Search NASA⌕ Search

SEARCH · Search NASA

Results for “Predictive Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Build-to-Replace Strategy to Reduce Operations and Maintenance Costs for Advanced Reactors

This paper targets the reduction of fixed operations and maintenance (O&M) costs for advanced reactor (AR) designs. This goal will be severely constrained if the underlying assumptions of O&M approaches and practices are not questioned and reexamined, especially today when changes can be implemented effectively and efficiently. Achieving a reduction in AR O&M costs requires a completely new way of thinking -a paradigm shift- not through incremental, technology-focused approaches alone. Here, we address this challenge by evaluating the impact of moving to a shorter design life for major structures, systems, and components and shorter, more predictable refurbishment cycles as modeled by the commercial airline industry: the build-to-replace approach. This paper provides a brief overview of this different mindset to O&M applied to ARs and it provided a set of analytical tools based on multi-objective optimization to identify the benefits of such an approach. In conclusion, we provide a direct example analysis of a build-to-replace scenario by identifying and evaluating scenarios for reduced system and component lifetimes and associated replacement and refurbishment schedules to evaluate impacts on O&M costs and other lifecycle elements, such as structure, system, and component reliability.

97 - MATHEMATICS AND COMPUTING↗

Problems with aging wiring in Naval aircraft

The Navy is experiencing a severe aircraft electrical wiring maintenance problem as a result of the extensive use of an aromatic polyimide insulation that is deteriorating at a rate that was unexpected when this wire was initially selected. This problem has significantly affected readiness, reliability, and safety and has greatly increased the cost of ownership of Naval aircraft. Failures in wire harnesses have exhibited arcing and burning that will propagate drastically, to the interruption of many electrical circuits from a fault initiated by the failure of deteriorating wires. There is an urgent need for a capability to schedule aircraft rewiring in an orderly manner with a logically derived determination of which aircraft have aged to the point of absolute necessity. Excessive maintenance was demonstrated to result from the accelerated aging due to the parameters of moisture, temperature, and strain that exist in the Naval Aircraft environment. Laboratory studies have demonstrated that MIL-W-81381 wire insulation when aged at high humidities followed the classical Arrhenius thermal aging relationship. In an extension of the project a multifactor formula was developed that is now capable of predicting life under varying conditions of these service parameters. An automated test system has also been developed to analyze the degree of deterioration that has occurred in wires taken from an aircraft in order to obtain an assessment of remaining life. Since it is both physically and financially impossible to replace the wiring in all the Navy's aircraft at once, this system will permit expedient scheduling so that those aircraft that are most probable to have wiring failure problems can be overhauled first.

Campbell, Frank J.↗

Evaluation of a Human Modeling Software Tool in the Prediction of Extra Vehicular Activity Tasks for an International Space Station Assembly Mission

The difficulty of accomplishing work in extravehicular activity (EVA) is well documented. It arises as a result of motion constraints imposed by a pressurized spacesuit in a near-vacuum and of the frictionless environment induced in microgravity. The appropriate placement of foot restraints is crucial to ensuring that astronauts can remove and drive bolts, mate and demate connectors, and actuate levers. The location on structural members of the foot restraint sockets, to which the portable foot restraint is attached, must provide for an orientation of the restraint that affords the astronaut adequate visual and reach envelopes. Previously, the initial location of these sockets was dependent upon the experienced designer's ability to estimate placement. The design was tested in a simulated zero-gravity environment; spacesuited astronauts performed the tasks with mockups while submerged in water. Crew evaluation of the tasks based on these designs often indicated the bolt or other structure to which force needed to be applied was not within an acceptable work envelope, resulting in redesign. The development of improved methods for location of crew aids prior to testing would result in savings to the design effort for EVA hardware. Such an effort to streamline EVA design is especially relevant to International Space Station construction and maintenance. Assembly operations alone are expected to require in excess of four hundred hours of EVA. Thus, techniques which conserve design resources for assembly missions can have significant impact. We describe an effort to implement a human modelling application in the design effort for an International Space Station Assembly Mission. On Assembly Flight 6A, the Canadian-built Space Station Remote Manipulator System will be delivered to the U.S. Laboratory. It will be released from its launch restraints by astronauts in EVA. The design of the placement of foot restraint sockets was carried out using the human model Jack, and the modelling results were compared with actual underwater test results. The predicted locations of the sockets was found to be acceptable for 94% of the tasks attempted by the astronauts, This effort provides confidence in the capabilities of this package to accurately model tasks. It therefore increases assurance that the tool maybe used early in the design process.

Dischinger, H. Charles↗

Software Released by LEWICE 2.0 Ice Accretion Software Development Project

Computational icing simulation methods are making the transition from the realm of research to commonplace use in design and certification. As such, standards of software management, design, validation, and documentation must be adjusted to accommodate the increased expectations of the user community with respect to accuracy, reliability, capability, and usability. With this in mind, in collaboration with Glenn's Engineering Design and Analysis Division, the Icing Branch of the NASA Glenn Research Center at Lewis Field began a software improvement project focused on the two-dimensional ice accretion simulation tool LEWICE. This project is serving as an introduction to the concepts of software management and is intended to serve as a pilot project for future icing simulation code development. The LEWICE 2.0 Software Development Project consisted of two major elements: software management and software validation. The software management element consisted of identifying features of well-designed and well-managed software that are appropriate for an analytical prediction tool such as LEWICE and applying them to a revised version of the code. This element included tasks such as identification of software requirements, development and implementation of coding standards, and implementation of software revision control practices. With the application of these techniques, the LEWICE ice accretion code became a more stable and reliable software product. In addition, the lessons learned about software development and maintenance can be factored into future software projects at the outset. The software validation activity was an integral part of our effort to make LEWICE a more accurate and reliable analysis tool. Because of the efforts taken to extensively validate this software, LEWICE 2.0 is more robust than previous releases and can reproduce results accurately across several computing platforms. It also differs from previous versions in the extensive quantitative comparisons of its results with a data base of ice shapes that were generated in Glenn's Icing Research Tunnel. The results of the shape comparisons were analyzed to determine the range of meteorological conditions under which LEWICE 2.0 is within the repeatability found for ice shapes obtained from experiments. These comparisons show that the average variation of LEWICE 2.0 from experimental data is 7.2 percent, whereas the overall variability of the experimental data is 2.5 percent. The LEWICE 2.0 Software Development Project resulted in the release, at the recent Icing Branch LEWICE Workshop, of a more useful and robust analysis tool than was previously available to the icing community. The lessons learned from this project will be applied to the Icing Branch s future software development efforts.

Potapczuk, Mark G.↗

The Analysis of the Contribution of Human Factors to the In-Flight Loss of Control Accidents

In-flight loss of control (LOC) is currently the leading cause of fatal accidents based on various commercial aircraft accident statistics. As the Next Generation Air Transportation System (NextGen) emerges, new contributing factors leading to LOC are anticipated. The NASA Aviation Safety Program (AvSP), along with other aviation agencies and communities are actively developing safety products to mitigate the LOC risk. This paper discusses the approach used to construct a generic integrated LOC accident framework (LOCAF) model based on a detailed review of LOC accidents over the past two decades. The LOCAF model is comprised of causal factors from the domain of human factors, aircraft system component failures, and atmospheric environment. The multiple interdependent causal factors are expressed in an Object-Oriented Bayesian belief network. In addition to predicting the likelihood of LOC accident occurrence, the system-level integrated LOCAF model is able to evaluate the impact of new safety technology products developed in AvSP. This provides valuable information to decision makers in strategizing NASA's aviation safety technology portfolio. The focus of this paper is on the analysis of human causal factors in the model, including the contributions from flight crew and maintenance workers. The Human Factors Analysis and Classification System (HFACS) taxonomy was used to develop human related causal factors. The preliminary results from the baseline LOCAF model are also presented.

Ancel, Ersin↗

Analyses of Dose Rates for Second Inner Reflector Plug Replacement at Spallation Neutron Source

The Inner Reflector Plug (IRP) is a central component of the Spallation Neutron Source (SNS) target monolith, which houses the liquid mercury target and four liter-sized neutron moderator units. It is exposed to high-level radiation fields during routine operation and builds up significant activity. The IRP needs to be replaced due to moderator neutron poison and decoupler burn-out, which is used for shaping neutron pulses. The first IRP exchange took place in March 2018 and next one, which is IRP2, is planned to be replaced during the facility maintenance period in the end of December 2025, beginning of January 2026 calendar year. The replacement of IRP is a complex task due to its location in the area receiving high irradiation, being under significant amount of shielding, and size, which requires removal in segments. For planning the replacement workflow to help to reduce radiation exposure to workers dose rates for each stage of extraction/replacement operation are predicted.

42 ENGINEERING↗

Model Specification for Rework of Aircraft Engine, Power Transmission, and Accessory/Auxiliary Ball and Roller Bearings

This document provides a model specification for the rework and/or repair of bearings used in aircraft engines, helicopter main power train transmissions, and auxiliary bearings determined to be critical by virtue of performance, function, or availability. The rolling-element bearings to be processed under the provisions of this model specification may be used bearings removed after service, unused bearings returned from the field, or certain rejected bearings returned for reinspection and salvage. In commercial and military aircraft application, it has been a practice that rolling-element bearings removed at maintenance or overhaul be reworked and returned to service. Depending on the extent of rework and based upon theoretical analysis, representative life factors (LF) for bearings subject to rework ranged from 0.87 to 0.99 the lives of new bearings. Based on bearing endurance data, 92 percent of the bearing sets that would be subject to rework would result in L(sub 10) lives equaling and/or exceeding that predicted for new bearings. The remaining 8 percent of the bearings have the potential to achieve the analytically predicted life of new bearings when one of the rings is replaced at rework. The potential savings from bearing rework varies from 53 to 82 percent of that of new bearings depending on the cost, size, and complexity of the bearing

Zaretsky, Erwin V.↗

Automating Maneuvers: Considerations for Collision Avoidance

As more space operators implement large constellations of spacecraft, automating orbit maintenance maneuvers becomes a key feature of their operations concept to ensure that the workload is manageable. However the practice of performing a maneuver without sharing the plan with other nearby spacecraft causes a risk that two spacecraft will collide, not only destroying the spacecraft involved, but creating debris that will affect all other spacecraft using that orbit regime. In order to share the maneuver plan, a predicted ephemeris file containing the maneuver must be sent to a central authority to screen against predicted trajectories of all other on-orbit objects to determine where and when close approaches may occur that need to be mitigated. Currently the screening authority used by US operators is the 19th Space Defense Squadron. However the conjunction screening process in use by the 19th was developed over 30 years ago and was not designed with automation in mind, so screenings are performed once every 8 hours, meaning that spacecraft using automated maneuvering need to allow 16 hours to share their maneuver plan via the screening process. Many operators assume that automated maneuver planning must be real-time; however this time between planning and execution to allow for screening is possible if planned for during system design. In an effort to speed up the screening process, NASA has developed a prototype system for performing near-real-time screenings. This prototype system was necessitated to support the NASA Starling mission, a constellation of 4 cubesats that planned to fly at the same altitude as the SpaceX Starlink constellation, both performing automated maneuvering. Without screening of the planned maneuvers, the two constellations risked a collision. Once converted from a prototype to an operational system, this capability will greatly help smallsats, for example those that are planning to test propulsive capabilities, by allowing fast turnaround feedback to ensure safety form collision with other objects. This paper describes the existing CA process, the prototype real-time capability, and results from the experiment that tested the prototype.

Matthew Hejduk↗

Automating Maneuvers: Considerations for Collision Avoidance

As more space operators implement large constellations of spacecraft, automating orbit maintenance maneuvers becomes a key feature of their operations concept to ensure that the workload is manageable. However, the practice of performing a maneuver without sharing the plan with other nearby spacecraft causes a risk that two spacecraft will collide, not only destroying the spacecraft involved, but creating debris that will affect all other spacecraft using that orbit regime. In order to share the maneuver plan, a predicted ephemeris file containing the maneuver must be sent to a central authority to screen against predicted trajectories of all other on-orbit objects to determine where and when close approaches will occur that may need to be mitigated. Currently the screening authority used by US operators is the 19th Space Defense Squadron; screenings are performed once every 8 hours, meaning that spacecraft using automated maneuvering need to allow 16 hours to share their maneuver plan via the screening process in advance of maneuver execution in case one screening is missed and the next needs to be used. In an effort to speed up the screening process to benefit spacecraft using automated maneuvering, a prototype system for performing near-real-time screenings has been developed in support of the NASA Starling mission, a constellation of four cubesats that fly at the same altitude as the SpaceX Starlink constellation. Both of these constellations perform automated maneuvering, so without screening the planned maneuvers before execution, the two constellations would risk a collision. This paper describes the traditional conjunction assessment (CA) process, the prototype real-time CA screening capability, plans for the experiment to test the prototype, and next steps.

conjunction assessment↗

Automating Maneuvers: Considerations for Collision Avoidance

As more space operators implement large constellations of spacecraft, automating orbit maintenance maneuvers becomes a key feature of their operations concept to ensure that the workload is manageable. However, the practice of performing a maneuver without sharing the plan with other nearby spacecraft causes a risk that two spacecraft will collide, not only destroying the spacecraft involved, but creating debris that will affect all other spacecraft using that orbit regime. In order to share the maneuver plan, a predicted ephemeris file containing the maneuver must be sent to a central authority to screen against predicted trajectories of all other on-orbit objects to determine where and when close approaches will occur that may need to be mitigated. Currently the screening authority used by US operators is the 19th Space Defense Squadron; screenings are performed once every 8 hours, meaning that spacecraft using automated maneuvering need to allow 16 hours to share their maneuver plan via the screening process in advance of maneuver execution in case one screening is missed and the next needs to be used. In an effort to speed up the screening process to benefit spacecraft using automated maneuvering, a prototype system for performing near-real-time screenings has been developed in support of the NASA Starling mission, a constellation of four cubesats that fly at the same altitude as the SpaceX Starlink constellation. Both of these constellations perform automated maneuvering, so without screening the planned maneuvers before execution, the two constellations would risk a collision. This paper describes the traditional conjunction assessment (CA) process, the prototype real-time CA screening capability, plans for the experiment to test the prototype, and next steps.

conjunction assessment↗

Enhanced methods for determining operational capabilities and support costs of proposed space systems

This report documents the work accomplished during the first two years of research to provide support to NASA in predicting operational and support parameters and costs of proposed space systems. The first year's research developed a methodology for deriving reliability and maintainability (R & M) parameters based upon the use of regression analysis to establish empirical relationships between performance and design specifications and corresponding mean times of failure and repair. The second year focused on enhancements to the methodology, increased scope of the model, and software improvements. This follow-on effort expands the prediction of R & M parameters and their effect on the operations and support of space transportation vehicles to include other system components such as booster rockets and external fuel tanks. It also increases the scope of the methodology and the capabilities of the model as implemented by the software. The focus is on the failure and repair of major subsystems and their impact on vehicle reliability, turn times, maintenance manpower, and repairable spares requirements. The report documents the data utilized in this study, outlines the general methodology for estimating and relating R&M parameters, presents the analyses and results of application to the initial data base, and describes the implementation of the methodology through the use of a computer model. The report concludes with a discussion on validation and a summary of the research findings and results.

Ebeling, Charles↗

A Simulation System for Validating the Analytical Prediction of Performance of the Convolutional Encoded and Symbol Interleaved TDRSS S-band Return Link Service in a Pulsed RFI Environment

A hardware integrated convolutional coding/symbol interleaving and integrated symbol deinterleaving/Viterbi decoding simulation system is described. Validation on the system of the performance of the TDRSS S-band return link with BPSK modulation, operating in a pulsed RFI environment is included. The system consists of three components, the Fast Linkabit Error Rate Tester (FLERT), the Transition Probability Generator (TPG), and a modified LV7017B which includes rate 1/3 capability as well as a periodic interleaver/deinterleaver. Operating and maintenance manuals for each of these units are included.

Source record↗

Smart Sensors' Role in Integrated System Health Management

During the last decade, there has been a major effort in the aerospace industry to reduce the cost per pond of payload and become competitive in the international market. Competition from Europe, Japan, and China has reduced this cost to almost a third from 1990 to 2000. This cost has leveled in recent years to an average price of around $12,000/pound of payload. One of NASA's goals is to promote the development of technologies to reduce this cost by a factor of 10 or more Exploration of space, specially manned exploration missions, involves very complex launch and flight vehicles, associated ground support systems, and extensive human support during all phases of the mission. When considering the Space Shuttle Program, we can see that vehicle and ground support systems' processing, operation, and maintenance represent a large percentage of the program cost and time. Reducing operating, processing and maintenance costs will greatly reduce the cost of Exploration programs. The Integrated System Health Management (ISHM) concept is one of the technologies that will help reduce these operating, processing and maintenance costs. ISHM is an integrated health monitoring system applicable to both flight and ground systems. It automatically and autonomously acquires information from sensors and actuators and processes that information using the ISHM-embedded knowledge. As a result, it establishes the health of the system based on the acquired information and its prior knowledge. When this concept is fully implemented, ISHM systems shall be able to perform failure prediction and remediation before actual hard failures occurs, preventing its costly consequences. Data sources, sensors, and their associated data acquisition systems, constitute the foundation of the system. A smart sensing architecture is required to support the acquisition of reliable, high quality data, required by the ISHM. A thorough definition of the smart sensor architectures, their embedded diagnostic agents, and communication protocols need to be established and standardized to allow the embedding and exchange of health information among sensors and ISHM. This workshop is aimed to foster the exchange of ideas and lessons learned between government, industry and academia to aid in the establishment of ISHM (and smart sensors) standards and guidelines as well as to identify present technology gaps that will have to be overcome to successfully achieve this goal.

Perotti, Jose M.↗

A Physics-Based Modeling Framework for Prognostic Studies

Prognostics and Health Management (PHM) methodologies have emerged as one of the key enablers for achieving efficient system level maintenance as part of a busy operations schedule, and lowering overall life cycle costs. PHM is also emerging as a high-priority issue in critical applications, where the focus is on conducting fundamental research in the field of integrated systems health management. The term diagnostics relates to the ability to detect and isolate faults or failures in a system. Prognostics on the other hand is the process of predicting health condition and remaining useful life based on current state, previous conditions and future operating conditions. PHM methods combine sensing, data collection, interpretation of environmental, operational, and performance related parameters to indicate systems health under its actual application conditions. The development of prognostics methodologies for the electronics field has become more important as more electrical systems are being used to replace traditional systems in several applications in the aeronautics, maritime, and automotive fields. The development of prognostics methods for electronics presents several challenges due to the great variety of components used in a system, a continuous development of new electronics technologies, and a general lack of understanding of how electronics fail. Similarly with electric unmanned aerial vehicles, electrichybrid cars, and commercial passenger aircraft, we are witnessing a drastic increase in the usage of batteries to power vehicles. However, for battery-powered vehicles to operate at maximum efficiency and reliability, it becomes crucial to both monitor battery health and performance and to predict end of discharge (EOD) and end of useful life (EOL) events. We develop an electrochemistry-based model of Li-ion batteries that capture the significant electrochemical processes, are computationally efficient, capture the effects of aging, and are of suitable accuracy for reliable EOD prediction in a variety of usage profiles.

Li-ion Batteries↗

Vehicle Integrated Prognostic Reasoner (VIPR) 2010 Annual Final Report

Honeywell's Central Maintenance Computer Function (CMCF) and Aircraft Condition Monitoring Function (ACMF) represent the state-of-the art in integrated vehicle health management (IVHM). Underlying these technologies is a fault propagation modeling system that provides nose-to-tail coverage and root cause diagnostics. The Vehicle Integrated Prognostic Reasoner (VIPR) extends this technology to interpret evidence generated by advanced diagnostic and prognostic monitors provided by component suppliers to detect, isolate, and predict adverse events that affect flight safety. This report describes year one work that included defining the architecture and communication protocols and establishing the user requirements for such a system. Based on these and a set of ConOps scenarios, we designed and implemented a demonstration of communication pathways and associated three-tiered health management architecture. A series of scripted scenarios showed how VIPR would detect adverse events before they escalate as safety incidents through a combination of advanced reasoning and additional aircraft data collected from an aircraft condition monitoring system. Demonstrating VIPR capability for cases recorded in the ASIAS database and cross linking them with historical aircraft data is planned for year two.

Hadden, George D.↗

NASA Goddard Space Flight Center

The NASA SLR Operational Center is responsible for: 1) NASA SLR network control, sustaining engineering, and logistics; 2) ILRS mission operations; and 3) ILRS and NASA SLR data operations. NASA SLR network control and sustaining engineering tasks include technical support, daily system performance monitoring, system scheduling, operator training, station status reporting, system relocation, logistics and support of the ILRS Networks and Engineering Working Group. These activities ensure the NASA SLR systems are meeting ILRS and NASA mission support requirements. ILRS mission operations tasks include mission planning, mission analysis, mission coordination, development of mission support plans, and support of the ILRS Missions Working Group. These activities ensure than new mission and campaign requirements are coordinated with the ILRS. Global Normal Points (NP) data, NASA SLR FullRate (FR) data, and satellite predictions are managed as part of data operations. Part of this operation includes supporting the ILRS Data Formats and Procedures Working Group. Global NP data operations consist of receipt, format and data integrity verification, archiving and merging. This activity culminates in the daily electronic transmission of NP files to the CDDIS. Currently of all these functions are automated. However, to ensure the timely and accurate flow of data, regular monitoring and maintenance of the operational software systems, computer systems and computer networking are performed. Tracking statistics between the stations and the data centers are compared periodically to eliminate lost data. Future activities in this area include sub-daily (i.e., hourly) NP data management, more stringent data integrity tests, and automatic station notification of format and data integrity issues.

Carter, David↗

Analysis/forecast experiments with a multivariate statistical analysis scheme using FGGE data

A three-dimensional, multivariate, statistical analysis method, optimal interpolation (OI) is described for modeling meteorological data from widely dispersed sites. The model was developed to analyze FGGE data at the NASA-Goddard Laboratory of Atmospherics. The model features a multivariate surface analysis over the oceans, including maintenance of the Ekman balance and a geographically dependent correlation function. Preliminary comparisons are made between the OI model and similar schemes employed at the European Center for Medium Range Weather Forecasts and the National Meteorological Center. The OI scheme is used to provide input to a GCM, and model error correlations are calculated for forecasts of 500 mb vertical water mixing ratios and the wind profiles. Comparisons are made between the predictions and measured data. The model is shown to be as accurate as a successive corrections model out to 4.5 days.

Baker, W. E.↗

Hydrogen density and proton flux in the topside ionosphere over Arecibo, Puerto Rico, from incoherent scatter observations.

Incoherent scatter observations of the topside ionosphere over Arecibo, Puerto Rico, have been analyzed and interpreted to give values for the neutral hydrogen density and vertical proton flux throughout a 30 hr period on December 7 and 8, 1965. The neutral hydrogen density is of the order of 1,000,000 per cu cm at 520 km, agreeing well with other recent measurements. A diurnal variation of about 2-1 was found, which confirms recent theoretical predictions. The vertical proton flux attained a maximum value of about one billion per sq cm per sec, being upward in the daytime and downward at night. The daytime flux appears to be of comparable magnitude with the limiting flux permitted, but the shape of the ion density profile suggests that the flux was not actually a limiting flux. For the night in question, the downward proton flux appears to account for the maintenance of the F layer, perhaps with some additional contribution from neutral winds and/or electric fields.

Ho, M. C.↗