Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Probabilistic Resource Adequacy Suite (PRAS) v0.6 Model Documentation

The Probabilistic Resource Adequacy Suite, or PRAS, is a software package for studying power system resource adequacy. It allows the user to simulate power system operations under a wide range of operating conditions, in order to study the system’s risk of failing to meet demand due to a resource shortfall, and identify the time periods and regions in which that risk occurs. This reports documents version 0.6 of the tool.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic Resource Adequacy Suite (PRAS) v0.8 Model Documentation

The Probabilistic Resource Adequacy Suite, or PRAS, is a software package for studying power system resource adequacy. It allows the user to simulate power system operations under a wide range of operating conditions, in order to study the system's risk of failing to meet demand due to a resource shortfall, and identify the time periods and regions in which that risk occurs. This reports documents version 0.8 of the tool.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2020. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2020. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2020 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

Resource Conservation and Recovery Act↗

Electrocardiographic changes predate Parkinson’s disease onset

Autonomic nervous system involvement precedes the motor features of Parkinson’s disease (PD). Our goal was to develop a proof-of-concept model for identifying subjects at high risk of developing PD by analysis of cardiac electrical activity. We used standard 10-s electrocardiogram (ECG) recordings of 60 subjects from the Honolulu Asia Aging Study including 10 with prevalent PD, 25 with prodromal PD, and 25 controls who never developed PD. Various methods were implemented to extract features from ECGs including simple heart rate variability (HRV) metrics, commonly used signal processing methods, and a Probabilistic Symbolic Pattern Recognition (PSPR) method. Extracted features were analyzed via stepwise logistic regression to distinguish between prodromal cases and controls. Stepwise logistic regression selected four features from PSPR as predictors of PD. The final regression model built on the entire dataset provided an area under receiver operating characteristics curve (AUC) with 95% confidence interval of 0.90 [0.80, 0.99]. The five-fold cross-validation process produced an average AUC of 0.835 [0.831, 0.839]. We conclude that cardiac electrical activity provides important information about the likelihood of future PD not captured by classical HRV metrics. Machine learning applied to ECGs may help identify subjects at high risk of having prodromal PD.

59 BASIC BIOLOGICAL SCIENCES↗

Distributionally Robust Decentralized Volt-Var Control With Network Reconfiguration

Here, this paper presents a decentralized volt-var optimization (VVO) and network reconfiguration strategy to address the challenges arising from the growing integration of distributed energy resources, particularly photovoltaic (PV) generation units, in active distribution networks. To reconcile control measures with different time resolutions and empower local control centers to handle intermittency locally, the proposed approach leverages a two-stage distributionally robust optimization; decisions on slow-responding control measures and set points that link neighboring subnetworks are made in advance while considering all plausible distributions of uncertain PV outputs. We present a decomposition algorithm with an acceleration scheme for solving the proposed model. Numerical experiments on the IEEE 123 bus distribution system are given to demonstrate its outstanding out-of-sample performance and computational efficiency, which suggests that the proposed method can effectively localize uncertainty via risk-informed proactive timely decisions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic feasibility assessment of sequestration reliance for climate targets

Countries worldwide are transforming their energy systems to achieve Carbon-Neutrality. Investing in renewable resources-based technologies and implementing Carbon Capture and Storage (CCS) are common strategies to achieve higher sequestration levels. Negative emissions through Bioenergy with CCS are expected to play an essential role in the transition to full decarbonization. On top of that, biomass is a limited resource that depends on environmental factors, which create uncertainties related to the amount that can be sustainably provided to the energy system. Here this study emphasizes the relevance of variability in carbon sequestration for achieving climate targets by 2050. Here this paper proposes a probabilistic approach that integrates the Global Change Analysis Model for Latin America (GCAM-LA) with a chance constraint approach. GCAM-LA is used to assess the impact on the energy sector of different limits of sustainable biomass and carbon budget scenarios. The risk associated with exceeding the sequestration capacity of a given region is modeled via Chance Constraint. Results show that electrification is an appropriate long-term decarbonization strategy. It smoothes the effects of uncertainty in sequestration capacity and responds to end-user demands. For this case study, higher levels of electrification are obtained at likelihood levels >66% for end-use sectors.

54 ENVIRONMENTAL SCIENCES↗

Scenario development for safety assessment in deep geologic disposal of high-level radioactive waste and spent nuclear fuel: A review

Radiation and radioactive substances result in the production of radioactive wastes which require safe management and disposal to avoid risks to human health and the environment. To ensure permanent safe disposal, the performance of a deep geological repository for radioactive waste is assessed against internationally agreed risk-based standards. Assessing postclosure safety of the future system's evolution includes screening of features, events, and processes (FEPs) relevant to the situation, their subsequent development into scenarios, and finally the development and execution of safety assessment (SA) models. Global FEP catalogs describe important natural and man-made repository system features and identify events and processes that may affect these features into the future. By combining FEPs, many of which are uncertain, different possible future system evolution scenarios are derived. Repository licensing should consider both the reference or “base” evolution as well as alternative futures that may lead to radiation release, pollution, or exposures. Scenarios are used to derive and consider both base and alternative evolutions, often through production of scenario-specific SA models and the recombination of their results into an assessment of the risk of harm. Furthermore, while the FEP-based scenario development process outlined here has evolved somewhat since its development in the 1980s, the fundamental ideas remain unchanged. A spectrum of common approaches is given here (e.g., bottom–up vs. top–down scenario development, probabilistic vs. bounding handling of uncertainty), related to how individual numerical models for possible futures are converted into a determination as to whether the system is safe (i.e., how aleatoric uncertainty and scenarios are integrated through bounding or Monte Carlo approaches).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Learning earthquake ground motions via conditional generative modeling

Predicting high-fidelity ground motions for future earthquakes is crucial for seismic hazard assessment and infrastructure resilience. Conventional empirical simulations suffer from sparse sensor distribution and geographically localized earthquake locations, while physics-based methods are computationally intensive and require accurate representations of Earth structures and earthquake sources. We propose an artificial intelligence (AI) spectrogram generator, Conditional Generative Modeling for Ground Motion (CGM-GM). CGM-GM leverages earthquake magnitudes and geographic coordinates of earthquakes and sensors as inputs, when postprocessed with phase information, capturing spatially continuous Fourier amplitude spectra (FAS) as well as properties such as P and S arrivals, and waveform durations, without explicit physics constraints. This is achieved through a probabilistic autoencoder that extracts latent distributions in the time-frequency domain and variational sequential models for prior and posterior distributions. We evaluate the performance of CGM-GM using small-magnitude earthquake records from the San Francisco Bay Area, a region with high seismic risks. Here, we report that CGM-GM demonstrates potential for complementing physics-based simulations and non-ergodic empirical ground motion models, as well as shows promise in seismology and beyond.

geophysics↗

A Sequential Model Predictive and Deep Reinforcement Learning-Based Controller for Distribution System Outage Mitigation under Hurricane Events

This paper proposes a proactive outage mitigation framework for power distribution networks to withstand hurricane-induced disruptions. It leverages Model Predictive Control (MPC) to identify safe lines for proactive switching during hurricanes, minimizing the risk of cascading failures and voltage violations. The switching strategies optimized by MPC are sequentially integrated with a Deep Reinforcement Learning agent using the Advantage Actor-Critic algorithm, enabling dynamic line switching to maximize connected buses and minimize voltage violations in real time. Using a probabilistic hurricane model, the framework predicts line failures and adapts to varying conditions to enhance grid resilience. Simulations on the IEEE 123-bus system demonstrate its effectiveness in maintaining high connectivity and minimizing disruptions. Real-time testing with an RTDS confirms the practicality and reliability of the proposed approach.

Selim, Alaa [University of Connecticut]↗

Effects of social structure and management on risk of disease establishment in wild pigs

Contact heterogeneity among hosts determines invasion and spreading dynamics of infectious disease, thus its characterization is essential for identifying effective disease control strategies. Yet, little is known about the factors shaping contact networks in many 28 wildlife species and how wildlife management actions might affect contact networks. Wild pigs in North America are an invasive, socially-structured species that pose a health concern for domestic swine given their ability to transmit numerous devastating diseases 2 such as African swine fever (ASF). Using proximity loggers and GPS data from 48 wild pigs in Florida and South Carolina, USA, we employed a probabilistic framework to estimate weighted contact networks. We determined the effects of sex, social group, and spatial distribution (monthly home range overlap and distance) on wild pig contact. We also estimated the impacts of management-induced perturbations on contact and inferred their effects on ASF establishment in wild pigs with simulation. Social group membership was the primary factor influencing contacts. Between-group contacts depended primarily on space use characteristics, with fewer contacts among groups separated by >2 km and no contacts among groups >4 km apart within a month. Modeling ASF dynamics on the contact network demonstrated that indirect contacts resulting from baiting (a typical method of attracting wild pigs or game species to a site to enhance recreational hunting) increased the risk of disease establishment by ~33% relative to direct contact. Low-intensity population reduction (<5.9% of the population) had no detectable impact on contact structure but reduced predicted ASF establishment risk relative to no population reduction. Here, we demonstrate an approach for understanding the relative role of spatial, social, and individual-level characteristics in shaping contact networks and predicting their effects on disease establishment risk, thus providing insight for optimizing disease control in spatially- and socially-structured wildlife species.

59 BASIC BIOLOGICAL SCIENCES↗

SSRS (Stochastic Soaring Raptor Simulator)

SSRS (Stochastic Soaring Raptor Simulator) is a generalizable, probabilistic, and predictive tool for wind energy developers, ecologists, wildlife managers and industry consultants to estimate the potential for soaring raptors to interact with operating wind turbines, without the need for site-specific data collection. Rapid expansion of wind energy development across the world has exposed the risk of turbine collisions for birds and bats. The risk to obligate soaring raptors such as golden eagles is of particular concern due to their small population and influence on ecological balance. Golden eagles rely heavily on updrafts to subsidize their flight, putting them in direct conflict with operational wind turbines that utilize the same wind resource. Understanding the behavior of soaring raptors with varying atmospheric conditions is crucial for predicting and mitigating the risk of turbine collision. This software contains a predictive movement model that simulates individual flight paths of golden eagles during updraft-subsidized long-distance flight, including migration. For a given set of atmospheric conditions, the model simulates thousands of eagles at turbine-scale spatial resolution (50m) to produce a relative presence density map. The simulated eagles rely on updrafts to pursue uninterrupted directional flight with minimal energy expenditure, following fluid-flow principles. The simulator includes a stochastic model of eagle behavior and a systematic method of accounting for spatiotemporal variations in atmospheric conditions. This framework only requires publicly available atmospheric data to estimate orographic and thermal updrafts, ensuring general usability.

Sandhu, Rimple↗

Composite Power System Reliability with Renewables and Customer Flexibility

Composite Power System Reliability is defined as the computational procedure that quantifies the probability that the power system will perform the function of delivering electric power to customers adequately, on a continuous basis and with an acceptable quality. This definition leaves many details undefined and exemplifies the ambiguity in reliability analysis. The increasing deployment of wind and PV creates additional uncertainties that make reliability analysis a rather complex issue. Because of increased uncertainty the need for composite reliability analysis and utilization of results in power system planning is critical. New approaches are emerging for dealing with these problems from the operational point of view, including demand response programs, tapping on customer and distributed resource flexibility and new control approaches. The key question to be addressed is: how the new operational paradigms affect composite power system reliability. Here, this paper presents the ongoing work of the IEEE Composite System Reliability Task Force of the IEEE PES Reliability, Risk, Probability Application (RRPA) Subcommittee.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Idaho National Laboratory Integrated Multisite SSHAC Level 3: Probabilistic Volcanic Hazards Assessment

The Idaho National Laboratory (INL) resides on the eastern Snake River Plain (ESRP), part of the Snake River Plain (SRP) with a complex origin and geologic history of volcanism. Much of the Quaternary (last 2.58 million years) volcanism within 400 km of INL is genetically associated with a major thermal anomaly referred to as the Yellowstone hotspot, which is currently located more than 180 km northeast of INL. Near INL, local volcanic sources include silicic domes near its southern border, and numerous dike-fed basaltic vents of the ESRP, some of which are near or within the INL boundaries. Quantitative probabilistic assessments of screened-in volcanic hazardous phenomena for nine different facility complexes at the INL are presented for a Senior Seismic Hazard Analysis Committee (SSHAC) Level 3 (SL3) study. The comprehensive, integrated multisite SSHAC study consists of a single regional Probabilistic Volcanic Hazards Assessment (PVHA) that pertains to all nine INL facility complexes, with site-specific information developed at each respective area of interest (AOI), referred to as the "INL facility AOI" (Figure ES-1). Hazard products are generated for specified INL facility AOIs for use by multiple stakeholders from different agencies in risk-informed decision-making regarding site selection, operations, and design of nuclear facilities at INL, consistent with U.S. Department of Energy (DOE) and U.S. Nuclear Regulatory Commission (NRC) regulatory guidance. The study also serves as the basis for future periodic safety assessments required for existing DOE facilities, such as 10-year evaluations of natural-phenomena hazards. Elements of the INL PVHA including initial characterization, screening, quantitative assessments of eruption and hazard potential, and consideration of facility needs are conducted using the three phases of the SSHAC process: evaluation, integration, and documentation. As per regulatory guidance, the SSHAC framework provided the necessary processes and procedures for the PVHA Technical Integration (TI) team, at three workshops, five formal working meetings and many TI team remote meetings, to conduct initial characterization, screen the volcanic hazards, create PVHA model inputs, exercise those models in the PVHA, consider facility-specific volcanic hazard needs, and perform final hazard calculations. The Participatory Peer Review Panel (PPRP) provided independent oversight and performed process and technical reviews of the PVHA throughout its duration. The study included an extensive New Data Collection and Analyses (NDCA) program developed by the PVHA TI team to reduce uncertainties in hazard-significant elements in the PVHA model. NDCA activities generated 20 reports providing important contributory datasets and results to the project database for characterizing the ESRP. For example, a report compiling the dimensions of ESRP shield volcanoes and lava fields was used to construct volcanic footprints (areas of impact), was compared with data from INL subsurface cores, and was used to validate the results of lava-flow inundation modeling on the contemporary terrain. Another example is the acquisition of aeromagnetic data over INL and its surrounding area, with maps of buried magmatic features (e.g., subsurface volcanoes and swarms of feeder dikes) that informed the PVHA conceptual model of volcanism. The SSHAC evaluation process was used to conduct all elements of the PVHA including initial characterization and screening. Existing data and NDCA activities provided the foundation to develop the tectonomagmatic conceptual model of volcanism for the region of geographical interest in the SRP and Yellowstone hotspot volcanic system, and for considering volcanoes in the western US. Considering Quaternary volcanic sources active during this period, the screening approach identified and evaluated magma compositions, types of eruptive and intrusive phenomena, types of hazardous phenomena, and proximity of sources to INL. The PVHA TI team evaluated 18 types of magmatic sources in terms of 20 potentially hazardous phenomena, resulting in 360 screening decisions. The screening process resulted in 140 screened-in hazardous volcanic phenomena for Quaternary volcanic sources 1) proximal to INL facility complexes in the ESRP (64 basaltic and 54 silicic), 2) regional sources associated with the Yellowstone caldera system and Blackfoot Reservoir volcanic field (7), and 3) more distal sources from thirteen Cascade volcanoes and two volcanoes at Long Valley caldera (CA).

58 GEOSCIENCES↗

Simulation-Based Recovery Action Analysis Using the EMRALD Dynamic Risk Assessment Tool

A recovery action is defined as the action that prevents deviant conditions from producing unwanted effects. It generally indicates a kind of countermeasure performed in response to a failure of human action. The recovery actions especially play an important role in complex systems like nuclear power plants (NPPs), which consist of highly sophisticated controllers to ensure that desired performance and safety must be achieved and maintained. This is because a combination of human error and its recovery failure may be able to cause a catastrophic effect on a system. Analyzing recovery actions has been a critical part of HRA, which is a technique to evaluate human errors and provide human error probabilities (HEPs) for application in probabilistic safety assessment (PSA). If recovery actions are not adequately analyzed and applied to PSA models, the PSA results may be under-estimated or be not able to reasonably account for the failure of human actions in the context of PSA. For this reason, some regulatory documents such as ASME/ANS RA-Sb-2013 by the American Society for Mechanical Engineers and the American Nuclear Society and NUREG-1792 by U.S. Nuclear Regulatory Commission have emphasized the importance of recovery analysis within the HRA. A couple of existing HRA methods, such as the Technique for Human Error-Rate Prediction (THERP), the Cause-Based Decision Tree (CBDT), and the Korean Standard HRA (K-HRA), have respectively suggested their own approaches to the HRA recovery analysis. However, there are a couple of limitations to treating recovery actions using only the current HRA methods available. The biggest limitation is that the existing recovery analysis does not explicitly consider a variety of recovery action types and recovery sequences as they occur in actual NPPs. To handle the limitations of existing recovery analysis, this study proposes a simulation-based recovery analysis method using the Event Modeling Risk Assessment Using Linked Diagram (EMRALD) software. The EMRALD software is a dynamic simulation tool for PSA. It supports realistic and dynamic modeling of human actions as they would be performed at NPPs. It is also favorable to simultaneously model the specific moment at which an action is performed, the time it takes to perform the action, and the failure probability of that action. In this paper, a detailed methodology for modeling recovery actions in the simulation platform is proposed with a couple of examples. Then, outputs from the simulation are discussed as reviewing if this novel approach can complement the challenges of existing recovery analyses.

99 GENERAL AND MISCELLANEOUS↗

Coupling of regional geophysics and local soil-structure models in the EQSIM fault-to-structure earthquake simulation framework

Accurate understanding and quantification of the risk to critical infrastructure posed by future large earthquakes continues to be a very challenging problem. Earthquake phenomena are quite complex and traditional approaches to predicting ground motions for future earthquake events have historically been empirically based whereby measured ground motion data from historical earthquakes are homogenized into a common data set and the ground motions for future postulated earthquakes are probabilistically derived based on the historical observations. This procedure has recognized significant limitations, principally due to the fact that earthquake ground motions tend to be dictated by the particular earthquake fault rupture and geologic conditions at a given site and are thus very site-specific. Historical earthquakes recorded at different locations are often only marginally representative. There has been strong and increasing interest in utilizing large-scale, physics-based regional simulations to advance the ability to accurately predict ground motions and associated infrastructure response. However, the computational requirements for simulations at frequencies of engineering interest have proven a major barrier to employing regional scale simulations. In a U.S. Department of Energy Exascale Computing Initiative project, the EQSIM application development is underway to create a framework for fault-to-structure simulations. This framework is being prepared to exploit emerging exascale platforms in order to overcome computational limitations. This article presents the essential methodology and computational workflow employed in EQSIM to couple regional-scale geophysics models with local soil-structure models to achieve a fully integrated, complete fault-to-structure simulation framework. Here, the computational workflow, accuracy and performance of the coupling methodology are illustrated through example fault-to-structure simulations.

97 MATHEMATICS AND COMPUTING↗

An Approach to Dependence Assessment in Human Reliability Analysis: Application of Lag and Linger Effects

Dependence assessment refers to an approach used in human reliability analysis (HRA) to adjust a human error probability (HEP) for the following action by considering the impact of the preceding action. It has been known to significantly affect the overall results of probabilistic safety assessment (PSA). If the dependence assessment is not adequate, the result could be unconvincing for explaining the operator failures in the context of PSA. To date, several methods and some recent research have identified suggestions for treating dependence issues in HRA; however, these are still exclusively based on the intrinsic approach of the Technique for Human Error Rate Prediction (THERP), an HRA method. THERP inevitably has a challenge with the subjectivity of expert evaluation as well as the requirement for PSA and HRA expertise with resource-intensive and time-consuming processes. This paper suggests an approach to dependence assessment that could not only minimize the influence of expert judgment, but also saves time to perform the analysis with reasonable manpower. It modifies existing HRA methods with considering lag and linger effects to apply dependence effects for them. Based on a representative HRA method, i.e., Standardized Plant Analysis Risk - HRA (SPAR-H), guidance for how to apply lag and linger effects for the HRA method is suggested. Then, an investigation is carried out to compare quantification results of the revised HRA method with that of the original approach based on experimental data.

99 GENERAL AND MISCELLANEOUS↗

Evaluating Probability of Containment Effectiveness at a GCS Sites using integrated assessment modeling approach with Bayesian decision Networks

Improved scientific and engineering understanding of the behavior of geologic CO2 storage together with established regulatory framework and incentive structures raise the prospects for accelerated, large-scale deployment of this greenhouse gas emissions reduction approach. Incentive structures call for the establishment of appropriate verification and accounting approaches to support claims of the integrity of a geologic storage complex and to justify taking credit for long-term storage. In this study, we present a framework for assessing the probability of containment effectiveness over the lifetime of a geologic carbon storage site (e.g., after 70 years of injection and post-injection site performance) using forward stochastic model realizations based on site characterization data and using a monitoring-informed Bayesian network based on hypothetical detectability from surface seismic surveys over the site injection and post-injection phases. The National Risk Assessment Partnership’s open-source Integrated Assessment Model (NRAP-Open-IAM) was utilized to develop an ensemble of 10,000 a priori stochastic forecasts of CO2 containment. Those simulations were used to train the Bayesian network model to estimate the prior probabilities of the CO2 leakage mass into overlying, monitorable aquifers considering the uncertainties in the reservoir properties, permeability of potentially leaky wells and the overlying aquifers. The conditional probabilities in the Bayesian network were either learned from the NRAP-Open-IAM simulations or derived from the predefined detection thresholds for the monitoring method. Observations obtained from monitoring, over time during the site operation phases were then used to generate updated posterior probabilities of containment (and any loss from containment) in the Bayesian network by propagating the prior probabilities through the conditional probabilities. We demonstrate how to construct and use the Bayesian network for verifying the long-term storage complex effectiveness informed by monitoring based on the NRAP-Open-IAM simulations previously developed for the FutureGen 2.0 site. This approach may have relevance for stake holders to demonstrate secure geologic storage, provide a defensible, probabilistic approach to claim credit for geologic storage, and to estimate the likelihood that any fraction of the claimed credit may need to be refunded to the creditor based on available monitoring information.

Bayesian network, Risk assessment, Monitoring, car↗

A valuation framework for customers impacted by extreme temperature-related outages

Extreme temperature outages can lead to not just economic losses but also various non-energy impacts (NEI), such as increased mortality rates, property damage, and reduced productivity, due to significant degradation of indoor operating conditions caused by service disruptions. However, existing resilience assessment approaches lack specificity for extreme temperature conditions. They often overlook temperature-related mortality and neglect the customer characteristics and grid response in the calculation, despite the significant influence of these factors on NEI-related economic losses. This paper aims to address these gaps by introducing a comprehensive framework to estimate the impact of resilience enhancement not only on the direct economic losses incurred by customers but also on potential NEI, including mortality and the value of statistical life during extreme temperature-related outages. The proposed resilience valuation integrates customer characteristics and grid response variables based on a scalable grid simulation environment. This study adopts a holistic approach to quantify customer-oriented economic impacts, utilizing probabilistic loss scenarios that incorporate health-related factors and damage/loss models as a function of exposure for valuation. The proposed methodology is demonstrated through comparative resilient outage planning, using grid response models emulating a Texas weather zone during the 2021 winter storm Uri. The case study results show that enhanced outage planning with hardened infrastructure can improve the system resilience and thereby reduce the relative risk of mortality by 16% and save the total costs related to non-energy impacts by 74%. In conclusion, these findings underscore the efficacy of the framework by assessing the financial implications of each case, providing valuable insights for decision-makers and stakeholders involved in extreme-weather related resilience planning for risk management and mitigation strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗