Search NASA⌕ Search

SEARCH · Search NASA

Results for “RP”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Mass measurements of 60–63 Ga reduce x-ray burst model uncertainties and extend the evaluated T=1 isobaric multiplet mass equation

We report precision mass measurements of neutron-deficient gallium isotopes approaching the proton drip line. The measurements of 60–63 Ga performed with the TITAN multiple-reflection time-of-flight mass spectrometer provide a more than threefold improvement over the current literature mass uncertainty of 61 Ga and mark the first direct mass measurement of 60 Ga. The improved precision of the 61 Ga mass has important implications for the astrophysical rp process, as it constrains essential reaction Q values near the 60 Zn waiting point. Based on calculations with a one-zone model, we demonstrate the impact of the improved mass data on prediction uncertainties of x-ray burst models. The first-time measurement of the 60 Ga ground-state mass establishes the proton-bound nature of this nuclide, thus constraining the location of the proton drip line along this isotopic chain. Including the measured mass of 60 Ga further enables us to extend the evaluated T = 1 isobaric multiplet mass equation up to A = 60.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Measurement of the Ne 18 ( α , p ) Na 21 reaction with the ANASEN active-target detector system at E c . m . = 2.5 – 4 MeV

The 18 Ne(α,p) 21 Na reaction plays a significant role in Type-I X-ray bursts. It is a major path in the breakout from the hot-CNO cycles to the synthesis of heavier elements in the αp- and rp-processes. An experiment to determine the cross section of this reaction was performed with the ANASEN active-target detector system, determining the cross section at energies between 2.5 and 4 MeV in the center-of-mass frame. The measured cross sections for reactions populating the ground state in 21 Na are consistent with results obtained from the time-inverse reaction, but significantly lower than the previously published experimental data of direct measurements. The total cross sections are also compared with those derived from indirect methods and statistical-model calculations. Furthermore, this experiment establishes a new experimental data set on the excitation function of the 18 Ne(α,p) 21 Na reaction, revealing the significance of the excited states' contributions to the total reaction cross section and allowing us to separate the contribution of the (α,2p) reaction. The impact of the measured cross section on thermal reaction rates is discussed.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

High-precision mass measurement of Si 24 and a refined determination of the r p process at the A = 22 waiting point

We report a high-precision mass measurement of 24 Si, performed with the Low Energy Beam and Ion Trap (LEBIT) facility at the National Superconducting Cyclotron Laboratory. The atomic mass excess, 10 753.8 (37) keV, is a factor of 5 more precise than previous results. This substantially reduces the uncertainty of the 23 Al(p ,γ) 24 Si reaction rate, which is a key part of the rapid proton capture (rp) process powering type I x-ray bursts. Furthermore, the updated rate constrains the onset temperature of the (α,p) process at the 22 Mg waiting point to a precision of 9%.

20 ≤ A ≤ 38↗

Negative thermal expansion in the Ruddlesden-Popper calcium titanates

Materials exhibiting negative thermal expansion (NTE) are important for the fabrication and operation of microelectronic devices and optical systems. In this paper, combining density-functional-theory calculations and the self-consistent quasiharmonic approximation method, we investigate the variation of the NTE mechanisms active in layered calcium titanate oxides. We find a NTE trend with layer number for the orthorhombic materials comprising the RP series, but the monoclinic polymorph is an outlier.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Etching of Si 3 N 4 induced by electron beam plasma from hollow cathode plasma in a downstream reactive environment

An etching system based on the interaction of electrons extracted from a direct current (DC) hollow-cathode (HC) Ar plasma and injected towards a Si3N4 covered silicon substrate located in the downstream reactive environment created by an additional remote CF 4 /O 2 plasma source was developed and evaluated. By controlling the properties of the injected beam electrons, this approach allows to deliver energy to a surface functionalized by exposure to reactive species, and initiate surface etching. The energy of the primary beam electrons is controlled by the acceleration voltage relative to the HC discharge. Ar atoms flow from the high-pressure HC discharge into the low pressure downstream reactive environment in the process chamber. For an acceleration voltage greater than the ionization potential of Ar and/or process gas species, the energetic primary beam electrons produce a secondary plasma in the process chamber, and can also cause additional dissociation. We have characterized the properties of the secondary plasma and also surface etching of Si 3 N 4 as a function of process parameters, including acceleration voltage (0-80 V), discharge current of the HC discharge (1-2 A), pressure (3.5-20 mTorr), source to substrate distance (1.5 to 5 cm), and feed gas composition (20% and 80% O2 in CF 4 /O 2 ). The electron energy probability function (EEPF) measured with a Langmuir probe about 2.5 cm below the extraction ring suggests several major groups of electrons for this situation, including high energy primary beam electrons with an energy that varies as the acceleration voltage is changed and low energy electrons produced by beam electron-induced ionization of the Ar gas in the process chamber. When a remote CF 4 /O 2 plasma is additionally coupled to the process chamber, Si 3 N 4 surfaces can be functionalized, and by varying the energy of the beam electrons, Si 3 N 4 etching can be induced by electron-neutral synergy effect with plasma-surface interaction. For conditions without beam electron injection, the remote plasma etching rate (ER) of Si 3 N 4 depends strongly on the O 2 concentration in the CF 4 /O 2 processing gas mixture and can be suppressed for O 2 -rich process conditions by the formation of a SiONF passivation layer on the Si 3 N 4 surface. The combination of the HC electron beam source with the remote plasma source (HCEB-RP) makes it possible to induce Si 3 N 4 etching for O 2 -rich remote plasma conditions where remote plasma by itself produces negligible Si 3 N 4 etching. The electron enhanced etching of Si 3 N 4 depends strongly on O 2 /CF 4 mixing ratio reflecting changing arrival rates of O and F species at the surface. Optical emission spectroscopy was used to estimate the ratio of gas phase F and O densities and found to be controlled by the gas mixing ratio and independent of HC EB operating conditions. At this time the detailed sequence of events operative in the etching mechanism is unclear. While the increase of the electron energy is ultimately responsible for initiating surface etching, at present we cannot rule out a role of ions from the simultaneously produced secondary plasma in plasma surface interaction mechanisms.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Calculator For Radioisotope Yields, Targets, And Products

An initial number of atoms in a material (by element or by isotope), defined by ENDF library availability, is used to produce an initial reaction products (RPs). The RPs are decayed using full, analytical solutions to the Bateman equations to calculate the RP inventory at a user-specified time. Since each radioisotope's inventory is known, the proportion to the total may be shown for each isotope. The total dose rate and activity is the main objective for experimenters. Built-in information about many reactors and irradiation positions is available. Full execution and display of results takes 5-10 seconds, depending on the complexity of the input parameters.

Holschuh, ThomasV [Idaho National Laboratory (INL)↗

WIPP MLU Shipment Preliminary Document

The following SNL document contains required information as part of final preparation for the LANL MLU shipping team. The documents pertain to MLU shipment activities scheduled at Sandia National Laboratories (SNL) in TA-5, for the week of July 20th— 24th: EILOT (Escort In Lieu Of Training) for MLU team members and crane operators and SNL-RP characterization surveys for the 11 SCA due for shipment. The EILOT document is listed first. The remaining pages are the radiation and contamination surveys completed on the 11 SCA containers that are being loaded and shipped to WIPP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP MLU Incoming Vehicles Survey Document

The following SNL document contains requested radiological survey information, as part of the documentation for the TRU-waste shipment being performed by the LANL MLU team. The surveys were performed in TA-5, on July 20th, 2020: Incoming WIPP TRU-Pact trailers survey: 1-20200720-4, and, Incoming MLU trailer and mobile crane survey: 1-20200720-8 The first survey was of 2 WIPP trailers carrying 2 empty TRU Half-Pacts each. The second survey was for a trailer with the MLU team's equipment, and for the contracted mobile crane that be used for loading Half-Pacts. All information contained was completed, reviewed, and approved by SNL RP personnel, and is released for receipt and use by the LANL MLU Team and WIPP personnel at their discretion.

61 RADIATION PROTECTION AND DOSIMETRY↗

Pressurizing Hagan and SAVY containers to 30-psig (air) to measure the release of analytical cerium oxide test powder

In response to an ESS surrounding the storage of sealed sources at TA-55, personnel from RP-SVS (Radiation Protection Services) and ORI-2 (Operational Readiness & Execution) were approached by ES-55 (Facility System Engineering) to provide technical testing of known nuclear material storage containers. Testing criteria were determined by SB-PF (Safety Basis for Plutonium Facilities). Tests were conducted in conjunction with multiple related projects at the Aerosol Sciences Laboratory (TA-03-0130-0103). An experimental system was quickly developed to deliver a pressure pulse (30-psig) that mimics a sealed source burst scenario. A series of twelve tests was conducted. Six tests were done with two different 5QT SAVY-4000 containers, where each SAVY filter-lid combination was subjected to three successive test insults. Three tests were done with a (0.375" diameter filter) 8Q.T Hagan container, and three tests with a (0.625" diameter filter) 8QT Hagan container. An unused, fresh container filter was used for each tested Hagan container, each receiving only one test insult per filter. Cerium oxide (CeO 2 ) powder was loaded (100 grams per test) into a nozzle in the tested Hagan and SAVY containers, and the nozzle was hard-plumbed to a ball valve and a pressure source. This system was installed into the Los Alamos RRFMC (Respirable Release Measurement Chamber), which is an integrated multipurpose aerosol wind tunnel that satisfies NQA-1 subpart 2.4 for R&D work. The ball valve was fitted with a mechanical linkage for operation from outside the wind tunnel. An aerodynamic particle sizer counted the particle concentrations and size distributions of released aerosol. Respirable aerosol released during the tests was measured and a correction factor for wind tunnel flowrate and internal duct deposition was applied.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2018 Report on Rare Plant Monitoring and Restoration at the Lawrence Livermore National Laboratory’s Experimental Test Site (Site 300)

This document meets the reporting requirements of LLNL’s California Endangered Species Act Scientific, Educational, or Management Permit (No. 2081 (a)-15-005-RP) for 2018. Section A describes monitoring and field activities conducted by LLNL biologists at the Site 300 native and experimental populations and the Carnegie Canyon native population of the federally-endangered plant, Amsinckia grandiflora (the large-flowered fiddleneck), between January 2018 and December 2018. In addition, monitoring and field activities conducted by LLNL biologists at the Site 300 native populations of the rare plants Eschscholzia rhombipetala (the diamond-petaled California poppy) and Blepharizonia plumosa (the big tarplant) between January 2018 and December 2018 are described in Sections B and C, respectively. Both plants have a California Rare Plant Rank (CRPR) of 1B, which includes species that are rare or endangered throughout their range. California macrophylla (the round-leaved filaree), formerly had a CRPR of 1B, but was downgraded to CBR (Considered But Rejected) in December 2017, as the species was “too common statewide: counties that contain small, localized populations under severe threat should track C. macrophylla as a species of local concern” (California Native Plant Society, 2018). As C. macrophylla is widespread at Site 300 (Carlsen and Paterson, 2018), 2018 will be the final year of monitoring C. macrophylla at Site 300, the results of which are described in Section D. Monitoring of the Navarretia nigelliformis ssp. radians (adobe navarretia), a CRPR 1B species, is planned, and results will be included in future reports.

54 ENVIRONMENTAL SCIENCES↗

Evaluation report on the Thermo Scientific TruDose (neutron,gamma) EPD3

This report summarizes an evaluation study on the Thermo Scientific TruDose n/γ EPD3 by LANL’s RP-SVS group. Two EPD3s were received for assessment (SNs 7500100 and 7500108) along with an EPD3 desktop reader. The evaluation included intercomparisons with Thermo’s N2 EPD which is in wide circulation at LANL but is no longer commercially available. A favourable assessment of the TruDose EPD3 would help support it as a viable option to replace the N2 EPD. The data and observations included in this report could also serve as the basis of a Technical Basis Document for the use of the EPD3 at LANL.

61 RADIATION PROTECTION AND DOSIMETRY↗

238 PuO 2 In Vitro Lung Dissolution Rate and Particle Size Determination for Material Involved in the June 8, 2020 Incident at the Los Alamos National Laboratory PF-4 Facility

As part of the LANL response to the June 8, 2020 238 PuO 2 inhalation exposure incident in PF-4, the Nuclear and Radiochemistry Group (C-NR) was asked to assist in determining the lung dissolution rate and particle size distribution of the airborne material. These material characteristics, along with urine and fecal bioassay data, are used by the Radiation Protection Services (RP-SVS) internal dosimetrists to refine dose estimates for exposed workers. Similar to previous studies, an in vitro lung dissolution rate study was performed to assess how fast 238 Pu is cleared from the lungs. Given that PuO 2 is a relatively insoluble material, it dissolves very slowly and requires in vitro studies of 100 or more days to estimate dissolution rates. This report details the results of a 100 day in vitro dissolution rate study and the particle size characteristics of 238 PuO 2 collected on an air filters during the incident. Results show that the 238 PuO 2 involved in this incident has behavior comparable to PuO 2 from previous in vitro studies, with approximately 1% of material dissolving quickly, and 99% of the material dissolving very slowly, with a half-time of approximately 120 years. This is somewhat slower than what was determined in a previous study of LANL 238 PuO 2 , which had an experimental dissolution half-time of 3 years, but significantly faster than 3000 years measured for 239 PuO 2 . Particle size distribution measurements indicate that particle sizes range from 0.10 µm – 6 µm, with most < 2 µm, which is reasonable based on our understanding of the process history of the 238 PuO 2 . Particle size, specific surface area, calcining temperature, specific activity, and age all are known factors that can impact the dissolution rate of refractory materials, however, there are too few studies to quantify the exact influence of these parameters on a measured dissolution rate. The results of this study add to that knowledge base, and provide new insights into the dissolution rates for this LANL process-specific 238 PuO 2 material.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

RCT Training and Qualification

The RCT training program prepares Radiological Control Technicians to support the advancement of the laboratory’s mission objectives while ensuring the health and safety of the workforce and public from radiological hazards, utilizing a multi-disciplinary, hands-on approach. Currently located at the MESA complex within the University of New Mexico – Los Alamos Campus, the RP Training department has established an immersive training environment that simulates realistic work conditions in which RCTs may develop the fundamental knowledge and skills required to control radiological work across the Laboratory

61 RADIATION PROTECTION AND DOSIMETRY↗

Neutron spectral measurements at the BNL NSLS-II synchrotron facility

During the first week of August 2022, Tim Gildea of Los Alamos National Laboratory’s (LANL) RP-SVS group performed a series of neutron spectral measurements at the National Synchrotron Light Source II (NSLS-II) 3GeV facility located at Brookhaven National Lab (BNL)1 . These measurements were conducted under Memorandum Purchase Order (MPO) 413911 with the objective of gaining an accurate understanding of the photoneutron fields generated under normal and selected fault conditions. The spectral data collected during the course of the study was analyzed at LANL and the results form the basis of this report.

61 RADIATION PROTECTION AND DOSIMETRY↗

Chromium Tolerant, Highly Active and Stable Electrocatalytic Internal Surface Coating for Cathode of Commercial SOFCs (Final Report)

This project is aimed to develop a chromium (Cr) tolerant, highly active, and stable coating layer on the internal surfaces of the porous composite cathode from commercially available SOFCs. Such coating layer was developed using the additive manufacturing process of Atomic Layer Deposition (ALD) and has been applied on the cathode consisting of either an electronic conductor of LaxSr 1-x MnyO 3-δ (LSM) or mixed ionic and electronic conducting La x Sr 1-x Co y Fe 1-y O 3-δ (LSCF). PI's work has demonstrated that the internal surface of cathode from the commercial cells, can be further tailored using ALD coating to dramatically enhance the cell performance. For instance, ALD layer consisting heterostructured nano composite of nano-Pt and nano-(Mn 0.8 Co 0.2 ) 3 O 4 oxide on the internal surface of porous LSM/YSZ cathode from SOFCs, has resulted in the large reduction of the cell polarizations resistance by up to 53%, and enormous increase of power density over 370%. For the cells with LSCF/Sm 2 O 3 doped CeO 2 (SDC) cathode, the conformal layer of nano-composite consisting of superjacent CoOx and subjacent minimum amount of Pt nano-grains has resulted in the power density enhancement by 126% for the large scale industry tubular cells at 750°C, and both the performance enhancement and nanostructure of the ALD layer are stable over ~ 2000 h continuous operation performed at industry test station. In the meanwhile, those ALD coating layer developed by PI's work is also inherently Cr-tolerant, and could act as physical barrier for preventing Cr diffusion into the cathode backbone, so as to mitigate the Cr poisoning effect on the cathode. In this project, the impact of Cr on the performance of those ALD coated commercial cells has been evaluated. Based on evolution of the cell performance, the ALD coating layer chemistry and ALD coating layer thickness has been optimized to maximize the overall Cr tolerance, cell power density and cell longevity. Different ALD coating has been applied onto the internal surface of LSM/YSZ and LSCF/SDC backbone respectively. The architecture/scaffold structures on the internal surface of different cathode, designed by this project, was catalogued and analyzed using High Resolution Transmission Electron Microscopy (HRTEM), and cell power/durability performance are assured via comprehensive electrochemical performance testing in the industry operation relevant conditions. The impact of the electrochemical operation current density, the water humidity, the cell operation temperature, and cell operation duration on the Cr tolerance of ALD coated cells has been systematically investigated. There is completely different nanostructure degradation mechanisms between LSM and LSCF cells induced by Cr contamination. For the LSCF/SDC baseline cell, With the Cr source, there is no apparent Sr surface segregation phase even for the baseline cell operated for 3000 h at 750 °C. With the Cr source, there is significant amorphous (SrCr)Ox phase accumulated in the original pore region. For the commercial baseline cells, Cr contaminants on the LSM electrode severely impacted the entire cell's electrochemical performance and nanostructure degradation. Those degradations include (1). Peak power density loss of 64 % after 109 h of operation. The dramatic increase in Rp (2). They are cracking at LSM/SSZ interface, LSM grains. SSZ remains intact but with (CrMn)Ox. By contrast, ALD coating (MnCo)Ox/Pt dramatically improves the Cr resistance, as follows (1). ALD-coated cell with a power density is 280-380 % of the baseline cell, depending on the ALD layer thickness. (2). For a cell with a 20 nm thick ALD layer, there is a large performance enhancement (> 200 % power density) induced by ALD coating of Cr-tolerant Mn 0.8 Co 0.2 Ox. (3). For a cell with a 20 nm thick ALD layer, after 168 h at 750 °C power density of the ALD-coated cell is ~ 600% of that baseline cell upon operation with Cr contamination for 109 h. The ALD coating on the internal surface of cathode developed by this project integrated multi-functions. Those multi-functions include (1). Dramatically improving the cell power density for the commercial cells; (2). Dramatically improving contamination resistance of the cathode, for being an excellent protection coating layer sealing off Cr contamination. (3). Dramatically increasing the cell longevity by potentially preventing the microstructure evolution and grain coarsening of the cathode. Overall, this project will provide a simple solution to simultaneously enhance power density and increase the reliability, robustness, and endurance of commercial SOFCs, over the entire operating temperature range of 650-800 °C. For the inherently functional SOFC, the ALD coating of LSM based cathode mitigate the Cr-contamination. Power density of ALD-coated cell is ~ 600% of that baseline cell upon operation with Cr contamination. In addition to SOFCs, the novel on-demand design approach and creation of multifunctional heterogeneous architecture on the electrode surface presented in this work opens further research for their application in other types of fuel cells, batteries, and sensors for which electrochemical reactions on the surface are similarly critical.

36 MATERIALS SCIENCE↗

Radioidone Event of March 2023

Internal Dosimetry (RP-SVS) will send each affected employee a dose assessment based on their thyroid measurement results. Affected employees will be kept apprised of their dose assessment with an issued progress report. Included in the progress report is an upper limit on the committed effective dose (total dose incurred before the radioiodine leaves the body). Final dose results are expected to be reported within about two weeks of the initial thyroid measurement. You can contact Deepesh Poudel (505-665-1798), John Klumpp (505-667-0325), or Sara Dumit (505-665-4095) if you have any questions about the status of your dose assessment

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

RCT Continuing Training: RCT Job Coverage and CONOPS

RCT Continuing Training covering all of the necessary steps associated with RCT, and how conduct of operations ties in with this process. The terminal objective of this training is: Given the need to perform radiological job coverage, recognize the requirements to maintain radiological work control in accordance with P121, Radiation Protection, RP-PROG-TP-200, Radiation Protection Manual, and P315, Conduct of Operations.

61 RADIATION PROTECTION AND DOSIMETRY↗