Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

The Development of NASA's Fault Management Handbook

Disciplined approach to Fault Management (FM) has not always been emphasized by projects, contributing to major schedule and cost overruns: (1) Often faults aren't addressed until nominal spacecraft design is fairly stable. (2) Design relegated to after-the-fact patchwork, Band-Aid approach. Progress is being made on a number of fronts outside of Handbook effort: (1) Processes, Practices and Tools being developed at some Centers and Institutions (2) Management recognition. Constellation FM roles, Discovery/New Frontiers mission reviews (3) Potential Technology solutions. New approaches could avoid many current pitfalls (3a) New FM architectures, including model-based approach integrated with NASA's MBSE (Model-Based System Engineering) efforts (3b) NASA's Office of the Chief Technologist: FM identified in seven of NASA's 14 Space Technology Roadmaps. Opportunity to coalesce and establish thrust area to progressively develop new FM techniques. FM Handbook will help ensure that future missions do not encounter same FM-related problems as previous missions. Version 1 of the FM Handbook is a good start: (1) Still need Version 2 Agency-wide FM Handbook to expand Handbook to other areas, especially crewed missions. (2) Still need to reach out to other organizations to develop common understanding and vocabulary. Handbook doesn't/can't address all Workshop recommendations. Still need to identify how to address programmatic and infrastructure issues.

Fault Management↗

Integrated Baseline Review (IBR) Handbook

The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, and need for management insight, and provides lessons learned from past IBRs. Appendices contain example documentation typically used in connection with an IBR. Note that these appendices are examples only, and should be tailored to meet the needs of individual projects and contracts.

Project↗

A Validation Study of the Performance Prediction Methodology of the Early Warning Metrics

Complex projects frequently experience delays and develop backlogs of their project control milestones during the acquisition and development lifecycles. In response, the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) formed an independent group of Subject Matter Experts (SMEs) to monitor the execution performance of GSFC Flight projects and instruments that are under development. The SME team’s objective is to generate data driven performance-based indicators that quantify the degree to which projects are meeting their respective schedule and budget commitments. One of these performance-based indicators, the Early Warning Metrics, provides performance forecasts and insight to project performance relative to historical successful projects. Herein this paper describes the purpose and utility of the Early Warning Metrics. Additionally, the initial prediction method used in the creation of the metrics is described along with its validity and the validity of comparable prediction methods.

Holloman, Sherrica↗

X-ray satellite (Rosat)

An overview of the current status of the ROSAT X-Ray satellite project is given. Areas discussed include an overview of problem areas, systems and mechanical subsystems, the electrical subsystem, power supply, data processing and transmission, the wide field camera, ground support equipment and the production scheduling. It is shown that the project is proceeding according to schedule, including the hardware production and costs. However, it is stated that estimated additional costs will exceed the plan. The previous schedule for production of the flight model will no longer be met. A modified milestone plan has been worked out with Dornier Systems. The current working schedule calls for a launch data of December 21, 1987; however, this does not take into account a 4-week buffer prior to transporting the flight model to the launch site. As of the date of this report, milestone M5 has been met. Previous problems with the gold vapor deposition on the flight model mirror due to contamination have been eliminated.

Source record↗

Managers Handbook for Software Development

Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences with flight dynamics software development. The management aspects of organizing the project, producing a development plan, estimation costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying are described.

Agresti, W.↗

Manager's handbook for software development, revision 1

Methods and aids for the management of software development projects are presented. The recommendations are based on analyses and experiences of the Software Engineering Laboratory (SEL) with flight dynamics software development. The management aspects of the following subjects are described: organizing the project, producing a development plan, estimating costs, scheduling, staffing, preparing deliverable documents, using management tools, monitoring the project, conducting reviews, auditing, testing, and certifying.

Source record↗

A Statistical Project Control Tool for Engineering Managers

This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

Bauch, Garland T.↗

Turbulent Methane-Air Combustion

This study is aimed at enhancing the understanding of turbulent premixed methane-air combustion. Such understanding is essential since: (1) many industries are now pursuing lighter hydrocarbon alternative fuels and the use of premixed flames to reduce pollutant emissions, and (2) the characteristic dimensions and flow rates of most industrial combustors are often large for flows to be turbulent. The specific objectives of the study are: (1) to establish the effects of process variables (e.g., flow rate, fuel/air ratio, chlorinated hydro-carbons, and pressure) on the emissions and flow structure (velocity distribution, streamlines, vorticity and flame shape), and (2) to develop a mechanistic model to explain the observed trends. This includes the acquisition of Dantec FlowMap Particle Image Velocimeter. The design and fabrication of the premixed burner has also been completed. The study is now at the stage of testing of equipment and analytical instruments. The presentation will give details on the tasks completed and on the current and future plans. The project is progressing well and all activities are on schedule. The outlook for the success of the project is bright.

Yaboah, Yaw D.↗

NAS Demand Predictions, Transportation Systems Analysis Model (TSAM) Compared with Other Forecasts

The current work incorporates the Transportation Systems Analysis Model (TSAM) to predict the future demand for airline travel. TSAM is a multi-mode, national model that predicts the demand for all long distance travel at a county level based upon population and demographics. The model conducts a mode choice analysis to compute the demand for commercial airline travel based upon the traveler s purpose of the trip, value of time, cost and time of the trip,. The county demand for airline travel is then aggregated (or distributed) to the airport level, and the enplanement demand at commercial airports is modeled. With the growth in flight demand, and utilizing current airline flight schedules, the Fratar algorithm is used to develop future flight schedules in the NAS. The projected flights can then be flown through air transportation simulators to quantify the ability of the NAS to meet future demand. A major strength of the TSAM analysis is that scenario planning can be conducted to quantify capacity requirements at individual airports, based upon different future scenarios. Different demographic scenarios can be analyzed to model the demand sensitivity to them. Also, it is fairly well know, but not well modeled at the airport level, that the demand for travel is highly dependent on the cost of travel, or the fare yield of the airline industry. The FAA projects the fare yield (in constant year dollars) to keep decreasing into the future. The magnitude and/or direction of these projections can be suspect in light of the general lack of airline profits and the large rises in airline fuel cost. Also, changes in travel time and convenience have an influence on the demand for air travel, especially for business travel. Future planners cannot easily conduct sensitivity studies of future demand with the FAA TAF data, nor with the Boeing or Airbus projections. In TSAM many factors can be parameterized and various demand sensitivities can be predicted for future travel. These resulting demand scenarios can be incorporated into future flight schedules, therefore providing a quantifiable demand for flights in the NAS for a range of futures. In addition, new future airline business scenarios are investigated that illustrate when direct flights can replace connecting flights and larger aircraft can be substituted, only when justified by demand.

Viken, Jeff↗

Utilizing Traveler Demand Modeling to Predict Future Commercial Flight Schedules in the NAS

The current work incorporates the Transportation Systems Analysis Model (TSAM) to predict the future demand for airline travel. TSAM is a multi-mode, national model that predicts the demand for all long distance travel at a county level based upon population and demographics. The model conducts a mode choice analysis to compute the demand for commercial airline travel based upon the traveler s purpose of the trip, value of time, cost and time of the trip,. The county demand for airline travel is then aggregated (or distributed) to the airport level, and the enplanement demand at commercial airports is modeled. With the growth in flight demand, and utilizing current airline flight schedules, the Fratar algorithm is used to develop future flight schedules in the NAS. The projected flights can then be flown through air transportation simulators to quantify the ability of the NAS to meet future demand. A major strength of the TSAM analysis is that scenario planning can be conducted to quantify capacity requirements at individual airports, based upon different future scenarios. Different demographic scenarios can be analyzed to model the demand sensitivity to them. Also, it is fairly well know, but not well modeled at the airport level, that the demand for travel is highly dependent on the cost of travel, or the fare yield of the airline industry. The FAA projects the fare yield (in constant year dollars) to keep decreasing into the future. The magnitude and/or direction of these projections can be suspect in light of the general lack of airline profits and the large rises in airline fuel cost. Also, changes in travel time and convenience have an influence on the demand for air travel, especially for business travel. Future planners cannot easily conduct sensitivity studies of future demand with the FAA TAF data, nor with the Boeing or Airbus projections. In TSAM many factors can be parameterized and various demand sensitivities can be predicted for future travel. These resulting demand scenarios can be incorporated into future flight schedules, therefore providing a quantifiable demand for flights in the NAS for a range of futures. In addition, new future airline business scenarios are investigated that illustrate when direct flights can replace connecting flights and larger aircraft can be substituted, only when justified by demand.

Viken, Jeff↗

Fuel Salt Synthesis for the Molten Chloride Reactor Experiment: Scale-up, Operations, and Production Update

Over the previous 5 years, Idaho National Laboratory (INL) has been working with Southern Co. and TerraPower on the Advanced Reactor Demonstration Program (ARDP) funded Molten Chloride Reactor Experiment (MCRE) project. As part of this effort, INL has developed a fuel synthesis process to produce the NaCl-UCl3 fuel salt that MCRE will need for operation. Dr. Phillips will present on process development and scale-up testing and results, as well as provide an update on the current status of fuel production for MCRE. To date, the fuel synthesis process has been demonstrated at full scale using depleted uranium, and the equipment necessary for production of the fuel for MCRE has been installed in the Fuel Manufacturing Facility (FMF) at the INL’s Materials and Fuels Complex (MFC). The NaCl-UCl3 produced to-date has been shown to be of 99.99% purity or greater, and be within tolerance for all relevant parameters. Overall process efficiency in terms of uranium utilization has been demonstrated to be above 90%. The synthesis operation has also been shortened to allow for completion of the reaction within a single 10 hour working shift. Consequently, the process developed is expected to be capable of meeting all project objectives for efficiency, purity, scale, and scheduling. Production of NaCl-UCl3 fuel salt for MCRE is projected to begin during the Summer of 2025.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Virtual environment and computer-aided technologies used for system prototyping and requirements development

The Space Station Freedom (SSF) Data Management System (DMS) consists of distributed hardware and software which monitor and control the many onboard systems. Virtual environment and off-the-shelf computer technologies can be used at critical points in project development to aid in objectives and requirements development. Geometric models (images) coupled with off-the-shelf hardware and software technologies were used in The Space Station Mockup and Trainer Facility (SSMTF) Crew Operational Assessment Project. Rapid prototyping is shown to be a valuable tool for operational procedure and system hardware and software requirements development. The project objectives, hardware and software technologies used, data gained, current activities, future development and training objectives shall be discussed. The importance of defining prototyping objectives and staying focused while maintaining schedules are discussed along with project pitfalls.

Logan, Cory↗

Hypertext-based design of a user interface for scheduling

Operations Mission Planner (OMP) is an ongoing research project at JPL that utilizes AI techniques to create an intelligent, automated planning and scheduling system. The information space reflects the complexity and diversity of tasks necessary in most real-world scheduling problems. Thus the problem of the user interface is to present as much information as possible at a given moment and allow the user to quickly navigate through the various types of displays. This paper describes a design which applies the hypertext model to solve these user interface problems. The general paradigm is to provide maps and search queries to allow the user to quickly find an interesting conflict or problem, and then allow the user to navigate through the displays in a hypertext fashion.

Woerner, Irene W.↗

Design of the ECCE detector for the Electron Ion Collider

The EIC Comprehensive Chromodynamics Experiment (ECCE) detector has been designed to address the full scope of the proposed Electron Ion Collider (EIC) physics program as presented by the National Academy of Science and provide a deeper understanding of the quark-gluon structure of matter. To accomplish this, the ECCE detector offers nearly acceptance and energy coverage along with excellent tracking and particle identification. The ECCE detector was designed to be built within the budget envelope set out by the EIC project while simultaneously managing cost and schedule risks. Finally, this detector concept has been selected to be the basis for the EIC project detector.

47 OTHER INSTRUMENTATION↗

Multi-Element Integrated Project Planning at Kennedy Space Center

This presentation demonstrates how the ASRC Scheduling team developed working practices to support multiple NASA and ASRC Project Managers using the enterprise capabilities of Primavera P6 and P6 Web Access. This work has proceeded as part of Kennedy Ground Systems' preparation for its transition from the Shuttle Program to the Constellation Program. The presenters will cover Primavera's enterprise-class capabilities for schedule development, integrated critical path analysis, and reporting, as well as advanced Primavera P6 Web Access tools and techniques for communicating project status.

Mullon, Robert↗

Measurement and interpretation of crustal deformation rates associated with postglacial rebound

This project involves obtaining GPS measurements in Scandinavia and using the measurements to estimate the viscosity profile of the earth's mantle and to correct tide-gauge measurements for the rebound effect. We report on several aspects of this project. The DSGS was not scheduled to be reoccupied with DOSE receivers during the report period. The permanent network set up by Onsala Space Observatory continues to operate, and the data are being evaluated. An important technical advance we intend for this project is to use the full three dimensional site velocity information for inferring geophysical parameters. During the report period, two papers have been been accepted for publication in the Journal of Geophysical Research and will be published in April. Reprints of these papers are contained in the Appendix.

Davis, James L.↗

Solid Rocket Motor for the Space Shuttle Booster

The Solid Rocket Motor (SRM) for the Space Shuttle Solid Rocket Booster (SRB) is being developed by Thiokol Corporation, Wasatch Division under the cognizance of Marshall Space Flight Center (MSFC), Contract NAS8-30490. Solid Rocket Motor requirements are summarized, and the overall SRM configuration and performance characteristics are presented in this paper. Design details of the major SRM components are reviewed and the approach taken in each component area is identified and related to previous industry experience. The overall scope of the SRM Project is presented. Activities on the project since authorization to proceed in June 1974 are reviewed. A summary schedule is presented which relates key SRM Project activities to the overall Shuttle Program.

Thirkill, J.↗