Search NASA⌕ Search

SEARCH · Search NASA

Results for “OUTAGES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Real-time digital simulation to improve advanced microgrid design

In this study, there are several ways to address energy reliability concerns during an extended power outage. This can include hardening the energy infrastructure to reduce potential loss of power, adding redundant backup systems with larger fuel tanks, and improving generator reliability through better maintenance. While each is valid, they are often expensive to adequately implement. The traditional emergency power approach for decades has been the use of building-tied emergency generators to start up and supply emergency power until the utility can come back on line. Unfortunately, operational experience from many recent extended power outages has shown that emergency backup generators are often mismatched in size with the building energy load, under-maintained such that their operational reliability is well below expected values, and have insufficient fuel to operate for the entire power outage. Here we describe how energy reliability and security can be enhanced with the use of Advanced Microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Increasing Resiliency Through Renewable Energy Microgrids

This paper describes a methodology to quantify the economic and resiliency benefit provided by renewable energy (RE) in a hybrid RE-storage-diesel microgrid. We present a case study to show how this methodology is applied to a multi-use/ multi-function telecommunications facility in southern California. In the case study, we first identify photovoltaic (PV) and battery energy storage system (BESS) technologies that minimize the lifecycle cost of energy at the site under normal, grid-connected operation. We then evaluate how those technologies could be incorporated alongside existing diesel generators in a microgrid to increase resiliency at the site, where resiliency is quantified in terms of the amount of time that the microgrid can sustain the critical load during a grid outage. We find that adding PV and BESS to the existing backup diesel generators with a fixed fuel supply extends the amount of time the site could survive an outage by 1.8 days, from 1.7 days for the existing diesel-only backup system to 3.5 days for the PV/diesel/BESS hybrid system. Furthermore, even after diesel fuel supplies are exhausted, the site can continue to operate critical loads during daytime hours using just the PV/BESS when there is sufficient solar resource. We find that the site can save approximately 100,000 dollars in energy costs over the 25-year lifecycle while doubling the amount of time they can survive an outage. Here, the methodology presented here provides a template for increasing resiliency at telecomm sites by implementing renewable energy solutions, which provide additional benefits of carbon emission reduction and energy cost savings.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Microgrid optimized resource dispatch for public-purpose resiliency and sustainability. The Olney Town Center Microgrid Project

Communities in Atlantic coastal regions have in recent years sought to improve the resiliency of their critical infrastructure and public services, especially to protect against hurricanes and other events capable of causing widespread damage and disruption. As the backbone of any community’s critical functions, the electricity distribution system requires high resiliency in order to maintain local energy delivery services. Against this backdrop, the Project sought to develop a resilient energy microgrid control system capable of integrating distributed renewable energy resources, natural gas CHP units, energy storage, and demand-side management technologies in near-real-time optimization schemes for the community of Olney, Md. The Montgomery County Planning Board in 2005 established the Olney Town Center area as a “civic center/town commons,” in part because it serves as a key point of interaction in the community – but also because it contains numerous vital community assets. With a total peak electrical load of about 8 MW (including Montgomery General Hospital with a 2.4 MW peak), the Project area is a business and essential services area, directly serving a suburban population of more than 33,000 residents. It contains a hospital, police station, two fire stations, two schools, grocery stores, and gas stations, and the community’s water tower, among other things. Moreover, the location stands at the crossroads of two state highways that represent major regional arteries for commerce and public safety in Montgomery County. These characteristics made the Project area an appropriate setting for considering microgrid deployment. It presented a model of a typical Maryland suburban community, with geographic dispersion of vital assets over a sizeable area, and a combination of overhead distribution lines and underground cables serving those critical loads. Such a representative model helped to ensure the solutions developed and the scenarios tested would be readily applicable to other communities in the state and the region. Further, the Project’s outcomes and lessons provide insights to guide community microgrid design and development in many locations. To achieve Project objectives – including those established by the U.S. Department of Energy (DOE) National Energy Technology Laboratory – the Project team researched, developed, and tested in simulation a set of microgrid controls capable of maintaining electricity supplies for critical community loads in the event of a regional utility outage lasting many days or even weeks. Testing and analysis showed that the microgrid would be capable of maintaining electricity supply to critical loads essentially indefinitely in most outage scenarios, while also substantially improving overall reliability for microgrid customers. With targeted improvements in local utility distribution infrastructure, test analysis showed that the microgrid would be capable of reducing annual electricity outages for critical loads by 98%. Further, to help achieve environmental and efficiency policy goals established by both the State of Maryland and the federal government, the team designed the system to reduce the annual carbon footprint of served loads by 20%, and to improve system energy efficiency for those loads by at least 20%. Testing showed that, as designed, the system is capable of meeting these performance requirements, with potential for further improvements through more effective thermal energy utilization. This Final Report, comprised of four volumes and 11 annexes, presents the results of these project efforts, including feasibility assessment (section F) and guidance for decision-makers considering prospective deployment of public-purpose microgrid systems in Maryland communities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AGC-4 Experiment Irradiation Monitoring Data Qualification Final Report

The Graphite Technology Development Program ran a series of six experiments to quantify the effects of irradiation on nuclear grade graphite. This report focuses on the fourth experiment, Advanced Graphite Creep 4 (AGC 4). The Advanced Reactor Development (ARD) Technology Development Office (TDO) Program for research and development activities require documentation of qualified monitoring data to design and license the first high-temperature reactor nuclear plant. Qualified data meets the requirements for use as described in the experiment planning and quality assurance documents. Failed data do not meet the requirements and provide no useable information. Trend data may not meet all requirements but still provide some useable information. Use of Trend data requires assessment of how any deficiencies affect a particular use of the data. AGC-4 began with Advanced Test Reactor (ATR) Cycle 157D on May 30, 2015. After irradiating the graphite for two cycles, the capsule was removed from the reactor after ATR Cycle 158A, which ended on January 2, 2016, due to interference with another experiment. Irradiation was resumed with Cycle 162A on October 7, 2017 after the interfering experiment was removed from the reactor. AGC-4 irradiation completed by the end of Cycle 166B on January 10, 2020. Between Cycles 162A and 166B, AGC-4 capsule was removed from the reactor core during two Powered Axial Locator Mechanism (PALM) Cycles 163A and 165A to avoid overheating. All thermocouples (TCs) have functioned throughout the AGC-4 experiment. A total of 9,256,184 out of all 11,167,213 temperature records (or 82.9%) are Qualified for use by the ARD Program and 1,911,029 missing values are Failed. Argon, helium, and total gas flow data were within expected ranges, except only eight out-of-range values occurred during outages. A total of 21,240,627 out of all 22,288,5103 gas flow rates (or 92.8%) are Qualified for use by the ARD Program and 1,644,476 are Failed records mostly due to missing values. Discharge gas line moisture values were consistently low during full ATR power, except for 162B, when moisture content was increasing to more than 200 ppmv by the end of this cycle. During outages, moisture content reached as high as 700 ppmv. 1,089,941 out of a total of 1,107,331 moisture values (or 98.4%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 17,390 missing moisture values are Failed. Graphite creep specimens were subjected to one of three loads: 393, 491, or 589 lbf. For a brief period during Cycle 157D between 12:19 on June 2, 2015, and 08:23 on June 11, 2015, the load cells were wired incorrectly, resulting in missing stack load data. Missing stack loads were estimated from measured ram pressures using regression equations developed from the existing data from Cycle 157D. Estimated stack loads during this period are considered to be an accurate representation of actual load applied to the stacks. These loads deviate slightly from the planned loads. This deviation does not prevent the data from being Qualified for use but must be taken into account when analyzing the effect of load on creep. 6,095,728 out of a total of 6,403,985 moisture values (or 95.2%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 308,257 missing load values are Failed. Stack displacement increased consistently throughout the eight cycles, with total displacement reached highest value of 2.4 in by the end of irradiation. During ATR outages, a set of pneumatic rams raised the stacks of graphite creep specimens to ensure the specimens were not stuck within the test train. This stack raising was performed seven times throughout irradiation. All stacks were raised successfully each time. 4,744,974 out of a total of 6,094,513 displacement values (or 77.9%) are within the measurement range of the instrument and are Qualified for use by the ARD Program and 1,349,539 displacement values are Failed mostly due to missing values. Analyses were conducted on correlations between TCs to look for trends and step changes that might indicate instrument degradation or failure. Correlation analysis was used to identify instances when TCs form short circuits, referred to as virtual junctions, which result in TCs reporting temperatures from some location in the capsule other than the location where they were intended to read. No evidence of virtual junctions was found. Analyses were also conducted on control charts of temperature differences of between two TCs, which are expected to behave consistently throughout the entire irradiation period. Upward or downward trend over time indicates at least one TC in the pair was drifted. Examining control charts for all 66 possible pairs out of twelve TCs installed in the AGC-4 capsules reveal no clear drift failures occurred, except unstable behavior of two TCs in Zone 3, TC-7 and TC-8, over irradiation time. In conclus

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Enhancing Distribution Grid Resilience Through Model Predictive Controller Enabled Prioritized Load Restoration Strategy: Preprint

Effective resilience improvement strategies enable the power grid to cope with disruptive extreme events. Most power grid outages are caused by disruptions in distribution grids. Motivated by the urgent need for power system resilience research, this paper proposes a priority-weighted optimal load restoration technique to enhance the resilience of distribution grids against extreme events. The proposed technique is based on smart distribution technology and framed as sequential multi-step decision process (MDP) and mixed integer linear program (MILP). It is formulated as optimal control problem with a model predictive control (MPC) approach. We applied the devised MILP-MPC-based load restoration technique to a simplified single-bus version of the IEEE 13-bus distribution system with integrated distributed energy resources (DERs) such as wind turbine, photovoltaic array, microturbine, and energy storage device. The technique executes a reducing and rolling horizon optimization in each control step in real-time using the forecasted information of the renewables, the fuel status of the microturbine and the state of charge of the energy storage device. We consider an extreme event which triggered outage of the upstream utility grid and caused islanded operation of the distribution grid. We demonstrated the effectiveness of the proposed MPC approach in restoring the distribution grid loads based on their priority during the main grid outage-caused islanded operation.

61 RADIATION PROTECTION AND DOSIMETRY↗

Enhancing Distribution Grid Resilience Through Model Predictive Controller Enabled Prioritized Load Restoration Strategy

Effective resilience improvement strategies enable the power grid to cope with disruptive extreme events. Most power grid outages are caused by disruptions in distribution grids. Motivated by the urgent need for power system resilience research, this paper proposes a priority-weighted optimal load restoration technique to enhance the resilience of distribution grids against extreme events. The proposed technique is based on smart distribution technology and framed as sequential multi-step decision process (MDP) and mixed integer linear program (MILP). It is formulated as optimal control problem with a model predictive control (MPC) approach. We applied the devised MILP-MPC-based load restoration technique to a simplified single-bus version of the IEEE 13-bus distribution system with integrated distributed energy resources (DERs) such as wind turbine, photovoltaic array, microturbine, and energy storage device. The technique executes a reducing and rolling horizon optimization in each control step in real-time using the forecasted information of the renewables, the fuel status of the microturbine and the state of charge of the energy storage device. We consider an extreme event which triggered outage of the upstream utility grid and caused islanded operation of the distribution grid. We demonstrated the effectiveness of the proposed MPC approach in restoring the distribution grid loads based on their priority during the main grid outage-caused islanded operation.

61 RADIATION PROTECTION AND DOSIMETRY↗

State Insights On The Water-Energy Nexus And Policy Ideas To Achieve Greater Savings

Governors, state policymakers, utilities and other stakeholders across the country are increasingly aware of the connection between energy and water production and use, and the need to conserve both resources to meet economic and environmental goals. It requires substantial amounts of water to produce energy and considerable amounts of energy to treat and deliver water. The critical interdependence between energy and water was clearly illustrated during the recent winter storm in Texas and other parts of the South in February 2021. Initial power outages contributed to a longer-term water crisis. Power outages led to water pump failures while water demand increased from frozen water pipes that burst. This caused low water pressure that can lead to harmful bacteria growth in the water. The power outages also prevented water treatment plants from properly treating the water for several days, thereby leaving many residents without clean drinking water and worsening the storm’s impacts. The National Governors Association has been working with states on this connection between water and energy and strategies for conserving those resources for several years. NGA held a Water-Energy Nexus Learning Lab in September 2020. This event invited two leading states in the water-energy nexus space, Arizona and Wisconsin, to showcase some of their model policies and programs to other states, Maryland, Nevada, North Carolina, North Dakota, and Washington, looking for greater savings opportunities. This paper provides an overview of challenges that states are facing in developing integrated water and energy conservation policies; provides background on Arizona and Wisconsin’s innovative water-energy policies and programs; and summarizes action items the participating state teams identified for their respective states. The main categories of policy solutions identified by states at NGA’s Water-Energy Nexus Learning Lab were: Funding & Financing – providing financial incentives for water efficiency modeled after established energy efficiency programs, and an emphasis on financial support for small water and energy utilities. Education & Technical Assistance – providing more education and training opportunities about ways to achieve cost-effective energy and water savings, and the needs of resource-constrained small and medium utilities for training and other assistance. Structural Changes to Encourage Conservation – developing ways to incentivize agricultural conservation such as through water allocation strategies; adopting water reuse or water loss standards; and requiring electric utilities to consider water impacts as part of their integrated resource planning process. Communications & Data – conducting energy audits, reviewing water data provided to state agencies, and developing data benchmarking tools to measure and better manage energy and water use. Climate Strategy – establishing a multi-agency working group or other collaborative approach to determine ways to integrate energy and water savings in state policies and help meet the state climate objectives.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimal Sizing of Resilience Solutions for the U.S. Army Reserve

Power or water outages in buildings threaten the ability of the military to support surrounding communities during natural disasters. Outages can last for days, weeks or months. Typical solutions include very expensive batteries and onsite generation that are sized based on historical power needs. The U.S. Army Reserve (USAR) has teamed up with the Pacific Northwest National Laboratory (PNNL) to develop a simulation framework that optimizes future power needs to reduce the cost of resilience solutions. The approach starts with the building. Power needs during an emergency event are simulated at the building end-use level, then loads are reduced through the selection of life cycle cost-effective building-level technology improvements. These new optimized loads are then fed into a microgrid sizing tool that dynamically constructs many different combinations of solar photovoltaic, battery storage, and generator resources to meet the load for hundreds of statistically generated outage scenarios. Six site assessments completed by USAR and PNNL in 2019 have resulted in a 1-14% reduction in overall investment when optimizing the buildings first before determining the generation requirements. This approach helps the Army secure critical missions and provide a 14 day-minimum supply of necessary energy and water in the most efficient manner.

buidlings, efficiency, resilience, FEDS, MCOR↗

Resilience Metrics for Building-Level Electrical Distribution Systems with Energy Storage: Preprint

The energy system infrastructure that delivers power to a building's loads needs to be resilient, such that it can withstand and recover from extreme outages (e.g., grid faults that leave millions of people without power during severe weather events). Building-level electrical distribution systems (BEDSs) distribute power from a building's energy sources - including the grid, solar photovoltaic (PV) panels, and batteries - to its loads, including lighting, HVAC, and plug loads. BEDS with storage can provide resilience by distributing local electricity supply to critical loads during an outage. Quantitative metrics are needed to assess the resilience improvements associated with new BEDS and storage system technologies. In this paper, we apply an existing metric, the probability of outage survival curve (POSC), to BEDS with storage and propose a set of novel metrics that improve upon POSC. Through a simulation-based case study, we demonstrate how these metrics are impacted by the BEDS design and how they can be used to design a resilient system.

buildings↗

Tracking Aging in Nuclear Electrical Cable Polymers

The electrical cable network is the nerve center of a nuclear plant, providing power, instrumentation and control of critical systems during operation, planned outage, and during design basis, unplanned outage events. It is therefore important to manage cable system health through awareness of local environments adverse to cable longevity, monitoring of cable condition, and predictive understanding of cable degradation [1-3]. Nondestructive methods can be used to assess the condition of the full length of installed cables and of localized cable regions to support cable repair and replacement planning decisions [4-5]. Informed knowledge of the effects of environment on cable performance over time combined with cable state assessment data can minimize costs associated with cable management by both avoiding outages and ramifications from unexpected cable failure and by avoiding premature replacement of functional cables. In this work, the aging behavior of commonly found nuclear cable insulation and jacketing materials is investigated along with established and emerging methods for locating and quantifying cable degradation. Ethylene-propylene rubber (EPR) and chlorinated polyethylene (CPE), examples of prevalent insulation and jacket materials used in nuclear power plants (NPPs), are thermally aged at elevated temperature to induced material changes similar to those experienced by cable material under long term service conditions. Destructive and nondestructive laboratory tests are used to follow changes in the materials with aging toward establishing predictive capabilities to help extend the life of installed nuclear cables and reduce cable management operational costs.

Cable aging, EPR, CPE, NDE, nuclear↗

Invite the Chaos Monkey: Test Effect Payloads for Tuning ICS Incident Response

In 2010, when Netflix moved their operational systems to the cloud, they developed a pseudo-random mechanism to cause deliberate outages and failures of key system elements to ensure that automated systems for detecting and remediating outages were mature and fully functional. This Chaos Monkey spawned an entire Simian Army designed to ensure system resilience and enable failure response before issues became outages. Through the DARPA RADICS program, Provatech, INL, and other researchers have developed a mechanism for creating controllable failures via Test Effect Payloads (TEPs) for Industrial Control Systems in order to enable an asset owner to tune network and process sensor technology, increase the effectiveness of incident response and remediation, and highlight areas where resilient technology could bring benefit to Operational Technology. This talk will explore what a TEP is, how to create a TEP, and suggest what a systematic system resilience plan using TEP’s might look like. We will also discuss how regulated entities might employ TEP’s in a compliant resilience strategy.

42 ENGINEERING↗

Explained: Causes of Three Recent Major Blackouts and What Is Being Done in Response

While the power grid is designed to have an adequate supply of electricity generating capacity under hot and cold conditions well above or below average, weather in recent years has approached the bounds of anticipated conditions, in both magnitude and duration. Extreme weather can result in unanticipated levels of electricity demand and correlated power plant outages driven by extreme temperatures. How power system planners account for the changing role of wind and solar also plays an important role in the power grid's ability to supply enough electricity during extreme weather. In response to recent significant outages, power system planners have been focusing on ensuring methods to evaluate reliability during periods of "net peak demand" consider availability of renewable resources and capture the impact of extreme weather on power plants of all types. In particular, there is significant emphasis on the ability of natural gas-fueled power plants to operate during periods of extreme cold temperatures. The impact of extreme weather on the need to change planning processes is demonstrated in this fact sheet that discusses three significant outages that occurred in recent years.

power grid↗

Robotic Underwater Decontamination Services for Nuclear Applications-18464

Successful Underwater Robotic Decontamination Demonstrates Dose-Saving And Outage-Shortening Technology Diakont successfully provided underwater robotic decontamination services on a North American nuclear power plant's refueling cavity and dryer-separator pool in Spring 2017 using a new tool system. Historically, nuclear plant operators have conducted cleaning and decontamination of these surfaces manually, after draining water from the space. However manual decontamination is slow, and can result in excessive personnel dose exposure. The underwater robotic decontamination services present a vast improvement over manual decontamination because it reduces personnel dose exposure, reduces radwaste, doesn't impact plant chemistry, and doesn't risk inadvertently spreading contamination. Also the new decontamination method avoids the risk of personnel injury and component damage associated with hydrolasing. And by performing the decontamination robotically while the cavities are flooded, in many cases the critical path outage schedule can be shortened. Able to decontaminate horizontal, vertical, and curved surfaces, the decontamination tools easily navigate to areas within flooded cavities that are inaccessible to previous solutions, performing decontamination in parallel to other activities including fuel movement. Also, unlike other legacy solutions, the new tools do not require continuous use of an overhead crane or other method of suspension while performing the decontamination activities. The ROV-type decontamination tool attaches and drives along the cavity and component surfaces using a high-force, no-flow vortex generator, even in the presence of Residual Heat Removal (RHR) or shutdown cooling flow. Efficient, effective cleaning is performed using a rugged brushing action to detach the crud, while vacuuming it away at high flow rates to a submerged filter. At the Spring 2017 refueling outage, the decontamination services with the new methodology were so effective that no additional manual cavity decontamination was required after drain-down. Using the tool's ability to swim, attach, and crawl, field technicians decontaminated the majority of the surfaces designated by the plant operator. Preliminary surveys indicated that all contamination levels were reduced to <50 K dpm/100 cm{sup 2}, helping the utility meet their INPO/Industry collective radiation exposure goals. The new cleaning and decontamination services are ideal for servicing various underwater areas within nuclear power plants such as refueling cavities, BWR-6 drywell heads, spent fuel pools, cask loading pools and fuel transfer canals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Accuracy Signal Validation Framework for Sensor Calibration Assessment in NPPs

Effective and efficient health management of sensing channels and instrumentation supports reliable and accurate process monitoring capacities in any industry. Current practice in the nuclear industry relies on periodic calibration assessment and correction activities. This time based maintenance technique consists of three steps: i) removal of sensor to a test environment, ii) testing and recalibration, and iii) reinstallation of sensor into its working environment. This procedure is highly labor intensive, adds to the outage cost and timeline, and contributes to worker radiation exposure and ALARA requirements. Furthermore, the human element contributes to error factors in all stages of the procedure. The effectiveness of this calibration procedure after sensors are returned to working environmental variables also raises concerns, and the practicability of this periodic approach is uncertain for future reactor designs with longer operating cycles between refueling outages. Studies indicate that periodic calibration assessment find only 10% of sensing instrumentations with calibration issues during a single outage (18- 24 months), meaning at least 90% of sensors are undergoing unnecessary maintenance actions. This provides an opportunity to maintain the current levels of safety and functional integrity with fewer, more targeted maintenance actions and lower economic burden. Performance-based maintenance planning shows much promise over current periodic maintenance approaches. Specifically, online monitoring (OLM) utilizes the continually collected process data to non-intrusively monitor the calibration status of process instrumentation and detect the onset of de-calibration, thereby minimizing the number of recalibration procedures required. Ultimately, this can lead to termination of time based recalibration at NPPs. OLM utilizes the process measurements made for process monitoring and control to evaluate the calibration status of the sensors and instrumentation making the measurements. OLM can detect and differentiate sensor faults and process anomalies, thus providing a valuable tool to suit the industry's and regulatory body's requirements. Though supported by more than a decade of research, OLM for sensor calibration assessment is yet to be implemented in the US fleet due to regulatory requirements and constraints. As shown in Figure 1, OLM utilizes process data to train statistical models that predict normal, error-free process behavior. Measured process values are compared with error-corrected predictions to ascertain the presence of faults. The reliability of OLM is dependent on the quality of its predictions, measured in part by the uncertainty in these predictions. This research develops a framework to accurately quantify the prediction uncertainty based on Bayesian inference techniques to provide the required confidence levels for OLM systems. The expected outcomes include signal validation by high-accuracy, high-confidence uncertainty quantification for variable sensor types and operating ranges. Furthermore, the framework will facilitate fault detection capacities and so-called virtual sensors, a capability to replace faulty sensor measurements with error-corrected values when a sensor fault is detected. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Increasing Energy Resilience at Tyndall Air Force Base

With increasing frequency of utility grid outages in the United States, there is growing interest in assessing risk and developing mitigations to reduce the impact of such outages. The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) developed an all-hazards energy resilience assessment methodology to help sites develop a comprehensive suite of mitigation actions to increase site energy resilience.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Compensating rain induced impairments in terrestrial FSO links using aperture averaging and receiver diversity

In this paper, we investigate the performance of a free space optical link considering the deteriorations caused by heavy rain. The applicability of receiver diversity and aperture averaging techniques to compensate the rain-induced impairments is analyzed on the basis of outage probability and signal to noise ratio at varying rain intensities. A 10-Mbps on-off keying modulated optical signal is taken as the test signal for which rain specific attenuation is calculated using a laboratory testbed having controlled rainfall conditions up to 250 mm/h. A 15-m single input multi output) optical link with selection combining technique at the receiver is used to observe diversity gain. Significant diversity improvement by a factor of 1.35 is observed by comparing the results with the conventional single input single output link. Experimental observations with and without aperture averaging shows average SNR gain of 1.58 and outage probability reduction of 12.3%.

42 ENGINEERING↗

Resilient cooling strategies – A critical review and qualitative assessment

The global effects of climate change will increase the frequency and intensity of extreme events such as heatwaves and power outages, which have consequences for buildings and their cooling systems. Buildings and their cooling systems should be designed and operated to be resilient under such events to protect occupants from potentially dangerous indoor thermal conditions. This study performed a critical review on the state-of-the-art of cooling strategies, with special attention to their performance under heatwaves and power outages. We proposed a definition of resilient cooling and described four criteria for resilience—absorptive capacity, adaptive capacity, restorative capacity, and recovery speed —and used them to qualitatively evaluate the resilience of each strategy. The literature review and qualitative analyses show that to attain resilient cooling, the four resilience criteria should be considered in the design phase of a building or during the planning of retrofits. The building and relevant cooling system characteristics should be considered simultaneously to withstand extreme events. A combination of strategies with different resilience capacities, such as a passive envelope strategy coupled with a low-energy space-cooling solution, may be needed to obtain resilient cooling. Finally, a further direction for a quantitative assessment approach has been pointed out.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Passive cooling designs to improve heat resilience of homes in underserved and vulnerable communities

Disadvantaged communities face a growing threat to staying safe during heat waves, especially during coincident power outages. This study develops a methodology to evaluate the effectiveness of passive cooling measures (those that operate without power) to improve residential building heat resilience. Building performance is simulated for representative homes and on district scales in two disadvantaged communities in Fresno, California. Eleven passive measures are evaluated using four heat resilience metrics with and without grid power. Results show performance of the mitigation measures varies by building characteristics, surrounding environment, and power scenario. The two most effective measures were installing solar-control window films and adding roof insulation. For pre-1978 single-family homes, these two measures can reduce unmet degree-hours (UDH) indoors by 12% and 11% respectively without grid power, or 28% and 37% with grid power. Their respective UDH reductions at district scale typically range 8% — 20% and 4% — 12% without grid power, or 14% — 44% and 8% — 51% with grid power. Top floors have higher overheating risk than lower floors during extreme heat events with coincident power outages. Natural ventilation can help, reducing UDH by 21% — 26%. The methodology and findings from this study can help cities, communities, and utilities develop effective and targeted strategies to promote greater residential heat resilience.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗