Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling and spacing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Lessons learned from the Autonomous Power System

The Autonomous Power System (APS) project at the NASA Lewis Research Center is designed to demonstrate the applications of integrated intelligent diagnosis, control and scheduling techniques to space power distribution systems. The project consists of three elements: the Autonomous Power Expert System (APEX) for Fault Diagnosis, Isolation, and Recovery (FDIR); the Autonomous Intelligent Power Scheduler (AIPS) to efficiently assign activities start times and resources; and power hardware (Brassboard) to emulate a space-based power system. The APS project had been through one design iteration. Each of the three elements of the APS project has been designed, tested, and integrated into a complete working system. After these three portions were completed, an evaluation period was initiated. Each piece of the system was critiqued based on individual performance as well as the ability to interact with the other portions of the APS project. These critiques were then used to determine guidelines for new and improved components of the APS system.

Ringer, Mark J.↗

A dc-coupled, high sensitivity bolometric detector system for the Infrared Telescope in Space

We report the performance of an ac bridge readout system that has been developed for use on the Infrared Telescope in Space which is scheduled for launch in 1994. The ac bridge readout provides excellent dc stability enabling observing strategies well-suited to space-borne observations. The ability to modulate the optical signal slowly allows the use of new, highly sensitive, long time-constant bolometers. At 300 mK, the bolometers have an electrical noise equivalent power of 3 x 10 exp -17 W/sq rt Hz. The total noise of the differential signal, including amplifier noise, is less than 8 x 10 exp -17 W/sq rt Hz at frequencies as low as 35 mHz.

Devlin, M.↗

Deep space mission integration with the space transportation system

The Galileo mission is the first interplanetary mission scheduled to use the Space Transportation System (STS). Therefore, Galileo is the trailblazer for mission integration of a deep space mission with the STS. A short overview of the Galileo mission is presented as background for the discussion of the mission integration effort. The components of the STS and the mission integration system are defined, documentation requirements explained, the work of the Flight Design Working Group described, and several examples of the types of problems dealt with are given. The steps of mission integration are shown from introducing requirements into the system to resolving conflicts that arise between the payload project and the STS operator. Conclusions are drawn from the Galileo mission integration effort to aid future payload projects in working with the STS.

Gray, W. B.↗

Analysis of Waves in Space Plasma (WISP) near field simulation and experiment

The WISP payload scheduler for a 1995 space transportation system (shuttle flight) will include a large power transmitter on board at a wide range of frequencies. The levels of electromagnetic interference/electromagnetic compatibility (EMI/EMC) must be addressed to insure the safety of the shuttle crew. This report is concerned with the simulation and experimental verification of EMI/EMC for the WISP payload in the shuttle cargo bay. The simulations have been carried out using the method of moments for both thin wires and patches to stimulate closed solids. Data obtained from simulation is compared with experimental results. An investigation of the accuracy of the modeling approach is also included. The report begins with a description of the WISP experiment. A description of the model used to simulate the cargo bay follows. The results of the simulation are compared to experimental data on the input impedance of the WISP antenna with the cargo bay present. A discussion of the methods used to verify the accuracy of the model is shown to illustrate appropriate methods for obtaining this information. Finally, suggestions for future work are provided.

Richie, James E.↗

Space station software reliability analysis based on failures observed during testing at the multisystem integration facility

Quality of software not only is vital to the successful operation of the space station, it is also an important factor in establishing testing requirements, time needed for software verification and integration as well as launching schedules for the space station. Defense of management decisions can be greatly strengthened by combining engineering judgments with statistical analysis. Unlike hardware, software has the characteristics of no wearout and costly redundancies, thus making traditional statistical analysis not suitable in evaluating reliability of software. A statistical model was developed to provide a representation of the number as well as types of failures occur during software testing and verification. From this model, quantitative measure of software reliability based on failure history during testing are derived. Criteria to terminate testing based on reliability objectives and methods to estimate the expected number of fixings required are also presented.

Tamayo, Tak Chai↗

Space shuttle with common fuel tank for liquid rocket booster and main engines (supertanker space shuttle)

An operation and schedule enhancement is shown that replaces the four-body cluster (Space Shuttle Orbiter (SSO), external tank, and two solid rocket boosters) with a simpler two-body cluster (SSO and liquid rocket booster/external tank). At staging velocity, the booster unit (liquid-fueled booster engines and vehicle support structure) is jettisoned while the remaining SSO and supertank continues on to orbit. The simpler two-bodied cluster reduces the processing and stack time until SSO mate from 57 days (for the solid rocket booster) to 20 days (for the liquid rocket booster). The areas in which liquid booster systems are superior to solid rocket boosters are discussed. Alternative and future generation vehicles are reviewed to reveal greater performance and operations enhancements with more modifications to the current methods of propulsion design philosophy, e.g., combined cycle engines, and concentric propellant tanks.

Thorpe, Douglas G.↗

Laser Metrology in the Micro-Arcsecond Metrology Testbed

The Space Interferometer Mission (SIM), scheduled for launch in 2009, is a space-born visible light stellar interferometer capable of micro-arcsecond-level astrometry. The Micro-Arcsecond Metrology testbed (MAM) is the ground-based testbed that incorporates all the functionalities of SIM minus the telescope, for mission-enabling technology development and verification. MAM employs a laser heterodyne metrology system using the Sub-Aperture Vertex-to-Vertex (SAVV) concept. In this paper, we describe the development and modification of the SAVV metrology launchers and the metrology instrument electronics, precision alignments and pointing control, locating cyclic error sources in the MAM testbed and methods to mitigate the cyclic errors, as well as the performance under the MAM performance metrics.

interferometry↗

Crew Autonomy through Self-Scheduling: Scheduling Performance Pilot Study

Within the domain of human spaceflight, crew scheduling for International Space Station (ISS) remains a human-driven planning task. Large teams of flight controllers (called Ops Planners) spend weeks creating violation-free schedules for all crewmembers. As NASA considers long-duration exploration missions, the necessary shift of scheduling and planning management from Ops Planners to crew members requires significant research and investigation of crew performance to complete these scheduling tasks. This pilot study was conducted to evaluate non-expert human performance for the task of planning and scheduling, focusing on scheduling problems that increased in complexity based on the number of activities to be scheduled and the number of planning constraints. Nine non-expert planners were recruited to complete scheduling tasks using Playbook, a scheduling software. The results of this pilot study show that scheduling performance decreased as scheduling workload (i.e. number of activities and percent of activities with planning constraints) increased. This paper provides evidence towards developing a model for scheduling task difficulty and identifies potential implications for future automated aids for flight crew scheduling.

planning↗

Crew Autonomy Through Self-Scheduling: Scheduling Performance Pilot Study

Within the domain of human spaceflight, crew scheduling for International Space Station (ISS) remains a human-driven planning task. Large teams of flight controllers (called Ops Planners) spend weeks creating violation-free schedules for all crewmembers. As NASA considers long-duration exploration missions, the necessary shift of scheduling and planning management from Ops Planners to crew members requires significant research and investigation of crew performance to complete these scheduling tasks. This pilot study was conducted to evaluate non-expert human performance for the task of planning and scheduling, focusing on scheduling problems that increased in complexity based on the number of activities to be scheduled and the number of planning constraints. Nine non-expert planners were recruited to complete scheduling tasks using Playbook, a scheduling software. The results of this pilot study show that scheduling performance decreased as scheduling workload (i.e. number of activities and percent of activities with planning constraints) increased. This paper provides evidence towards developing a model for scheduling task difficulty and identifies potential implications for future automated aids for flight crew scheduling.

planning↗

A Generalized Timeline Representation, Services, and Interface for Automating Space Mission Operations

Numerous automated and semi-automated planning & scheduling systems have been developed for space applications. Most of these systems are model-based in that they encode domain knowledge necessary to predict spacecraft state and resources based on initial conditions and a proposed activity plan. The spacecraft state and resources as often modeled as a series of timelines, with a timeline or set of timelines to represent a state or resource key in the operations of the spacecraft. In this paper, we first describe a basic timeline representation that can represent a set of state, resource, timing, and transition constraints. We describe a number of planning and scheduling systems designed for space applications (and in many cases deployed for use of ongoing missions) and describe how they do and do not map onto this timeline model.

Chien, Steve A.↗

Prototype resupply scheduler

Resupply scheduling for the Space Station presents some formidable logistics problems. One of the most basic problems is assigning supplies to a series of shuttle resupply missions. A prototype logistics expert system which constructs resupply schedules was developed. This prototype is able to reconstruct feasible resupply plans. In addition, analysts can use the system to evaluate the impact of adding, deleting or modifying launches, cargo space, experiments, etc.

Tanner, Steve↗

Reducing Stray Light To Characterize Nirspec Subsystems: The Focal Plane Array And Micro-Shutter Array

The James Webb Space Telescope (JWST) is an infrared, space-based telescope scheduled for launch in 2013. JWST includes four scientific instruments, including the Near Infrared Spectrometer (NIRSpec), which operates in the wavelength range from 0.6 to 5 microns. NASA/Goddard Space Flight Center (GSFC) is responsible for two NIRSpec subsystems: the detector subsystem, with its focal plane array (FPA), and the micro-shutter subsystem, with its micro-shutter array (MSA). The FPA is comprised of two side-by-side Rockwell Scientific HgCdTe 2kx2k detectors, with detectors and readout electronics optimized for low noise. The MSA is a GSFC developed micro-electro-mechanical system (MEMS) that serves as a programmable slit mask, allowing NIRSpec to obtain simultaneous spectra of >100 objects in a single field of view. We present the optical characterization test plan of the FPA. The test plan is driven by many requirements: cryogenic operating temperature, a flight-like beam shape, and multi-wavelength photon flux from 1 to 60,000 per second, thus low stray light is critical. We use commercial optical modeling software to predict stray light effects at the FPA. We also present the optical contrast test plan of the MSA. Since each individual shutter element operates in on/off fashion, the most important optical metric is contrast. The MSA structure is designed to minimize stray and scattered light, and the test setup reduces stray light such that the optical contrast requirement is met.

Connelly, Joseph A.↗

An Analysis of Shuttle Crew Scheduling Violations

From the early years of the Space Shuttle program, National Aeronautics and Space Administration (NASA) Shuttle crews have had a timeline of activities to guide them through their time on-orbit. Planners used scheduling constraints to build timelines that ensured the health and safety of the crews. If a constraint could not be met it resulted in a violation. Other agencies of the federal government also have scheduling constraints to ensure the safety of personnel and the public. This project examined the history of Space Shuttle scheduling constraints, constraints from Federal agencies and branches of the military and how these constraints may be used as a guide for future NASA and private spacecraft. This was conducted by reviewing rules and violations with regard to human aerospace scheduling constraints, environmental, political, social and technological factors, operating environment and relevant human factors. This study includes a statistical analysis of Shuttle Extra Vehicular Activity (EVA) related violations to determine if these were a significant producer of constraint violations. It was hypothesized that the number of SCSC violations caused by EVA activities were a significant contributor to the total number of violations for Shuttle/ISS missions. Data was taken from NASA data archives at the Johnson Space Center from Space Shuttle/ISS missions prior to the STS-107 accident. The results of the analysis rejected the null hypothesis and found that EVA violations were a significant contributor to the total number of violations. This analysis could help NASA and commercial space companies understand the main source of constraint violations and allow them to create constraint rules that ensure the safe operation of future human private and exploration missions. Additional studies could be performed to evaluate other variables that could have influenced the scheduling violations that were analyzed.

Bristol, Douglas↗

Hubble Space Telescope Servicing Mission 3A

The Hubble Space Telescope's purpose is to spend 20 years probing the farthest and faintest reaches of the cosmos. Crucial to fulfilling this objective is a series of on-orbit servicing missions. Hubble was placed in orbit on April 25, 1990, by the shuttle Discovery and subsequent servicing followed in December 1993 and February 1997. The third in the series of planned servicing missions for the Hubble Space Telescope was scheduled for June 2000. This third Servicing Mission has been separated into two flights. The first of these flights, Servicing Mission 3A, is scheduled for December 1999, and the second, Servicing Mission 3B, is scheduled for 2001. The fourth Servicing Mission is scheduled for 2003 with a "close-out" Mission in 2010. Three instruments are currently in active scientific use on Hubble - the Wide Field and Planetary Camera 2, the Space Telescope Imaging Spectrograph, and Fine Guidance Sensor I R, which has been designated as the prime FGS for astrometric science. Other instrument bays are occupied by the Near Infrared Camera and Multi-Object Spectrometer (NICMOS), which is now dormant due to the depletion of its solid nitrogen cryogen, the Faint Object Camera, which has been decommissioned, and the corrective optical device called COSTAR, which is no longer needed.

Source record↗

JPL's Space Flight Operations Center: Development project overview

The topics are covered in view graph form and include the following: (1) major elements of deep space flight programs; (2) development schedule; (3) primary design goals; (4) Space Flight Operations Center (SFOC) data systems architecture; (5) technical guidelines; (6) SFOC data system functional architecture; (7) typical SFOC node; (8) SFOC components; (9) SFOC software categories; (10) planned subsystem core diagram for Mars observer; (11) SFOC use of public domain/3rd party software; (12) SFOC hardware; (13) SFOC target six mission configuration; and (14) SFOC development status and plans.

Ebersole, M.↗

Multiple NEO Rendezvous Using Solar Sail Propulsion

The NASA Marshall Space Flight Center (MSFC) Advanced Concepts Office performed an assessment of the feasibility of using a near-term solar sail propulsion system to enable a single spacecraft to perform serial rendezvous operations at multiple Near Earth Objects (NEOs) within six years of launch on a small-to-moderate launch vehicle. The study baselined the use of the sail technology demonstrated in the mid-2000 s by the NASA In-Space Propulsion Technology Project and is scheduled to be demonstrated in space by 2014 as part of the NASA Technology Demonstration Mission Program. The study ground rules required that the solar sail be the only new technology on the flight; all other spacecraft systems and instruments must have had previous space test and qualification. The resulting mission concept uses an 80-m X 80-m 3-axis stabilized solar sail launched by an Athena-II rocket in 2017 to rendezvous with 1999 AO10, Apophis and 2001 QJ142. In each rendezvous, the spacecraft will perform proximity operations for approximately 30 days. The spacecraft science payload is simple and lightweight; it will consist of only the multispectral imager flown on the Near Earth Asteroid Rendezvous (NEAR) mission to 433 Eros and 253 Mathilde. Most non-sail spacecraft systems are based on the Messenger mission spacecraft. This paper will describe the objectives of the proposed mission, the solar sail technology to be employed, the spacecraft system and subsystems, as well as the overall mission profile.

Johnson, Les↗