Integrated Commercial Carbon Capture and Storage (CCS) Prefeasibility Study at Dry Fork Station, Wyoming
The study focuses on the Basin Electric Dry Fork Power Station (DFS), the newest coal-fired power plant operating in the lower 48 states. DFS began operation in 2011 and has an operating lifetime of approximately 80 years, is a 420 MW plant, and emits roughly 3.3 million metric tonnes (Mt) of CO 2 per annum. Adjacent to DFS is the Wyoming Integrated Test Center (ITC). The ITC provides space and access to DFS flue gas for researchers to test CO 2 utilization and CO 2 capture technologies. The objective of this study is to identify saline storage opportunities proximal to DFS and the ITC in the Powder River Basin. The objectives of the prefeasibility study were as follows: (1) to establish a CCS coordination team capable of achieving a successful implementation of commercial-scale CCS for the Dry Fork Power Station; (2) to develop site-specific business and execution strategies; and (3) to identify and describe promising saline storage sites capable of storing 50 million metric tons of CO 2 .