Search NASA⌕ Search

SEARCH · Search NASA

Results for “PILOT SELECTION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

STS 107 Shuttle Press Kit: Providing 24/7 Space Science Research

Space shuttle mission STS-107, the 28th flight of the space shuttle Columbia and the 113th shuttle mission to date, will give more than 70 international scientists access to both the microgravity environment of space and a set of seven human researchers for 16 uninterrupted days. Columbia's 16-day mission is dedicated to a mixed complement of competitively selected and commercially sponsored research in the space, life and physical sciences. An international crew of seven, including the first Israeli astronaut, will work 24 hours a day in two alternating shifts to carry out experiments in the areas of astronaut health and safety; advanced technology development; and Earth and space sciences. When Columbia is launched from Kennedy Space Center's Launch Pad 39A it will carry a SPACEHAB Research Double Module (RDM) in its payload bay. The RDM is a pressurized environment that is accessible to the crew while in orbit via a tunnel from the shuttle's middeck. Together, the RDM and the middeck will accommodate the majority of the mission's payloads/experiments. STS-107 marks the first flight of the RDM, though SPACEHAB Modules and Cargo Carriers have flown on 17 previous space shuttle missions. Astronaut Rick Husband (Colonel, USAF) will command STS-107 and will be joined on Columbia's flight deck by pilot William 'Willie' McCool (Commander, USN). Columbia will be crewed by Mission Specialist 2 (Flight Engineer) Kalpana Chawla (Ph.D.), Mission Specialist 3 (Payload Commander) Michael Anderson (Lieutenant Colonel, USAF), Mission Specialist 1 David Brown (Captain, USN), Mission Specialist 4 Laurel Clark (Commander, USN) and Payload Specialist 1 Ilan Ramon (Colonel, Israeli Air Force), the first Israeli astronaut. STS-107 marks Husband's second flight into space - he served as pilot during STS-96, a 10-day mission that saw the first shuttle docking with the International Space Station. Husband served as Chief of Safety for the Astronaut Office until his selection to command the STS-107 crew. Anderson and Chawla will also be making their second spaceflights. Anderson first flew on STS-89 in January 1998 (the eighth Shuttle-Mir docking mission) while Chawla flew on STS-87 in November 1997 (the fourth U.S. Microgravity Payload flight). McCool, Brown, Clark and Ramon will be making their first flights into space.

Source record↗

6th AIAA Biennial Flight Test Conference, Hilton Head Island, SC, Aug. 24-26, 1992, Selected Papers

Topics presented include training for avionics evaluation, flight testing in the '90s, methodology for the critical evaluation of flight test data, flight testing of an electric powered vehicle, and the flying qualities of a remotely piloted vehicle. Also presented are airspeed calibration using GPS, the design and conduct of a windshear detection flight experiment, the 757 fly-by-wire demonstrator flight test, and an update of the B-52 flight test program.

American Institute of Aeronautics and Astronautics↗

Controlled Rest: Profile of Use, Challenges, and Best Practices

Despite the introduction of flight, duty, and rest time regulations to reduce the risk of sleepiness, airline pilots often encounter elevated sleepiness during flight. To combat this sleepiness, in some instances, pilots can take a short nap on the flight deck (controlled rest) to improve their alertness. Little is known, however, as to when and how often this countermeasure is used operationally. Methods: Forty-four pilots from a European carrier wore actiwatches and filled in an electronic sleep and work diary for approximately 2 weeks resulting in data from 239 flights. Self-reported in-flight rest periods were used to set rest intervals and sleep was estimated within these intervals using Philips Actiware 6.0.9. Wake threshold selection was set to medium; sleep threshold detection algorithm was set to 10 immobile minutes at sleep onset and sleep end. Timing of sleep periods was analyzed relative to home base time. Results: Preliminary analyses showed that controlled rest was taken on 46% (n=110) of flights. On 23 flights (10%) pilots reported taking two controlled rest periods. Sleep, as estimated by actigraphy, was achieved during 80% (n=106) of controlled rest periods. The mean sleep duration was 32 (± 12) minutes estimated within successful controlled rest periods. Approximately two-thirds (67.5%, n=81) of all rest periods were initiated during home base time night (0000h-0800h). On 11% (n=26) of flights, pilots also reported taking bunk rest (longer rest period in a designated sleeping facility).Conclusion:This study shows that controlled rest is commonly used as a countermeasure to sleepiness on the flight deck. Further analysis is required to determine what other factors contribute to the decision to take controlled rest, and how effective it is in reducing sleepiness on the flight deck.

Hilditch, Cassie J.↗

Description of path-in-the-sky contact analog piloting display

A contact analog display called Path-In-The-Sky (PITS) integrates information on airplane attitude, airplane kinematic performance, navigation situation, and path prediction into one instrument. The pictorial format utilized in the PITS display concept was designed to reduce the required instrument scan and to simplify interpretation of informtion with the objective of reducing pilot work load. Described are the symbology of the PITS display, the coordinate systems used to generate the display, and the magnitudes of pertinent geometric characteristics selected during the display development. Also included are examples of the PITS display generated on a stand-alone graphics computer.

Knox, C. E.↗

Activities of the Pilot Land Data System project

The University of Maryland's Remote Sensing Systems Laboratory submitted to NASA/Goddard an interim progress report on the work being conducted within its Pilot Land Data System IPLDS project. The Remote Sensing Systems Laboratory addressed the following tasks: (1) identify data types and data sources needed to describe the selected test sites in collaboration with Goddard's Hydrological Sciences Branch; (2) define the procedures necessary to access/acquire this data; (3) conduct meetings with the PLDS Systems Engineering Group to identify functional specification priorities for PLDS development; (4) assemble documentation on historical remotely sensed imagery and transfer of such information to the PLDS Data Management Group; (5) collect data identified by Goodard's Hydrological Sciences Branch for data set inventory in PLD; (6) develop a Workstation-PLDS system interface over high speed lines, (7) develop and test through a Phase 1 demonstration of a micro workstation to access PLDS; and (8) establish interdepartmental agreement of development of computer link for electronic access of water resources data from USGS.

Sircar, J. K.↗

Lunar Base Sitting

Speculation with regard to a permanent lunar base has been with us since Robert Goddard was working on the first liquid-fueled rockets in the 1920's. With the infusion of data from the Apollo Moon flights, a once speculative area of space exploration has become an exciting possibility. A Moon base is not only a very real possibility, but is probably a critical element in the continuation of our piloted space program. This article, originally drafted by World Space Foundation volunteers in conjuction with various academic and research groups, examines some of the strategies involved in selecting an appropriate site for such a lunar base. Site selection involves a number of complex variables, including raw materials for possible rocket propellant generation, hot an cold cycles, view of the sky (for astronomical considerations, among others), geological makeup of the region, and more. This article summarizes the key base siting considerations and suggests some alternatives. Availability of specific resources, including energy and certain minerals, is critical to success.

Staehle, Robert L.↗

Instrument Display Visual Angles for Conventional Aircraft and the MQ-9 Ground Control Station

Aircraft instrument panels should be designed such that primary displays are in optimal viewing location to minimize pilot perception and response time. Human Factors engineers define three zones (i.e. cones ) of visual location: 1) "Easy Eye Movement" (foveal vision); 2) "Maximum Eye Movement" (peripheral vision with saccades), and 3) "Head Movement (head movement required). Instrument display visual angles were measured to determine how well conventional aircraft (T-34, T-38, F- 15B, F-16XL, F/A-18A, U-2D, ER-2, King Air, G-III, B-52H, DC-10, B747-SCA) and the MQ-9 ground control station (GCS) complied with these standards, and how they compared with each other. Selected instrument parameters included: attitude, pitch, bank, power, airspeed, altitude, vertical speed, heading, turn rate, slip/skid, AOA, flight path, latitude, longitude, course, bearing, range and time. Vertical and horizontal visual angles for each component were measured from the pilot s eye position in each system. The vertical visual angles of displays in conventional aircraft lay within the cone of "Easy Eye Movement" for all but three of the parameters measured, and almost all of the horizontal visual angles fell within this range. All conventional vertical and horizontal visual angles lay within the cone of Maximum Eye Movement. However, most instrument vertical visual angles of the MQ-9 GCS lay outside the cone of Easy Eye Movement, though all were within the cone of Maximum Eye Movement. All the horizontal visual angles for the MQ-9 GCS were within the cone of "Easy Eye Movement". Most instrument displays in conventional aircraft lay within the cone of Easy Eye Movement, though mission-critical instruments sometimes displaced less important instruments outside this area. Many of the MQ-9 GCS systems lay outside this area. Specific training for MQ-9 pilots may be needed to avoid increased response time and potential error during flight. The learning objectives include: 1) Know three physiologic cones of eye/head movement; 2) Understand how instrument displays comply with these design principles in conventional aircraft and an uninhabited aerial vehicle system. Which of the following is NOT a recognized physiologic principle of instrument display design? Cone of Easy Eye Movement 2) Cone of Binocular Eye Movement 3) Cone of Maximum Eye Movement 4) Cone of Head Movement 5) None of the above. Answer: # 2) Cone of Binocular Eye Movement

Kamine, Tovy Haber↗

Instrument Display Visual Angles for Conventional Aircraft and the MQ-9 Ground Control Station

Aircraft instrument panels should be designed such that primary displays are in optimal viewing location to minimize pilot perception and response time. Human Factors engineers define three zones (i.e. "cones") of visual location: 1) "Easy Eye Movement" (foveal vision); 2) "Maximum Eye Movement" (peripheral vision with saccades), and 3) "Head Movement" (head movement required). Instrument display visual angles were measured to determine how well conventional aircraft (T-34, T-38, F- 15B, F-16XL, F/A-18A, U-2D, ER-2, King Air, G-III, B-52H, DC-10, B747-SCA) and the MQ-9 ground control station (GCS) complied with these standards, and how they compared with each other. Methods: Selected instrument parameters included: attitude, pitch, bank, power, airspeed, altitude, vertical speed, heading, turn rate, slip/skid, AOA, flight path, latitude, longitude, course, bearing, range and time. Vertical and horizontal visual angles for each component were measured from the pilot s eye position in each system. Results: The vertical visual angles of displays in conventional aircraft lay within the cone of "Easy Eye Movement" for all but three of the parameters measured, and almost all of the horizontal visual angles fell within this range. All conventional vertical and horizontal visual angles lay within the cone of "Maximum Eye Movement". However, most instrument vertical visual angles of the MQ-9 GCS lay outside the cone of "Easy Eye Movement", though all were within the cone of "Maximum Eye Movement". All the horizontal visual angles for the MQ-9 GCS were within the cone of "Easy Eye Movement". Discussion: Most instrument displays in conventional aircraft lay within the cone of "Easy Eye Movement", though mission-critical instruments sometimes displaced less important instruments outside this area. Many of the MQ-9 GCS systems lay outside this area. Specific training for MQ-9 pilots may be needed to avoid increased response time and potential error during flight.

Bendrick, Gregg A.↗

Flight-path and airspeed control for the STOL approach and landing

Analytical investigations and piloted moving base simulator evaluations were conducted for manual control of flight path and airspeed for the approach and landing of a powered lift jet STOL aircraft. Flight-path and airspeed response characteristics were described analytically and were evaluated for the simulation experiments which were carried out on a large motion simulator. The response characteristics were selected and evaluated for a specified path and speed control technique. These characteristics were the initial flight-path response, flight-path overshoot, flight-path-airspeed coupling in response to a change in thrust, and the sensitivity of airspeed to pitch-attitude changes. Results are presented in the form of pilot opinion ratings and commentary, substantiated where appropriate by response time histories and aircraft states at the point of touchdown.

Franklin, J. A.↗

Development and pilot line production of lithium doped silicon solar cells

The work performed over the period of September 1971 to August 1972 to develop production processes for fabrication of lithium doped P/N cells is described. The BCl3 diffusion without 02 was selected as the optimum diffusion process for fabrication of lithium doped cells. An 8-2-7 (warm up - deposition - drive-in time in minutes) diffusion schedule at 1055 C was used for the first two lots (300 cells each) delivered to JPL. Cell efficiencies ranged from 11.0 to 13.7% based on an AMO of 135.3 mW/sq cm. These high efficiencies were obtained using from 10 to 40 cells per boron diffusion; increasing the quantity beyond 40 resulted in lower outputs. At this point, the emphasis was placed on investigation of a BCl3 with 02 diffusion. Through evaluation of the effects of diffusion time and temperature, gas flow rates, and desposition plus drive-in vs. continuous deposition and no drive-in cycles, diffusion parameters were determined which produced short circuit currents of 136 + or - 4 mA for ten cells spaced along 12 in. of the diffusion boat. The quantity was increased to 60, 100, and 150 cell diffusions with no more variation in cell short circuit current than observed with 10 cells.

Payne, P. A.↗

Pilot interaction with automated airborne decision making systems

Two project areas were pursued: the intelligent cockpit and human problem solving. The first area involves an investigation of the use of advanced software engineering methods to aid aircraft crews in procedure selection and execution. The second area is focused on human problem solving in dynamic environments, particulary in terms of identification of rule-based models land alternative approaches to training and aiding. Progress in each area is discussed.

Rouse, W. B.↗

A linguistic geometry for 3D strategic planning

This paper is a new step in the development and application of the Linguistic Geometry. This formal theory is intended to discover the inner properties of human expert heuristics, which have been successful in a certain class of complex control systems, and apply them to different systems. In this paper we investigate heuristics extracted in the form of hierarchical networks of planning paths of autonomous agents. Employing Linguistic Geometry tools the dynamic hierarchy of networks is represented as a hierarchy of formal attribute languages. The main ideas of this methodology are shown in this paper on the new pilot example of the solution of the extremely complex 3D optimization problem of strategic planning for the space combat of autonomous vehicles. This example demonstrates deep and highly selective search in comparison with conventional search algorithms.

Stilman, Boris↗

Low-speed aerodynamic characteristics from wind-tunnel tests of a large-scale advanced arrow-wing supersonic-cruise transport concept

Tests have been conducted to extend the existing low speed aerodynamic data base of advanced supersonic-cruise arrow wing configurations. Principle configuration variables included wing leading-edge flap deflection, wing trailing-edge flap deflection, horizontal tail effectiveness, and fuselage forebody strakes. A limited investigation was also conducted to determine the low speed aerodynamic effects due to slotted training-edge flaps. Results of this investigation demonstrate that deflecting the wing leading-edge flaps downward to suppress the wing apex vortices provides improved static longitudinal stability; however, it also results in significantly reduced static directional stability. The use of a selected fuselage forebody strakes is found to be effective in increasing the level of positive static directional stability. Drooping the fuselage nose, which is required for low-speed pilot vision, significantly improves the later-directional trim characteristics.

Smith, P. M.↗

Levels of Information Processing in a Fitts law task (LIPFitts)

State-of-the-art flight technology has restructured the task of human operators, decreasing the need for physical and sensory resources, and increasing the quantity of cognitive effort required, changing it qualitatively. Recent technological advances have the most potential for impacting a pilot in two areas: performance and mental workload. In an environment in which timing is critical, additional cognitive processing can cause performance decrements, and increase a pilot's perception of the mental workload involved. The effects of stimulus processing demands on motor response performance and subjective mental workload are examined, using different combinations of response selection and target acquisition tasks. The information processing demands of the response selection were varied (e.g., Sternberg memory set tasks, math equations, pattern matching), as was the difficulty of the response execution. Response latency as well as subjective workload ratings varied in accordance with the cognitive complexity of the task. Movement times varied according to the difficulty of the response execution task. Implications in terms of real-world flight situations are discussed.

Mosier, K. L.↗

Cooperative Collision Avoidance Step 1 - Technology Demonstration Flight Test Report. Revision 1

The National Aeronautics and Space Administration (NASA) Access 5 Project Office sponsored a cooperative collision avoidance flight demonstration program for unmanned aircraft systems (UAS). This flight test was accomplished between September 21st and September 27th 2005 from the Mojave Airport, Mojave, California. The objective of these flights was to collect data for the Access 5 Cooperative Collision Avoidance (CCA) Work Package simulation effort, i.e., to gather data under select conditions to allow validation of the CCA simulation. Subsequent simulation to be verified were: Demonstrate the ability to detect cooperative traffic and provide situational awareness to the ROA pilot; Demonstrate the ability to track the detected cooperative traffic and provide position information to the ROA pilot; Demonstrate the ability to determine collision potential with detected cooperative traffic and provide notification to the ROA pilot; Demonstrate that the CCA subsystem provides information in sufficient time for the ROA pilot to initiate an evasive maneuver to avoid collision; Demonstrate an evasive maneuver that avoids collision with the threat aircraft; and lastly, Demonstrate the ability to assess the adequacy of the maneuver and determine that the collision potential has been avoided. The Scaled Composites, LLC Proteus Optionally Piloted Vehicle (OPV) was chosen as the test platform. Proteus was manned by two on-board pilots but was also capable of being controlled from an Air Vehicle Control Station (AVCS) located on the ground. For this demonstration, Proteus was equipped with cooperative collision sensors and the required hardware and software to place the data on the downlink. Prior to the flight phase, a detailed set of flight test scenarios were developed to address the flight test objectives. Two cooperative collision avoidance sensors were utilized for detecting aircraft in the evaluation: Traffic Alert and Collision Avoidance System-II (TCAS-II) and Automatic Dependent Surveillance Broadcast (ADS-B). A single intruder aircraft was used during all the flight testing, a NASA Gulfstream III (G-III). During the course of the testing, six geometrically different near-collision scenarios were evaluated. These six scenarios were each tested using various combinations of sensors and collision avoidance software. Of the 54 planned test points 49 were accomplished successfully. Proteus flew a total of 21.5 hours during the testing and the G-III flew 19.8 hours. The testing fully achieved all flight test objectives. The Flight IPT performed an analysis to determine the accuracy of the simulation model used to predict the location of the host aircraft downstream during an avoidance maneuver. The data collected by this flight program was delivered to the Access 5 Cooperative Collision Avoidance (CCA) Work Package Team who was responsible for reporting on their analysis of this flight data.

Trongale, Nicholas A.↗

Rapid Assessment of a Lunar Surface Laboratory Module

Johnson Space Center is piloting an innovation team known as the Forge to perform rapid turnaround, concurrent engineering studies. The Forge is intended to be able to pull together a team of strategically selected domain experts to innovatively solve a specified problem within a short period of time. The Forge’s inaugural project being the development of a Lunar Surface Laboratory Module concept. The lab module is intended as an option for the Artemis program’s Lunar Architecture Team. The lab module may allow for increased science productivity and return on investment than a surface architecture with only the habitat. This paper will discuss the configuration of the Lunar Laboratory module, including the pressure vessel, its placement relative to the Surface Habitat and Pressurized Rover, and internal architecture. In order to determine the suitability of such a design, a human factors evaluation is conducted. Historically, a human factors evaluation of a habitable volume could require a month or longer, including time needed to prepare a test plan, conduct the evaluation, compile the data, and produce a report. The entire Forge effort will only last for five weeks, forcing the creation of a rapid assessment process. This rapid assessment includes three evaluation studies, all conducted and processed in the space of a single day, to determine the acceptability of the resulting design. The first evaluation is a card sort evaluation of the laboratory instruments. A brief discussion of the card sort evaluation is provided. This card sort is focused on the relative positioning of the laboratory instruments, determining whether a given instrument should be adjacent to, or separated from, another. It will use human factors personnel and both life and physical scientists as subject matter experts. The second evaluation is a science productivity tabletop evaluation. This evaluation focuses on the selection of instruments and the number of instruments, attempting to assess the amount of work the crew will be able to use the facility to do. It uses life and physical science personnel as subject matter experts. The third evaluation is a CAD or Virtual Reality human factors walkthrough evaluation. This evaluation focuses on the layout of the lab module and its connectivity to the basecamp’s pressurized elements. If possible, astronauts will be used as subject matter experts. Each of these evaluations will focus primarily on objective data with limited subjective comments, reducing the time required for processing responses. The results of each evaluation and their implications will be discussed. Based on the evaluation data, an overall acceptability of the Lunar Surface Laboratory Module produced by the Forge study can be determined. Lessons learned and recommendations for future use of the human factors rapid assessment process in early design trades will also be provided.

Lunar Laboratory↗