Search NASA⌕ Search

SEARCH · Search NASA

Results for “September 2012”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Sterile Neutrino Searches in MINOS/MINOS+ Experiment

This dissertation presents the searches on sterile neutrinos using the data collected in MINOS+ Experiment from September 2013 to September 2014, and the full data set of MINOS Experiment collected from 2005 to 2012. Anomalies in short baseline experiments, such as LSND and MiniBooNE, showed hints of sterile neutrinos, a type of neutrino that does not interact with the Standard Model particles. In this work, two models are considered: 3+1 and large extra dimension (LED). In the 3+1 model, one sterile neutrino state is added into the standard oscillation scheme consisting of three known active neutrino states $\nu_e$, $\nu_\mu$ and $\nu_\tau$. In the LED model, sterile neutrinos arise as Kaluza-Klein (KK) states due to assumed large extra dimensions. Mixing between sterile and active neutrino states may modify the oscillation patterns observed in the MINOS detectors. Both searches yield null results. For 3+1, a combined fit of MINOS and MINOS+ data gives a stronger limit on $\theta_{24}$ in the range of $10^{-2}\text{ eV}^2 < \Delta m^2_{41} < 1\text{ eV}^2$ than previous experiments. For LED, with the complete MINOS data set, the size of extra dimensions is constrained to be smaller than $\sim 0.35\ \mu\text{m}$ at 90\% C.L. in the limit of a vanishing lightest neutrino mass.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

The DAWN Project's Transition to Mission Operations: on Its Way to Rendezvous with (4) Vesta and (1) Ceres

Dawn launched on 27 September 2007 on a mission to orbit main belt asteroids (4) Vesta in 2011 - 2012 and (1) Ceres in 2015. The operations team conducted an extensive set of assessments of the engineering subsystems and science instruments during the first 80 days of the mission. A major objective of this period was to thrust for one week with the ion propulsion system to verify flight and ground systems readiness for typical interplanetary operations. Upon successful conclusion of the checkout phase, the interplanetary cruise phase began, most of which will be devoted to thrusting. The flexibility afforded by the use of ion propulsion enabled the project to accommodate a launch postponement of more than 3 months caused by a combination of launch vehicle and tracking system readiness, unfavorable weather, and then conflicts with other launches. Even with the shift in the launch date, all of the science objectives are retained with the same schedule and greater technical margins. This paper describes the conclusion of the development phase of the project, launch operations, and the progress of mission operations.

launch operations↗

The Second Year of Dawn Mission Operations: Mars Gravity Assist and Onward to Vesta

Dawn launched in September 2007 on a mission to orbit main belt asteroids (4) Vesta in 2011 - 2012 and (1) Ceres in 2015. The mission is enabled by an ion propulsion system, which will be operated for the majority of the interplanetary cruise. Following 10.5 months of thrusting that concluded in October 2008, the spacecraft began a period of optimal coast that ended in June 2009. A Mars gravity assist in February 2009 provided an effective deltav of 2.6 km/s. The mission flexibility afforded by the use of ion propulsion provided relatively simple targeting at Mars. Additional engineering activities were conducted during the coast period after Mars, including loading new software into the spacecraft's central computer. This paper describe the progress of the mission, including the approach to Mars, the encounter itself, special activities conducted prior to the resumption of ion thrusting, and the continuation toward Vesta.

Rayman, Marc D.↗

EVIDENCE OF AN ASTEROID ENCOUNTERING A PULSAR

Debris disks and asteroid belts are expected to form around young pulsars due to fallback material from their original supernova explosions. Disk material may migrate inward and interact with a pulsar's magnetosphere, causing changes in torque and emission. Long-term monitoring of PSR J0738–4042 reveals both effects. The pulse shape changes multiple times between 1988 and 2012. The torque, inferred via the derivative of the rotational period, changes abruptly from 2005 September. This change is accompanied by an emergent radio component that drifts with respect to the rest of the pulse. No known intrinsic pulsar processes can explain these timing and radio emission signatures. The data lead us to postulate that we are witnessing an encounter with an asteroid or in-falling debris from a disk.

79 ASTRONOMY AND ASTROPHYSICS↗

Zero Emission Bay Area (ZEBA) Fuel Cell Bus Demonstration: Second Results Report

This report presents results of a demonstration of 12 new fuel cell electric buses (FCEB) operating in Oakland, California. The 12 FCEBs operate as a part of the Zero Emission Bay Area (ZEBA) Demonstration, which also includes two new hydrogen fueling stations. This effort is the largest FCEB demonstration in the United States and involves five participating transit agencies. The ZEBA partnersare collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The first results report was published in August 2011, describing operation of these new FCEBs from September 2010 through May 2011. New results in this report provide an update through April 2012.

08 HYDROGEN↗

CEBAF Upgrade: Cryomodule Performance And Lessons Learned

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

43 PARTICLE ACCELERATORS↗

Cassini Solstice Mission Maneuver Experience: Year Two

The Cassini Spacecraft was launched in October 1997 on a mission to observe Saturn and its moons; it entered orbit around Saturn in July 2004 for a nominal four-year Prime Mission, later augmented by two extensions: the Equinox Mission, from July 2008 through September 2010, and the Solstice Mission, from October 2010 through September 2017. This paper provides an overview of the maneuver activities from August 2011 through June 2012 which include the design of 38 Orbit Trim Maneuvers--OTM-288 through OTM-326-- for attaining 14 natural satellite encounters: seven with Titan, six with Enceladus, and one with Dione.

navigation↗

Unprecedented Atmospheric Conditions (1948–2019) Drive the 2019 Exceptional Melting Season Over the Greenland Ice Sheet

Understanding the role of atmospheric circulation anomalies on the surface mass balance of the Greenland ice sheet (GrIS) is fundamental for improving estimates of its current and future contributions to sea level rise. Here, we show, using a combination of remote sensing observations, regional climate model outputs, reanalysis data, and artificial neural networks, that unprecedented atmospheric conditions (1948–2019) occurring in the summer of 2019 over Greenland promoted new record or close-to-record values of surface mass balance (SMB), runoff, and snowfall. Specifically, runoff in 2019 ranked second within the 1948–2019 period (after 2012) and first in terms of surface mass balance negative anomaly for the hydrological year 1 September 2018–31 August 2019. The summer of 2019 was characterized by an exceptional persistence of anticyclonic conditions that, in conjunction with low albedo associated with reduced snowfall in summer, enhanced the melt–albedo feedback by promoting the absorption of solar radiation and favored advection of warm, moist air along the western portion of the ice sheet towards the north, where the surface melt has been the highest since 1948. The analysis of the frequency of daily 500 hPa geopotential heights obtained from artificial neural networks shows that the total number of days with the five most frequent atmospheric patterns that characterized the summer of 2019 was 5 standard deviations above the 1981–2010 mean, confirming the exceptional nature of the 2019 season over Greenland.

Greenland ice sheet↗

Development of Treatment Process for Radioactive Wastewater Generated from Molybdenum-99 Study - 16415

Molybdenum-99 (Mo-99) high acidic waste solution was securely stored at INER for numerous years. Until 2004, the procedures of waste solution draw-out and pressure-release were accompanied, along with construction of treatment facilities. In 2009, after simulated solution and small volume Mo-99 waste solution tests, the treatment procedure was determined. Then batch-scale treatment facilities were set up. The waste solution was preserved using the instrument, along with modification of some facilities simultaneously. Ultimately all of 12 tanks of Mo-99 inorganic waste solution stored in Building 014 were finished on July, 2012. And residential 5 tanks of those solution served in Building 015B were also completed on September, 2014. A practicable process has been developed for treating radioactive waste generated from Mo-99 study, and it can effectively remove radionuclides from a nitric acid solution. At first, after the waste was sucked from the bucket, the pH value was adjusted to about 10.0 through acid-alkali neutralization. Then, an adsorbent of natural zeolite powder was added to adsorb nuclides, and two adsorption columns filled with Cs-treat and Sr-treat adsorbents were used for removing nuclear species of Cs-137 and Sr-90. In this step, the nuclear species of Cs-137 and Sr-90 contained in the liquid waste are significantly reduced to a degree for manual operation allowable. Then, nitrate ion and mercury ion were removed through another procedure. As a result, the operations were safer and more efficient than other conventional methods. Additionally, the hazard of accidental leakage caused by corrosion of the bucket after long period of storage can be effectively prevented and potential pollution threats are also eliminated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Navigation of the Twin GRAIL Spacecraft into Science Formation at the Moon

On February 29, 2012 the twin NASA Gravity Recovery And Interior Laboratory (GRAIL) spacecraft, Ebb and flow, achieved precise synchronized formation for collecting highly sensitive lunar gravity data. This was accomplished after performing a total of 27 propulsive maneuvers between the two spacecraft (13 on Ebb, 14 on Flow) over six months. Each 300 kg GRAIL spacecraft independently flew a 3.8-month, low-energy trajectory to reach the Moon after separation from the launch vehicle on September 10, 2011. The space craft were captured into 11.5 hr co- planar polar orbits after performing Lunar Orbit Insertion (LOI) maneuvers on New Years Eve (Dec 31, 2011) and New Years Day (Jan 1, 2012), respectively for Ebb, and Flow. Once captured, each spacecraft performed clusters of period reduction maneuvers to bring their orbit periods down to just less than 2 hrs. Finally, the orbiters we replaced into science formation by performing five strategic maneuvers (2 on Ebb, 3 on Flow). These maneuvers ensured 3 months of orbit life time with mean altitudes of 55 km and separations of 82-217 km by targeting the orbits' eccentricity vectors to specific locations. This paper will discuss the navigation strategy and performance of the twin GRAIL spacecraft from the September 10, 2011 launch through the end of the Prime Mission Science Phase in June 2012.

lunar gravity↗

Anomalous Variability in Antarctic Sea Ice Extents During the 1960s With the Use of Nimbus Data

The Nimbus I, II, and III satellites provide a new opportunity for climate studies in the 1960s. The rescue of the visible and infrared imager data resulted in the utilization of the early Nimbus data to determine sea ice extent. A qualitative analysis of the early NASA Nimbus missions has revealed Antarctic sea ice extents that are signicant larger and smaller than the historic 1979-2012 passive microwave record. The September 1964 ice mean area is 19.7x10 km +/- 0.3x10 km. This is more the 250,000 km greater than the 19.44x10 km seen in the new 2012 historic maximum. However, in August 1966 the maximum sea ice extent fell to 15.9x10 km +/- 0.3x10 km. This is more than 1.5x10 km below the passive microwave record of 17.5x10 km set in September of 1986. This variation between 1964 and 1966 represents a change of maximum sea ice of over 3x10 km in just two years. These inter-annual variations while large, are small when compared to the Antarctic seasonal cycle.

Sea Ice↗

CHARACTERIZATION OF ACTIVE MAIN BELT OBJECT P/2012 F5 (GIBBS): A POSSIBLE IMPACTED ASTEROID

In this work, we characterize the recently discovered active main belt object P/2012 F5 (Gibbs), which was discovered with a dust trail >7' in length in the outer main belt, 7 months prior to aphelion. We use optical imaging obtained on UT 2012 March 27 to analyze the central condensation and the long trail. We find B-band and R-band apparent magnitudes of 20.96 {+-} 0.04 mag and 19.93 {+-} 0.02 mag, respectively, which give an upper limit on the radius of the nucleus of 2.1 km. The geometric scattering cross-section of material in the trail was {approx}4 Multiplication-Sign 10{sup 8} m{sup 2}, corresponding to a mass of {approx}5 Multiplication-Sign 10{sup 7} kg. Analysis of infrared images taken by the Wide-field Infrared Survey Explorer in 2010 September reveals that the object was below the detection limit, suggesting that it was less active than it was during 2012, or possibly inactive, just six months after it passed through perihelion. We set a 1{sigma} upper limit on its radius during this time of 2.9 km. P/2012 F5 (Gibbs) is dynamically stable in the outer main belt on timescales of {approx}1 Gyr, pointing toward an asteroidal origin. We find that the morphology of the ejected dust is consistent with it being produced by a single event that occurred on UT 2011 July 7 {+-} 20 days, possibly as the result of a collision with a small impactor.

79 ASTRONOMY AND ASTROPHYSICS↗

Mars Reconnaissance Orbiter Navigation Strategy for Dual Support of Insight and ExoMars Entry, Descent and Landing Demonstrator Module in 2016

Mars Reconnaissance Orbiter (MRO) will support NASA's InSight Mission and ESA's ExoMars Entry, Descent and Landing Demonstrator Module (EDM) in the fall of 2016 when both landers arrive at Mars. MRO provided relay support during the Entry, Descent and Landing (EDL) sequences of Mars Phoenix Lander in 2008 and the Mars Science Laboratory in 2012. Unlike these missions, MRO will coordinate between two EDL events separated by only three weeks: InSight on September 28, 2016 and EDM on October 19, 2016. This paper describes MRO Navigation's maneuver strategy to move MRO's ascending node to meet the In- Sight EDL phasing requirement and support EDM.

EDM↗

Microwave Thermal Propulsion

We have conducted research in microwave thermal propulsion as part of the space exploration access technologies (SEAT) research program, a cooperative agreement (NNX09AF52A) between NASA and Carnegie Mellon University. The SEAT program commenced on the 19th of February 2009 and concluded on the 30th of September 2015. The DARPA/NASA Millimeter-wave Thermal Launch System (MTLS) project subsumed the SEAT program from May 2012 to March 2014 and one of us (Parkin) served as its principal investigator and chief engineer. The MTLS project had no final report of its own, so we have included the MTLS work in this report and incorporate its conclusions here. In the six years from 2009 until 2015 there has been significant progress in millimeter-wave thermal rocketry (a subset of microwave thermal rocketry), most of which has been made under the auspices of the SEAT and MTLS programs. This final report is intended for multiple audiences. For researchers, we present techniques that we have developed to simplify and quantify the performance of thermal rockets and their constituent technologies. For program managers, we detail the facilities that we have built and the outcomes of experiments that were conducted using them. We also include incomplete and unfruitful lines of research. For decision-makers, we introduce the millimeter-wave thermal rocket in historical context. Considering the economic significance of space launch, we present a brief but significant cost-benefit analysis, for the first time showing that there is a compelling economic case for replacing conventional rockets with millimeter-wave thermal rockets.

Parkin, Kevin L. G.↗

Soil Water Content Effects on Net Ecosystem CO2 Exchange and Actual Evapotranspiration in a Mediterranean Semiarid Savanna of Central Chile

Biosphere-atmosphere water and carbon fluxes depend on ecosystem structure, and their magnitudes and seasonal behavior are driven by environmental and biological factors. We studied the seasonal behavior of net ecosystem CO2 exchange (NEE), Gross Primary Productivity (GPP), Ecosystem Respiration (RE), and actual evapotranspiration (ETa) obtained by eddy covariance measurements during two years in a Mediterranean Acacia savanna ecosystem (Acacia caven) in Central Chile. The annual carbon balance was −53 g C/sq. m in 2011 and −111 g C/sq. m in 2012, showing that the ecosystem acts as a net sink of CO2, notwithstanding water limitations on photosynthesis observed in this particularly dry period. Total annual ETa was of 128 mm in 2011 and 139 mm in 2012. Both NEE and ETa exhibited strong seasonality with peak values recorded in the winter season (July to September), as a result of ecosystem phenology, soil water content and rainfall occurrence. Consequently, the maximum carbon assimilation rate occurred in wintertime. Results show that soil water content is a major driver of GPP and RE, defining their seasonal patterns and the annual carbon assimilation capacity of the ecosystem, and also modulating the effect that solar radiation and air temperature have on NEE components at shorter time scales.

Meza, Francisco J.↗

Strategy for Long-Term Stewardship and Monitoring of Amchitka Island - 12190

The Long-Term Surveillance and Maintenance Plan (LTSMP) for Amchitka details how the U.S. Department of Energy (DOE) intends to fulfill its mission to maintain protection of human health and the environment at and around the sites on Amchitka Island. The LTSMP calls for monitoring to be performed every 5 years, at least in the initial phase of the project. The purpose of the monitoring is to develop a baseline of activity concentrations for selected radionuclides in biota, water, and soil, both on Amchitka and at the reference location on Adak Island, approximately 322 km (200 miles) northeast of Amchitka. Data compiled by the Consortium for Risk Evaluation with Stakeholder Participation (CRESP, 2006) are being included as part of the baseline data set. The specific biological, water, and sediment samples collected during the 2011 sampling event were developed through close coordination with the primary stakeholders, including the Alaska Department of Environmental Conservation, the Aleutian Pribilof Island Association, and the U.S. Fish and Wildlife Service (USFWS). Amchitka is managed by the USFWS as part of the Alaska Maritime National Wildlife Refuge. Two plans were developed to address specific needs of the biological- and the terrestrial-monitoring programs. Results from these monitoring programs will help determine whether the environment is being impacted by radionuclide migration and uptake, and if subsistence and commercial-catch seafood is safe for human consumption. The RESRAD-BIOTA code is being used to evaluate ecological health relative to the radionuclide levels determined from this sampling event. The samples were sent to three laboratories for analysis. With the exception of the seawater samples, most of the samples were sent to the Center for Accelerator Mass Spectrometry at the Lawrence Livermore National Laboratory. A smaller subset of rock-weed samples, Star reindeer lichen samples, and soil samples collected from beneath the lichen were sent to UAF for cesium-137 analysis. Marine sediment samples were also collected and sent to UAF for testing. The seawater samples were sent to the University of Miami Tritium Laboratory for enriched tritium analysis. Results from the seawater samples for tritium were received in September 2011. Results from the 2011 sampling are expected to be available on the LM web site in 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Instrument development continues in Oak Ridge

Peer review panels composed of 80 external scientists recently visited Oak Ridge National Laboratory (ORNL) to review almost 700 proposals for experiments on 23 instruments at the Spallation Neutron Source (SNS) and High Flux Isotope Reactor (HFIR). These were proposed for the time period from January-June 2012. About 40% of the proposals were approved for beam time and 20% were placed on an alternate list if time becomes available. The Hybrid Spectrometer HYSPEC at SNS began its commissioning in September 2011. HYSPEC is otpimized for studying low energy dynamics in single-crystal samples using a broad variety of sample environments, and is equipped with a polarization analysis capability. It is expected to be available for users on a limited basis in the second half of 2012. The detector tank of CORELLI has been installed on beamline 9 at SNS. Now that the tank is in place, banks of neutron detectors and boron carbide shielding will be installed around the interior. CORELLI is optimized to probe complex disorder in crystalline materials through diffuse scattering from single-crystal samples. It will begin commissioning in 2014. CORELLI is one of four instruments being developed under the SING II (SNS Instruments Next Generation II) project. The others are the Macromolecular Neutron Diffractometer (MANDI), the Vibrational Spectrometer (VISION, scheduled to begin commissioning in 2012), and the Time of Flight Ultra Small Angle Neutron Scattering Instrument (TOF-USANS). The single crystal neutron diffractometer IMAGINE, was deliverd to HFIR in October 2011. Preliminary testing has been carried out. IMAGINE will provide atomic resolution information on chemical, organic, metallo-organic and protein single crystals that will enable their chemical, physical and biological structure and function to be understood. This instrument will benefit scientists with interests in pharmaceuticals, minerals and other inorganic crystals, small molecules, molecular organo-metallic crystals and metal-organic frameworks (MOFs) molecular crystal structures. The quasi-Laue geometry, combined with a large solid angle detector, will enable rapid data collection from crystals with volume < 1mm{sup 1} and unit cell < 100 {angstrom}. Construction and installation of the optical system is in progress. Commissioning is expected to start in April 2012.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam during Water Year 2015

This report examines the financial implications of experimental flows conducted at the Glen Canyon Dam (GCD) in water year (WY) 2015. It is the seventh report in a series examining the financial implications of experimental flows conducted since the Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). A report released in January 2011 examined WYs 1997 to 2005 (Veselka et al. 2011); a report released in August 2011 examined WYs 2006 to 2010 (Poch et al. 2011); a report released June 2012 examined WY 2011 (Poch et al. 2012); a report released April 2013 examined WY 2012 (Poch et al. 2013); a report released June 2014 examined WY 2013 (Graziano et al. 2014); and a report released September 2015 examined WY 2014 (Graziano et al. 2015). An experimental release may have either a positive or negative impact on the financial value of energy production. Only one experimental release was conducted at GCD in WY 2015; specifically, a high flow experimental (HFE) release conducted in November 2014. For this experimental release, financial costs of approximately $2.1 million were incurred because the HFE required sustained water releases that exceeded the powerplant’s maximum flow rate. In addition, during the month of the experiment, operators were not allowed to shape GCD power production to either follow firm power customer loads or to respond to market prices. This study identifies the main factors that contribute to HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate financial impacts by simulating the GCD operations under two scenarios: (1) a baseline scenario that mimics both HFE operations during the experiment and during the rest of the year when it complies with the 1996 ROD operating criteria, and (2) a “without experiments” scenario that is identical to the baseline except it assumes that the HFE did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to simulate the dispatch of hydropower plants at GCD and other plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). The research team used extensive data sets and historical information on SLCA/IP powerplant characteristics, hydrologic conditions, and Western Area Power Administration’s (WAPA’s) power purchase prices in the modeling process. In addition to estimating the financial impact of the HFE, the team used the GTMax model to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and WAPA operating practices.

54 ENVIRONMENTAL SCIENCES↗