Search NASA⌕ Search

SEARCH · Search NASA

Results for “Salt Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Antifoam Development for Eliminating Flammability Hazards and Decreasing Cycle Time in the Defense Waste Processing Facility

Foam, due to the high gas generation rates of boiling and chemical reaction offgasing, requires control measures to prevent the foam from contaminating the condensate and to facilitate efficient plant operation. Antifoam was utilized to minimize foam production during chemical processing in the DWPF and during High-Level Waste (HLW) evaporation at SRS and Hanford. However, the current antifoam used in the SRS DWPF increases flammability risk during chemical processing (generates three flammable degradation products) and while feeding the melter (can decompose to CO/hydrogen). It is also the likely source of methyl functional groups for the organo-mercury present in the tank farm and excessive mercury in Saltstone. Additionally, the planned startup of Salt Waste Processing Facility (SWPF), with much higher throughput, will challenge DWPF to process at higher gas generation rates. DWPF employs Antifoam 747, a superspreader produced by Momentive Performance Materials, as an antifoaming agent during waste processing. During DWPF chemical processing, antifoam must be effective up to boiling (i.e., up to 103°C) and between a pH of 3-13. Antifoam 747 is most effective at a pH range of 6-8 and degrades as pH deviates. In addition, SRNL identified three flammable antifoam degradation products using mass spectrometer (MS) and fourier transform infrared (FTIR) offgas analyzers during simulations. A new antifoam or a new method to control foam is needed to minimize DWPF processing time and reduce the risk of contamination. In addition, testing should be completed to ensure that other antifoams used in HLW processing do not have similar flammability hazards or cause unintended impacts in downstream processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ANALYSIS OF THE LEACHING EFFICIENCY OF INHIBITED WATER AND TANK SIMULANT IN REMOVING RESIDUES ON THERMOWELL PIPES

A key component for the accelerated implementation and operation of the Salt Waste Processing Facility (SWPF) is the recovery of Tank 48H. Tank 48H is a type IIIA tank with a maximum capacity of 1.3 million gallons. Video inspection of the tank showed that a film of solid material adhered to the tank internal walls and structures between 69 inch and 150 inch levels. From the video inspection, the solid film thickness was estimated to be 1mm, which corresponds to {approx}33 kg of TPB salts (as 20 wt% insoluble solids) (1). This film material is expected to be easily removed by single-rinse, slurry pump operation during Tank 48H TPB disposition via aggregation processing. A similar success was achieved for Tank 49H TPB dispositioning, with slurry pumps operating almost continuously for approximately 6 months, after which time the tank was inspected and the film was found to be removed. The major components of the Tank 49H film were soluble solids - Na{sub 3}H(CO{sub 3}){sub 2} (Hydrated Sodium Carbonate, aka: Trona), Al(OH){sub 3} (Aluminum Hydroxide, aka: Gibbsite), NaTPB (Sodium Tetraphenylborate), NaNO{sub 3} (Sodium Nitrate) and NaNO{sub 2} (Sodium Nitrite) (2). Although the Tank 48H film is expected to be primarily soluble solids, it may not behave the same as the Tank 49H film. There is a risk that material on the internal surfaces of Tank 48H could not be easily removed. As a risk mitigation activity, the chemical composition and leachability of the Tank 48H film are being evaluated prior to initiating tank aggregation. This task investigated the dissolution characteristics of Tank 48H solid film deposits in inhibited water and DWPF recycle. To this end, SRNL received four separate 23-inch long thermowell-conductivity pipe samples which were removed from the tank 48H D2 risers in order to determine: (1) the thickness of the solid film deposit, (2) the chemical composition of the film deposits, and (3) the leaching behavior of the solid film deposit in inhibited water (IW) and in DWPF recycle simulant (3).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Refinement of Salt Dissolution Inhibitor Requirements (Interim Report)

At Savannah River Site, High-Level Waste is stored in below-grade carbon steel tanks. This waste in part consists of sludge, salt cake, and/or supernate. Preparation of this waste for future processing involves dissolution of the salt cake layer. The salt dissolution process can create conditions that leave the carbon steel tanks susceptible to localized corrosion. The salt to be dissolved contains high concentrations of nitrate, that once released, create an environment that may be conducive to pitting corrosion or stress corrosion cracking (SCC) of carbon steel. The salt dissolution process also liberates interstitial liquid trapped between the salt crystals. This liquid is initially high in nitrite and hydroxide concentration. High pH and greater ratios of nitrite to nitrate act as inhibitors to minimize corrosion of carbon steel in high nitrate environments. However, as dissolution proceeds, the concentration of nitrate increases while the hydroxide and nitrite concentration of the interstitial liquid depletes and becomes insufficient to prevent the onset of corrosion attack. While tank blending and the addition of inhibitors are used to ensure adequate concentrations of hydroxide and nitrite during normal operation, this is not desirable during salt dissolution as it can reduce process efficiency and increase the amount of waste that needs processed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PAPER STUDY EVALUATIONS OF THE INTRODUCTION OF SMALL COLUMN ION EXCHANGE WASTE STREAMS TO THE DEFENSE WASTE PROCESSING FACILITY

The objective of this paper study is to provide guidance on the impact of Monosodium Titanate (MST) and Crystalline Silicotitanate (CST) streams from the Small Column Ion Exchange (SCIX) process on the Defense Waste Processing Facility (DWPF) flowsheet and glass waste form. A series of waste processing scenarios was evaluated, including projected compositions of Sludge Batches 8 through 17 (SB8 through SB17), MST additions, CST additions to Tank 40 or to a sludge batch preparation tank (Tank 42 or Tank 51, referred to generically as Tank 51 in this report), streams from the Salt Waste Processing Facility (SWPF), and two canister production rates. A wide array of potential glass frit compositions was used to support this assessment. The sludge and frit combinations were evaluated using the predictive models in the current DWPF Product Composition Control System (PCCS). The results were evaluated based on the number of frit compositions available for a particular sludge composition scenario. A large number of candidate frit compositions (e.g., several dozen to several hundred) is typically a good indicator of a sludge composition for which there is flexibility in forming an acceptable waste glass and meeting canister production rate commitments. The MST and CST streams will significantly increase the concentrations of certain components in glass, such as Nb{sub 2}O{sub 5}, TiO{sub 2}, and ZrO{sub 2}, to levels much higher than have been previously processed at DWPF. Therefore, several important assumptions, described in detail in the report, had to be made in performing the evaluations. The results of the paper studies, which must be applied carefully given the assumptions made concerning the impact of higher Ti, Zr, and Nb concentrations on model validity, provided several observations: (1) There was difficulty in identifying a reasonable number of candidate frits (and in some cases an inability to identify any candidate frits) when a waste loading of 40% is targeted for Sludge Batches 8, 16, and 17, regardless of the addition of SCIX or SWPF streams. This indicates that the blending strategy for these sludge batches should be reevaluated by Savannah River Remediation (SRR). (2) In general, candidate frits were available to accommodate CST additions to either Tank 40 or Tank 51. A larger number of candidate frits were typically available for the sludge batches when CST is added to Tank 51 rather than Tank 40, meaning that more compositional flexibility would be available for frit selection and DWPF operation. Note however that for SB8 and SB17, no candidate frits were available to accommodate CST going to Tank 40 with and without SWPF streams. The addition of SWPF streams generally improves the number of candidate frits available for processing of a given sludge batch. (3) The change in production rate from 40 Sludge Receipt and Adjustment Tank (SRAT) batches per year (i.e., the current production rate) to 75 SRAT batches per year, without SWPF streams included, had varied results in terms of the number of candidate frits available for processing of a given sludge batch. Therefore, this variable is not of much concern in terms of incorporating the SCIX streams. Note that the evaluation at 75 SRAT batches per year (approximately equivalent to 325 canisters per year) is more conservative in terms of the impact of SCIX streams as compared to a production rate of 400 canisters per year. Overall, the outcome of this paper study shows no major issues with the ability to identify an acceptable glass processing window when CST from the SCIX process is transferred to either Tank 40 or Tank 51. The assumptions used and the model limitations identified in this report must be addressed through further experimental studies, which are currently being performed. As changes occur to the planned additions of MST and CST, or to the sludge batch preparation strategy, additional evaluations will be performed to determine the potential impacts. As stated above, the issues with Sludge Batches 8, 16, and 17 should be further evaluated by SRR. A review of Chemical Process Cell (CPC) processing identified no changes to the recommendations from the previous review of the SCIX process impacts. Recommendations for testing were made during the previous review to evaluate the impact of CST on the rheological properties of DWPF process streams and evaluate the impact of CST on catalytic hydrogen generation during CPC processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Knowledge-driven design of solid-electrolyte interphases on lithium metal via multiscale modelling

Abstract Due to its high energy density, lithium metal is a promising electrode for future energy storage. However, its practical capacity, cyclability and safety heavily depend on controlling its reactivity in contact with liquid electrolytes, which leads to the formation of a solid electrolyte interphase (SEI). In particular, there is a lack of fundamental mechanistic understanding of how the electrolyte composition impacts the SEI formation and its governing processes. Here, we present an in-depth model-based analysis of the initial SEI formation on lithium metal in a carbonate-based electrolyte. Thereby we reach for significantly larger length and time scales than comparable molecular dynamic studies. Our multiscale kinetic Monte Carlo/continuum model shows a layered, mostly inorganic SEI consisting of LiF on top of Li 2 CO 3 and Li after 1 µs. Its formation is traced back to a complex interplay of various electrolyte and salt decomposition processes. We further reveal that low local Li + concentrations result in a more mosaic-like, partly organic SEI and that a faster passivation of the lithium metal surface can be achieved by increasing the salt concentration. Based on this we suggest design strategies for SEI on lithium metal and make an important step towards knowledge-driven SEI engineering.

25 ENERGY STORAGE↗

Produced Water and Waste Heat-aided Blowdown Water Treatment: Using Chemical and Energy Synergisms for Value Creation

The project objective was to develop a cooling blowdown water (BDW) treatment process utilizing produced water (PW) and low-grade heat to maximize water reuse and saleable by-product generation while reducing chemical and energy footprints of the treatment. The proposed treatment process consists of mixing, softening, organics and suspended solids removal, reverse osmosis (RO), thermal desalination, and brine electrolysis. BDW samples collected from a local coal-fired power plant and PW samples from two shale gas production wells were used in this study. Each treatment unit was first designed and tested to quantify its treatment efficiency, and its chemical and energy requirements. In addition, a process model was developed and model simulations were conducted based on the experimental results and literature data to optimize the treatment process. A techno-economic analysis was conducted to quantify chemical and energy savings as well as production of 10-lb brine as a saleable product. With the field-collected BDW and PW samples, mixing experiments determined a volumetric mixing ratio 10:1 (BDW:PW) resulted in the best performance of multivalent ions removal and largest chemical savings for softening. Softening of the BDW/PW mixtures using alkaline chemicals (Na 2 CO 3 and NaOH) achieved 95%-100% removal of scaling-forming cations (Ca, Mg, Fe, Ba, Sr) and 60% of silicon, and 10% of total organic carbon (TOC). The mixing and softening treatments yielded an effluent with total dissolved solids (TDS) concentration of 23 g/L. Activated carbon (AC) filtration removed TOC to a low level (< 3 mg/L) and further removed remaining scale-forming divalent metals and silica from the softened water. The AC filtration resulted in a slight reduction of TDS from 23 g/L to 20 g/L, leaving behind only mostly monovalent ions (i.e., sodium and chloride) in the filtered water. These pretreatments yielded a feed water that met the criteria of the downstream reverse osmosis (RO) to prevent membrane fouling. A cross-flow RO system was used to further concentrate the TDS of the AC effluent. Various factors including TDS, pH, and applied pressure were examined and optimal conditions were determined for the co-treatment process. An integrated process consisting of mixing, softening, AC filtration and RO was used to treat a continuous flow (0.25 – 1.2 L/min, or 0.07 – 0.32 gpm) and successfully generated RO permeate as product water (TDS < 0.5 g/L) for reuse in cooling operation, and a concentrate (TDS ~ 45 g/L) to be further treated in a thermal desalination unit. These flow rates meet the FOA’s criterion of 0.01 – 1 gpm. Overall, the co-treatment of BDW/PW allowed shorter ramp-up time compared to treatment of BDW alone. It resulted in 40% and 55% savings of Na 2 CO 3(s) and NaOH, respectively, compared to treating the BDW and PW individually for the same level of softening. The co-treatment also resulted in a 29% energy saving compared to treatment of BDW only for the level of TDS concentration. A thermal desalination system was designed using CFD simulations and manufactured in the WVU Innovation Hub for further treatment of the RO concentrate to generate 10-lb brine. The system has a design flow rate of 2 gpm and has been successfully tested. A bench-scale brine electrolysis system was developed for on-site generation of chlorine/hypochlorite (Cl 2 /OCl - ) and caustic soda (NaOH) as useful chemicals for the co-treatment process. Using salt solutions (0.5 M and 1 M), the system achieved faradaic efficiencies of 93%-97% and 70%-77% for caustic soda and chlorine/hypochlorite generation, respectively. An economic analysis showed that the electricity costs for on-site generation of these chemicals were significantly lower than the chemical prices offered by suppliers. An industrial-scale process model consisting of mixing, softening, AC filtration, RO, thermal desalination, and brine electrolysis was developed using the Aspen Plus V9 in conjunction with Aspen Custom Modeler V9. The model serves as a solvable Aspen Plus model and as basis to form the costing infrastructure. In addition, techno-economic analysis considering capital, operating, and transportation costs was conducted. An optimization solution showed that produced water for mixing is still advantageous in low quantities. The optimum solution approaches a leveled cost of water (LCW) of 2 $/m 3 which becomes cost competitive with nominal water treatment prices.

20 FOSSIL-FUELED POWER PLANTS↗

Overview of Salt Repository Research and Development for Spent Nuclear Fuel and High-level Nuclear Waste in the United States - 20307

This paper summarizes the current US Department of Energy Office of Nuclear Energy's (DOE-NE) work towards developing and executing a research and development program that addresses both scientific and technical issues related to long-term disposal of spent nuclear fuel (SNF) and high-level waste (HLW) in a hypothetical bedded salt based geological repository. A primary goal of the program is to create a generic Geologic Disposal Safety Assessment (GDSA) Framework that can be used to help guide decisions on siting a possible future bedded salt repository. The generic GDSA work includes analysis of the impacts of heat generation caused by decay of short-lived radionuclides. We report progress in four primary areas. First, we discuss the development and recent modifications of a research and development road-map. Second, we briefly describe an experimental approach to better understand thermal processes in salt. Third, we highlight collaborations with the international research community that leverage salt-based repository science around the world. Finally, we discuss how our findings are being used to aid in the development of a generic safety assessment for a bedded salt repository containing SNF and HLW. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Submersible Blend Pump Mixing Evaluation

Savannah River Remediation (SRR) requested Savannah River National Laboratory (SRNL) to perform an engineering analysis to investigate the mixing behavior in feed blend tanks for the Salt Waste Processing Facility (SWPF). The baseline for mixing the feed blend tanks is a U 0 D of 5.1 ft 2 /s, a pump nozzle elevation of 165.86 inches above the sludge layer and 174 inches above the tank bottom, a liquid level 174.28 inches above the pump nozzle, and a blend time of 10.63 hours. The current Salt Batch Plan identifies Tanks 21, 26, 41, and 42 as the designated blend tanks. This supplemental study only addresses Type IIIA tanks (i.e., Tanks 26, 41, and 42). Using the Tank 41 current configuration as the baseline, the analysis considers the impact on blending if: 1) the distance between the pump discharge nozzle and the liquid surface increases above the baseline, 2) the distance between the pump discharge nozzle and the liquid surface decreases below the baseline, 3) the distance between the pump discharge nozzle and the sludge layer at the bottom of the tank increases above the baseline, or 4) the distance between the pump discharge nozzle and the sludge layer at the bottom of the tank decreases below the baseline, each while maintaining the minimum U 0 D of 5.1 ft 2 /s. Per subsequent direction from SRR, the minimum distance between the pump discharge nozzle and the sludge will be 165.86 inches. Hence, distances less than 165.86 inches between the pump discharge nozzle and the sludge were not included in the analysis. In addition, SRR requested SRNL to evaluate the impact of the abandoned in place, failed slurry pumps in Tank 42 on liquid blending.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 11H Samples from Tank Closure Cesium Removal 1A (TCCR 1A) Batch 1

Savannah River Mission Completion (SRMC) is currently operating the Tank Closure Cesium Removal 1A (TCCR 1A) process to remove 137 Cs from tank waste supernate using an ion exchange process. The TCCR 1A unit processes dissolved salt fed from Tank 10H through a series of ion exchange columns containing crystalline silicotitanate (CST, IONSIV TM R9120-B, 30x60) and the effluent is then discharged to Tank 11H. In support of the TCCR 1A program, SRNL analyzed samples taken from Tank 11H (without tank mixing) before, during, and at the completion of TCCR 1A Batch 1 processing. Tank 11H serves as the receipt tank for the filtered and cesium removed product from the TCCR 1A system. Processing of Batch 1 commenced on January 13, 2022 and completed on February 17, 2022, after processing approximately 70,100 gallons. A pre-production sample was collected from the heel remaining in Tank 11H just before Batch 1 processing began. In addition, five interim surface samples were collected from Tank 11H during processing, and both a surface and a variable depth sample (VDS, ~7” from tank bottom) were collected just after processing completed. Analysis of all samples included density and gamma spectroscopy, in addition to a more comprehensive suite of analytes for the pre- and post-production samples. The density of the pre-production sample was the highest of all samples measured and was then observed to decrease for the first two interim samples, followed by becoming fairly consistent for the remainder of the samples (~1.3 g/mL). The density of 1.3 g/mL is similar to the density measured for one of the three Tank 10H qualification samples (HTF-10-21-126). The 137 Cs activity was found to decrease as additional decontaminated effluent from the TCCR columns was added to Tank 11H during processing; however, an increase in activity was observed during periods of no processing which can be attributed to leaching of 137 Cs from the known solids in Tank 11H. The Cs isotope concentrations in the Tank 11H postproduction surface sample were determined to be 99.7-99.8% lower than the concentrations measured in the Tank 10H feed as measured by mass spectrometry.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation of Mercury Compound Partitioning Through the Solvent Extraction System

Savannah River National Laboratory (SRNL) has been requested by Savannah River Mission Completion (SRMC)/ Salt Waste Processing Facility (SWPF) personnel to investigate the potential routes for titanium and mercury accumulations within the SWPF Flowsheet. This report documents work performed to examine how various forms of mercury can migrate through the multiple flowsheets of a solvent extraction system. This entailed 29 single stage distribution tests, a multi-stage Extraction-Scrub-Strip (ESS) test, and a detailed speciation analysis of several salt batch feed samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Interactions between hydrated cement paste and organic acids: Thermodynamic data and speciation modeling

Interactions of short-chain organic acids with hydrated cement phases affect structure durability in the agro-food and nuclear waste industries but can also be used to modify cement properties. Most previous studies have been experimental, performed at fixed concentrations and pH, without quantitatively discriminating among polyacidity effects, or complexation and salt precipitation processes. This paper addresses such issues by thermodynamic equilibrium calculations for acetic, citric, oxalic, succinic acids and a simplified hydrated CEM-I. The thermodynamic constants collected from the literature allow the speciation to be modeled over a wide range of pH and concentrations. Citric and oxalic had a stronger chelating effect than acetic acid, while succinic acid was intermediate. Similarly, Ca-citrate and Ca-oxalate salts were more insoluble than Ca-acetate and Ca-succinate salts. Regarding aluminium complexation, hydroxyls, sulfates, and acid competition was highlighted. The exploration of acid mixtures showed the preponderant effect of oxalate and citrate over acetate and succinate.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Extraction-Scrub-Strip test results from the interim Salt Disposition Program Macrobatch 9 Tank 21H qualification samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). The Salt Batch 9 characterization results were previously reported. An Extraction-Scrub-Strip (ESS) test was performed to determine cesium distribution ratios (D (Cs) ) and cesium concentration in the strip effluent and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a blend solvent prepared by SRNL that mimics the solvent composition currently being used at the Modular Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D (Cs) value of 52.4. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This compares well against the predicted value of 56.5 from a recently created D (Cs) model

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Re-evaluating the Thermal-Spectrum Molten-Salt Breeder Reactor Fuel Cycle in a Modern Context

The current need to rapidly and substantially expand clean power production combined with limited capability for domestic uranium enrichment results in a U.S. nuclear power production planning environment similar to that of the first nuclear era. The U.S. thermal-spectrum molten-salt breeder reactor (TS-MSBR) program emerged during the first nuclear era as means to support rapid nuclear power expansion while minimizing demand on fissile resources. The primary reasons that the TS-MSBR program was discontinued in the 1970s were the comparatively large amount of required effort to mature its technology sufficiently for commercial deployment and the access to separated fissile material provided by the design of its integrated fuel cycle. The slowdown in U.S. electrical load growth after 1980 and the abundance of inexpensive fossil fuels inhibited reconsideration of TS-MSBR development for decades. The purpose of this discussion is to re-examine the value and technical challenges of TS-MSBRs with integrated fuel salt chemical processing considering the renewed need for rapid expansion of clean energy production worldwide, the current state of technology, the challenge of actinide wastes, and the continuing need to maintain a high degree of proliferation resistance and to integrate safeguards into the design.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

MEASUREMENT OF SPECIFIC HEAT CAPACITY OF SALTSTONE

One of the goals of the Saltstone variability study is to identify (and quantify the impact of) the operational and compositional variables that control or influence the important processing and performance properties of Saltstone grout mixtures. The heat capacity of the Saltstone waste form is one of the important properties of Saltstone mixes that was last measured at SRNL in 1997. It is therefore important to develop a core competency for rapid and accurate analysis of the specific heat capacity of the Saltstone mixes in order to quantify the impact of compositional and operational variations on this property as part of the variability study. The heat capacity, coupled with the heat of hydration data obtained from isothermal calorimetry for a given Saltstone mix, can be used to predict the maximum temperature increase in the cells within the vaults of the Saltstone Disposal Facility (SDF). The temperature increase controls the processing rate and the pour schedule. The maximum temperature is also important to the performance properties of the Saltstone. For example, in mass pours of concrete or grout of which Saltstone is an example, the maximum temperature increase and the maximum temperature difference (between the surface and the hottest location) are controlled to ensure durability of the product and prevent or limit the cracking caused by the thermal gradients produced during curing. This report details the development and implementation of a method for the measurement of the heat capacities of Saltstone mixes as well as the heat capacities of the cementitious materials of the premix and the simulated salt solutions used to batch the mixes. The developed method utilizes the TAM Air isothermal calorimeter and takes advantage of the sophisticated heat flow measurement capabilities of the instrument. Standards and reference materials were identified and used to validate the procedure and ensure accuracy of testing. Heat capacities of Saltstone mixes were {approx} 55% higher than the previous measurement of specific heat capacity on a reference Saltstone mix in 1997. Values of mixes prepared using Deliquification, Dissolution and Adjustment (DDA), Modular Caustic Side Solvent Extraction Unit (MCU) and Salt Waste Processing Facility (SWPF) simulants and premix at 0.60 w/cm ratio were {approx} 1.95 J/g/{sup o}C and were equivalent within experimental error. The simple law of mixtures was used to predict the heat capacities of the Saltstone and the results were in excellent agreement with experimental data. This simple law of mixtures can therefore be used to predict the heat capacities of Saltstone mixes in those cases where measurements have not been made. The time dependence of the heat capacity is important as an input to the modeling of temperature increase in Saltstone vaults. The heat capacity of a mix of MCU and premix at 0.60 w/cm ratio was measured immediately after initial mixing and then periodically up to times greater than 100 days. Within experimental error, the heat capacity did not change with time. Therefore, the modeling is not complicated by requiring a time dependent function for specific heat capacity. The water to cementitious material (w/cm) ratio plays a key role in determining the value of the heat capacity. Both experimental and predictive values for SWPF mixes as function of the w/cm ratio were obtained and presented in this report. Predictions of the maximum temperatures of the Saltstone mixes were made using the heat of hydration data from previous isothermal measurements and the newly measured heat capacities for DDA, MCU and SWPF mixes. The maximum temperature increase ranged from 37 to 48 C for these mixes. The presence of aluminate at 0.33 M produced a temperature increase of 68 C which is close to the adiabatic temperature rise of 74 C observed by Steimke and Fowler in 1997 for a mix containing 0.35 M aluminate. Aluminum dissolution of the sludge will increase the aluminate in the DSS which in turn will result in a larger temperature increase in the Saltstone vaults during the curing period. The initial temperature of the Saltstone mixes in the Saltstone Production Facility (SPF) can be predicted using the specific heat capacities of Decontaminated Salt Solutions (DSS), the specific heat capacities of cementitious materials, and the initial temperatures of the DSS and the premix. This initial mix temperature is dominated by the DSS temperature due to its high heat capacity relative to the cementitious materials. Therefore, controlling the initial temperature of the DSS to lower temperatures will lead to lower maximum temperatures in the vault for a given batch of Saltstone.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Replacement of Melter 2 at the Defense Waste Processing Facility (DWPF) - 18608

The original DWPF melter was replaced in 2002 with an identical unit, and radioactive operation of Melter 2 commenced in 2003. After nearly 14 years of service, a lower electrode failure of Melter 2 occurred in February 2017 which required its removal and replacement with Melter 3. The scope of the replacement outage involves several significant evolutions: - Shutdown of Melter 2 and placement into a safe state; - Remote external and internal inspection of Melter 2 to chronicle its condition prior to removal; - Disassembly and removal of Melter 2 from the process cell; - Placement of Melter 2 into a storage box and transport to a storage vault; - Preparation and initial testing of Melter 3 prior to transport to the DWPF; - Transport to the DWPF and installation of Melter 3 in the process cell; - Final startup testing and initiation of radioactive operation. Upon determination that repair of Melter 2 was not feasible, DWPF created an outage team to integrate schedules and resources needed to execute melter replacement as well as including maintenance scope for facility work that can only be performed when the melter is de-energized. The execution of this scope required integration with other mission critical outage activities already in progress, and planned to start, including initial facility tie-in scope for the new Salt Waste Processing Facility (SWPF). This unplanned addition of the melter replacement scope to the existing outage scope resulted in the longest facility outage period since the initiation of radioactive operations at the DWPF in 1996. Successful completion of this scope across all Liquid Waste facilities would require balance - for schedules, resources, priority, funding, etc. To overcome the significant challenges created by this additional scope, a WAR Room was established to ensure adequate integration and coordination of critical resources, and daily progress. The execution of this scope has required the integration of nearly two dozen work groups across multiple facilities at Savannah River Site (SRS), in addition to support from nearly a dozen vendors. The melter replacement outage was executed with a high degree of disciplined operation to ensure the facility was ready to resume glass pouring operation in time to support restart of the Liquid Waste program at the Savannah River Site (SRS). This paper will provide a brief overview of Melter 2 operational history. The execution of the removal and replacement operations will be described with a specific focus on lessons learned and opportunities where the outage execution diverged from the original Melter 1 replacement outage. It is expected to be of interest to vitrification facilities, as well as facilities, which require remote maintenance and replacement of large process equipment. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Porous membrane electrochemical cell for uranium and transuranic recovery from molten salt electrolyte

An improved process and device for the recovery of the minor actinides and the transuranic elements (TRU's) from a molten salt electrolyte. The process involves placing the device, an electrically non-conducting barrier between an anode salt and a cathode salt. The porous barrier allows uranium to diffuse between the anode and cathode, yet slows the diffusion of uranium ions so as to cause depletion of uranium ions in the catholyte. This allows for the eventual preferential deposition of transuranics present in spent nuclear fuel such as Np, Pu, Am, Cm. The device also comprises an uranium oxidation anode. The oxidation anode is solid uranium metal in the form of spent nuclear fuel. The spent fuel is placed in a ferric metal anode basket which serves as the electrical lead or contact between the molten electrolyte and the anodic uranium metal.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Novel Electrowinning Reactor for the Energy-Efficient, Low- Cost Production of Rare Earth Metals

This project developed a novel neodymium (Nd) electrowinning reactor for energy-efficient electrowinning of Nd metal. Throughout this project we have developed an alternative chloride based molten salt electrolysis process. Our process lowers the specific electrical energy consumption compared to the state of the art, while producing reusable chlorine gas and eliminating direct CO2 and PFC emissions. Facilities required for implementing the project were setup and designs were finalized, and a standard operating procedure for safe operation of high temperature electrolysis cells was written. The electrowinning reactor was designed and constructed. Electrolysis experiments confirmed the ability to reproducibly electrowin Nd metal on a Mo cathode. The current efficiency for Nd electrowinning was measured as a function of applied current density in the presence of the separator. Successful electrowinning of Nd sponge at high current densities (200 mA/cm2 and above) at a current efficiency >80% was demonstrated using multiple techniques. Stable Nd electrowinning up to 10h at 250 mA/cm2 was demonstrated. All of these design advancements were used to develop a techno-economic and life cycle assessment model that demonstrated that our process could be operated at cost of less than $0.20/kg-Nd (~30% lower compared to state of the art when comparing electrolysis energy cost) with a >20% total reduction in global warming potential compared to the state of the art while generating no direct CO2 or perfluorocarbon emissions.

42 ENGINEERING↗

Microstructural Changes In Thermally Cycled U-Pu-Zr-Am-Np Metallic Transmutation Fuel With 1.5% Lanthanides

The United States Department of Energy (DOE) Global Nuclear Energy Partnership (GNEP) is developing metallic actinide-zirconium alloy fuels for the transmutation of minor actinides as part of a closed fuel cycle. The molten salt electrochemical process to be used for fuel recycle has the potential to carry over up to 2% fission product lanthanide content into the fuel fabrication process. Within the scope of the fuel irradiation testing program at Idaho National Laboratory (INL), candidate metal alloy transmutation fuels containing quantities of lanthanide elements have been fabricated, characterized, and delivered to the Advanced Test Reactor for irradiation testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗