Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Effectiveness of Redundant Communications Systems in Maintaining Operational Control of Small Unmanned Aircraft

NASA has been researching prototype technologies for an Unmanned Aircraft System (UAS) Traffic Management (UTM) system to facilitate enabling of safe and efficient civilian low-altitude airspace and UAS operations, in a series of Technical Capability Levels (TCL) activities that are increasingly complex. In TCL1, completed in 2015, visual line-of-sight operations such as agriculture, firefighting and infrastructure monitoring were addressed with a focus on geofencing and operations scheduling. Technologies and requirements needed for beyond visual line-of-sight (BVLOS) operations in sparsely populated areas were examined in TCL2 in 2016, and those for operations over moderately populated areas in TCL3 in 2017 and 2018. TCL4 will build on the earlier TCLs and focus on technologies and requirements for operations in higher-density urban areas for tasks such as news gathering, package delivery and for managing large-scale contingencies. This paper describes a communications test conducted in TCL3 and discusses insights gained from the test. In the test, operators were directed to equip UAS with redundant Command and Control (C2) communications systems, send a maneuver command to Unmanned Aircraft (UA) via the primary system, then verify execution of the sent command. This exercise was repeated with each redundant system. The test was designed to assess effectiveness of redundant C2 systems in maintaining operational control of UA. Several UAS were configured with varying arrangements to achieve redundancy, including two identical radio modems using the same frequency band, WiFi and Long-Term Evolution (LTE) cellular modems, etc. From the test, digital data such as time maneuver command sent, time maneuver verified, etc., were collected. Descriptions of methods to detect loss of C2 communications and contingency steps for such event were collected and assessed. The final paper will include a detailed analysis of the collected data leading to the following insights. First, effectiveness of redundant C2 systems depends on several factors, such as operational environment and communications service availability. For example, use of two identical point-to-point radio to connect operator and UA on the same frequency band can be effective in mitigating radio malfunction when operating in an environment where possibility of Radio Frequency (RF) interference is low, such as over open plains. However, the same arrangement may not be effective where high level of RF transmissions in broad spectrum ranges can be expected, such as over or near urban areas. For redundant systems that consist of external communications services, such as cellular and satellite communications network, redundancy is maintained only in the areas where more than one services are available. Therefore, UAS operators should have the means to plan for and monitor the performance of external communications services they are relying on to control UA. Second, communications performance needs, such as the minimum data transfer rate and the maximum tolerable latency, should be assessed to reflect the potential hazard that can come from loss of UA control. For example, UA operations over desolate area pose less hazard to people than operations over densely populated area and performance need for the former would be less than the latter.

Jung, Jaewoo↗

Corridor Design and Analysis for UAM Operations

The Urban Air Mobility (UAM) concept is a part of Advanced Air Mobility (AAM), a joint initiative between the Federal Aviation Administration (FAA), NASA, and industry to develop an air transportation system that uses new electric (i.e., green) air vehicles in geographical areas previously underserved by traditional aviation. Market forecast studies predict that there will be demand for alternate modes of air transportation using electric Vertical Take-off and Landing aircraft. UAM expands transportation networks by introducing short flights to move people and goods around metropolitan areas​. UAM is expected to improve mobility for the public, decongest road traffic, reduce trip time, and decrease strain on existing public transportation networks. Various challenges exist to make the introduction of UAM operations successful in the U.S. National Airspace System (NAS). These include but are not limited to integration with existing airports and airspace, provision of air traffic services (e.g., separation), vehicle design and certification, and community acceptance. The focus of this paper is on integration of UAM operations into the NAS via introduction of new airspace structures. UAM will operate within a regulatory, operational, and technical environment that is incorporated into the NAS​. As per the UAM Concept of Operations (ConOps), the FAA retains regulatory authority and is responsible for establishing operational parameters and maintaining oversight. The FAA’s UAM ConOps describes flights at low altitudes (below 5,000 ft) with minimal disruption to established conventional aircraft traffic and limited voice interactions with the Air Traffic Control (ATC). Early stages of UAM may use existing procedures to safely integrate UAM with conventional flights. This would involve flying under Part 91 Visual Flight Rules (VFR) and using voice for communications. The initial UAM ecosystem will utilize the current infrastructure such as routes, helipads, and ATC services, where practicable. ​A NASA study explored the use of existing helicopter routes in Dallas Fort Worth (DFW) airspace for initial UAM operations with a Letter of Agreement (LOA) that included procedures to request a Class B (controlled airspace) clearance. The research showed that the chosen approach was feasible for near-term, low-demand UAM traffic, but was not scalable. The growth of operations in today’s aviation system has resulted in airspace reorganization and procedures to ensure safety and efficiency as traffic rates increase. One proposed operating innovation that can help with the scalability of UAM is establishing routes and corridors. This may look similar to the Area Navigation (RNAV) procedures used today to streamline operations into busy airports. However, instead of FAA automation systems and ATC managing the flow of traffic, some UAM concepts envision a third-party service provider performing this role as part of the Provider of Services for UAM (PSU) network. The FAA’s UAM ConOps posits that new airspace structures such as UAM corridors include the following design criteria: 1) Minimal impact on existing NAS operations, 2) no or minimal additional ATC services, 3) public interest considerations such as noise, safety, and security, and 4) customer needs. The airspace available in urban environments is limited by the height of buildings, the effect of weather including wind gusts, privacy needs, and a clearance envelope. The new airspace structure would need to be designed around large airports and urban areas where the initial market demand is likely to exist. NASA has started evaluating airspace in the Dallas Fort Worth area to design new airspace structures, keeping the first two design criteria in mind. It is assumed that there will be an on-board pilot-in-command, and the flights will operate under VFR in Visual Meteorological Conditions. Corridors will be required in controlled airspace, whereas UAM operations can fly in uncontrolled Class G and E airspace using current day rules. Keeler et. al identified factors and heuristics for development of routes for UAM operations for integration with airspace close to large airports such as Dallas Fort Worth and Dallas Love Field. This paper describes the heuristics applied to define the corridors, analyzes them with respect to legacy traffic and presents key results.

Urban Air Mobility↗

“Just Do It” Mission Operations Training in a COVID World

“No”- “not”- “can’t do it” – these words don’t fly in M2020 Mission Operations. The M2020 Surface Mission Operations Team trained for landing the Perseverance Rover under COVID-19 remote work/mandatory stay-at-home conditions. Training activities included presenting Flight Schools to the team via video conferencing, training COVID personal safety requirements to on-premises staff, and constantly updating and communicating COVID restrictions to the team as safety requirements changed. This paper explores the impact of COVID on the Mission System Training for M2020 Mission Operations. The layers of COVID, aptly named the “COVID Tax” by team management, affected project roles, communications, personnel interactions, operations facility usage and training exercises practiced by the team. Flight Schools and Operational Readiness Tests (ORTs) are driving forces behind the surface mission operations training. These activities work hand-in-hand to prepare the team for landing day, surface operations that transition from cruise to nominal operations, and nominal operations. Under normal training conditions, Flight Schools and ORTs are only concerned with tactical operations for the Uplink (Command) Downlink (Analysis) and Campaign Implementation (Planning) Teams of scientists and system engineers. Due to COVID, and the necessity to maintain physical distance between people, training for the landing team needed to include the new category of COVID personal safety. COVID also necessitated remote teams and video conferencing of the entirety of Flight Schools. This reliance on distance learning had not been done on previous missions. We will explore the advantages and disadvantages of video conferencing as a training platform; training effectiveness in communicating and practicing the multiple changes to the COVID safety protocols; and the timing in which we received and responded to COVID directives. Additionally, this paper will review the practical measures taken by the on-premises team and how the team adapted during the readiness tests, landing, and early mission operations, as well as how the team responded to the post-vaccine ramping down of COVID Protocols. The M2020 Surface Mission Operations Team responded very well to the challenges of COVID. All pre-landing operational and COVID-related training was completed. Post-landing COVID Training was provided as needed to new on-premises personnel. Training presented on COVID for the first operational readiness test (ORT) consisted of 2.5 hours of training. Each ORT had COVID Training. A person who had participated in all of the ORTs from September 2020 – February 2021 would have received over 7 hours of COVID Training. By ORT-12 (approximately 8 weeks after the first ORT), the Training team consolidated the original COVID training to a one-hour COVID Basic Training course, with additional recommended training. The Basic training course was updated after landing, as vaccines became available. COVID Training had multiple Flight Schools in the self-directed Blackboard Learning system, as well as a Quick Reference Wiki for Onboarding of new on-premises personnel and keeping on-premises personnel up-to-date. COVID Training covered many topics including practical methods of 6-foot distancing, how to interact with an IT professional when help was needed at a workstation, and challenging indoor meal-eating protocols. COVID Training continued to be updated, as the lab and the project respond to the virus variants and federal, state and local ordinances.

Rosette, Theresa↗

Viper Science Operations: Lunar Dynamic Science Table and ‘Tracker’ Tool.

Introduction: The NASA VIPER lunar rover mission [1] presents a unique operational paradigm within the history of robotic spaceflight. The proximity of the Moon to the Earth and the terrain elements (surface characteristics, light/shadow dynamics, communication links) of the Lunar South Polar landing site create unprecedented operational conditions between these two planetary bodies. Apollo era lunar science and exploration included humans in situ to operate instruments and assimilate observational inputs in real-time. Previous lunar orbital missions have worked to operational timescales, e.g., decisional timelines and communication exchanges, that were weeks in duration. Mars rover missions have worked to operational timescales, e.g., decisional timelines and communication exchanges between Mars and Earth, that were hours, days, and weeks in length. In the case of the VIPER mission, our operational decisioning for rover driving and instrument commanding will be compressed to minute-scale timeframes. These operational conditions will directly impact the workflow and speed with which the VIPER Science Team (VST) will be required to synthesize and analyze data and produce timely science-driven decisions throughout surface mission operations [2]. The VST in the VIPER Mission Science Center (MSC) and the Mission Operations Center (MOC) shall provide mission-enhancing scientific input to guide traverse planning and drill site confirmation/selection throughout surface operations. Further, the VST input will be of vital importance to the mission’s ability to maximize science return and to meet broader NASA objectives for future lunar ISRU and exploration activities. Specifically, the VST in the MSC and MOC will provide science-driven, consensus-based, timely input and decision-making to enhance mission operations and align mission science return with broader Agency goals. They will enable the characterization of the distribution (lateral and vertical extent, concentration, variability), form (chemical/physical state of these reservoirs of lunar water and key isotopes), and context (e.g., accessibility/overburden, environment, soil mechanics, trafficability, and temperatures) of lunar polar volatiles and water content for the VIPER mission. Additionally, the MSC will be selecting or reconfirming the location and path towards and from the third drill site (Drill Site Charlie) within each Science Station [6]. To enable scientific decision-making within the operational paradigm of the VIPER lunar rover mission requires detailed articulation of the VST’s scientific objectives and goals, and the operationalization of these objectives and goals through their association with specific data products, tasks, and decisional procedures. Further, defining and tracking scientific success metrics throughout surface operations will enable the VST to have a quantified understanding of the mission’s evolving ability to accomplish the stated scientific objectives and goals both during and after the mission. This abstract provides an overview of the methods and development activities towards defining, operationalizing, and tracking scientific objectives and goals throughout VIPER surface operations. Specifically, we focus on the VIPER Lunar Dynamic Science Table (LDST) and the VIPER “Tracker” tool.

Darlene Sze Shien Lim↗

Evaluation of Initial and Mid-Term Air Traffic Procedures for Urban Air Mobility Operations

Urban air mobility (UAM) operations are expected to expand in scale over the next several years as novel aircraft types, including electric vertical takeoff and landing aircraft, are certified and begin operations. These new aircraft may increase safety, decrease noise, and lower operating costs compared with helicopters, allowing them to operate in ways existing aircraft do not. It is vital that these expanded operations are compatible with and do not disrupt existing operations or the air traffic management system. To study the ways in which scaled UAM operations can best integrate in the national airspace system, NASA and Joby Aviation partnered to conduct a high-fidelity air traffic controller-in-the-loop study. Building on air traffic procedures used to manage high tempo operations in other parts of the airspace, new procedures, routes, and communications protocols were developed and tested by retired controllers in NASA’s Future Flight Central tower simulation facility. In addition, new cooperative airspace constructs in the form of corridors were developed to understand their potential contributions to even greater scales of operation. The controllers managed traffic scenarios in the Dallas-Fort Worth and Dallas Love Field airports consisting of fleets of up to 100 UAM aircraft operating alongside traditional traffic . Metrics for air traffic controller workload, duration of communications, departure delays, and other measures of allowable aircraft throughput were collected. The analysis indicates that using today’s procedures for initial UAM operations under nominal conditions could enable up to 40 operations per hour to an airport’s central terminal area if that involved crossing a runway and up to 55operations per hour if reaching the central terminal did not involve crossing a runway. Operations at these tempos did not delay or otherwise interfere with simulated runway traffic and were rated acceptable by the air traffic controllers. The new corridor constructs dramatically lowered controller workload in certain circumstances, suggesting they may be effective in further increasing the allowable scale of operations.

Urban Air Mobility↗

Multi-Operator Multi-UAV (MOMU) Control: Exploring the Influence of Sensor Tools and Playbook Task Delegation

New concepts of operations for Unmanned Aerial Vehicles (UAVs) will require a change from the current 2:1 operator to vehicle crew configuration. One particular control paradigm, largely driven by logistics, manpower, and training burdens, as well as the desire to force multiply, involves a single operator simultaneously managing multiple UAVs. This mode of operations has shown to significantly increase cognitive workload and decrease situation awareness, as operators are required to simultaneously attend to multiple sources of information. One potential way to mitigate potential drawbacks of multi-vehicle control by a single operator is to migrate to a multi-operator multi-UAV (MOMU) crew configuration, whereby M operators control N (> M) vehicles. This type of crew configuration can be organized in several ways to dynamically manage cognitive workload, match operator qualifications and skills to mission requirements, increase utilization of available assets, and thereby achieve maximum force multiplication. The present experiment examined task performance in a simulated MOMU environment and evaluated the potential benefits of sensor management aids ("Tools") as well as integrated sensor and flight automation ("Plays") compared to a fully manual condition ("Manual"). Tools support the operator by facilitating rapid understanding and management of sensor information, while the Plays support the operator by offloading/automating subtasks. Six pairs of participants were recruited for this study and tasked with sharing a pool of UAVs in order to conduct reconnaissance, surveillance, and target acquisition (RSTA) missions in adjacent Areas of Operation (AOs). Participants were given four tasks to accomplish, in order of priority: 1) prosecute High Value Targets (HVTs); 2) identify / track targets (military vehicles); 3) identify / mark civilian vehicles; and 4) respond to chat messages. Performance on the mission tasks was measured in terms of accuracy and reaction time. A composite mission score was also calculated using a payoff matrix that weighted each task according to priority. The results indicate that Playbook demonstrated better performance overall with higher accuracy rates and the highest composite score compared to Tools and Manual. The implications of these results to supporting future MOMU concepts of operations is discussed.

Playbook↗

ISS Payload Operations Training During the COVID-19 Pandemic: Impacts and Solutions

Introduction: The onset and the protracted duration of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity in 2020. The world’s space agencies and their missions were not immune to the unpredictable and wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that critical function. Mission support teams, especially for complex and crewed missions like the International Space Station (ISS) were forced to rapidly rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their scientific missions, providing recurring proficiency and currency material to flight controllers, as well as ensuring new team members are ready to join their colleagues on console. Every element of training was impacted by COVID restrictions. From orientation and introductory classes for new controllers, training for scientists and payload developers, to simulations and advanced lessons, critical On the Job Training (OJT) and final evaluations; all aspects faced new challenges. Operations trainers at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, were forced to rethink, retool, and become more efficient with trainees and training resources in order to continue supporting payload operations on the ISS. Impacts and Barriers to Operations Training: The pandemic started in the United States in early March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to the ISS Payload Operations Center was restricted to only those people supporting console operations. Thus, use of on-site NASA facilities and any trainer to trainee face-to-face interaction was not authorized. Trainers and trainees had to quickly shift to 100% remote learning. In the short term, this was not a problem since NASA had already prepared Information Technology (IT) resources that facilitated remote access to mission resources like classes, documents and teleconferences. However, instructors quickly discovered the classes that they were accustomed to delivering in a large classroom environment did not translate well to remote teaching. The lack of non-verbal communication with the class became a major barrier to instruction. Another significant hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of planning and executing even small simulations proved to be challenging, almost impossible, due to IT technology and public internet limitations. With simulations essentially stopped, as well as the restrictions on most OJT training, trainees were essentially stopped in their advancement towards certification. An additional barrier that had to be overcome was the formal documentation of the curriculum objectives. Even though NASA had been deliberately transitioning to electronic documents for years, some organizations were still relying on “pen and ink” documents to formalize training completion. The logistics of implementing secure and controlled e-signature documents in a standardized, NASA approved format had to be addressed. Lesson Learned and Efficiencies: Once the various limitations were identified, ISS trainers at MSFC discussed, proposed, and prioritized new options and techniques. Transitioning to all electronic learning materials and certifications was a relevantly easy fix. Teaching courses to large and diverse groups took additional shifts in the NASA training paradigm. Likewise, methods and procedures for preparing astronauts for their missions were forced to be revised. Simulation supervisors and their teams were also forced to find more efficient techniques to provide realistic training experience. Communication and approvals from management was essential. In every case, the ISS payload operations instructors found novel and efficient solutions to all functions listed above. This paper will discuss the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS Operations↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Operability Engineering for the Europa Clipper Mission: Formulation Phase Results and Lessons

Operability is an important factor in both success and cost of space missions, but is difficult to quantify, and can suffer if not considered as part of early formulation and design. The Europa Clipper mission has taken a deliberate approach to infusing operability into the concepts and designs since early in the formulation phase. This paper reports on that approach to operability and the results thus far, as the Europa Clipper mission approaches its Preliminary Design Review. Definitions for operability and its various aspects are presented along with a description of the engineering and organizational approach taken to infusing operability into designs. A number of examples of operability requirements are shown, and key examples of trade studies and design decisions are described, along with influence on outcomes motivated by operability considerations. We find that support from management, empowerment of a cross-discipline Operability Working Group, consistent tracking of operability aspects over time, and broad infusion and participation in operability considerations are all significant factors in implementing operability. In particular, thoughtful and deliberate consideration of operability criteria has led to design decisions that include proper consideration of concerns related to the mission operations phase, and seem likely to provide better science results and mission outcomes.

Huh, Shin M.↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Opportunities, Challenges, and Research Needs for Remote Microreactor Operations

As the nuclear industry develops new advanced reactor technologies, many companies are embracing this advancement by pursuing the development of microreactors. The term microreactor generally refers to a nuclear reactor with an operating power of 20 MW(thermal) or less. The power range of microreactors makes them appealing for many use cases, such as powering remote communities, mining sites, and military bases. Most of the microreactor designs being pursued are expected to incorporate remote facility operations into the final product. However, no framework has yet been developed to determine what remote operations systems require for reliable, resilient, and secure operation of a microreactor. Here, this work identifies the research needs for challenges that are unique to remote operations and monitoring for microreactors, specifically regarding instrumentation and control, communication methods, regulatory requirements, and operational policies. The types of commands and sensor measurements that must be transmitted between the facilities, as well as methods for verifying the trustworthiness of these signals, are assessed. This work evaluates the security, reliability, and performance requirements that must be met when considering the selection of communication hardware and protocols for use in remote operations. Also, an assessment was performed to study how remote operations fit within current regulatory requirements and what may need to be updated in regulatory policy to allow for remote operation. Finally, the operational contingencies unique to remote operations that must be in place for responses to abnormal events are identified. This paper identifies the challenges and research opportunities within the areas of importance for the design of remote operation systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Implementation and Demonstration of the Digital Twin Certification System Remote Operations Framework

Microreactors are one promising advanced-reactor concept being pursued by the nuclear industry. They are distinguished by a relatively low power output of 20 MWth or less. These microreactors are intended for deployment in applications where conventional small-capacity power solutions, such as diesel generators, are either economically unfeasible or logistically challenging. Such applications include providing electric power and/or heat for remote communities, mining sites, defense installations, and humanitarian and disaster-relief missions. An important feature for the successful deployment of microreactors is their capability to be operated remotely. This capability can significantly reduce staffing costs by eliminating the need for licensed operators to be physically present at each reactor site. Instead, operators can be centralized in a single remote operations center placed in an economically advantageous location, thereby optimizing resources by consolidating expertise and enhancing operational efficiency. However, the implementation of a remote operation system for nuclear reactors raises new concerns regarding the security, reliability, and resilience of such a system. One way in which remote operations can be supported in a manner that maintains system security, reliability, and resilience is through the use of digital twins in a novel framework designed to verify and validate sensor data and commands communicated between the remote operations center and reactor. This framework, known as the Digital Twin Certification System (DTCS), has previously been proposed as an operations architecture that can bring security and resiliency levels of remote nuclear-reactor operations to a level acceptable for commercial deployment. This paper moves the proposed DTCS architecture from concept to reality by presenting the implementation and testing of the system. The rationale and implementation of the DTCS using tools such as DeepLynx and Apache Airflow, is covered in-depth. This is followed by a demonstration of the DTCS by applying the implemented system architecture to the Single Primary Heat Extraction and Removal Emulator, a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The demonstration includes both normal and abnormal operating scenarios to highlight how the DTCS can increase the security, reliability, and resilience of a remote operations system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Implementation and Demonstration of the Digital Twin Certification System Remote Operations Framework

Microreactors are one promising advanced-reactor concept being pursued by the nuclear industry. They are distinguished by a relatively low power output of 20 MWth or less. These microreactors are intended for deployment in applications where conventional small-capacity power solutions, such as diesel generators, are either economically unfeasible or logistically challenging. Such applications include providing electric power and/or heat for remote communities, mining sites, defense installations, and humanitarian and disaster-relief missions. An important feature for the successful deployment of microreactors is their capability to be operated remotely. This capability can significantly reduce staffing costs by eliminating the need for licensed operators to be physically present at each reactor site. Instead, operators can be centralized in a single remote operations center placed in an economically advantageous location, thereby optimizing resources by consolidating expertise and enhancing operational efficiency. However, the implementation of a remote operation system for nuclear reactors raises new concerns regarding the security, reliability, and resilience of such a system. One way in which remote operations can be supported in a manner that maintains system security, reliability, and resilience is through the use of digital twins in a novel framework designed to verify and validate sensor data and commands communicated between the remote operations center and reactor. This framework, known as the Digital Twin Certification System (DTCS), has previously been proposed as an operations architecture that can bring security and resiliency levels of remote nuclear-reactor operations to a level acceptable for commercial deployment. This paper moves the proposed DTCS architecture from concept to reality by presenting the implementation and testing of the system. The rationale and implementation of the DTCS using tools such as DeepLynx and Apache Airflow, is covered in-depth. This is followed by a demonstration of the DTCS by applying the implemented system architecture to the Single Primary Heat Extraction and Removal Emulator, a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The demonstration includes both normal and abnormal operating scenarios to highlight how the DTCS can increase the security, reliability, and resilience of a remote operations system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Effect of Engine Operating Variables on Combustor-inlet Parameters

Studies of the fundamental processes of combustion are usually concerned with wide ranges of investigation of individual processes. In general, each fundamental combustion process may be studied in an environment that is most suited to its evaluation and possibly unrelated basically to any practical application. The majority of the data presented in volume I of this series concern the fundamental aspects of combustion as functions of the individual occurrence of various contributing processes. In a jet engine, however, the various fundamental combustion processes may occur simultaneously and may interact. Furthermore, the engine environment usually does not permit independent variation of single combustion parameters, since specified operating conditions impose specific values on the parameters. In volume II, data are presented to show the effect of operating conditions on the over-all combustion process in different combustion components. To show the effect of operating conditions, it is necessary to specify the range of these conditions within which combustion components may operate. Therefore, this chapter presents only the operating conditions that might be required in the primary combustors and afterburners of typical current turbojet engines. (Corresponding information on ram-jet engines is presented in ch. xisi.) This chapter is not intended to serve as an explanation of engine operation. The operating conditions of the combustion components are presented in terms of total pressures and temperatures at the primary-combustor and afterburner inlets, reference velocities and outlet total temperatures of the primary combustors, and velocities at the plane of the flameholder in the afterburners. The data are presented to relate the operating regions of typical current turbojet combustion components to flight altitudes, Mach numbers, and modes of engine operation. Specifically, data are presented for the combustion parameters of the primary combustor and afterburner of three turbojet engines having rated compressor total-pressure ratios of 5, 8, and 12 under full-throttle conditions. Operational data for the primary combustor also include part-throttle operation at 70, 80, and 90 percent of rated engine speed and windmifling operation. The range of flight conditions includes altitudes from sea level to 65,000 feet and flight Mach numbers from zero to 1.6.

Jones, A. W.↗

Operator assistant to support deep space network link monitor and control

Preparing the Deep Space Network (DSN) stations to support spacecraft missions (referred to as pre-cal, for pre-calibration) is currently an operator and time intensive activity. Operators are responsible for sending and monitoring several hundred operator directivities, messages, and warnings. Operator directives are used to configure and calibrate the various subsystems (antenna, receiver, etc.) necessary to establish a spacecraft link. Messages and warnings are issued by the subsystems upon completion of an operation, changes of status, or an anomalous condition. Some points of pre-cal are logically parallel. Significant time savings could be realized if the existing Link Monitor and Control system (LMC) could support the operator in exploiting the parallelism inherent in pre-cal activities. Currently, operators may work on the individual subsystems in parallel, however, the burden of monitoring these parallel operations resides solely with the operator. Messages, warnings, and directives are all presented as they are received; without being correlated to the event that triggered them. Pre-cal is essentially an overhead activity. During pre-cal, no mission is supported, and no other activity can be performed using the equipment in the link. Therefore, it is highly desirable to reduce pre-cal time as much as possible. One approach to do this, as well as to increase efficiency and reduce errors, is the LMC Operator Assistant (OA). The LMC OA prototype demonstrates an architecture which can be used in concert with the existing LMC to exploit parallelism in pre-cal operations while providing the operators with a true monitoring capability, situational awareness and positive control. This paper presents an overview of the LMC OA architecture and the results from initial prototyping and test activities.

Cooper, Lynne P.↗

New Human-Computer Interface Concepts for Mission Operations

The current climate of budget cuts has forced the space mission operations community to reconsider how it does business. Gone are the days of building one-of-kind control centers with teams of controllers working in shifts 24 hours per day, 7 days per week. Increasingly, automation is used to significantly reduce staffing needs. In some cases, missions are moving towards lights-out operations where the ground system is run semi-autonomously. On-call operators are brought in only to resolve anomalies. Some operations concepts also call for smaller operations teams to manage an entire family of spacecraft. In the not too distant future, a skeleton crew of full-time general knowledge operators will oversee the operations of large constellations of small spacecraft, while geographically distributed specialists will be assigned to emergency response teams based on their expertise. As the operations paradigms change, so too must the tools to support the mission operations team's tasks. Tools need to be built not only to automate routine tasks, but also to communicate varying types of information to the part-time, generalist, or on-call operators and specialists more effectively. Thus, the proper design of a system's user-system interface (USI) becomes even more importance than before. Also, because the users will be accessing these systems from various locations (e.g., control center, home, on the road) via different devices with varying display capabilities (e.g., workstations, home PCs, PDAS, pagers) over connections with various bandwidths (e.g., dial-up 56k, wireless 9.6k), the same software must have different USIs to support the different types of users, their equipment, and their environments. In other words, the software must now adapt to the needs of the users! This paper will focus on the needs and the challenges of designing USIs for mission operations. After providing a general discussion of these challenges, the paper will focus on the current efforts of creatin(y an effective USI for one specific suite of tools, SERS (The Spacecraft Emergency Response System), which has been built to enable lights-out operations. SERS is a Web-based collaborative environment that enables secure distributed fault management.

Fox, Jeffrey A.↗

A Virtual Mission Operations Center - Collaborative Environment

Development of technologies that enable significant reductions in the cost of space mission operations is critical if constellations, formations, federations and sensor webs, are to be economically feasible. One approach to cost reduction is to infuse automation technologies into mission operations centers so that fewer personnel are needed for mission support. But missions are more culturally and politically adverse to the risks of automation. Reducing the mission risk associated with increased use of automation within a MOC is therefore of great importance. The belief that mission risk increases as more automation is used stems from the fact that there is inherently less direct human oversight to investigate and resolve anomalies in an unattended MOC. The Virtual Missions Operations Center - Collaborative Environment (VMOC-CE) project was launched to address this concern. The goal of the VMOC-CE project is to identify, develop, and infuse technology to enable mission operations between onsite operators and on-call personnel in geographically dispersed locations. VMOC-CE enables missions to more readily adopt automation because off-site operators and engineers can more easily identify, investigate, and resolve anomalies without having to be present in the MOC. The VMOC-CE intent is to have a single access point for all resources used in a collaborative mission operations environment. Team members will be able to interact during spacecraft operations, specifically for resolving anomalies, utilizing a desktop computer and the Internet. Mission operations management can use the VMOC-CE as a tool to participate in and monitor status of anomaly resolution or other mission operations issues. In this paper we present the VMOC-CE project, system capabilities and technologies, operations concept, and results of its pilot in support of the Earth Science Mission Operations System (ESMOS).

Medina, Barbara↗

Designing a Better Spacecraft: Assessing Flight Operability of Human Rated Spacecraft

The design of a human rated spacecraft is a complex and costly process requiring the integrated assessment of many individual criteria. Historically, it has been difficult to include in that integrated assessment the design s full impact on the flight operations community and its costs. The unique "operability requirements" have not been well understood, nor has there been a well-defined set of criteria for assessing operability. As a result, flight operations organizations and program managers are often faced with difficult and costly operations phase implementations. In response, the Mission Operations Directorate at NASA s Lyndon B. Johnson Space Center has established a formal technique to evaluate and communicate the operational characteristics of spacecraft system designs for the Constellation Program. This process is not intended to replace or replicate other critical assessments such as risk, reliability and safety assessments. Instead, this new technique adds to the assessment toolset a means to address the concerns and potential cost drivers that are unique to the operational phase of a program and the flight operations community. This paper describes the implementation and application of this "Spacecraft Flight Operability Assessment Scale" in supporting vehicle design efforts. The six key factors of flight operability are defined, with guiding principles and goals stated for each factor. A standardized rating technique provides feedback that is useful to both the operations and program management communities. Sample assessments of legacy spacecraft, including the Space Shuttle and International Space Station systems, are provided to provide real world examples of this technique s application.

Crocker, Alan R.↗