Search NASA⌕ Search

SEARCH · Search NASA

Results for “Space Launch System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

To the Moon! Space Launch System Modal Testing with Video and Motion Magnification

MIT Lincoln Laboratory and NASA Marshall Space Flight Center have been collaborating on using video camera measurements and motion magnification for modal testing of large aerospace components for several years. This presentation will discuss results from the Space Launch System Integrated Modal Test (IMT) and Dynamic Rollout/Rollback Test (DRRT) in support of the Artemis I mission. During the IMT, the data collection focused on operational mode shapes. In addition, the cameras were repositioned mid-test to better understand the physics of a low-frequency torsion mode. The non-contact nature of video data capture allowed for the quick redeployment of the cameras while not causing any delay in test schedule, whereas traditional instrumentation would have required a pause in testing to attach the sensors to the test article. The motion magnification analysis was able to find the low-frequency operational mode shapes and help the test team better understand the physics of the torsion mode. Building upon the success of the IMT motion magnification work, a camera system was used during the DRRT to find operational mode shapes, if the physics of the low-frequency torsion mode remained with different boundary conditions, and relative deflection of the vehicle and ML tower during the roll. In this paper we will present operational mode shape results, discuss the physics of the torsion mode, and review experimental setup idiosyncrasies to help the community in designing video camera measurement systems.

optical↗

Damage Tolerance of Candidate Sandwich Structure for the Space Launch System (SLS) Payload Adapter Fitting (PAF)

This Technical Memorandum presents results from a damage tolerance study undertaken in support of the payload adapter fitting (PAF) for the Space Launch System (SLS) program at NASA’s Marshall Space Flight Center (MSFC). The study consisted of determining the compression-after-impact (CAI) strength of candidate carbon/epoxy face sheet sandwich structure that has been identified for potential use to manufacture the PAF hardware. Two types of core material that have been considered for use on the PAF structure were used in this study. One was an aluminum honeycomb and the other was a Rohacell foam. Levels of barely visible impact damage (BVID) were determined for the types of sandwich structure tested in this study and this level of damage was used for CAI strength testing. It was found that the honeycomb core sandwich structure failed by face sheet failure and the foam core sandwich structure failed by core shear failure. CAI strength values were normalized by weight of the sandwich structure since lower mass is desirable for this structure.

sandwich structure↗

NASA's Space Launch System: Secondary Payload Accommodations in Block 1 and Beyond

Launching from pad 39B at Kennedy Space Center no earlier than December 2019, NASA's Space Launch System (SLS) will send the Orion crew vehicle to a distant retrograde lunar orbit in order to test and validate the new systems developed for SLS, Orion and Kennedy Space Center's Exploration Ground Systems (EGS). In addition to these primary mission objectives, the first integrated fight of NASA's new deep space exploration system, Exploration Mission-1 (EM-1), offers accommodations for 13 6U CubeSats, which will be deployed in deep space after Orion separates from the SLS Interim Cryogenic Propulsion Stage (ICPS). In 2017, the SLS Program, managed by NASA's Marshall Space Flight Center (MSFC) in Huntsville, Alabama, completed the ICPS and delivered it to the EGS Program, which has responsibility for stacking and launch operations. The 13 EM-1 secondary payloads will reside in the Orion Stage Adapter (OSA), which connects the ICPS to Orion's spacecraft adapter. The OSA is essentially complete with preparations being made for transporting the hardware to Kennedy Space Center with accommodations for secondary payload dispensers and with the secondary payload avionics unit installed.

Robinson, Kimberly F.↗

The Effects of Peel Ply on the Damage Tolerance Characteristics of the Space Launch System (SLS) Payload Adapter Fitting (PAF)

A payload adaptor fitting (PAF) has been manufactured at NASA’s Marshall Space Flight Center (MSFC) in support of the Space Launch System (SLS) program. This structure is essentially a large cone made up of eight curved “lobes” that are joined together to form the cone. The lobes were manufactured via automated fiber placement (AFP). The PAF will carry predominantly compressive loads thus compression strength will be the focus of this study. The lobes are sandwich structure made with aluminum honeycomb core and carbon/epoxy face sheets. The lobes will be inserted into metallic rings at the top and bottom of the cone to form the full cone. Both front and back exterior surfaces of each lobe have a plain weave fabric placed at ±45⁰ to the vertical direction to help prevent fiber “breakout” during drilling. The face sheet of each lobe is thickest at the top and plies are dropped as the cone reaches the main acreage in the bottom section of the cone. The entire structure used resin impregnated peel ply that, once removed, supplies a good bonding surface for secondary bonding steps. The peel ply can be removed either directly after cure, or just before any bonding operation. Since foreign object impact can occur to the structure at any time during its life, damage tolerance of the PAF structure both with and without peel ply needed to be addressed because a previous study, albeit with limited data, showed some significant differences in damage tolerance whether the peel ply was present or not [1]. A literature search showed no results for comparing impact damage on composite laminates with and without peel ply. Load versus deflection of impact curves, visual damage, dent depth, damage as ascertained by thermography and cross-sectional microscopy were evaluated as part of the damage resistance of the structure. Compression After Impact (CAI) was performed to assess damage tolerance. The impact tests were conducted on representative specimens both with and without the peel ply present.

Sandwich Structure↗

Impact of Cross-Axis Structural Dynamics on Validation of Linear Models for Space Launch System

A feasibility study was performed to examine the advisability of incorporating a set of Programmed Test Inputs (PTIs) during the Space Launch System (SLS) vehicle flight. The intent of these inputs is to provide validation to the preflight models for control system stability margins, aerodynamics, and structural dynamics. During October 2009, Ares I-X program was successful in carrying out a series of PTI maneuvers which provided a significant amount of valuable data for post-flight analysis. The resulting data comparisons showed excellent agreement with the preflight linear models across the frequency spectrum of interest. However unlike Ares I-X, the structural dynamics associated with the SLS boost phase configuration are far more complex and highly coupled in all three axes. This presents a challenge when implementing this similar system identification technique to SLS. Preliminary simulation results show noticeable mismatches between PTI validation and analytical linear models in the frequency range of the structural dynamics. An alternate approach was examined which demonstrates the potential for better overall characterization of the system frequency response as well as robustness of the control design.

Pei, Jing↗

Informing the Space Launch System Booster Separation Initial CFD Run Matrix with Observed Parametric Sensitivity

It currently requires significant computational cost to simulate the flow physics of the booster separation event on the Space Launch System. This comes from the large parametric space in which the event occurs, as pre-separation flight conditions and separated booster core-relative trajectories can vary. Functionally removing the risk of core-booster collision mandates careful assessment of the fluid dynamics in terms of several trajectory parameters. However, simulating the entire trajectory envelope is computationally intractable given the high parametric dimension. In order to reduce the uncertainty in the resulting low-parametric-resolution aerodynamic booster separation database, a data-driven approach was developed to select which breakpoints should be studied by simulations and experiments and which should be relegated to a regression-based interpolation procedure. This technique works by simulating cases where the flow physics are most sensitive to changes in the parameters and leaving the less parametrically sensitive regions for interpolation. The result is a booster separation run matrix whose computational cost is comparable to that of previous database generations but has lower interpolation errors.

SLS↗

Informing the Space Launch System Booster Separation Initial CFD Run Matrix with Observed Parametric Sensitivity

It currently requires significant computational cost to simulate the flow physics of the booster separation event on the Space Launch System. This comes from the large parametric space in which the event occurs, as pre-separation flight conditions and separated booster core-relative trajectories can vary. Functionally removing the risk of core-booster collision mandates careful assessment of the fluid dynamics in terms of several trajectory parameters. However, simulating the entire trajectory envelope is computationally intractable given the high parametric dimension. In order to reduce the uncertainty in the resulting low-parametric-resolution aerodynamic booster separation database, a data-driven approach was developed to select which breakpoints should be studied by simulations and experiments and which should be relegated to a regression-based interpolation procedure. This technique works by simulating cases where the flow physics are most sensitive to changes in the parameters and leaving the less parametrically sensitive regions for interpolation. The result is a booster separation run matrix whose computational cost is comparable to that of previous database generations but has lower interpolation errors.

SLS↗

NASA's Space Launch System: Payload Opportunities for Lunar Exploration, Science Missions

Nearing its first launch, the Space Launch System (SLS), NASA’s new super heavy-lift launch vehicle, offers highly energetic launches that deliver more mass and provide more volume in 8.4 m-diameter and potentially larger fairings to make a new generation of deep space missions possible. An evolvable launcher available in crew, crew with a co-manifested payload (CPL) and cargo-only configurations, SLS is a crucial capability to enable astronauts to return to the Moon, but it also offers key benefits for science missions. NASA’s 21st-century return to the Moon recently received a formal name: the Artemis program. In addition to the core enabling capabilities of SLS and the Orion crew spacecraft, NASA will also enlist international and commercial partnerships for Artemis. The Agency intends to build a scientific outpost in lunar orbit, the Gateway, from which human and robotic missions to and from the surface can rendezvous. SLS will launch Orion on a series of missions leading to landing the first woman and the next man on the Moon as part of Artemis. SLS uses proven propulsion systems: two solid rocket boosters and four RS-25s engines that have been upgraded to provide more thrust and operate in the SLS environment. SLS Block 1 uses a modified Delta IV Heavy upper stage, called the Interim Cryogenic Propulsion Stage (ICPS) and lifts at least 26 metric tons (t) to trans-lunar injection (TLI). The Block 1 vehicle can also be outfitted with a 5 m-diameter fairing. Block 1B, the next major variant, also uses solid rocket boosters and RS-25 engines to achieve Earth escape velocity, but replaces the single-engine liquid hydrogen (LH2)/liquid oxygen (LOX) ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS) to increase mass to TLI to 34-37 t, depending on crew or cargo configuration. In the Block 1B crew configuration, a 10 m-tall Universal Stage Adapter (USA) connects the vehicle to Orion and can carry a CPL up to 10 t. The USA provides 286 m3 of unpressurized volume for payloads. For large payloads, 8.4 m- and 10 m-diameter cargo fairings in 19.1 m and 27.4 m lengths are possible. The ultimate SLS vehicle, Block 2, incorporates evolved boosters to reach a lift capacity of more than 45 t to TLI. The capabilities of SLS not only make new missions to the Moon possible, but also game-changing science missions, such as deployment of large-aperture space telescopes, spacecraft to the ice giants or even probes to the interstellar medium. This paper will discuss the capabilities of SLS, the vehicle’s planned evolution, missions that can effectively utilize the vehicle and manufacturing status of the vehicle.

Creech, Stephen D.↗

NASA's Space Launch System: Payload Opportunities for Lunar Exploration, Science Missions

Nearing its first launch, the Space Launch System (SLS), NASA’s new super heavy-lift launch vehicle, offers highly energetic launches that deliver more mass and provide more volume in 8.4 m-diameter and potentially larger fairings to make a new generation of deep space missions possible. An evolvable launcher available in crew, crew with a co-manifested payload (CPL) and cargo-only configurations, SLS is a crucial capability to enable astronauts to return to the Moon, but it also offers key benefits for science missions. NASA’s 21st-century return to the Moon recently received a formal name: the Artemis program. In addition to the core enabling capabilities of SLS and the Orion crew spacecraft, NASA will also enlist international and commercial partnerships for Artemis. The Agency intends to build a scientific outpost in lunar orbit, the Gateway, from which human and robotic missions to and from the surface can rendezvous. SLS will launch Orion on a series of missions leading to landing the first woman and the next man on the Moon as part of Artemis. SLS uses proven propulsion systems: two solid rocket boosters and four RS-25s engines that have been upgraded to provide more thrust and operate in the SLS environment. SLS Block 1 uses a modified Delta IV Heavy upper stage, called the Interim Cryogenic Propulsion Stage (ICPS) and lifts at least 26 metric tons (t) to trans-lunar injection (TLI). The Block 1 vehicle can also be outfitted with a 5 m-diameter fairing. Block 1B, the next major variant, also uses solid rocket boosters and RS-25 engines to achieve Earth escape velocity, but replaces the single-engine liquid hydrogen (LH2)/liquid oxygen (LOX) ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS) to increase mass to TLI to 34-37 t, depending on crew or cargo configuration. In the Block 1B crew configuration, a 10 m-tall Universal Stage Adapter (USA) connects the vehicle to Orion and can carry a CPL up to 10 t. The USA provides 286 m3 of unpressurized volume for payloads. For large payloads, 8.4 m- and 10 m-diameter cargo fairings in 19.1 m and 27.4 m lengths are possible. The ultimate SLS vehicle, Block 2, incorporates evolved boosters to reach a lift capacity of more than 45 t to TLI. The capabilities of SLS not only make new missions to the Moon possible, but also game-changing science missions, such as deployment of large-aperture space telescopes, spacecraft to the ice giants or even probes to the interstellar medium. This paper will discuss the capabilities of SLS, the vehicle’s planned evolution, missions that can effectively utilize the vehicle and manufacturing status of the vehicle.

Creech, Steve↗

NASA's Space Launch System Marks Critical Design Review

With completion of its Critical Design Review (CDR) in 2015, NASA is deep into the manufacturing and testing phases of its new Space Launch System (SLS) for beyond-Earth exploration. This CDR was the first in almost 40 years for a NASA human launch vehicle and marked another successful milestone on the road to the launch of a new era of deep space exploration. The review marked the 90-percent design-complete, a final look at the design and development plan of the integrated vehicle before full-scale fabrications begins and the prelude to the next milestone, design certification. Specifically, the review looked at the first of three increasingly capable configurations planned for SLS. This "Block I" design will stand 98.2 meters (m) (322 feet) tall and provide 39.1 million Newtons (8.8 million pounds) of thrust at liftoff to lift a payload of approximately 70 metric tons (154,000 pounds). This payload is more than double that of the retired space shuttle program or other current launch vehicles. It dramatically increases the mass and volume of human and robotic exploration. Additionally, it will decrease overall mission risk, increase safety, and simplify ground and mission operations - all significant considerations for crewed missions and unique, high-value national payloads. The Block 1 SLS will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on an uncrewed flight beyond the moon and back and the first crewed flight around the moon. The current design has a direct evolutionary path to a vehicle with a 130t lift capability that offers even more flexibility to reduce planetary trip times, simplify payload design cycles, and provide new capabilities such as planetary sample returns. Every major element of SLS has hardware in production or testing, including flight hardware for the Exploration 1 (EM-1) test flight. In fact, the SLS MPCV-to-Stage-Adapter (MSA) flew successfully on the Exploration Flight Test (EFT) 1 launch of a Delta IV and Orion spacecraft in December 2014. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Singer, Chris↗

Human Factors Virtual Analysis Techniques for NASA's Space Launch System Ground Support using MSFC's Virtual Environments Lab (VEL)

Using virtual environments to assess complex large scale human tasks provides timely and cost effective results to evaluate designs and to reduce operational risks during assembly and integration of the Space Launch System (SLS). NASA's Marshall Space Flight Center (MSFC) uses a suite of tools to conduct integrated virtual analysis during the design phase of the SLS Program. Siemens Jack is a simulation tool that allows engineers to analyze human interaction with CAD designs by placing a digital human model into the environment to test different scenarios and assess the design's compliance to human factors requirements. Engineers at MSFC are using Jack in conjunction with motion capture and virtual reality systems in MSFC's Virtual Environments Lab (VEL). The VEL provides additional capability beyond standalone Jack to record and analyze a person performing a planned task to assemble the SLS at Kennedy Space Center (KSC). The VEL integrates Vicon Blade motion capture system, Siemens Jack, Oculus Rift, and other virtual tools to perform human factors assessments. By using motion capture and virtual reality, a more accurate breakdown and understanding of how an operator will perform a task can be gained. By virtual analysis, engineers are able to determine if a specific task is capable of being safely performed by both a 5% (approx. 5ft) female and a 95% (approx. 6'1) male. In addition, the analysis will help identify any tools or other accommodations that may to help complete the task. These assessments are critical for the safety of ground support engineers and keeping launch operations on schedule. Motion capture allows engineers to save and examine human movements on a frame by frame basis, while virtual reality gives the actor (person performing a task in the VEL) an immersive view of the task environment. This presentation will discuss the need of human factors for SLS and the benefits of analyzing tasks in NASA MSFC's VEL.

Searcy, Brittani↗

Improved Techniques for Measuring Static Ground Wind Loads on the NASA Space Launch System Mobile Launcher 2

Vertical distribution of static ground wind loads was directly measured on Mobile Launcher ground support hardware to the NASA Space Launch System (SLS) at 1.75% scale in the Langley Research Center 14- by 22-Foot Subsonic Tunnel. Low-speed wind tunnel testing in the liftoff phase of flight was conducted for the SLS Block 1B family of rockets with their associated ground support systems. Improved methods for measuring and estimating static ground wind loads on the launch tower assembly are introduced in detail. A novel, distributed loads measurement technique is introduced and compared against lower-fidelity, previously utilized methods.

Ground Wind Loads↗

Low-Speed Space Launch System Computational Fluid Dynamics: A Comprehensive Overview

In this review paper, low-speed computational work from NASA Langley in support of the Space Launch System (SLS) is discussed. This information includes both historic and present efforts with the Kestrel CFD solver. The low-speed aerodynamics of SLS is highly complex and analysis of the unsteady flowfield requires significant computational efforts. The SLS mission profile varies from the vehicle static on the launch pad through high-speed ascent, and this paper focuses on the prelaunch as well as liftoff and transition portions of the flight both in proximity to the launch tower and in isolation. High-alpha conditions, as large as 90 deg, result in a flowfield dominated by massive, large-scale flow separation and asymmetric vortices. High-fidelity solutions require an unsteady computational formulation to accurately capture the aerodynamics of the vehicle. A detailed discussion of the computational approach is presented, followed by key efforts to support the program, both historic and present, including information which has been either previously published or that has never before published external to NASA.

Brent Pomeroy↗

NASA’s Space Launch System Stands Ready on Doorstep of Maiden Voyage Launch and Progress Made to Future Missions

NASA and its partners made significant progress towards the Artemis I launch in 2022. The integrated Space Launch System (SLS)vehicleand Orion spacecraft were first rolled out of the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center (KSC) in March. SLS is a super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars, and beyond. It isthebackbone of the Artemis human lunar exploration program. Rollout transported the vehicle to Launch Pad 39B for a series of tests, including the wet dress rehearsal (WDR). Multiple attempts were required to complete WDR, each building on the one before. Following the WDR campaign, NASA teams refined hardware and launch procedures, and the vehicle was prepared for its first launch attempt scheduled for August 29. Challenges with the weather and hardware resulted in a scrub on the 29th, and the second attempt was set for Sept. 3. A hydrogen leak on the tail service mast umbilical forced a scrub. NASA teams completed repairs and testing on the vehicle on Launch Pad 39B to preserve a launch attempt at the end of September. Managers chose to return the vehicle to the VAB to protect it fromthe threat of Hurricane Ian. Within the VAB, NASA further inspected and prepared SLS for selected November windows. In addition to progress to the Artemis I mission, significant progress was made on the Artemis II and Artemis III rockets. Progress was also made towards on the Block 1B and Block 2 variants, beginning on the fourth and ninth flight, respectively. Both variants will provide significant improvements in both launch mass and mission flexibility to multiple destinations. This paper will discuss Artemis I vehicle integration, testing, and available results from the launch campaign to date.

Bruce Askins↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations (GSDO) program is transforming Kennedy Space Center (KSC) into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton Block 1 configuration, and will then evolve to an ultimate capability of 130 metric tons. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS - Exploration Mission-1 (EM-1), an uncrewed mission to orbit the moon and return, and progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility (MAF) in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance (ULA) in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Space Launch System Spacecraft and Payload Elements: Making Progress Toward First Launch

Significant and substantial progress continues to be accomplished in the design, development, and testing of the Space Launch System (SLS), the most powerful human-rated launch vehicle the United States has ever undertaken. Designed to support human missions into deep space, SLS is one of three programs being managed by the National Aeronautics and Space Administration's (NASA's) Exploration Systems Development directorate. The Orion spacecraft program is developing a new crew vehicle that will support human missions beyond low Earth orbit, and the Ground Systems Development and Operations program is transforming Kennedy Space Center into next-generation spaceport capable of supporting not only SLS but also multiple commercial users. Together, these systems will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. SLS will deliver a near-term heavy-lift capability for the nation with its 70 metric ton (t) Block 1 configuration, and will then evolve to an ultimate capability of 130 t. The SLS program marked a major milestone with the successful completion of the Critical Design Review in which detailed designs were reviewed and subsequently approved for proceeding with full-scale production. This marks the first time an exploration class vehicle has passed that major milestone since the Saturn V vehicle launched astronauts in the 1960s during the Apollo program. Each element of the vehicle now has flight hardware in production in support of the initial flight of the SLS -- Exploration Mission-1 (EM-1), an un-crewed mission to orbit the moon and return. Encompassing hardware qualification, structural testing to validate hardware compliance and analytical modeling, progress in on track to meet the initial targeted launch date in 2018. In Utah and Mississippi, booster and engine testing are verifying upgrades made to proven shuttle hardware. At Michoud Assembly Facility in Louisiana, the world's largest spacecraft welding tool is producing tanks for the SLS core stage. This paper will particularly focus on work taking place at Marshall Space Flight Center (MSFC) and United Launch Alliance in Alabama, where upper stage and adapter elements of the vehicle are being constructed and tested. Providing the Orion crew capsule/launch vehicle interface and in-space propulsion via a cryogenic upper stage, the Spacecraft/Payload Integration and Evolution (SPIE) Element serves a key role in achieving SLS goals and objectives. The SPIE element marked a major milestone in 2014 with the first flight of original SLS hardware, the Orion Stage Adapter (OSA) which was used on Exploration Flight Test-1 with a design that will be used again on EM-1. Construction is already underway on the EM-1 Interim Cryogenic Propulsion Stage (ICPS), an in-space stage derived from the Delta Cryogenic Second Stage. Manufacture of the Orion Stage Adapter and the Launch Vehicle Stage Adapter is set to begin at the Friction Stir Facility located at MSFC while structural test articles are either completed (OSA) or nearing completion (Launch Vehicle Stage Adapter). An overview is provided of the launch vehicle capabilities, with a specific focus on SPIE Element qualification/testing progress, as well as efforts to provide access to deep space regions currently not available to the science community through a secondary payload capability utilizing CubeSat-class satellites.

Schorr, Andrew A.↗

Estimation of Aerodynamic Stability Derivatives for Space Launch System and Impact on Stability Margins

This paper describes the techniques involved in determining the aerodynamic stability derivatives for the frequency domain analysis of the Space Launch System (SLS) vehicle. Generally for launch vehicles, determination of the derivatives is fairly straightforward since the aerodynamic data is usually linear through a moderate range of angle of attack. However, if the wind tunnel data lacks proper corrections then nonlinearities and asymmetric behavior may appear in the aerodynamic database coefficients. In this case, computing the derivatives becomes a non-trivial task. Errors in computing the nominal derivatives could lead to improper interpretation regarding the natural stability of the system and tuning of the controller parameters, which would impact both stability and performance. The aerodynamic derivatives are also provided at off nominal operating conditions used for dispersed frequency domain Monte Carlo analysis. Finally, results are shown to illustrate that the effects of aerodynamic cross axis coupling can be neglected for the SLS configuration studied

Pei, Jing↗