's during the Space Station Freedom program, the precursor to the ISS. The mechanical connector was originally designed for rapid astronaut assembly while also providing a high quality structural connection with linear load deflection response. The paper will discuss the business case for ISA, the general approach taken to exploit on-orbit assembly in the GEO communication satellite market, and the concept of operations associated with the ISA approach, thus laying the foundation for ISA to become an accepted operational approach for commercial in-space operations.

Lymer, John↗

Rendezvous and Docking for Space Exploration

To achieve the exploration goals, new approaches to exploration are being envisioned that include robotic networks, modular systems, pre-positioned propellants and in-space assembly in Earth orbit, Lunar orbit and other locations around the cosmos. A fundamental requirement for rendezvous and docking to accomplish in-space assembly exists in each of these locations. While existing systems and technologies can accomplish rendezvous and docking in low earth orbit, and rendezvous and docking with crewed systems has been successfully accomplished in low lunar orbit, our capability must extend toward autonomous rendezvous and docking. To meet the needs of the exploration vision in-space assembly requiring both crewed and uncrewed vehicles will be an integral part of the exploration architecture. This paper focuses on the intelligent application of autonomous rendezvous and docking technologies to meet the needs of that architecture. It also describes key technology investments that will increase the exploration program's ability to ensure mission success, regardless of whether the rendezvous are fully automated or have humans in the loop.

Machula, M. F.↗

A Comprehensive Survey of Earth-Moon Libration Orbits: Stationkeeping Strategies And Intra-Orbit Transfers

Cislunar space is a readily accessible region that may well develop into a prime staging area in the effort to colonize space near the Earth or to colonize the moon. While there have been statements made by various NASA programs regarding placement of resources in orbit about the Earth-Moon Lagrangian locations, there is no survey of the total cost associated with attaining and maintaining these unique orbits in an optimal fashion. Transfer trajectories between these orbits required for assembly, servicing, and positioning of these resources have not been extensively investigated. These orbits are dynamically similar to those used for the Sun-Earth missions, but differences in governing gravitational ratios and perturbation sources result in their having their own unique characteristics.

Folta, David↗

A Survey Of Earth-Moon Libration Orbits: Stationkeeping Strategies And Intra-Orbit Transfers

Cislunar space is a readily accessible region that may well develop into a prime staging area in the effort to colonize space near Earth or to colonize the Moon. While there have been statements made by various NASA programs regarding placement of resources in orbit about the Earth-Moon Lagrangian locations, there is no survey of the total cost associated with attaining and maintaining these unique orbits in an operational fashion. Transfer trajectories between these orbits required for assembly, servicing, and positioning of these resources have not been extensively investigated. These orbits are dynamically similar to those used for the Sun-Earth missions, but differences in governing gravitational ratios and perturbation sources result in unique characteristics. We implement numerical computations using high fidelity models and linear and nonlinear targeting techniques to compute the various maneuver (Delta)V and temporal costs associated with orbits about each of the Earth-Moon Lagrangian locations (L1, L2, L3, L4, and L5). From a dynamical system standpoint, we speak to the nature of these orbits and their stability. We address the cost of transfers between each pair of Lagrangian locations.

Folta, David↗

TriTruss: A New and Novel Structural Concept Enabling Modular Space Telescopes and Space Platforms

Modular structures that can be assembled on-orbit will be the backbone for all future persistent missions, including in-space assembled telescopes and platforms for science and communications. The TriTruss is a new and innovative structural module that has been conceived by researchers at the NASA Langley Research Center for platform and telescope applications. Some of the innovative features of the TriTruss include: very compact packaging for launch, the possibility of staged packaging, simple robotic deployment, ease of embedding payload components, an innovative structural connector that has linear structural performance, ease of module-to-module robotic assembly, design versatility, and ease of customizing its design for specific applications. This paper will introduce the TriTruss concept and describe how it can serve as the foundation for many different mission applications, in particular, a 20-meter diameter large space telescope and a beam-type platform that can host a variety of payloads and instruments. The geometry of the TriTruss will be described and the various truss design variables (such as truss depth, member diameter, material modulus, etc.) and each of their impacts on the truss performance will be illustrated. The TriTruss can be mapped to a variety of structural forms, such as beams, two-dimensional platforms and filled curved apertures (for antennas and telescopes), and examples will be illustrated. The TriTruss lends itself to a large variety of packaging schemes; the structural concepts associated with packaging and deployment will be described, as well as the means for robotically deploying TriTruss modules and locking them into their final configuration. TriTruss module-to-TriTruss module robotic assembly operations will also be described. Equations will be presented to structurally size TriTruss modules, such that when assembled into the final persistent platform, the platform achieves a desired level of global structural performance. A status of the TriTruss development will also be presented. This material will cover design and fabrication of TriTruss hardware for platform and telescope applications as well as structural testing of that hardware (the struts, connectors and platforms). Robotic assembly of TriTruss modules is also being performed, and the results of those tests will be summarized.

Doggett, William↗

Aerobraking technology studies

For a Mars Expedition, aerobrakes can play a vital role in several major mission events, including aerocapture to achieve orbit and descent to the planetary surface both at Mars and upon return to Earth. The feasibility of aerobrake designs will depend upon material and structures technologies because they will serve as a key factor in determining: (1) aerobrake mass and mass fraction; (2) the extent to which aerobrakes can survive the thermal environment. This is especially important for reusable aerobrakes. With the cancellation of the Aeroassist Flight Experiment, the effort to validate aerobrake designs has focused on laboratory test and analysis; (3) the feasibility of assembling and/or deploying large aerobrakes. On-orbit assembly is a critical issue for all spacecraft intended for Mars exploration missions. Current studies are addressing options related to inspace assembly and construction; and (4) configuration lift-to-drag (L/D) ratio. High L/D increases convective heating, whereas low L/D emphasizes radiative heating. In general, the lowest L/D design that can satisfy mission requirements is preferred.

Eldred, Charles H.↗

Manned maneuvering unit: User's guide

The space shuttle will provide an opportunity to extend and enhance the crew's inherent capabilities in orbit by allowing them to operate effectively outside of their spacecraft by means of extravehicular activity. For this role, the shuttle crew will have a new, easier to don and operate space suit with integral life support system, and a self-contained propulsive backpack. The backpack, called the manned maneuvering unit, will allow the crew to operate beyond the confines of the Shuttle cargo bay and fly to any part of their own spacecraft or to nearby free-flying payloads or structure. This independent mobility will be used to support a wide variety of activities including free-space transfer of cargo and personnel, inspection and monitoring of orbital operations, and construction and assembly of large structures in orbit.

Lenda, J. A.↗