Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Assemblers: A Modular, Reconfigurable Manipulator for Autonomous in-Space Assembly

This paper presents a modular, reconfigurable robotic manipulator for autonomous in-space assembly. On-orbit and planetary surface assembly is a challenging domain that encompasses various technological thrusts to support human exploration, science, and technology demonstration missions. The system architecture presented here addresses the need for robotic assembly of structures in locations that prohibit constant human oversight and/or teleoperation. This system is capable of scheduling, reconfiguring itself, and executing structural assembly tasks with the ability to assess construction and correct errors during the assembly as needed. An example concept of operations is presented. Details of the mechanical and electrical design of the robotic modules as well as the dynamic modeling approach, control algorithms, and sensing and perception systems are also provided.

robotics↗

Artemis I Countdown 101

Before the Artemis I mission launches on its way around the Moon, the launch team at Kennedy Space Center and supporting teams across the country will begin the launch countdown about two days before liftoff. The launch countdown contains "L Minus” and "T Minus" times. "L minus" indicates how far away we are from liftoff in hours and minutes and does not include built-in holds. “T minus” time is a sequence of events that are built into the launch countdown where counting and holds are inserted. The 730,000 gallons of propellants that will be loaded into the rocket are liquid oxygen (LO2) and liquid hydrogen (LH2). Pauses in the countdown, or "holds," are built into the countdown to allow the launch team to target a precise launch window, and to provide a cushion of time for certain tasks and procedures without impacting the overall schedule. For the Artemis I countdown, planned built-in holds vary in length and occur at the following times: L-8 hours, 40 minutes, and L-40 minutes.

Madison Elizabeth Tuttle↗

Scheduling periodic jobs that allow imprecise results

The problem of scheduling periodic jobs in hard real-time systems that support imprecise computations is discussed. Two workload models of imprecise computations are presented. These models differ from traditional models in that a task may be terminated any time after it has produced an acceptable result. Each task is logically decomposed into a mandatory part followed by an optional part. In a feasible schedule, the mandatory part of every task is completed before the deadline of the task. The optional part refines the result produced by the mandatory part to reduce the error in the result. Applications are classified as type N and type C, according to undesirable effects of errors. The two workload models characterize the two types of applications. The optional parts of the tasks in an N job need not ever be completed. The resulting quality of each type-N job is measured in terms of the average error in the results over several consecutive periods. A class of preemptive, priority-driven algorithms that leads to feasible schedules with small average error is described and evaluated.

Chung, Jen-Yao↗

Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

Richards, Stephen F.↗

NASA Goddard Space Flight Center

The NASA SLR Operational Center is responsible for: 1) NASA SLR network control, sustaining engineering, and logistics; 2) ILRS mission operations; and 3) ILRS and NASA SLR data operations. NASA SLR network control and sustaining engineering tasks include technical support, daily system performance monitoring, system scheduling, operator training, station status reporting, system relocation, logistics and support of the ILRS Networks and Engineering Working Group. These activities ensure the NASA SLR systems are meeting ILRS and NASA mission support requirements. ILRS mission operations tasks include mission planning, mission analysis, mission coordination, development of mission support plans, and support of the ILRS Missions Working Group. These activities ensure than new mission and campaign requirements are coordinated with the ILRS. Global Normal Points (NP) data, NASA SLR FullRate (FR) data, and satellite predictions are managed as part of data operations. Part of this operation includes supporting the ILRS Data Formats and Procedures Working Group. Global NP data operations consist of receipt, format and data integrity verification, archiving and merging. This activity culminates in the daily electronic transmission of NP files to the CDDIS. Currently of all these functions are automated. However, to ensure the timely and accurate flow of data, regular monitoring and maintenance of the operational software systems, computer systems and computer networking are performed. Tracking statistics between the stations and the data centers are compared periodically to eliminate lost data. Future activities in this area include sub-daily (i.e., hourly) NP data management, more stringent data integrity tests, and automatic station notification of format and data integrity issues.

Carter, David↗

Employing Earned Value Management in Government Research and Design - Lessons Learned from the Trenches

To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.

Simon, Tom↗

Third Report of the Task Force on the Shuttle-Mir Rendezvous and Docking Missions

In May 1994, the Task Force on the Shuttle-Mir Rendezvous and Docking Missions was established by the NASA Advisory Council. Its purpose is to review Phase 1 (Shuttle-Mir) planning, training, operations, rendezvous and docking, and management and to provide interim reports containing specific recommendations to the Advisory Council. Phase 1 represents the building block to create the experience and technical expertise for an International Space Station. The Phase 1 program brings together the United States and Russia in a major cooperative and contractual program that takes advantage of both countries' capabilities. The content of the Phase 1 program consists of the following elements as defined by the Phase 1 Program Management Plan, dated October 6, 1994: Shuttle-Mir rendezvous and docking missions; astronaut long duration presence on Mir Requirements for Mir support of Phase 1 when astronauts are not on board; outfitting Spektr and Priroda modules with NASA science, research, and risk mitigation equipment Related ground support requirements of NASA and the Russian Space Agency (RSA) to support Phase 1 Integrated NASA and RSA launch schedules and manifests The first meeting of the Task Force was held at the Johnson Space Center (JSC) on May 24 and 25, 1994 with a preliminary report submitted to the NASA Advisory Council on June 6, 1994. The second meeting of the Task Force was held at JSC on July 12 and 13, 1994 and a detailed report containing a series of specific recommendations was submitted on July 29, 1994. This report reflects the results of the third Task Force meeting which was held at JSC on 11 and 12 October, 1994. The briefings presented at that meeting reviewed NASA's response to the Task Force recommendations made to date and provided background data and current status on several critical areas which the Task Force had not addressed in its previous reports.

Source record↗

Planning and scheduling for robotic assembly

A system for reasoning about robotic assembly tasks is described. The first element of this system is a facility for itemizing the constraints which determine the admissible orderings over the activities to be sequenced. The second element is a facility which partitions the activities into independent subtasks and produces a set of admissible strategies for each. Finally, the system has facilities for constructing an admissible sequence of activities which is consistent with the given constraints. This can be done off-line, in advance of task execution, or it can be done incrementally, at execution time, according to conditions in the execution environment. The language of temporal constraints and the methods of inference presented in related papers are presented. It is shown how functional and spatial relationships between components impose temporal constraints on the order of assembly and how temporal constraints then imply admissible strategies and feasible sequences.

Fox, Barry R.↗

Operator strategies under varying conditions of workload

An attempt was made to operationally define and measure strategic behavior in a complex multiple task environment. The Multi-Attribute Task battery was developed to simulate various aspects of flight and consisted of an auditory communication task, monitoring tasks, a tracking tasks, a resource management task which allowed a wide range of responding patterns, and a scheduling window which allowed operators to predict changes in workload. This battery was validated for its sensitivity to strategic behavior, and baseline measures for each individual task were collected. Twenty-four undergraduate and graduate students then performed the battery for four 64 minute sessions which took place over a period of 2 days. Each subject performed the task battery under four levels of workload, which were presented for equal lengths of time during all four sessions. Results indicated that in general, performance improves as a function of experience with the battery, but that performance decreased as workload level increased. The data also showed that subjects developed strategies for responding to the resource management task which allowed them to manage the high workload levels more efficiently. This particular strategy developed over time but was also associated with errors of complacency. These results are presented along with implications for the aviation field and areas of future research.

Arnegard, Ruth J.↗

Structural Verification of the Space Shuttle's External Tank Super LightWeight Design: A Lesson in Innovation

The Super LightWeight Tank (SLWT) team was tasked with a daunting challenge from the outset: boost the payload capability of the Shuttle System by safely removing 7500 lbs. from the existing 65,400 lb. External Tank (ET). Tools they had to work with included a promising new Aluminum Lithium alloy, the concept of a more efficient structural configuration for the Liquid Hydrogen (LH2) tank, and a highly successful, mature Light Weight Tank (LWT) program. The 44 month schedule which the SLWT team was given for the task was ambitious by any measure. During this time the team had to not only design, build, and verify the new tank, but they also had to move a material from the early stages of development to maturity. The aluminum lithium alloy showed great promise, with an approximately 29% increase in yield strength, 15% increase in ultimate strength, 5 deg/O increase in modulus and 5 deg/O decrease in density when compared to the current 2219 alloy. But processes had to be developed and brought under control, manufacturing techniques perfected, properties characterized, and design allowable generated. Because of the schedule constraint, this material development activity had to occur in parallel with design and manufacturing. Initial design was performed using design allowable believed to be achievable with the Aluminum Lithium alloy system, but based on limited test data. Preliminary structural development tests were performed with material still in the process of iteration. This parallel path approach posed obvious challenges and risks, but also allowed a unique opportunity for interaction between the structures and materials disciplines in the formulation of the material.

Otte, Neil↗

STS-78 Flight Day 8

On this eighth day of the STS-78 mission, the flight crew, Cmdr. Terence T. Henricks, Pilot Kevin R. Kregel, Payload Cmdr. Susan J. Helms, Mission Specialists Richard M. Linnehan, Charles E. Brady, Jr., and Payload Specialists Jean-Jacques Favier, Ph.D. and Robert B. Thirsk, M.D., continue to conduct experiments primarily focusing on the effects of weightlessness on human physiology. Results from the studies of muscle activity, task performance, and sleep will help future mission planners organize crew schedules for greater efficiency and productivity. For a second consecutive day, Henricks, Kregel, Thirsk, and Favier continue to enter responses to a battery of problem-solving tasks on the Performance Assessment Work Station, a laptop computer.

Source record↗

The First Development of Human Factors Engineering Requirements for Application to Ground Task Design for a NASA Flight Program

The National Aeronautics and Space Administration has long applied standards-derived human engineering requirements to the development of hardware and software for use by astronauts while in flight. The most important source of these requirements has been NASA-STD-3000. While there have been several ground systems human engineering requirements documents, none has been applicable to the flight system as handled at NASA's launch facility at Kennedy Space Center. At the time of the development of previous human launch systems, there were other considerations that were deemed more important than developing worksites for ground crews; e.g., hardware development schedule and vehicle performance. However, experience with these systems has shown that failure to design for ground tasks has resulted in launch schedule delays, ground operations that are more costly than they might be, and threats to flight safety. As the Agency begins the development of new systems to return humans to the moon, the new Constellation Program is addressing this issue with a new set of human engineering requirements. Among these requirements is a subset that will apply to the design of the flight components and that is intended to assure ground crew success in vehicle assembly and maintenance tasks. These requirements address worksite design for usability and for ground crew safety.

Dischinger, H. Charles, Jr.↗

E-Area Low-Level Waste Facility Inadvertent Human Intruder Limits and Doses in Support of the PA2022

This report documents the inadvertent human intruder (IHI) analysis for the E-Area Low-Level Waste Facility (ELLWF) at the Savannah River Site (SRS), near Aiken, South Carolina. This analysis supports the revised ELLWF Performance Assessment (PA), complying with the Department of Energy standard for operation of low-level waste disposal facilities (USDOE, 2017). The ELLWF is an operating waste disposal facility and is scheduled to continue accepting waste to 2065. One task of the revised PA is to establish waste inventory limits for the various disposal units at ELLWF. This is done by modeling future contaminant release and transport through applicable pathways to human receptors, comparing predicted doses per disposed curie with applicable performance measures, to obtain inventory limits which will assure that doses to receptors do not exceed performance measures. This report documents results of modeling future doses to one class of receptor, the inadvertent human intruder. It is assumed that after site closure, public knowledge of the site is lost, and IHIs will engage in activities on the ELLWF that will disrupt the closure cap, causing dose to the IHI. Following USDOE (2017), six different stylized exposure scenarios are considered, simulating activities by an IHI which could result in a radiological dose. The six scenarios are: • Acute – Basement Construction: IHI constructs a basement and encounters waste during excavation which is inadvertently mixed with clean soil and diluted. • Acute – Well Drilling: IHI drills a water well through waste and is exposed to drill cuttings mixed with clean soil that are brought to the surface. • Acute – Discovery: IHI begins constructing a basement but stops when encountering the riprap in the final closure cap and is exposed to photon radiation from unexcavated material residing in the undisturbed waste zone. • Chronic – Agriculture: Resident IHI is exposed to waste that was excavated for basement construction and mixed with native soil in the intruder’s vegetable garden. • Chronic – Post-Drilling: Resident IHI is exposed to waste from drill cuttings mixed with native soil and scattered in the garden area. • Chronic – Residential: Resident IHI is exposed to external radiation while in home located above waste with shielding provided by the concrete basement floor and any soil or engineered material remaining between the basement and waste. Dose calculations are performed using the SRNL Dose Toolkit (Aleman, 2023), following the approach of Smith et al (2019). Calculations are performed separately for 27 of the 33 disposal units (DUs) at ELLWF and are radionuclide specific. The results of the IHI analysis include: • Dose Factors: mrem per disposed curie (acute) and mrem/yr per disposed curie (chronic) for each parent radionuclide, for each DU. • Inventory Limits: in curies, for each parent radionuclide, for each DU. • Estimated Dose to IHI: mrem (acute) and mrem/yr (chronic), for each DU, given its projected closure inventory without inventory biases applied. Most DU-specific IHI inventory limits are in the range of 10 3 to 10 7 curies per nuclide. The lowest inventory limits are associated with gamma-emitters such as Sn-126, Ra-226, Th-232, and Cm-248. Radionuclides with short half-lives such as Pu-241, and nuclides which are pure beta emitters or which decay by electron capture, such as Ni-59 and Ni-63, have the highest limits. For the 27 evaluated DUs, predicted IHI doses are shown in Table ES-1. The maximum acute dose is 1.18 mrem, at ST23, much less than the DOE performance measure of 500 mrem (USDOE, 2017). The highest chronic dose is 37.2 mrem/yr at ST02, below the DOE performance measure of 100 mrem/yr. Also shown are estimated inventory sums of fractions (SOFs) at closure in 2065, for groundwater (GW) and IHI pathways. For each DU, the inventory is constrained by the GW pathway. For most DUs, the IHI SOFs are approximately 1000 times lower than the GW SOF values, and the IHI pathway does not drive risk for any disposal unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Notes on Soviet space astronomy

Soviet space programs intended for making astronomical observations are reviewed. The Cosmos, Intercosmos, and Prognoz satellites designed for astronomical measurements are identified, and unmanned lunar and planetary missions are discussed, including the Luna, Lunokhod, Mars, and Venera programs. The Salyut 4 space station is described in detail along with the following major astronomical instruments: the Orbiting Solar Telescope 1, the infrared telescope spectrometer, the two solar spectrometers, the light-nuclei mass spectrometer, and the Filin and RT-4 X-ray telescopes. The future of Soviet space astronomy is assessed, particularly the tasks of the Salyut 5 station and the scheduled launch of Salyut 6.

Oberg, J. E.↗

Feasibility study of an Integrated Program for Aerospace vehicle Design (IPAD). Volume 6: IPAD system development and operation

The strategy of the IPAD implementation plan presented, proposes a three phase development of the IPAD system and technical modules, and the transfer of this capability from the development environment to the aerospace vehicle design environment. The system and technical module capabilities for each phase of development are described. The system and technical module programming languages are recommended as well as the initial host computer system hardware and operating system. The cost of developing the IPAD technology is estimated. A schedule displaying the flowtime required for each development task is given. A PERT chart gives the developmental relationships of each of the tasks and an estimate of the operational cost of the IPAD system is offered.

Redhed, D. D.↗

Specific construction tests

The technical feasibility of the Satellite Power System (SPS) is discussed. The development of feasible operational concepts and conceptualization of specific construction tasks are examined. The logic flow of functional analyses of both the rectenna and the satellite is illustrated. Constraints placed upon the construction processes and equipment by the satellite design are outlined. The construction tasks, when defined and combined into an integrated schedule establish, a time line for construction mass flow demands to be satisfied by the space transportation systems. An example of satellite constructive demands and HLLV delivery capabilities is given.

Mcrae, W. V., Jr.↗

Multiprogramming and the performance of parallel programs

A programming methodology is introduced that utilizes computational synchronization and avoids tight control flow synchronization in parallel programs. In this methodology, each phase of the computation is assigned a status that can be ready, blocked, or completed, and tasks in each computational phase are self-scheduled to ensure computational progress by the available executing processes. Results indicate that this methodology avoids the catastrophic performance losses resulting from the swapping of processes in multiprogrammed multiprocessors.

Benten, Muhammad S.↗

Support of the Laboratory for Terrestrial Physics for Dynamics of the Solid Earth (DOSE)

This final report summarizes the accomplishments during the contract period. Under the contract NVI, Inc. provided support to the VLBI group at NASA's Goddard Space Flight Center. The contract covered a period of approximately eight years during which geodetic and astrometric VLBI evolved through several major changes. This report is divided into four sections which correspond to major task areas in the contract: A) Coordination and Scheduling, B) Field System, C) Station Support, and D) Analysis and Research and Development.

Vandenberg, Nancy R.↗