Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Using containers to speed up development, to run integration tests and to teach about distributed systems

GlideinWMS is a workload manager provisioning resources for many experiments including CMS and DUNE. The software is distributed both as native packages and specialized production containers. Following an approach used in other communities like web development we built our workspaces, system-like containers to ease development and testing. Developers can change the source tree or check out a different branch and quickly reconfigure the services to see the effect of their changes. In this paper, we’ll talk about what differentiates workspaces from other containers. We’ll describe our base system composed of three containers. A one-node cluster including a compute element and a batch system. A GlideinWMS Factory controlling pilot jobs. And a scheduler and Frontend, to submit jobs and provision resources. Additional containers can be used for optional components. This system can easily run on a laptop and we’ll share our evaluation of different container runtimes, with an eye for ease of use and performance. Finally, we’ll talk about our experience as developers and with students. The GlideinWMS workspaces are easily integrated with IDEs like VS Code, simplifying debugging and allowing development and testing of the system also when offline. They simplified the training and onboarding of new team members and Summer interns. And they were useful in workshops where students could have first-hand experience with the mechanisms and components that, in production, run millions of jobs.

Mambelli, Marco↗

Using Containers to Speed Up Development, to Run Integration Tests and to Teach About Distributed Systems

GlideinWMS is a workload manager provisioning resources for many experiments, including CMS and DUNE. The software is distributed both as native packages and specialized production containers. Following an approach used in other communities like web development, we built our workspaces, system-like containers to ease development and testing. Developers can change the source tree or check out a different branch and quickly reconfigure the services to see the effect of their changes. In this paper, we will talk about what differentiates workspaces from other containers. We will describe our base system, composed of three containers: a one-node cluster including a compute element and a batch system, a GlideinWMS Factory controlling pilot jobs, and a scheduler and Frontend to submit jobs and provision resources. Additional containers can be used for optional components. This system can easily run on a laptop, and we will share our evaluation of different container runtimes, with an eye for ease of use and performance. Finally, we will talk about our experience as developers and with students. The GlideinWMS workspaces are easily integrated with IDEs like VS Code, simplifying debugging and allowing development and testing of the system even when offline. They simplified the training and onboarding of new team members and summer interns. And they were useful in workshops where students could have first-hand experience with the mechanisms and components that, in production, run millions of jobs.

Mambelli, Marco [Fermilab] (ORCID:0000000294892681↗

Wind Plant Ramping Behavior

With the increasing wind penetrations, utilities and operators (ISOs) are quickly trying to understand the impacts on system operations and planning. This report focuses on ramping imapcts within the Xcel service region.

17 WIND ENERGY↗

Fermilab HEPCloud Facility Decision Engine Design

The Decision Engine is a critical component of the HEP Cloud Facility. It provides the functionality of resource scheduling for disparate resource providers, including those which may have a cost or a restricted allocation of cycles. Along with the architecture, design, and requirements for the Decision Engine, this document will provide the rationale and explanations for various design decisions. In some cases, requirements and interfaces for a limited subset of external services will be included in this document. This document is intended to be a high level design. The design represented in this document is not complete and does not break everything down in detail. The class structures and pseudo-code exist for example purposes to illustrate desired behaviors, and as such, should not be taken literally. The protocols and behaviors are the important items to take from this document. This project is still in prototyping mode so flaws and inconsistencies may exist and should be noted and treated as failures.

97 MATHEMATICS AND COMPUTING↗

EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING

The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

02 PETROLEUM↗

In Situ Cold-Spray Repair of Environmental Mission Infrastructure for Component Life Extension - 19424

Cold spray offers a potential option for performing in situ repair of U.S. Department of Energy (DOE) complex infrastructure critical to the Office of Environmental Management cleanup mission. Application to the DOE complex has the potential to reduce cost, schedule, and safety risk impacts associated with component failures and would negate the need to procure and construct replacement infrastructure. A concept and technical basis are presented for developing remotely deployable cold-spray systems for performing in situ repairs in hazardous environments such as nuclear waste tanks, piping, and process vessels to extend component service life or return critical infrastructure to service. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Argonne Leadership Computing Facility: 2021 Operational Assessment Report

This Operational Assessment Report describes how the Argonne Leadership Computing Facility (ALCF) met or exceeded every one of its goals for calendar year (CY) 2021 as an advanced scientific computing center. In CY 2021, the ALCF operated its production resource, Theta, an Intel-based Cray XC40 system (11.7-petaflops) augmented with 24 NVIDIA DGX A100-based nodes (3.9-petaflops) that supports diverse workloads, integrating data analytics with artificial intelligence (AI) training and learning in a single platform. In 2021, we began deploying Polaris, our newest 40- petaflops system, and augmented this powerful testbed system with an additional 28 nodes to support the integration of real-time experiments and HPC resources. We also deployed our two largest storage systems yet, named Grand and Eagle, that will bring new services to our users and will power data-driven research for years to come. Last year, Theta delivered a total of 20.8 million node-hours to 16 Innovative and Novel Computational Impact on Theory and Experiment (INCITE) projects and 7.2 million node-hours to ASCR Leadership Computing Challenge (ALCC) projects (32 awarded during the 2020–2021 ALCC year and 17 awarded during the 2021–2022 ALCC year), as well as substantial support to Director’s Discretionary (DD) projects (5.5 million node-hours). As Table ES.1 shows, Theta performed exceptionally well in terms of overall availability (95.1 percent), scheduled availability (99.4 percent), and utilization (98.1 percent; Table 2.1). As of the submission date of this document, ALCF’s user community has published 249 papers in high-quality, peer-reviewed journals and technical proceedings. At the 2021 International Conference for High Performance Computing, Networking, Storage and Analysis (SC’21), Argonne researchers won two HPCwire Readers’ Choice Awards and were part of a Gordon Bell Prize finalist team recognized for developing an AI-enabled, multi-resolution simulation framework for studying complex biomolecular machines. Their framework was used to observe the SARS-CoV-2 replication-transcription machinery in action, by directly integrating experimental data. ALCF also provided a comprehensive program of high-performance computing (HPC) support services to help our community make productive use of the facility’s diverse and growing collection of resources. We are now entering the exascale era, with exascale machines being planned for national laboratories across the country, including Aurora at Argonne National Laboratory (Argonne) in 2023. ALCF researchers have been leading and guiding numerous strategic activities that will push the boundaries of what’s possible in computational science and engineering and allow us to deliver science on day one.

97 MATHEMATICS AND COMPUTING↗

Semantic Information Modeling for Emerging Applications in Smart Grid

Smart Grid modernizes power grid by integrating digital and information technologies. Millions of smart meters, intelligent appliances and communication infrastructures are under deployment allowing advanced IT applications to be developed to secure and manage power grid operations. Demand response (DR) is one such emerging application to optimize electricity demand by curtailing/shifting power load when peak load occurs. Existing DR approaches are mostly based on static plans such as pricing policies and load shedding schedules. However, improvements to power management applications rely on data emanating from existing and new information sources with the growth of Smart Grid information space. In particular, dynamic DR algorithms depend on information from smart meters that report interval-based power consumption measurement, HVAC systems that monitor buildings heat and humidity, and even weather forecast services. In order for emerging Smart Grid applications to take advantage of the diverse data influx, extensible information integration is required. In this paper, we develop an integrated Smart Grid information model using Semantic Web techniques and present case studies of using semantic information for dynamic DR. We show the semantic model facilitates information integration and knowledge representation for developing the next generation Smart Grid applications.

complex event processing↗

Renewable Microgrid STEM Education & Colonias Outreach Program

To provide Science, Technology, Engineering, and Math (STEM) outreach and education to secondary students to encourage them to select science and engineering as a career by providing an engineering-based problem-solving experience involving renewable energy systems such as photovoltaic (PV) panels or wind turbines. All public and private schools, community colleges, and vocational training programs would be eligible for participation. The Power Microgrids High School Engineering Experience used renewable energy systems (PV and wind) to provide a design capstone experience to secondary students. The objective for each student team was to design a microgrid for the student’s school using renewable energy sources under cost, schedule, performance, and risk constraints. The students then implemented their designs in a laboratory environment to evaluate the completeness of the proposed design, which is a unique experience even for undergraduate college students. This application-based program was marketed to secondary schools in the 28th Congressional District through the Texas Education Agency’s (TEA) Regional Service Centers. Upon application, TEES identified regionally available engineers to act as mentors and supervisors for the projects. Existing curriculum was modified to include microgrid and additional renewable technologies and was made available to the schools.

99 GENERAL AND MISCELLANEOUS↗

Zero-Emission Transit Bus Needs Assessment

The transition to zero-emissions vehicles (ZEVs) in public transit has gained traction due to significant federal investments from the Bipartisan Infrastructure Law (BIL) and the Inflation Reduction Act (IRA). This needs assessment, commissioned by the Joint Office of Energy and Transportation and conducted by researchers at the Idaho National Laboratory, explores the current state of electrification in transit agencies, identifying barriers to implementation, potential funding sources, and operational considerations necessary for a successful transition. The assessment involved qualitative interviews with representatives from 19 transit service providers across diverse geographic regions. Key findings highlight the challenges related to bus facilities and operations, which require careful planning for charging infrastructure and maintenance capabilities to accommodate battery electric buses (BEBs) and hydrogen fuel cell buses (HFCBs). Agencies reported operational hurdles due to the shorter range of BEBs compared to diesel buses, necessitating revised scheduling and routing strategies. Despite these challenges, many agencies expressed optimism about their capacity to adapt. Funding availability emerged as a critical factor influencing the transition to ZEVs. While agencies welcomed increased financial support, particularly from the Low or No Emission Grant Program (Lo-No), concerns about the sustainability of this funding and the ongoing operational costs were prevalent. The need for a comprehensive funding inventory was underscored to ensure transit agencies are aware of all available resources. Technological constraints were significant barriers to ZEV adoption. The limited range of BEBs was frequently cited as a concern, leading to operational challenges and reliability issues. Agencies reported difficulties in sourcing replacement parts, which exacerbated downtime and maintenance challenges. Workforce development and training were identified as pivotal for a successful transition. Many agencies rely heavily on manufacturers for technician training, highlighting the need for scalable training programs that equip staff with the necessary skills to maintain electric powertrains effectively. This assessment offers actionable recommendations for the Joint Office, including enhancing outreach to transit agencies, developing resources for effective utility partnerships, and facilitating comprehensive training programs. Establishing a zero-emission bus evaluation program to track performance metrics such as cost, range, and reliability could provide valuable insights for transit agencies. The needs assessment provides a detailed examination of the challenges and opportunities facing transit agencies in their transition to zero-emissions bus fleets. By addressing these issues through targeted support, stakeholders can collaboratively work towards a cleaner, more sustainable public transportation system that benefits all communities.

33 - ADVANCED PROPULSION SYSTEMS↗

Partnership For Edge Physics Simulation

In this effort, we will extend our prior work as part of CPES (i.e., DART and DataSpaces) to support in-situ tight coupling between application codes that exploits data locality and core-level parallelism to maximize on-chip data exchange and reuse. This will be accomplished by mapping coupled simulations so that the data exchanges are more localized within the nodes. Coupled simulation workflows can more effectively utilize the resources available on emerging HEC platforms if they can be mapped and executed to exploit data locality as well as the communication patterns between application components. Scheduling and running such workflows requires an extended framework that should provide a unified hybrid abstraction to enable coordination and data sharing across computation tasks that run on the heterogeneous multi-core-based systems, and develop a data-locality based dynamic tasks scheduling approach to increase on-chip or intra-node data exchanges and in-situ execution. This effort will extend our prior work as part of CPES (i.e., DART and DataSpaces), which provided a simple virtual shared-space abstraction hosted at the staging nodes, to support application coordination, data sharing and active data processing services. Moreover, it will transparently manage the low-level operations associated with the inter-application data exchange, such as data redistributions, and will enable running coupled simulation workflow on multi-cores computing platforms.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Adaptive cold-load pickup considerations in 2-stage microgrid unit commitment for enhancing microgrid resilience

In an extended main grid outage spanning multiple days, load shedding serves as a critical mechanism for islanded microgrids to maintain essential power and energy reserves that are indispensable for fulfilling reliability and resiliency mandates. However, using load shedding for such purposes leads to increasing occurrence of cold load pickup (CLPU) events. Here, this study presents an innovative adaptive CLPU model that introduces a method for determining and incorporating parameters related to CLPU power and energy requirements into a two-stage microgrid unit commitment (MGUC) algorithm. In contrast to the traditional fixed-CLPU-curve approach, this model calculates CLPU duration, power, and energy demands by considering outage durations and ambient temperature variations within the MGUC process. By integrating the adaptive CLPU model into the MGUC problem formulation, it allows for the optimal allocation of energy resources throughout the entire scheduling horizon to fulfill the CLPU requirements when scheduling multiple CLPU events. The performance of the enhanced MGUC algorithm considering CLPU needs is assessed using actual load and photovoltaic (PV) data. Simulation results demonstrate significant improvements in dispatch optimality evaluated by the amount of load served, customer comfort, energy storage operation, and adherence to energy schedules. These enhancements collectively contribute to reliable and resilient microgrid operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Deep reinforcement learning assisted co-optimization of Volt-VAR grid service in distribution networks

With the increasing penetration of distributed energy resources in distribution networks, Volt-VAR control and optimization (VVC/VVO) have become very important to ensure an acceptable quality of service to all customers. System operators can rely on slow-responding utility devices, including capacitor banks and on-load tap changing transformers, along with fast-responding battery and photovoltaic (PV) inverters for the VVC/VVO implementation. Because of variations in response time of these two classes of devices, and different control actions (discrete versus continuous), coordinated and optimal scheduling and operation have become of utmost importance. Here, this paper develops a look-ahead deep reinforcement learning (DRL)-based multi-objective VVO technique to improve the voltage profile of active distribution networks, decrease network and inverter power loss, and save the operational cost of the grid. It proposes a deep deterministic policy gradient (DDPG)-based approach to schedule the optimal reactive and/or active power set-points of fast-responding inverters, and a deep Q-network (DQN)-based DRL agent to schedule the discrete decisions variables of slow-responding assets. The reactive power output of PV and battery smart inverters are scheduled at 30-minute intervals and the capacitors’ commitment status is scheduled with several hour intervals. The proposed framework is validated on the modified IEEE 34-bus and 123-bus test cases with embedded PV and PV-plus-storage. To validate the efficacy of the proposed VVO, it is compared with several scenarios, including the base case without VVO, localized droop control of DERs, DDPG-only, and twin delayed DDPG (TD3) agent-based DRL techniques. The results justify the superior performance of the proposed method to improve the voltage profile, reduce network power loss, and minimize the look-ahead grid operational cost while minimizing the undesirable power losses in inverters as a result of power factor adjustments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cloud Services Enable Efficient AI-Guided Simulation Workflows across Heterogeneous Resources

Applications which fuse machine learning and simulation are rarely best served by a single computing resource. Highly parallel simulation codes are best deployed on super- computers, while AI tasks used to decide which simulations to perform may be best suited to specialized accelerators. Here we present a Function-as-a-Service (FaaS) system for executing complex, distributed computational campaigns that achieves performance parity with conventional workflow systems without the complexities of secure network connections between compute providers. One innovation enabling high performance is a subsystem that directly moves task data between sites, separate from the cloud-hosted FaaS system used to distribute task instructions. We also introduce a flexible scheduling system that allows us access factor of 2 trade offs between the amount of resources required to solve a problem at each compute site. We anticipate that this system will upgrade multi-site applications from demonstration projects to routine practice in computational science.

Ward, Logan↗

The Impact of Solar Photovoltaic Generation on Balancing Requirements in the Southern Nevada System

Abstract—The impact of integrating large-scale solar photovoltaic (PV) generation on the balancing requirements in terms of regulation and load-following requirements in the southern Nevada balancing area is evaluated. The “swinging door” algorithm and the “probability box” method developed by Pacific Northwest National Laboratory (PNNL) were used to quantify the impact of large PV generation on the balancing requirements of the system operations. The system’s actual scheduling, real-time dispatch and regulation processes were simulated. Different levels of distributed generation were also considered in the study. The impact of hourly solar PV generation forecast errors on regulation and load-following requirements was assessed. The sensitivity of balancing requirements with respect to real-time forecast errors of large PV generation was analyzed. Index Terms—Ancillary services, balancing requirements, load following, regulation, renewables integration, swinging door

Balancing' Southern Nevada System↗

Experimental evaluation of the impact of packet capturing tools for web services.

Network measurement is a discipline that provides the techniques to collect data that are fundamental to many branches of computer science. While many capturing tools and comparisons have made available in the literature and elsewhere, the impact of these packet capturing tools on existing processes have not been thoroughly studied. While not a concern for collection methods in which dedicated servers are used, many usage scenarios of packet capturing now requires the packet capturing tool to run concurrently with operational processes. In this work we perform experimental evaluations of the performance impact that packet capturing process have on web-based services; in particular, we observe the impact on web servers. We find that packet capturing processes indeed impact the performance of web servers, but on a multi-core system the impact varies depending on whether the packet capturing and web hosting processes are co-located or not. In addition, the architecture and behavior of the web server and process scheduling is coupled with the behavior of the packet capturing process, which in turn also affect the web server's performance.

99 GENERAL AND MISCELLANEOUS↗

Radar Wind Profiler for Cloud Forecasting at Brookhaven National Laboratory (BNL) Field Campaign Report

The Radar Wind Profiler for Cloud Forecasting at Brookhaven National Laboratory (BNL) [http://www.arm.gov/campaigns/osc2013rwpcf] campaign was scheduled to take place from 15 July 2013 through 15 July 2015 (or until shipped for the next U.S. Department of Energy Atmospheric Radiation Measurement [ARM] Climate Research Facility first Mobile Facility [AMF1] deployment). The campaign involved the deployment of the AMF1 Scintec 915 MHz Radar Wind Profiler (RWP) at BNL, in conjunction with several other ARM, BNL and National Weather Service (NWS) instruments. The two main scientific foci of the campaign were: 1) To provide profiles of the horizontal wind to be used to test and validate short-term cloud advection forecasts for solar-energy applications and 2) to provide vertical profiling capabilities for the study of dynamics (i.e., vertical velocity) and hydrometeors in winter storms. This campaign was a serendipitous opportunity that arose following the deployment of the RWP at the Two-Column Aerosol Project (TCAP) campaign in Cape Cod, Massachusetts and restriction from participation in the Green Ocean Amazon 2014/15 (GoAmazon 2014/15) campaign due to radio-frequency allocation restriction for international deployments. The RWP arrived at BNL in the fall of 2013, but deployment was delayed until fall of 2014 as work/safety planning and site preparation were completed. The RWP further encountered multiple electrical failures, which eventually required several shipments of instrument power supplies and the final amplifier to the vendor to complete repairs. Data collection began in late January 2015. The operational modes of the RWP were changed such that in addition to collecting traditional profiles of the horizontal wind, a vertically pointing mode was also included for the purpose of precipitation sensing and estimation of vertical velocities. The RWP operated well until the end of the campaign in July 2015 and collected observations for more than 20 precipitation events.

54 ENVIRONMENTAL SCIENCES↗

Radar Wind Profiler for Cloud Forecasting at Brookhaven National Laboratory (BNL) Field Campaign Report

The Radar Wind Profiler for Cloud Forecasting at Brookhaven National Laboratory (BNL) [http://www.arm.gov/campaigns/osc2013rwpcf] campaign was scheduled to take place from 15 July 2013 through 15 July 2015 (or until shipped for the next U.S. Department of Energy Atmospheric Radiation Measurement [ARM] Climate Research Facility first Mobile Facility [AMF1] deployment). The campaign involved the deployment of the AMF1 Scintec 915 MHz Radar Wind Profiler (RWP) at BNL, in conjunction with several other ARM, BNL and National Weather Service (NWS) instruments. The two main scientific foci of the campaign were: 1) To provide profiles of the horizontal wind to be used to test and validate short-term cloud advection forecasts for solar-energy applications and 2) to provide vertical profiling capabilities for the study of dynamics (i.e., vertical velocity) and hydrometeors in winter storms. This campaign was a serendipitous opportunity that arose following the deployment of the RWP at the Two-Column Aerosol Project (TCAP) campaign in Cape Cod, Massachusetts and restriction from participation in the Green Ocean Amazon 2014/15 (GoAmazon 2014/15) campaign due to radio-frequency allocation restriction for international deployments. The RWP arrived at BNL in the fall of 2013, but deployment was delayed until fall of 2014 as work/safety planning and site preparation were completed. The RWP further encountered multiple electrical failures, which eventually required several shipments of instrument power supplies and the final amplifier to the vendor to complete repairs. Data collection began in late January 2015. The operational modes of the RWP were changed such that in addition to collecting traditional profiles of the horizontal wind, a vertically pointing mode was also included for the purpose of precipitation sensing and estimation of vertical velocities. The RWP operated well until the end of the campaign in July 2015 and collected observations for more than 20 precipitation events.

54 ENVIRONMENTAL SCIENCES↗