Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

The Third Annual NASA Science Internet User Working Group Conference

The NASA Science Internet (NSI) User Support Office (USO) sponsored the Third Annual NSI User Working Group (NSIUWG) Conference March 30 through April 3, 1992, in Greenbelt, MD. Approximately 130 NSI users attended to learn more about the NSI, hear from projects which use NSI, and receive updates about new networking technologies and services. This report contains material relevant to the conference; copies of the agenda, meeting summaries, presentations, and descriptions of exhibitors. Plenary sessions featured a variety of speakers, including NSI project management, scientists, and NSI user project managers whose projects and applications effectively use NSI, and notable citizens of the larger Internet community. The conference also included exhibits of advanced networking applications; tutorials on internetworking, computer security, and networking technologies; and user subgroup meetings on the future direction of the conference, networking, and user services and applications.

Lev, Brian S.↗

Integrated Traction Drive Thermal Management: Keystone Project 3

The presentation was developed for the U.S. Department of Energy (DOE) Vehicle Technologies Program 2020 Annual Merit Review and Peer Evaluation Meeting. It reports on progress and accomplishments of DOE funded Integrated Traction Drive Thermal Management project. Highlighted are NREL's research accomplishments during FY 2020. Challenges associated with thermal management of integrated traction drives for electric vehicles arise due to the limited packaging space, coolant distribution, electrical connections, and ambient temperatures. For this project at NREL, research focuses on enabling thermal management technologies to support a modular, compact, self-contained integrated electric drive unit with motor and power electronics. Integration approaches, based on packaging location and coolant options for power electronics integrated with candidate motor technologies to reduce cables and connectors, are reviewed and compared using finite element analysis (FEA) tools. Automatic transmission fluid (ATF) jet impingement cooling characterization is carried out experimentally (measuring heat transfer coefficients) and using computational fluid dynamics (CFD) modeling.

47 OTHER INSTRUMENTATION↗

Development of a Training Program for Commercial Building Technicians

This project focused on developing and deploying a comprehensive program of 22 training modules, including certification requirements, and accreditation standards for commercial building technicians, to help achieve the full savings potential of energy efficient buildings, equipment, and systems. This curriculum extended the currently available commercial building technician programs -- training a labor force in a growing market area focused on energy efficiency. The program helps to remove a major market impediment to low energy/zero energy commercial building system acceptance, namely a lack of operating personnel capable of handling more complex high efficiency systems. The project developed a training curriculum for commercial building technicians, with particular focus on high-efficiency building technology, and systems. In Phase 1, the project team worked collaboratively in developing a draft training syllabus to address project objectives. The team identified energy efficiency knowledge gaps in existing programs and plans and plans to address the gaps with either modified or new curricula. In Phase 2, appropriate training materials were developed to meet project objectives. This material was developed for alternative modes of delivery, including classroom lecture materials, e-learning elements, video segments, exercises, and hands-on training elements. A Certification and Accreditation Plan and a Commercialization and Sustainability Plan were also investigated and developed. The Project Management Plan was updated quarterly and provided direction on the management approaches used to accomplish the expected project objectives. GTI project management practices tightly coordinate project activities using management controls to deliver optimal customer value. The project management practices include clear scope definition, schedule/budget tracking, risk/issue resolution and team coordination.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Continuous Risk Management at NASA

NPG 7120.5A, "NASA Program and Project Management Processes and Requirements" enacted in April, 1998, requires that "The program or project manager shall apply risk management principles..." The Software Assurance Technology Center (SATC) at NASA GSFC has been tasked with the responsibility for developing and teaching a systems level course for risk management that provides information on how to comply with this edict. The course was developed in conjunction with the Software Engineering Institute at Carnegie Mellon University, then tailored to the NASA systems community. This presentation will briefly discuss the six functions for risk management: (1) Identify the risks in a specific format; (2) Analyze the risk probability, impact/severity, and timeframe; (3) Plan the approach; (4) Track the risk through data compilation and analysis; (5) Control and monitor the risk; (6) Communicate and document the process and decisions. This risk management structure of functions has been taught to projects at all NASA Centers and is being successfully implemented on many projects. This presentation will give project managers the information they need to understand if risk management is to be effectively implemented on their projects at a cost they can afford.

Hammer, Theodore F.↗

The 2015-2016 SEPMAP Program at NASA JSC: Science, Engineering, and Program Management Training

The Systems Engineering Project Management Advancement Program (SEPMAP) at NASA Johnson Space Center (JSC) is an employee development program designed to provide graduate level training in project management and systems engineering. The program includes an applied learning project with engineering and integrated science goals requirements. The teams were presented with a task: Collect a representative sample set from a field site using a hexacopter platform, as if performing a scientific reconnaissance to assess whether the site is of sufficient scientific interest to justify exploration by astronauts. Four teams worked through the eighteen-month course to design customized sampling payloads integrated with the hexacopter, and then operate the aircraft to meet sampling requirements of number (≥ 5) and mass (≥ 5g each). The "Mars Yard" at JSC was utilized for this purpose. This project activity closely parallels NASA plans for the future exploration of Mars, where remote sites will be reconnoitered ahead of crewed exploration.

Graham, L.↗

Civilian Agency Industry Working Group EVM World Update

Objectives include: Promote the use of standards ]based, objective, and quantitative systems for managing projects and programs in the federal government. Understand how civilian agencies in general, manage their projects and programs. Project management survey expected to go out soon to civilian agencies. Describe how EVM and other best practices can be applied by the government to better manage its project and programs irrespective of whether work is contracted out or the types of contracts employed. Develop model policies aimed at project and program managers that are transportable across the government.

Kerby, Jerald↗

Integrated Vehicle Health Management Project-Modeling and Simulation for Wireless Sensor Applications

This paper describes the efforts in modeling and simulating electromagnetic transmission and reception as in a wireless sensor network through a realistic wing model for the Integrated Vehicle Health Management project at the Glenn Research Center. A computer model in a standard format for an S-3 Viking aircraft was obtained, converted to a Microwave Studio software format, and scaled to proper dimensions in Microwave Studio. The left wing portion of the model was used with two antenna models, one transmitting and one receiving, to simulate radio frequency transmission through the wing. Transmission and reception results were inconclusive.

Wallett, Thomas M.↗

Reducing NPR 7120.5D to Practice: Transitioning from Design Reviews to the SIR Hardware Review

The Gravity Recovery And Interior Laboratory (GRAIL) mission was the first Jet Propulsion Laboratory (JPL) project initiated under NASA's revised rules for space flight project management, NPR 7120.5D, "NASA Space Flight Program and Project Management Requirements." NASA selected GRAIL through a competitive Announcement of Opportunity process and funded its Phase B Preliminary Design effort. The team's first major milestone was a JPL institutional milestone, the Project Mission System Review (PMSR), which proved an excellent tune-up for the end-of-Phase-B NASA life-cycle review, the Preliminary Design Review (PDR). Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. For the Project Critical Design Review (CDR), lessons learned from the PDR and updated Standing Review Board (SRB) practices from the Agency were factored into the review preparation effort. Additionally, the review was held at the Principal Investigator's institution, the Massachusetts Institute of Technology, rather than at the project management center (JPL), which necessitated additional cross-country coordination steps. The PMSR, PDR, and CDR were design reviews and largely paper-oriented. For the System Integration Review (SIR), the project needed to transition to a hardware review and deal with paper in a very different manner. While many of the practices employed for the design reviews were modified and retained (e.g., review preparation team, gate products management, pre-reviews, SRB coordination), the review agenda, presentation style, and slide templates were significantly changed. A key success factor concerned the handling of project open paper, which was succinctly and effectively communicated to the SRB in presentations.This paper provides a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project SIR preparation and execution activities, including positive and negative lessons learned and identifies recommendations for future NASA (and non- NASA) project teams.

NPR 7120.5D↗

Engineering management challenges of the CIGeO Project - 15576

After being involved for years in the conceptual studies on the French Deep Geological Repository's (DGR) design for ANDRA, INGeROP (www.ingerop.com) is carrying out since 2012 the global project management and the technical integration of the preliminary, basic and detailed design of the Cigeo project, within the framework of GAIYA consortium. The article presents some particular organizational aspects that turned out to be more challenging than foreseen in the course of our activities. Starting from the presentation of real examples, some lessons learned are derived as well as practices of interest in solving analogue issues in similar projects, with focus on their application to the engineering phase of geological repositories in different countries. Finally, the paper concludes with some avenues for reflection on the 'reversibility' - including 'retrievability' - requirement asked for by the French public and government and its consequences on the engineering choices, on the expected lifetime of components and structures and on the (increased) complexity of CIGeO systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Antennas Designed for Advanced Communications for Air Traffic Management (AC/ATM) Project

The goal of the Advanced Communications for Air Traffic Management (AC/ATM) Project at the NASA Glenn Research Center at Lewis Field is to enable a communications infrastructure that provides the capacity, efficiency, and flexibility necessary to realize a mature free-flight environment. The technical thrust of the AC/ATM Project is targeted at the design, development, integration, test, and demonstration of enabling technologies for global broadband aeronautical communications. Since Ku-band facilities and equipment are readily available, one of the near-term demonstrations involves a link through a Kuband communications satellite. Two conformally mounted antennas will support the initial AC/ATM communications links. Both of these are steered electronically through monolithic microwave integrated circuit (MMIC) amplifiers and phase shifters. This link will be asymmetrical with the downlink to the aircraft (mobile vehicle) at a throughput rate of greater than 1.5 megabits per second (Mbps), whereas the throughput rate of the uplink from the aircraft will be greater than 100 kilobits per second (kbps). The data on the downlink can be narrow-band, wide-band, or a combination of both, depending on the requirements of the experiment. The AC/ATM project is purchasing a phased-array Ku-band transmitting antenna for the uplink from the test vehicle. Many Ku-band receiving antennas have been built, and one will be borrowed for a short time to perform the initial experiments at the NASA Glenn Research Center at Lewis Field. The Ku-band transmitting antenna is a 254-element MMIC phased-array antenna being built by Boeing Phantom Works. Each element can radiate 100 mW. The antenna is approximately 43-cm high by 24-cm wide by 3.3-cm thick. It can be steered beyond 60 from broadside. The beamwidth varies from 6 at broadside to 12 degrees at 60 degrees, which is typical of phased-array antennas. When the antenna is steered to 60 degrees, the beamwidth will illuminate approximately five satellites on the orbital arc. Spread spectrum techniques will be employed to keep the power impinging on the adjacent satellites below their noise floor so that no interference results. This antenna is power limited. If the antenna elements (currently 254) are increased by a factor of 4 (1024) or 16 (4096), the gain will increase and the beamwidth will decrease in proportion. For the latter two antenna sizes, the power must be "backed off" to prevent interference with the neighboring satellites. The receiving antenna, which is approximately 90-cm high, 60-cm wide, and 3.5-cm thick, is composed of 1500 phased-array elements. The system phased-array controller can control both a 1500-element receiving antenna and a 500-element transmitting antenna. For ground testing, this controller will allow manual beam pointing and polarization alignment. For normal operation, the system can be connected to the receiving antenna and the navigation system for real-time autonomous track operation. This will be accomplished by first pointing both antennas at the satellite using information from the aircraft data bus. Then, the system phased-array controller will electronically adjust the antenna pointing of the receiving antenna to find the peak signal. After the peak signal has been found, the beam of the transmitting antenna will be pointed to the same steering angles as the receiving antenna. For initial ground testing without an aircraft, the ARINC 429 data bus (ARINC Inc., Annapolis, Maryland) will be simulated by a gyro system purchased for the follow-on to the Monolithic Microwave Integrated Circuit (MMIC) Arrays for Satellite Communication on the Move (MASCOM) Project. MASCOM utilized the Advanced Communications Technology Satellite (ACTS) with a pair of Ka-band experimental phased-array antennas.

Zakrajsek, Robert J.↗

Students Solving Problems for ISS and Beyond: Inspiring the Next-Generation

Students Solving Problems for ISS and Beyond: Inspiring the Next-Generation Session Title: Students Solving Problems for ISS and Beyond: Inspiring the Next-Generation Session Description: NASA High school students United with NASA to Create Hardware (HUNCH) mission is to empower and inspire students through a Project-Based Learning program where 7-12 grade students learn 21st century skills and can launch their careers through participation in the design and fabrication of real-world valued products for NASA. With six different tracks consisting of Design & Prototype, Culinary Challenge, Softgoods, Precision Machining, Software, and Video Challenge, students are given the opportunity to create solutions for the International Space Station (ISS), the Moon, and beyond. Many projects are requested by the Crew to help ease living conditions, giving students the opportunity to make an impact on the lives of Astronauts. Other projects come directly from NASA and its partners. Join our session to learn how NASA is working with teachers across the country to mentor the next generation of scientists and engineers to solve some of NASA’s greatest challenges. Learning Outcomes: 1. Describe the NASA HUNCH Program, including the program objectives, goals, and strategic partnerships for middle school and high school outreach and advocacy efforts. 2. Identify the innovative strategies NASA is using to work with middle and high school students to solve real-world problems 3. Use the knowledge gained to inspire the next generation of scientists and engineers Session Track: Advocacy & Outreach Specialized Focus Area: Women in Government and Military Learning Level: Foundational Session Format: Listen & Learn Speaker Qualifications: 1. Deboshri Sadhukhan • Current Job Title: Deputy Project Manager • Topic Experience (years of experience related to proposed topic): 1-5 years • Biography: Deboshri Sadhukhan is an engineer for NASA Glenn Research Center (GRC). She has worked on numerous projects — from International Space Station (ISS) fluid technologies, to Orion European Service Module propulsion, to planetary science missions and other game-changing technologies. Her roles have ranged from Project Manager to System Safety Lead. She currently serves as a GRC Regional Mentor for the High school students United with NASA to Create Hardware (HUNCH) program. She also serves as Deputy Project Manager for an ISS payload and Safety & Mission Assurance Lead for a Radioisotope Power Systems project. In these roles, she oversees each phase of a project from beginning to end and provides leadership to increase the reliability, maintainability and system safety of hardware and personnel throughout the system life cycle. She holds a Bachelor of Science in Electrical Engineering from The University of Akron. 2. Nancy Hall • Current Job Title: Project Manager • Topic Experience: 20+ years • Biography: Nancy Rabel Hall earned a B.S. degree in Space Sciences from Florida Institute of Technology and a M.S. degree in Mechanical Engineering from the University of Toledo. She has been at NASA Glenn for over 30 years. She has led several International Space Station experiments that studied how the behavior of fluids and fluid systems behave differently in microgravity as compared to here on Earth. She is also the High school students United with NASA to Create Hardware (HUNCH) project manager, a program that allows students to design and fabricate hardware and softgoods for NASA as well as participate in a culinary and video challenge. She enjoys talking to the public and students about the work being done at NASA as well as showing students how math and science can be fun. She is an amateur radio operator, enjoys playing golf, and reading science fiction and fantasy books.

HUNCH↗

JPL Project Information Management: A Continuum Back to the Future

This slide presentation reviews the practices and architecture that support information management at JPL. This practice has allowed concurrent use and reuse of information by primary and secondary users. The use of this practice is illustrated in the evolution of the Mars Rovers from the Mars Pathfinder to the development of the Mars Science Laboratory. The recognition of the importance of information management during all phases of a project life cycle has resulted in the design of an information system that includes metadata, has reduced the risk of information loss through the use of an in-process appraisal, shaping of project's appreciation for capturing and managing the information on one project for re-use by future projects as a natural outgrowth of the process. This process has also assisted in connection of geographically disbursed partners into a team through sharing information, common tools and collaboration.

Information Management↗

IMPLEMENTING THE SAFEGUARDS-BY-DESIGN PROCESS

The Safeguards-by-Design (SBD) approach incorporates safeguards into the design and construction of nuclear facilities at the very beginning of the design process. It is a systematic and structured approach for fully integrating international and national safeguards for material control and accountability (MC&A), physical protection, and other proliferation barriers into the design and construction process for nuclear facilities. Implementing SBD is primarily a project management or project coordination challenge. This paper focuses specifically on the design process; the planning, definition, organization, coordination, scheduling and interaction of the safeguards experts and stakeholders as they participate in the design and construction of a nuclear facility. It delineates the steps in a nuclear facility design and construction project in order to provide the project context within which the safeguards design activities take place, describes the involvement of the safeguards experts in the design process, the nature of their analyses, interactions and decisions, and describes the documents created and how they are used. This report highlights the project context of safeguards activities, and identifies the safeguards community (nuclear facility operator, designer/builder, state regulator, SSAC and IAEA) must accomplish in order to implement SBD within the project.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Information Management Platform for Data Analytics and Aggregation (IMPALA) System Design Document

The System Design document tracks the design activities that are performed to guide the integration, installation, verification, and acceptance testing of the IMPALA Platform. The inputs to the design document are derived from the activities recorded in Tasks 1 through 6 of the Statement of Work (SOW), with the proposed technical solution being the completion of Phase 1-A. With the documentation of the architecture of the IMPALA Platform and the installation steps taken, the SDD will be a living document, capturing the details about capability enhancements and system improvements to the IMPALA Platform to provide users in development of accurate and precise analytical models. The IMPALA Platform infrastructure team, data architecture team, system integration team, security management team, project manager, NASA data scientists and users are the intended audience of this document. The IMPALA Platform is an assembly of commercial-off-the-shelf (COTS) products installed on an Apache-Hadoop platform. User interface details for the COTS products will be sourced from the COTS tools vendor documentation. The SDD is a focused explanation of the inputs, design steps, and projected outcomes of every design activity for the IMPALA Platform through installation and validation.

Carnell, Andrew↗

MPO B593110 - Final Report

National Security Technologies, LLC (NSTec) shall provide one (1) Mechanical Engineer to support the Linear Collider Subsystem Development Program at Lawrence Livermore National Security, LLC (LLNS). The NSTec Mechanical Engineer's efforts will include engineering, design, and drawing support for the Vacuum Seal Test. NSTec will also provide a final report of the setup and input to LLNL's project management on project status. The NSTec Mechanical Engineer's efforts will also include engineering, design, and drawing support to the conceptual design for manufacturing of the Flux Concentrator Magnet. NSTec will also contribute to LLNS's final report on the Flux Concentrator Magnet. The deliverables are drawings, sketches, engineering documents, and final reports delivered to the LLNS Technical Representative.

43 PARTICLE ACCELERATORS↗

Reducing NPR 7120.5D to Practice: Preparing for a Life-Cycle Review

In March 2007, NASA issued revised rules for space flight project management, NPR 7120.5D, 'NASA Space Flight Program and Project Management Requirements.' Central to the new rules was the construct of Key Decision Points, maturity gates that the project team must pass in order to continue development. In order that the KDP decision be fully informed, the NPR required, as entrance criteria for the gate, the generation and delivery of specified planning, technical, and cost/schedule documents (gate products) and a life-cycle review, the Preliminary Design Review. Building on JPL experience on the Prometheus and Juno projects, the team successfully organized for and conducted these reviews on an aggressive schedule. Key actions were taken to proactively interact with the SRB, produce high-quality gate products with stakeholder review, generate review presentation materials, and handle a myriad of supporting logistical functions. A review preparation team was established, including a Review Captain and leads for documentation, information systems, and logistics, and their roles, responsibilities and task assignments were identified. Aids were produced, including a detailed review preparation schedule and a comprehensive gate products production table. Institutional support was leveraged early and often. Implementation strategy reflected the needs of a nationally-distributed team, as well as applicable export control and IT security requirements. This paper gives a brief overview of the GRAIL mission and its project management challenges, provides a detailed description of project PMSR and PDR preparation and execution activities, including positive and negative lessons learned, and identifies recommendations for future NASA (and non-NASA) project teams.

NPR 7120.5D↗

Using a contingent valuation approach for improved solid waste management facility: Evidence from Kuala Lumpur, Malaysia

This study employed contingent valuation method to estimate the willingness to pay (WTP) of the households to improve the waste collection system in Kuala Lumpur, Malaysia. The objective of this study is to evaluate how household WTP changes when recycling and waste separation at source is made mandatory. The methodology consisted of asking people directly about their WTP for an additional waste collection service charge to cover the costs of a new waste management project. The new waste management project consisted of two versions: version A (recycling and waste separation is mandatory) and version B (recycling and waste separation is not mandatory). The households declined their WTP for version A when they were asked to separate the waste at source although all the facilities would be given to them for waste separation. The result of this study indicates that the households were not conscious about the benefits of recycling and waste separation. Concerted efforts should be taken to raise environmental consciousness of the households through education and more publicity regarding waste separation, reducing and recycling.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Social cost impact assessment of pipeline infrastructure projects

A key advantage of trenchless construction methods compared with traditional open-cut methods is their ability to install or rehabilitate underground utility systems with limited disruption to the surrounding built and natural environments. The equivalent monetary values of these disruptions are commonly called social costs. Social costs are often ignored by engineers or project managers during project planning and design phases, partially because they cannot be calculated using standard estimating methods. In recent years some approaches for estimating social costs were presented. Nevertheless, the cost data needed for validation of these estimating methods is lacking. Development of such social cost databases can be accomplished by compiling relevant information reported in various case histories. This paper identifies eight most important social cost categories, presents mathematical methods for calculating them, and summarizes the social cost impacts for two pipeline construction projects. The case histories are analyzed in order to identify trends for the various social cost categories. The effectiveness of the methods used to estimate these values is also discussed. These findings are valuable for pipeline infrastructure engineers making renewal technology selection decisions by providing a more accurate process for the assessment of social costs and impacts. - Highlights: • Identified the eight most important social cost factors for pipeline construction • Presented mathematical methods for calculating those social cost factors • Summarized social cost impacts for two pipeline construction projects • Analyzed those projects to identify trends for the social cost factors.

54 ENVIRONMENTAL SCIENCES↗