Search NASA⌕ Search

SEARCH · Search NASA

Results for “Programmatic”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Payload transportation system study

A standard size set of shuttle payload transportation equipment was defined that will substantially reduce the cost of payload transportation and accommodate a wide range of payloads with minimum impact on payload design. The system was designed to accommodate payload shipments between the level 4 payload integration sites and the launch site during the calendar years 1979-1982. In addition to defining transportation multi-use mission support equipment (T-MMSE) the mode of travel, prime movers, and ancillary equipment required in the transportation process were also considered. Consistent with the STS goals of low cost and the use of standardized interfaces, the transportation system was designed to commercial grade standards and uses the payload flight mounting interfaces for transportation. The technical, cost, and programmatic data required to permit selection of a baseline system of MMSE for intersite movement of shuttle payloads were developed.

Source record↗

Political and legal implications of developing and operating a satellite power system

A number of political and legal implications of developing and operating a satellite power system (SPS) are identified and studied in this report. These include the vulnerability of SPS to actions of adversaries, communications impacts, the legality of an SPS in orbit including on-orbit military protection, alleviation of political concerns about deployment and operation of SPS, programmatic planning for SPS and the interaction of SPS with federal regulatory agencies and major departments. In comparing SPS to terrestrial power stations, it is seen that the political problems are neither clearly larger nor clearly smaller--they are clearly different and they are international in nature. If SPS is to become a reality these problems must be dealt with. Five major issues are identified. These must be resolved in order to obtain international acceptance of SPS. However, this study has found no insurmountable obstacles that would clearly prohibit the deployment, operation and protection of an SPS fleet.

Hazelrigg, G. A., Jr.↗

Space Construction Automated Fabrication Experiment Definition Study (SCAFEDS). Volume 1: Executive summary

The techniques, processes, and equipment required for automatic fabrication and assembly of structural elements in space using the space shuttle as a launch vehicle and construction base were investigated. Additional construction/systems/operational techniques, processes, and equipment which can be developed/demonstrated in the same program to provide further risk reduction benefits to future large space systems were included. Results in the areas of structure/materials, fabrication systems (beam builder, assembly jig, and avionics/controls), mission integration, and programmatics are summarized. Conclusions and recommendations are given.

Source record↗

Large wind turbine generators

The development associated with large wind turbine systems is briefly described. The scope of this activity includes the development of several large wind turbines ranging in size from 100 kW to several megawatt levels. A description of the wind turbine systems, their programmatic status and a summary of their potential costs is included.

Thomas, R. L.↗

Solar probe study

Realistic options for a Solar Probe Mission consistent with known technical, fiscal, and programmatic constraints are identified. A program plan for NASA which includes identification of necessary research and development activities is developed. A baseline mission and a strawman spacecraft design were selected and used to determine the feasibility of meeting the mission requirements and the sensitivity to variations in those requirements.

Randolph, J. E.↗

Outer planets exploration - A mission strategy for the 1980's

This paper presents a mission strategy for exploring the outer planets in the 1980s. The strategy is based on the anticipated findings of the 1977 Voyager Jupiter/Saturn Mission, and the 1982 Jupiter Orbiter Probe (JOP) Mission, recently approved as a new project start, beginning in October 1977. The JOP Mission then becomes a principal element in the strategy presented here. Characteristics (launch energy, trajectory parameters, etc.) of other mission opportunities to the outer planets in the 1980s are developed and presented. The need for and benefits from advanced propulsion systems, which can enable the more difficult missions to the outer planets, also are cited. The overall mission strategy, including a description of the options, is evolved in consideration of scientific rationale and return, and technical and programmatic coupling factors.

Moore, J. W.↗

Satellite Power Systems (SPS) concept definition study. Volume 7: SPS program plan and economic analysis

The economic and programmatic requirements for a recommended SPS solar photovoltaic baseline concept were analyzed. Costs are determined for the DDT&E; initial capital investment (covers initial procurement and emplacement of each SPS plant and equipment); replacement capital investment (capital asset replacement over the SPS operating life); operations and maintenance (expendables, minor maintenance, repair crews); and taxes/insurance.

Hanley, G.↗

Satellite Power Systems (SPS) Concept Definition Study. Volume 1: Executive Summary

The evolution of a total satellite power is described as well as major subsystem alternatives. Trade study results are given for satellite concepts, ground receiving antennas, satellite construction sites, and transportation. Point design definition, end-to-end analysis, and programmatics are covered. The GaAlAs photovoltaic concept is recommended as the current preliminary baseline satellite concept with silicon photovoltaic and Rankine cycle solar-thermal concepts as viable alternatives. Geosynchronous orbit is preferred for the construction of the satellite. A horizontal takeoff and landing air breathing rocket HLLV concept is preferred for earth-to-LEO transportation, with vertical takeoff options as viable alternatives. An argon electric orbit transfer vehicle is preferred for cargo transport from LEO and GEO orbit, and a chemical LH2/L02, two-stage orbit transfer vehicle is recommended for crew transport. A stripline rectenna array is the current preferred concept.

Hanley, G.↗

The 25 kW power module evolution study. Part 3: Conceptual designs for power module evolutions. Volume 3: Cost estimates

Cost data generated for the evolutionary power module concepts selected are reported. The initial acquisition costs (design, development, and protoflight unit test costs) were defined and modeled for the baseline 25 kW power module configurations. By building a parametric model of this initial building block, the cost of the 50 kW and the 100 kW power modules were derived by defining only their configuration and programmatic differences from the 25 kW baseline module. Variations in cost for the quantities needed to fulfill the mission scenarios were derived by applying appropriate learning curves.

Source record↗

Space-based solar power conversion and delivery systems study. Volume 5: Economic analysis

Space-based solar power conversion and delivery systems are studied along with a variety of economic and programmatic issues relevant to their development and deployment. The costs, uncertainties and risks associated with the current photovoltaic Satellite Solar Power System (SSPS) configuration, and issues affecting the development of an economically viable SSPS development program are addressed. In particular, the desirability of low earth orbit (LEO) and geosynchronous (GEO) test satellites is examined and critical technology areas are identified. The development of SSPS unit production (nth item), and operation and maintenance cost models suitable for incorporation into a risk assessment (Monte Carlo) model (RAM) are reported. The RAM was then used to evaluate the current SSPS configuration expected costs and cost-risk associated with this configuration. By examining differential costs and cost-risk as a function of postulated technology developments, the critical technologies, that is, those which drive costs and/or cost-risk, are identified. It is shown that the key technology area deals with productivity in space, that is, the ability to fabricate and assemble large structures in space, not, as might be expected, with some hardware component technology.

Source record↗

Extraterrestrial processing and manufacturing of large space systems. Volume 3: Executive summary

Facilities and equipment are defined for refining processes to commercial grade of lunar material that is delivered to a 'space manufacturing facility' in beneficiated, primary processed quality. The manufacturing facilities and the equipment for producing elements of large space systems from these materials and providing programmatic assessments of the concepts are also defined. In-space production processes of solar cells (by vapor deposition) and arrays, structures and joints, conduits, waveguides, RF equipment radiators, wire cables, converters, and others are described.

Miller, R. H.↗

Challenges to life support system's future

The development and future requirements of life support systems are considered, and the choice of equipment for long-duration missions is examined. The need for programmatic flexibility, capability growth, and integration of life support systems is discussed. Water supply, CO2 control, oxygen supply, trace contaminant control, and waste management are surveyed, and evolution forecast is presented.

Smith, W. L.↗

Large wind turbine generators

The large wind turbine portion of the Federal Wind Energy Program consists of two major project efforts: (1) the Mod-0 test bed project for supporting research technology, and (2) the large experimental wind turbines for electric utility applications. The Mod-0 has met its primary objective of providing the entire wind energy program with early operations and performance data. The large experimental wind turbines to be tested in utility applications include three of the Mod-0A (200 kW) type, one Mod-1 (2000 kW), and possibly several of the Mod-2 (2500 kW) designs. This paper presents a description of these wind turbine systems, their programmatic status, and a summary of their potential costs.

Thomas, R. L.↗

The ground processing simulator - A tool for mission model analysis and planning from a launch site perspective

The Ground Processing Simulator (GPS) is a computer-assisted planning tool designed and developed for Space Shuttle launch site application. Utilizing two programming languages, General Purpose Simulation System and FORTRAN, GPS provides the capability to analyze proposed Shuttle mission models via computer simulation. NASA-developed mission models which specify Shuttle launch rates, mission durations, cargo elements, and designated launch site are tested for feasibility by the simulator. GPS produces facility utilization schedules (including the identification of conflicts), launch data options, cargo element requirement dates, ground support equipment inventory requirements, and other data necessary to assess both the programmatic and launch site resources required to support proposed mission models. The purpose of this computer-assisted analysis is to determine methods which will permit the launching of the maximum number of cargoes per year on schedule, and in the sequence desired, with the minimum expenditure of resources.

Ralph, J. A.↗

PEP solar array definition study

The power extension package (PEP) is a solar array system that will be used on the space transportation system to augment the power of the Orbiter vehicle and to extend the time the vehicle may stay in orbit. The baseline configuration of the PEP is reviewed. The programmatic aspects of the design covering the development plan, the manufacturing facility plan and the estimated costs and risks are presented.

Source record↗

A description of a system of programs for mathematically processing on unified series (YeS) computers photographic images of the Earth taken from spacecraft

A description of a batch of programs for the YeS-1040 computer combined into an automated system for processing photo (and video) images of the Earth's surface, taken from spacecraft, is presented. Individual programs with the detailed discussion of the algorithmic and programmatic facilities needed by the user are presented. The basic principles for assembling the system, and the control programs are included. The exchange format within whose framework the cataloging of any programs recommended for the system of processing will be activated in the future is displayed.

Zolotukhin, V. G.↗

Orbit transfer vehicle engine study. Volume 1: Executive summary

The orbit transfer vehicle (OTV) engine study provided parametric performance, engine programmatic, and cost data on the complete propulative spectrum that is available for a variety of high energy, space maneuvering missions. Candidate OTV engines from the near term RL 10 engine to advanced high performance expander engines were examined.

Source record↗