Search NASA⌕ Search

SEARCH · Search NASA

Results for “Robot Framework”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

304 records · Page 17

Dissipative rendering and neural network control system design

Model-based control system designs are limited by the accuracy of the models of the plant, plant uncertainty, and exogenous signals. Although better models can be obtained with system identification, the models and control designs still have limitations. One approach to reduce the dependency on particular models is to design a set of compensators that will guarantee robust stability to a set of plants. Optimization over the compensator parameters can then be used to get the desired performance. Conservativeness of this approach can be reduced by integrating fundamental properties of the plant models. This is the approach of dissipative control design. Dissipative control designs are based on several variations of the Passivity Theorem, which have been proven for nonlinear/linear and continuous-time/discrete-time systems. These theorems depend not on a specific model of a plant, but on its general dissipative properties. Dissipative control design has found wide applicability in flexible space structures and robotic systems that can be configured to be dissipative. Currently, there is ongoing research to improve the performance of dissipative control designs. For aircraft systems that are not dissipative active control may be used to make them dissipative and then a dissipative control design technique can be used. It is also possible that rendering a system dissipative and dissipative control design may be combined into one step. Furthermore, the transformation of a non-dissipative system to dissipative can be done robustly. One sequential design procedure for finite dimensional linear time-invariant systems has been developed. For nonlinear plants that cannot be controlled adequately with a single linear controller, model-based techniques have additional problems. Nonlinear system identification is still a research topic. Lacking analytical models for model-based design, artificial neural network algorithms have recently received considerable attention. Using their universal approximation property, neural networks have been introduced into nonlinear control designs in several ways. Unfortunately, little work has appeared that analyzes neural network control systems and establishes margins for stability and performance. One approach for this analysis is to set up neural network control systems in the framework presented above. For example, one neural network could be used to render a system to be dissipative, a second strictly dissipative neural network controller could be used to guarantee robust stability.

Gonzalez, Oscar R.↗

DC Modeling of 4H-SiC JFET Gate Length Reduction at 500°C

The development of robust, high-performance integrated circuits (ICs) will enable numerous potential NASA missions of current interest, including long-duration robotic missions exploring the 460 °C surface of Venus. Currently, NASA is looking towards SiC-based devices to provide such a solution. However, the current NASA silicon carbide (SiC) JFET device with a channel length of 6μm (for recently fabricated Gen. 11 ICs) limits on mission relevant circuit capabilities [1]. In this study, we combined experiments with simulations to explore two straightforward fabrication strategies to reduce the SiC JFET channel length while maintaining turn-off behavior (Fig. 1a) needed to realize 500 °C circuit operation. The first fabrication strategy uses a shallow self-align nitrogen implant (Figure 1b) along the device's top surface but not below the gate combined with a high-dose phosphorous implant directly below the source and drain contacts. For the second fabrication strategy (Figure 1c), the high-dose phosphorous implants extended from below the contacts all the way up to the gate edges. Simulations guided gate length reductions without significant degradation in the turn-off performance. In total 12 SiC JFET variants implementing using the different fabrication strategies, gate lengths, and n-channel epilayer thickness were implemented in our simulation framework implemented in COMSOL. Since the COMSOL database does not have the material properties for 4H-SiC, these parameters were taken from the literature and implemented in COMSOL. The empirical models [2] for incomplete ionization, Auger recombination, low field mobility, and Shockley-Read-Hall recombination were implemented to account for material-specific device behavior.

4H-SiC JFET↗

Ares Launch Vehicles Overview: Space Access Society

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission in ways that promote leadership in space and economic expansion on the new frontier. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. The Vision commits NASA and the nation to an agenda of exploration that also includes robotic exploration and technology development, while building on lessons learned over 50 years of hard-won experience. NASA is building on common hardware, shared knowledge, and unique experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, which transports the Orion Crew Exploration Vehicle, and the Ares V Cargo Launch Vehicle, which transports the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit, where it will rendezvous with the Lunar Module in the Earth Departure Stage, which will then propel the combination into lunar orbit. The imperative to explore space with the combination of astronauts and robots will be the impetus for inventions such as solar power and water and waste recycling. This next chapter in NASA's history promises to write the next chapter in American history, as well. It will require this nation to provide the talent to develop tools, machines, materials, processes, technologies, and capabilities that can benefit nearly all aspects of life on Earth. Roles and responsibilities are shared between a nationwide Government and industry team. The Exploration Launch Projects Office at the Marshall Space Flight Center manages the design, development, testing, and evaluation of both vehicles and serves as lead systems integrator. A little over a year after it was chartered, the Exploration Launch Projects team is testing engine components, refining vehicle designs, performing wind tunnel tests, and building hardware for the first flight test of Ares I-X, scheduled for spring 2009. The Exploration Launch Projects team conducted the Ares I System Requirements Review (SRR) at the end of 2006. In Ares' first year, extensive trade studies and evaluations were conducted to refine the design initially recommended by the Exploration Systems Architecture Study, conceptual designs were analyzed for fitness, and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. Now, the project turns its focus to the Preliminary Design Review (PDR), scheduled for 2008. Taking into consideration the findings of the SRR, the design of the Ares I is being tightened and refined to meet the safety, operability, reliability, and affordability goals outlined by the Constellation Program. The Ares V is in the early design stage, focusing its activities on requirements validation and ways to develop this heavy-lift system so that synergistic hardware commonality between it and the Ares I can reduce the operational footprint and foster sustained exploration across the decades ahead.

Cook, Steve↗

A Mossbauer investigation of iron-rich terrestrial hydrothermal vent systems: lessons for Mars exploration

Hydrothermal spring systems may well have been present on early Mars and could have served as a habitat for primitive life. The integrated instrument suite of the Athena Rover has, as a component on the robotic arm, a Mossbauer spectrometer. In the context of future Mars exploration we present results of Mossbauer analysis of a suite of samples from an iron-rich thermal spring in the Chocolate Pots area of Yellowstone National Park (YNP) and from Obsidian Pool (YNP) and Manitou Springs, Colorado. We have found that Mossbauer spectroscopy can discriminate among the iron-bearing minerals in our samples. Those near the vent and on the surface are identified as ferrihydrite, an amorphous ferric mineraloid. Subsurface samples, collected from cores, which are likely to have undergone inorganic and/or biologically mediated alteration (diagenesis), exhibit spectral signatures that include nontronite (a smectite clay), hematite (alpha-Fe2O3), small-particle/nanophase goethite (alpha-FeOOH), and siderite (FeCO3). We find for iron minerals that Mossbauer spectroscopy is at least as efficient in identification as X-ray diffraction. This observation is important from an exploration standpoint. As a planetary surface instrument, Mossbauer spectroscopy can yield high-quality spectral data without sample preparation (backscatter mode). We have also used field emission scanning electron microscopy (FESEM), in conjunction with energy-dispersive X ray (EDX) fluorescence spectroscopy, to characterize the microbiological component of surface sinters and the relation between the microbiological and the mineralogical framework. Evidence is presented that the minerals found in these deposits can have multi-billion-year residence times and thus may have survived their possible production in a putative early Martian hot spring up to the present day. Examples include the nanophase property and the Mossbauer signature for siderite, which has been identified in a 2.09-billion-year old hematite-rich chert stromatolite. Our research demonstrates that in situ Mossbauer spectroscopy can help determine whether hydrothermal mineral deposits exist on Mars, which is significant for exobiology because of the issue of whether that world ever had conditions conductive to the origin of life. As a useful tool for selection of samples suitable for transport to Earth, Mossbauer spectroscopy will not only serve geological interests but will also have potential for exopaleontology.

NASA Discipline Exobiology↗

The NASA Education Enterprise: Inspiring the Next Generation of Explorers

On April 12, 2002, NASA Administrator Sean O Keefe opened a new window to the future of space exploration with these words in his Pioneering the Future address. Thus began the conceptual framework for structuring the new Education Enterprise. The Agency s mission is to understand and protect our home planet; to explore the universe in search for life; and to inspire the next generation of explorers as only NASA can. In adopting this mission, education became a core element and is now a vital part of every major NASA research and development mission. NASA s call to inspire the next generation of explorers is now resounding throughout the NASA community and schools of all levels all around the country. The goal is to capture student interest, nurture their natural curiosities, and intrigue their minds with new and exciting scientific research; as well as to provide educators with the creative tools they need to improve America s scientific literacy. The future of NASA begins with America s youngest scholars. According to Administrator O Keefe s address, if NASA does not motivate the youngest generation now, there is little prospect this generation will choose to pursue scientific disciplines later. Since embracing Administrator O Keefe s educational mandate over a year ago, NASA has been fully devoted to broadening its roadmap to motivation. The efforts have generated a whole new showcase of thoughtprovoking and fun learning opportunities, through printed material, Web sites and Webcasts, robotics, rocketry, aerospace design contests, and various other resources as only NASA can.

Source record↗

Expanding NASA and Roscosmos Scientific Collaboration on the International Space Station

The International Space Station (ISS) is a world-class laboratory orbiting in space. NASA and Roscosmos have developed a strong relationship through the ISS Program Partnership, working together and with the other ISS Partners for more than twenty years. Since 2013, based on a framework agreement between the Program Managers, NASA and Roscosmos are building a joint program of collaborative research on ISS. This international collaboration is developed and implemented in phases. Initially, members of the ISS Program Science Forum from NASA and TsNIIMash (representing Roscosmos) identified the first set of NASA experiments that could be implemented in the "near term". The experiments represented the research categories of Technology Demonstration, Microbiology, and Education. Through these experiments, the teams from the "program" and "operations" communities learned to work together to identify collaboration opportunities, establish agreements, and jointly plan and execute the experiments. The first joint scientific activity on ISS occurred in January 2014, and implementation of these joint experiments continues through present ISS operations. NASA and TsNIIMash have proceeded to develop "medium term" collaborations, where scientists join together to improve already-proposed experiments. A major success is the joint One-Year Mission on ISS, with astronaut Scott Kelly and cosmonaut Mikhail Kornienko, who returned from ISS in March, 2016. The teams from the NASA Human Research Program and the RAS Institute for Biomedical Problems built on their considerable experience to design joint experiments, learn to work with each other's protocols and processes, and share medical and research data. New collaborations are being developed between American and Russian scientists in complex fluids, robotics, rodent research and space biology, and additional human research. Collaborations are also being developed in Earth Remote Sensing, where scientists will share data from imaging systems mounted on ISS as well as other orbiting spacecraft to improve our understanding of the Earth and its climate. NASA and Roscosmos continue to encourage international scientific cooperation and expanded use of the ISS Laboratory. "Long-term", larger collaborations will achieve scientific objectives that no single national science team or agency can achieve on its own. The joint accomplishments achieved so far have paved the way for a stronger international scientific community and improved results and benefits from ISS.

Hasbrook, Pete↗

Dynamic Charging Rendezvous and Motion Planning for a Multi-AGV Team Including a Mobile Charging Host

Teams of automated battery-powered electric vehicles have the potential to execute complex mission tasks in off-road environments for agriculture, military, and other applications. Limited onboard energy reserves hinder their adoption in large-scale resource-constrained environments, where recharging is a necessity. It may be infeasible to install a network of static charging stations in off-road environments. For this reason, dedicated mobile host vehicles with charging capabilities are proposed as a means to increase range and capabilities of the multivehicle team. Here, in this study, we consider an ad hoc planning framework, where results from a high-confidence trajectory planner are leveraged to plan charging rendezvous between a host and other worker vehicles in a receding horizon fashion to provide high confidence that energy reserves will not be prematurely exhausted. The core problem is posed so as to minimize the impact of recharging on the mission in terms of task delays, overall energy utilization, and costs of fast charging. Through extensive Monte Carlo simulations of an off-road mission, we show a decrease in task delays without substantial increases in energy needs by updating the charging rendezvous plan during the mission. However, if updates are made too often, model mismatch may cause unnecessary cycling and mission failure.

Energy constraints↗

Superlattice reflection signatures of the insulator–metal transition in V 3 O 5 thin films

Nanoelectronic systems that are inspired by the brain are increasingly looking to insulator–metal transition (IMT) materials as they can mimic the response characteristics of neurons to temperature changes so that these can be used in robotic and computational applications. V 3 O 5 has an insulator–metal transition at ∼430 or ∼80 K higher than VO 2 and provides a unique high-temperature opportunity for these types of applications. Here, in this work, we track the structural evolution of V 3 O 5 thin films across the IMT through conventional selected-area electron diffraction (SAED) and four-dimensional scanning TEM (4D-STEM), correlated with temperature-dependent resistance measurements. SAED patterns show reversible evidence of superlattice reflections associated with the IMT—present below T IMT and absent above it—consistent with the accompanying drop in resistance. At room temperature, nanobeam electron diffraction patterns further reveal three local configurations: (i) type I regions with clean patterns lacking superlattice reflections and spot splitting; (ii) type II regions exhibiting rows of superlattice reflections and split spots indicative of crystallographic variants; and (iii) type III regions with negligible superlattice reflections but larger spot splitting suggestive of overlapping domains of insulating and conducting phases likely driven by local lattice distortions. Upon heating, the superlattice reflections disappear between 413 and 453 K, concurrent with the resistance drop at T IMT , consistent with the emergence of a conducting phase. The overall diffraction geometry remains essentially unchanged up to 573 K, implying that relative domain orientations persist through the transition. These observations reveal nanoscale structural heterogeneity in V 3 O 5 thin films across the IMT and inform operation in regimes where mixed-phase textures are expected. A plausible indexing framework rationalizing the observed geometries is presented in the Discussion section, alongside its limitations and alternative interpretations.

25 ENERGY STORAGE↗

Education and Public Outreach and Engagement at NASA's Analog Missions in 2012

Analog missions are integrated, multi-disciplinary activities that test key features of future human space exploration missions in an integrated fashion to gain a deeper understanding of system-level interactions and operations early in conceptual development. These tests often are conducted in remote and extreme environments that are representative in one or more ways to that of future spaceflight destinations. They may also be conducted at NASA facilities, using advanced modeling and human-in-the-loop scenarios. As NASA develops a capability driven framework to transport crew to a variety of space environments, it will use analog missions to gather requirements and develop the technologies necessary to ensure successful exploration beyond low Earth orbit. NASA s Advanced Exploration Systems (AES) Division conducts these high-fidelity integrated tests, including the coordination and execution of a robust education and public outreach (EPO) and engagement program for each mission. Conducting these mission scenarios in unique environments not only provides an opportunity to test the EPO concepts for the particular future-mission scenario, such as the best methods for conducting events with a communication time delay, but it also provides an avenue to deliver NASA s human space exploration key messages. These analogs are extremely exciting to students and the public, and they are performed in such a way that the public can feel like part of the mission. They also provide an opportunity for crew members to obtain training in education and public outreach activities similar to what they would perform in space. The analog EPO team is responsible for the coordination and execution of the events, the overall social media component for each mission, and public affairs events such as media visits and interviews. They also create new and exciting ways to engage the public, manage and create website content, coordinate video footage for missions, and coordinate and integrate each activity into the mission timeline. In 2012, the AES Analog Missions Project performed three distinct missions - NASA Extreme Environment Mission Operations (NEEMO), which simulated a mission to an asteroid using an undersea laboratory; In-Situ Resource Utilization (ISRU) Field Test, which simulated a robotic mission to the moon searching and drilling for water; and Research and Technology Studies (RATS) integrated tests, which also simulated a mission to an asteroid. This paper will discuss the education and public engagement that occurred during these missions.

Watkins, Wendy L.↗

Investigation of Transient Gas Phase Column Density Due to Droplet Evaporation

A NASA robotic refueling mission experiment on board the International Space Station (ISS) was designed to repeatedly transfer simulated cryogenic propellant between two dewars. After each metered transfer, the cryogen was to be vented overboard via sublimation or evaporation. ISS payload providers must conduct analyses to demonstrate that any planned gaseous venting generate no more than a certain level of material that may interfere with optical measurements from other payloads that may be located nearby. This requirement is expressed in terms of a maximum column number density (CND). For the experiment under consideration, fluid droplets likely would accompany any such vapor. Earlier related studies led to development of analytical expressions for column density along general paths for a number of practical cases under steady conditions, including droplet evaporation. These expressions are not appropriate for rapid evaporation of small droplets however, since the droplets cannot sustain mass flow rates consistent with steady conditions. In this work, analytical expressions are developed for estimating column density near a rapidly evaporating droplet along general paths. The influence for instantaneous evaporation is created first as a limiting case, where it is found the peak value occurs at the time it takes a wave of vapor to reach the closest point along the optical path traveling at its most probable thermal speed. Next, the case for finite-period evaporation is evaluated for constant conditions. Compared to the instantaneous case, peak column density occurs shortly after droplet extinction, but at a lower intensity. A new mathematical function is discovered that solves the integrals associated with this case. Finally, ways to account for droplet motion and changes in evaporation rate with size and temperature are discussed in this framework.

Woronowicz, M. S.↗

Human Systems Integration (HSI) Practitioner's Guide

The NASA/SP-2015-3709, Human Systems Integration (HSI) Practitioner's Guide, also known as the "HSIPG," provides a tool for implementing HSI activities within the NASA systems engineering framework. The HSIPG is written to aid the HSI practitioner engaged in a program or project (P/P), and serves as a knowledge base to allow the practitioner to step into an HSI lead or team member role for NASA missions. Additionally, this HSIPG is written to address the role of HSI in the P/P management and systems engineering communities and aid their understanding of the value added by incorporating good HSI practices into their programs and projects. Through helping to build a community of knowledgeable HSI practitioners, this document also hopes to build advocacy across the Agency for establishing strong, consistent HSI policies and practices. Human Systems Integration (HSI) has been successfully adopted (and adapted) by several federal agencies-most notably the U.S. Department of Defense (DoD) and the Nuclear Regulatory Commission (NRC)-as a methodology for reducing system life cycle costs (LCCs). These cost savings manifest themselves due to reductions in required numbers of personnel, the practice of human-centered design, decreased reliance on specialized skills for operations, shortened training time, efficient logistics and maintenance, and fewer safety-related risks and mishaps due to unintended human/system interactions. The HSI process for NASA establishes how cost savings and mission success can be realized through systems engineering. Every program or project has unique attributes. This HSIPG is not intended to provide one-size-fits-all recommendations for HSI implementation. Rather, HSI processes should be tailored to the size, scope, and goals of individual situations. The instructions and processes identified here are best used as a starting point for implementing human-centered system concepts and designs across programs and projects of varying types, including manned and unmanned, human spaceflight, aviation, robotics, and environmental science missions. The practitioner using this guide should have expertise in Systems Engineering or other disciplines involved in producing systems with anticipated human interactions. (See section 1.6 of this guide for further discussion on HSI discipline domains.) The HSIPG provides an "HSI layer" to the NASA Systems Engineering Engine (SEE), detailed in NASA Procedural Requirement (NPR) 7123.1B, NASA Systems Engineering Processes and Requirements, and further explained in NASA/SP-2007-6105, Systems Engineering Handbook (see HSIPG Table 2.2-1, NASA Documents with HSI Content, for specific references and document versions).

Zumbado, Jennifer Rochlis↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Preparing for Mars: The Evolvable Mars Campaign 'Proving Ground' Approach

As the National Aeronautics and Space Administration (NASA) prepares to extend human presence beyond Low Earth Orbit, we are in the early stages of planning missions within the framework of an Evolvable Mars Campaign. Initial missions would be conducted in near-Earth cis-lunar space and would eventually culminate in extended duration crewed missions on the surface of Mars. To enable such exploration missions, critical technologies and capabilities must be identified, developed, and tested. NASA has followed a principled approach to identify critical capabilities and a "Proving Ground" approach is emerging to address testing needs. The Proving Ground is a period subsequent to current International Space Station activities wherein exploration-enabling capabilities and technologies are developed and the foundation is laid for sustained human presence in space. The Proving Ground domain essentially includes missions beyond Low Earth Orbit that will provide increasing mission capability while reducing technical risks. Proving Ground missions also provide valuable experience with deep space operations and support the transition from "Earth-dependence" to "Earth-independence" required for sustainable space exploration. A Technology Development Assessment Team identified a suite of critical technologies needed to support the cadence of exploration missions. Discussions among mission planners, vehicle developers, subject-matter-experts, and technologists were used to identify a minimum but sufficient set of required technologies and capabilities. Within System Maturation Teams, known challenges were identified and expressed as specific performance gaps in critical capabilities, which were then refined and activities required to close these critical gaps were identified. Analysis was performed to identify test and demonstration opportunities for critical technical capabilities across the Proving Ground spectrum of missions. This suite of critical capabilities is expected to provide the foundation required to enable a variety of possible destinations and missions consistent with the Evolvable Mars Campaign.. The International Space Station will be used to the greatest extent possible for exploration capability and technology development. Beyond this, NASA is evaluating a number of options for Proving Ground missions. An "Asteroid Redirect Mission" will demonstrate needed capabilities (e.g., Solar Electric Propulsion) and transportation systems for the crew (i.e., Space Launch System and Orion) and for cargo (i.e., Asteroid Redirect Vehicle). The Mars 2020 mission and follow-on robotic precursor missions will gather Mars surface environment information and will mature technologies. NASA is considering emplacing a small pressurized module in cis-lunar space to support crewed operations of increasing duration and to serve as a platform for critical exploration capabilities testing (e.g., radiation mitigation; extended duration deep space habitation). In addition, "opportunistic mission operations" could demonstrate capabilities not on the Mars critical path that may, nonetheless, enhance exploration operations (e.g., teleoperations, crew assisted Mars sample return). The Proving Ground may also include "pathfinder" missions to test and demonstrate specific capabilities at Mars (e.g., entry, descent, and landing). This paper describes the (1) process used to conduct an architecture-driven technology development assessment, (2) exploration mission critical and supporting capabilities, and (3) approach for addressing test and demonstration opportunities encompassing the spectrum of flight elements and destinations consistent with the Evolvable Mars Campaign.

Bobskill, Marianne R.↗

Integrated Network Architecture for NASA's Orion Missions

NASA is planning a series of short and long duration human and robotic missions to explore the Moon and then Mars. The series of missions will begin with a new crew exploration vehicle (called Orion) that will initially provide crew exchange and cargo supply support to the International Space Station (ISS) and then become a human conveyance for travel to the Moon. The Orion vehicle will be mounted atop the Ares I launch vehicle for a series of pre-launch tests and then launched and inserted into low Earth orbit (LEO) for crew exchange missions to the ISS. The Orion and Ares I comprise the initial vehicles in the Constellation system of systems that later includes Ares V, Earth departure stage, lunar lander, and other lunar surface systems for the lunar exploration missions. These key systems will enable the lunar surface exploration missions to be initiated in 2018. The complexity of the Constellation system of systems and missions will require a communication and navigation infrastructure to provide low and high rate forward and return communication services, tracking services, and ground network services. The infrastructure must provide robust, reliable, safe, sustainable, and autonomous operations at minimum cost while maximizing the exploration capabilities and science return. The infrastructure will be based on a network of networks architecture that will integrate NASA legacy communication, modified elements, and navigation systems. New networks will be added to extend communication, navigation, and timing services for the Moon missions. Internet protocol (IP) and network management systems within the networks will enable interoperability throughout the Constellation system of systems. An integrated network architecture has developed based on the emerging Constellation requirements for Orion missions. The architecture, as presented in this paper, addresses the early Orion missions to the ISS with communication, navigation, and network services over five phases of a mission: pre-launch, launch from T0 to T+6.5 min, launch from T+6.5 min to 12 min, in LEO for rendezvous and docking with ISS, and return to Earth. The network of networks that supports the mission during each of these phases and the concepts of operations during those phases are developed as a high level operational concepts graphic called OV-1, an architecture diagram type described in the Department of Defense Architecture Framework (DoDAF). Additional operational views on organizational relationships (OV-4), operational activities (OV-5), and operational node connectivity (OV-2) are also discussed. The system interfaces view (SV-1) that provides the communication and navigation services to Orion is also included and described. The challenges of architecting integrated network architecture for the NASA Orion missions are highlighted.

Bhasin, Kul B.↗

CHARGE-MAP: An integrated framework to study the multicriteria EV charging infrastructure expansion problem

The widespread adoption of electric vehicles (EVs) in recent years has necessitated the development of effective charging infrastructures. However, charging infrastructure expansion is a multifaceted problem that requires careful consideration of the existing infrastructure, spatiotemporal distribution of charging demands, power-grid capacity, and budget constraints. Here, to approach this complex problem, we present CHARGE-MAP, a data-driven simulation-optimization framework, focused on ensuring meaningful charging experience for individual EV owners. CHARGE-MAP integrates three modules: an agent-based simulation module that estimates spatiotemporal distribution of charging demands by modeling EV adopter mobility and charging behavior; an optimization module that determines optimal new charging station/charger locations and capacities, while minimizing expected detour distances and wait-times with a limited number of new stations; and a power module that determines how to connect the stations to the power grid while maintaining its stability. Using the state of Virginia (consisting of 95 counties and 38 independent cities) as a case study, our results show that CHARGE-MAP can meet the demand of ~198,600 predicted EVs with 1,305 new public charging stations and 2,164 new chargers. It reduces average detour distances for charging by 66% and wait-times at stations by 72% compared to the existing infrastructure. Furthermore, transformer capacity requirement analysis reveals that only 1.8% of residential transformers require upgrades, while over 80% of commercial charging locations can be supported with modest transformer infrastructure (25 to 50 kVA). This indicates that targeted investments can facilitate cost-effective EV integration. Consequently, CHARGE-MAP provides policymakers and urban planners with crucial data-driven insights for effective EV charging infrastructure expansion. Sign up for PNAS alerts.

charging infrastructure↗

A Comprehensive Framework for Assessing Terrestrial Analogue Field Sites for Ocean Worlds

Field studies at terrestrial analogue sites represent an important contribution to the science of ocean worlds. The value of the science and technology investigations conducted at field analogue sites depends on the relevance of the analogue environment to the target ocean world. We accept that there are no perfect analogues for many of the unique environments represented by ocean worlds but suggest that a one‐to‐one matching of environmental characteristics and conditions is not crucial to the success or impact of the work. Instead, we must determine which processes and parameters are required to map directly to the target ocean world environment with high fidelity to address the science question. In this review paper, we discuss the outcomes of a workshop aimed at developing a new framework for evaluating the suitability of analogue field locations for ocean worlds research. Here we present a two‐step approach to (a) identify the most crucial processes and parameters associated with a given science question and (b) assess the fidelity of these processes and parameters at a proposed field site to those expected for the target ocean world. We demonstrate this approach in a test case evaluating three types of ocean world analogue environments with respect to a science question. The consensus document presented here equips veteran and new investigators with valuable tools to better assess and justify their analogue site selections.

58 GEOSCIENCES↗