Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling and planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Enabling New Operations Concepts for Lunar and Mars Exploration

The planning and scheduling of human space activities is an expensive and time-consuming task that seldom provides the crew with the control, flexibility, or insight that they need. During the past thirty years, scheduling software has seen only incremental improvements; however, software limitations continue to prevent even evolutionary improvements in the operations concept that is used for human space missions. Space missions are planned on the ground long before they are executed in space, and the crew has little input or influence on the schedule. In recent years the crew has been presented with a job jar of activities that they can do whenever they have time, but the contents of the jar is limited to tasks that do not use scarce shared resources and do not have external timing constraints. Consequently, the crew has no control over the schedule of the majority of their own tasks. As humans venture farther from earth for longer durations, it will become imperative that they have the ability to plan and schedule not only their own activities, but also the unattended activities of the systems, equipment, and robots on the journey with them. Significant software breakthroughs are required to enable the change in the operations concept. The crew does not have the time to build or modify the schedule by hand. They only need to issue a request to schedule a task and the system should automatically do the rest. Of course, the crew should not be required to build the complete schedule. Controllers on the ground should contribute the models and schedules where they have the better knowledge. The system must allow multiple simultaneous users, some on earth and some in space. The Mission Operations Laboratory at NASA's Marshall Space flight Center has been researching and prototyping a modeling schema, scheduling engine, and system architecture that can enable the needed paradigm shift - it can make the crew autonomous. This schema and engine can be the core of a planning and scheduling system that would enable multiple planners, some on the earth and some in space, to build one integrated timeline. Its modeling schema can capture all the task requirements; its scheduling engine can build the schedule automatically, and its architecture can allow those (on earth and in space) with the best knowledge of the tasks to schedule them. This paper describes the enabling technology and proposes an operations concept for astronauts autonomously scheduling their activities and the activities around them.

Jaap, John↗

Maximally Expressive Task Modeling

Planning and scheduling systems organize "tasks" into a timeline or schedule. The tasks are defined within the scheduling system in logical containers called models. The dictionary might define a model of this type as "a system of things and relations satisfying a set of rules that, when applied to the things and relations, produce certainty about the tasks that are being modeled." One challenging domain for a planning and scheduling system is the operation of on-board experiment activities for the Space Station. The equipment used in these experiments is some of the most complex hardware ever developed by mankind, the information sought by these experiments is at the cutting edge of scientific endeavor, and the procedures for executing the experiments are intricate and exacting. Scheduling is made more difficult by a scarcity of space station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling space station experiment operations calls for a "maximally expressive" modeling schema. Modeling even the simplest of activities cannot be automated; no sensor can be attached to a piece of equipment that can discern how to use that piece of equipment; no camera can quantify how to operate a piece of equipment. Modeling is a human enterprise-both an art and a science. The modeling schema should allow the models to flow from the keyboard of the user as easily as works of literature flowed from the pen of Shakespeare. The Ground Systems Department at the Marshall Space Flight Center has embarked on an effort to develop a new scheduling engine that is highlighted by a maximally expressive modeling schema. This schema, presented in this paper, is a synergy of technological advances and domain-specific innovations.

Japp, John↗

Maximally Expressive Modeling of Operations Tasks

Planning and scheduling systems organize "tasks" into a timeline or schedule. The tasks are defined within the scheduling system in logical containers called models. The dictionary might define a model of this type as "a system of things and relations satisfying a set of rules that, when applied to the things and relations, produce certainty about the tasks that are being modeled." One challenging domain for a planning and scheduling system is the operation of on-board experiments for the International Space Station. In these experiments, the equipment used is among the most complex hardware ever developed, the information sought is at the cutting edge of scientific endeavor, and the procedures are intricate and exacting. Scheduling is made more difficult by a scarcity of station resources. The models to be fed into the scheduler must describe both the complexity of the experiments and procedures (to ensure a valid schedule) and the flexibilities of the procedures and the equipment (to effectively utilize available resources). Clearly, scheduling International Space Station experiment operations calls for a "maximally expressive" modeling schema.

Jaap, John↗

Planning and Resource Management in an Intelligent Automated Power Management System

Power system management is a process of guiding a power system towards the objective of continuous supply of electrical power to a set of loads. Spacecraft power system management requires planning and scheduling, since electrical power is a scarce resource in space. The automation of power system management for future spacecraft has been recognized as an important R&D goal. Several automation technologies have emerged including the use of expert systems for automating human problem solving capabilities such as rule based expert system for fault diagnosis and load scheduling. It is questionable whether current generation expert system technology is applicable for power system management in space. The objective of the ADEPTS (ADvanced Electrical Power management Techniques for Space systems) is to study new techniques for power management automation. These techniques involve integrating current expert system technology with that of parallel and distributed computing, as well as a distributed, object-oriented approach to software design. The focus of the current study is the integration of new procedures for automatically planning and scheduling loads with procedures for performing fault diagnosis and control. The objective is the concurrent execution of both sets of tasks on separate transputer processors, thus adding parallelism to the overall management process.

Morris, Robert A.↗

The DSN view periods for a mission

The Jet Propulsion Laboratory Resource Allocation, Planning and Scheduling Office (JPL-RAPSO) is chartered to allocate the limited amount of tracking hours among the various missions in as equitable allotment as can be achieved. The communication windows that can be used for communication between the ground and the Project/spacecraft are called 'viewperiods.' The concept of the viewperiods for (any) mission is presented in this paper, along with the levels of refinement over time (Forecasting/Project/Mid- Range/NSS) associated with those viewperiods.

planning scheduling viewperiods↗

Mission Design Evaluation Using Automated Planning for High Resolution Imaging of Dynamic Surface Processes from the ISS

A challenge for any proposed mission is to demonstrate convincingly that the proposed systems will in fact deliver the science promised. Funding agencies and mission design personnel are becoming ever more skeptical of the abstractions that form the basis of the current state of the practice with respect to approximating science return. To address this, we have been using automated planning and scheduling technology to provide actual coverage campaigns that provide better predictive performance with respect to science return for a given mission design and set of mission objectives given implementation uncertainties. Specifically, we have applied an adaptation of ASPEN and SPICE to the Eagle-Eye domain that demonstrates the performance of the mission design with respect to coverage of science imaging targets that address climate change and disaster response. Eagle-Eye is an Earth-imaging telescope that has been proposed to fly aboard the International Space Station (ISS).

International Space Station↗

Decision theory for computing variable and value ordering decisions for scheduling problems

Heuristics that guide search are critical when solving large planning and scheduling problems, but most variable and value ordering heuristics are sensitive to only one feature of the search state. One wants to combine evidence from all features of the search state into a subjective probability that a value choice is best, but there has been no solid semantics for merging evidence when it is conceived in these terms. Instead, variable and value ordering decisions should be viewed as problems in decision theory. This led to two key insights: (1) The fundamental concept that allows heuristic evidence to be merged is the net incremental utility that will be achieved by assigning a value to a variable. Probability distributions about net incremental utility can merge evidence from the utility function, binary constraints, resource constraints, and other problem features. The subjective probability that a value is the best choice is then derived from probability distributions about net incremental utility. (2) The methods used for rumor control in Bayesian Networks are the primary way to prevent cycling in the computation of probable net incremental utility. These insights lead to semantically justifiable ways to compute heuristic variable and value ordering decisions that merge evidence from all available features of the search state.

Linden, Theodore A.↗

ASPEN: EO-1 Mission Activity Planning Made Easy

This paper describes the application of an automated planning and scheduling system to the NASA Earth Orbitin 1 (EO-1) missions. The planning system, ASPEN, is used to autonomously schedule the daily activites of the satellite.

ASPEN Activity Planning↗

Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE). Volume 1: User's guide

An interactive computer program for automatically generating traffic models for the Space Transportation System (STS) is presented. Information concerning run stream construction, input data, and output data is provided. The flow of the interactive data stream is described. Error messages are specified, along with suggestions for remedial action. In addition, formats and parameter definitions for the payload data set (payload model), feasible combination file, and traffic model are documented.

Dupnick, E.↗

Automating Mission Scheduling for Space-Based Observatories

In this paper we describe the use of our planning and scheduling framework, HSTS, to reduce the complexity of science mission planning. This work is part of an overall project to enable a small team of scientists to control the operations of a spacecraft. The present process is highly labor intensive. Users (scientists and operators) rely on a non-codified understanding of the different spacecraft subsystems and of their operating constraints. They use a variety of software tools to support their decision making process. This paper considers the types of decision making that need to be supported/automated, the nature of the domain constraints and the capabilities needed to address them successfully, and the nature of external software systems with which the core planning/scheduling engine needs to interact. HSTS has been applied to science scheduling for EUVE and Cassini and is being adapted to support autonomous spacecraft operations in the New Millennium initiative.

Pell, Barney↗

Validation of Self-Scheduling Countermeasures in NASA's HERA Campaign 6

Enhancing crew capabilities for planning and scheduling activities is critical for periods of increased crew autonomy in future long-duration missions where communication delays preclude real-time ground support from Earth. Our study focuses on how to empower astronauts to manage their timelines independently from the experts in the mission control center (MCC). Our objective was to evaluate the impact of scheduling countermeasures on crew scheduling performance, workload, and usability in an analog mission environment. The study involved 16 crew members across four missions in the Limited Autonomy phase of Human Exploration Research Analog (HERA) Campaign 6. Crew members used Playbook to schedule one operational day for the entire crew. Half the participants accessed scheduling aids, and we compared their performance to a control group with no aids. Performance, workload, and usability were assessed using time on task, violation counts, NASA Task Load Index (NASA-TLX), and System Usability Scale (SUS). Participants using scheduling aids completed sessions 20% faster and committed 33% fewer violations. While these differences were not statistically significant due to the study’s operational limitations, trends indicate that scheduling aids may reduce errors and improve efficiency. These results can inform the design of scheduling tools to enhance astronauts’ autonomy in long-duration space missions, contributing to improved crew performance and reduced reliance on ground support.

space robotics↗

Validation of Self-Scheduling Countermeasures in NASA's HERA Campaign 6

Enhancing crew capabilities for planning and scheduling activities is critical for periods of increased crew autonomy in future long-duration missions where communication delays preclude real-time ground support from Earth. Our study focuses on how to empower astronauts to manage their timelines independently from the experts in the mission control center (MCC). Our objective was to evaluate the impact of scheduling countermeasures on crew scheduling performance, workload, and usability in an analog mission environment. The study involved 16 crew members across four missions in the Limited Autonomy phase of Human Exploration Research Analog (HERA) Campaign 6. Crew members used Playbook to schedule one operational day for the entire crew. Half the participants accessed scheduling aids, and we compared their performance to a control group with no aids. Performance, workload, and usability were assessed using time on task, violation counts, NASA Task Load Index (NASA-TLX), and System Usability Scale (SUS). Participants using scheduling aids completed sessions 20% faster and committed 33% fewer violations. While these differences were not statistically significant due to the study’s operational limitations, trends indicate that scheduling aids may reduce errors and improve efficiency. These results can inform the design of scheduling tools to enhance astronauts’ autonomy in long-duration space missions, contributing to improved crew performance and reduced reliance on ground support.

space robotics↗

Recent results in Mars Relay Network planning and scheduing

At different time periods in the future, Mars missions will overlap and previous studies indicate that during such periods existing deep space communication infrastructure will not be able to handle all Mars communication needs. A plausible solution is to perform optimal resource allocation for the Mars relay communication network; a network consisting of multiple surface units and orbiters on Mars and the Deep Space Stations. Unlike direct-to-earth, a relay communication, either in real-time or store-and-forward, can increase network science data return, reduce surface unit's direct-to-earth communication demands, and enable communication even when the surface unit is not facing Earth. It is the objective of this paper to take advantage of the relay operation to efficiently plan and schedule the network communications.

Relay Network planning and scheduling constrained ↗

Automated telescope scheduling

With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

Johnston, Mark D.↗

Increasing Crew Autonomy for Long Duration Exploration Missions: Self-Scheduling

Over the last three years, we have been investigating the operational concept of crew self-scheduling as a method of increasing crew autonomy for future exploration missions. Through Playbook, a planning and scheduling software tool, we have incrementally increased the ability for Earth analog mission crews to modify their schedules. Playbook allows the crew to add new activities from scratch, add new activities or groups of activities through a Task List, and reschedule or reassign flexible activities. The crew is also able to identify if plan modifications create violations, i.e., plan constraints not being met. This paper summarizes our observations with qualitative evidence from four NASA Extreme Environment Mission Operations (NEEMO) analog missions that supported self-scheduling as a feasible operational concept.

planning and scheduling↗

Increasing Crew Autonomy for Long Duration Exploration Missions: Self-Scheduling

Over the last three years, we have been investigating the operational concept of crew self-scheduling as a method of increasing crew autonomy for future exploration missions. Through Playbook, a planning and scheduling software tool, we have incrementally increased the ability for Earth analog mission crews to modify their schedules. Playbook allows the crew to add new activities from scratch, add new activities or groups of activities through a Task List, and reschedule or reassign flexible activities. The crew is also able to identify if plan modifications create violations, i.e., plan constraints not being met. This paper summarizes our observations with qualitative evidence from four NASA Extreme Environment Mission Operations (NEEMO) analog missions that supported self-scheduling as a feasible operational concept.

crew autonomy↗

Improving the Operations of the Earth Observing One Mission via Automated Mission Planning

We describe the modeling and reasoning about operations constraints in an automated mission planning system for an earth observing satellite - EO-1. We first discuss the large number of elements that can be naturally represented in an expressive planning and scheduling framework. We then describe a number of constraints that challenge the current state of the art in automated planning systems and discuss how we modeled these constraints as well as discuss tradeoffs in representation versus efficiency. Finally we describe the challenges in efficiently generating operations plans for this mission. These discussions involve lessons learned from an operations model that has been in use since Fall 2004 (called R4) as well as a newer more accurate operations model operational since June 2009 (called R5). We present analysis of the R5 software documenting a significant (greater than 50%) increase in the number of weekly observations scheduled by the EO-1 mission. We also show that the R5 mission planning system produces schedules within 15% of an upper bound on optimal schedules. This operational enhancement has created value of millions of dollars US over the projected remaining lifetime of the EO-1 mission.

Chien, Steve A.↗