TDWR information on the flight deck

TDWR information on the flight deck is presented in the form of view-graphs. The following subject areas are covered: air/ground wind shear information integration research; wind shear detection/warning and avoidance system; initial experiment; and future plans.

Hinton, Dave↗

Quality Control Algorithms and Proposed Integration Process for Wind Profilers Used by Launch Vehicle Systems

Impact of winds to space launch vehicle include Design, Certification Day-of-launch (DOL) steering commands (1)Develop "knockdowns" of load indicators (2) Temporal uncertainty of flight winds. Currently use databases from weather balloons. Includes discrete profiles and profile pair datasets. Issues are : (1)Larger vehicles operate near design limits during ascent 150 discrete profiles per month 110-217 seasonal 2.0 and 3.5-hour pairs Balloon rise time (one hour) and drift (up to 100 n mi) Advantages of the Alternative approach using Doppler Radar Wind Profiler (DRWP) are: (1) Obtain larger sample size (2) Provide flexibility for assessing trajectory changes due to winds (3) Better representation of flight winds.

Decker, Ryan↗

The North American Renewable Integration Study (NARIS): A U.S. Perspective

The North American electric power system is undergoing significant change, with renewable resources now contributing more generation than ever before. This transformation is poised to continue given decreasing technology costs and ambitious decarbonization goals at the federal, state, local, corporate, and consumer levels. The North American Renewable Integration Study (NARIS) aims to inform grid planners, utilities, industry, policymakers, and other stakeholders about challenges and opportunities for continental system integration of large amounts of wind, solar, and hydropower to support a low-carbon future grid. The National Renewable Energy Laboratory (NREL) conducted a detailed, continent-wide analysis with planning scenarios of transmission, generation, and demand to reach 80%–92% carbon reductions (from 2005) for the Canadian electric power system, and up to 80% reductions continent-wide. We used a suite of models to study future scenarios and gain insights, including potential impacts on costs, emissions, resource adequacy, and the specific technologies that help enable the transition to a low-carbon grid. Our analysis had a particular focus on the potential role of cooperation among the three North American countries and between regions within each country, and how transmission can support sharing of supply and demand diversity. The NARIS project began in 2016. This report describes a U.S. perspective in coordination with the U.S. Department of Energy, and a companion report describes a Canadian perspective in coordination with the Natural Resources Canada. NARIS was an extension of a previous body of work, including the Western Wind and Solar Integration Study, the Eastern Renewable Generation Integration Study, Interconnections Seam Study, and the Pan Canadian Wind Integration Study. NARIS analyzed the entire continent in detail while studying higher renewable generation than previous studies. The scenarios in NARIS were informed by the goals in the Mid-Century Strategies for the Paris Agreement in each country.

14 SOLAR ENERGY↗

The North American Renewable Integration Study (NARIS): A Canadian Perspective

The North American electric power system is undergoing significant change, with renewable resources now contributing more generation than ever before. This transformation is poised to continue given decreasing technology costs and ambitious decarbonization goals at the federal, state, local, corporate, and consumer levels. The North American Renewable Integration Study (NARIS) aims to inform grid planners, utilities, industry, policymakers, and other stakeholders about challenges and opportunities for continental system integration of large amounts of wind, solar, and hydropower to support a low-carbon future grid. The National Renewable Energy Laboratory (NREL) conducted a detailed, continent-wide analysis with planning scenarios of transmission, generation, and demand to reach 80%–92% carbon reductions (from 2005) for the Canadian electric power system, and up to 80% reductions continent-wide. We used a suite of models to study future scenarios and gain insights, including potential impacts on costs, emissions, resource adequacy, and the specific technologies that help enable the transition to a low-carbon grid. Our analysis had a particular focus on the potential role of cooperation among the three North American countries and between regions within each country, and how transmission can support sharing of supply and demand diversity. The NARIS project began in 2016. This report describes a Canadian perspective in coordination with the Natural Resources Canada, and a companion report describes a U.S. perspective in coordination with the U.S. Department of Energy. NARIS was an extension of a previous body of work, including the Western Wind and Solar Integration Study, the Eastern Renewable Generation Integration Study, Interconnections Seam Study, and the Pan Canadian Wind Integration Study. NARIS analyzed the entire continent in detail while studying higher renewable generation than previous studies. The scenarios in NARIS were informed by the goals in the Mid-Century Strategies for the Paris Agreement in each country.

14 SOLAR ENERGY↗

NREL Energy Models Examine the Potential for Wind and Solar Grid Integration (Fact Sheet)

As renewable energy generating sources, such as wind turbines and solar power systems, reach high levels of penetration in parts of the United States, the National Renewable Energy Laboratory (NREL) is helping the utility industry to peer into the future. Using software modeling tools that the lab developed, NREL is examining the future operation of the electrical grid as renewable energy continues to grow.

14 SOLAR ENERGY↗

Great Lakes O shore Wind Project: Utility and Regional Integration Study

This project aims to identify transmission system upgrades needed to facilitate offshore wind projects as well as operational impacts of offshore generation on operation of the regional transmission system in the Great Lakes region. A simulation model of the US Eastern Interconnection was used as the test system as a case study for investigating the impact of the integration of a 1000MW offshore wind farm operating in Lake Erie into FirstEnergy/PJM service territory. The findings of this research provide recommendations on offshore wind integration scenarios, the locations of points of interconnection, wind profile modeling and simulation, and computational methods to quantify performance, along with operating changes and equipment upgrades needed to mitigate system performance issues introduced by an offshore wind project.

17 WIND ENERGY↗

Market-Integrated Optimization of Wind-Battery-Hydrogen Hybrids for Peaking Capacity via Storage

As Integrated Energy Systems (IES) combine multiple energy and storage technologies to provide potentially more value and less risk via resource diversification, complementary overbuild, increased flexibility, and revenue-stacking, IES value is dependent on electricity market dispatch and grid interactions should play an important role in IES design and operation. This study hybridizes and retrofits wind and combustion turbine plants to study the impacts of replacing gas generation capacity with wind, battery, PEM electrolysis, hydrogen tanks and hydrogen turbines. The optimized design is co-simulated in a production cost model with different bidding strategies in order to compare performance and highlight the importance of grid-interactions. We analyze the revenue and dispatch changes as well as the price and cost implications of wind-battery-hydrogen IESs.

electrolysis↗

Evaluation of the wind farm parameterization in the Weather Research and Forecasting model (version 3.8.1) with meteorological and turbine power data

Forecasts of wind-power production are necessary to facilitate the integration of wind energy into power grids, and these forecasts should incorporate the impact of wind-turbine wakes. Our paper focuses on a case study of four diurnal cycles with significant power production, and assesses the skill of the wind farm parameterization (WFP) distributed with the Weather Research and Forecasting (WRF) model version 3.8.1, as well as its sensitivity to model configuration. After validating the simulated ambient flow with observations, we quantify the value of the WFP as it accounts for wake impacts on power production of downwind turbines. We also illustrate with statistical significance that a vertical grid with approximately 12 m vertical resolution is necessary for reproducing the observed power production. Further, the WFP overestimates wake effects and hence underestimates downwind power production during high wind speed, highly stable, and low turbulence conditions. We also find the WFP performance is independent of the number of wind turbines per model grid cell and the upwind–downwind position of turbines. Rather, the ability of the WFP to predict power production is most dependent on the skill of the WRF model in simulating the ambient wind speed.

17 WIND ENERGY↗

Exploring Optimization Opportunities in Four-Point Suspension Wind Turbine Drivetrains through Integrated Design Approaches

Drivetrain design has significant influence on the costs of wind power generation. Current industry practices usually approach the drivetrain design with loads and system requirements defined by the turbine manufacturer. Several different manufacturers are contracted to supply individual components from the low-speed shaft to the generator - each receiving separate design specifications from the turbine manufacturer. Increasingly, more integrated approaches to turbine design have shown promise for blades and towers. Yet, integrated drivetrain design is a challenging task owing to the complex physical behavior of the important load-bearing components, namely the main bearings, gearbox, and the generator. In this paper we combine two of NREL's systems engineering design tools, DriveSE and GeneratorSE, to enable a comprehensive system-level drivetrain optimization for the IEAWind reference turbine for land-based applications. We compare a more traditional design with integrated approaches employing decoupled and coupled design optimization. It is demonstrated that both approaches have the potential to realize notable mass savings with opportunities to lower the costs of energy.

17 WIND ENERGY↗

DOE: Integrating Southwest Power Pool Wind Energy into Southeast Electricity Markets

Wind power development in the United States is outpacing previous estimates for many regions, particularly those with good wind resources. The pace of wind power deployment may soon outstrip regional capabilities to provide transmission and integration services to achieve the most economic power system operation. Conversely, regions such as the Southeastern United States do not have good wind resources and will have difficulty meeting proposed federal Renewable Portfolio Standards with local supply. There is a growing need to explore innovative solutions for collaborating between regions to achieve the least cost solution for meeting such a renewable energy mandate. The DOE-funded project 'Integrating Southwest Power Pool Wind Energy into Southeast Electricity Markets' aims to evaluate the benefits of coordination of scheduling and balancing for Southwest Power Pool (SPP) wind transfers to Southeastern Electric Reliability Council (SERC) Balancing Authorities (BAs). The primary objective of this project is to analyze the benefits of different balancing approaches with increasing levels of inter-regional cooperation. Scenarios were defined, modeled and investigated to address production variability and uncertainty and the associated balancing of large quantities of wind power in SPP and delivery to energy markets in the southern regions of the SERC. The primary analysis of the project is based on unit commitment (UC) and economic dispatch (ED) simulations of the SPP-SERC regions as modeled for the year 2022. The UC/ED models utilized for the project were developed through extensive consultation with the project utility partners, to ensure the various regions and operational practices are represented as accurately as possible realizing that all such future scenario models are quite uncertain. SPP, Entergy, Oglethorpe Power Company (OPC), Southern Company, and the Tennessee Valley Authority (TVA) actively participated in the project providing input data for the models and review of simulation results and conclusions. While other SERC utility systems are modeled, the listed SERC utilities were explicitly included as active participants in the project due to the size of their load and relative proximity to SPP for importing wind energy. The analysis aspects of the project comprised 4 primary tasks: (1) Development of SCUC/SCED model of the SPP-SERC footprint for the year 2022 with only 7 GW of installed wind capacity in SPP for internal SPP consumption with no intended wind exports to SERC. This model is referred to as the 'Non-RES' model as it does not reflect the need for the SPP or SERC BAs to meet a federal Renewable Energy Standard (RES). (2) Analysis of hourly-resolution simulation results of the Non-RES model for the year 2022 to provide project stakeholders with confidence in the model and analytical framework for a scenario that is similar to the existing system and more easily evaluated than the high-wind transfer scenarios that are analyzed subsequently. (3) Development of SCUC/SCED model of the SPP-SERC footprint for the year 2022 with sufficient installed wind capacity in SPP (approximately 48 GW) for both SPP and the participating SERC BAs to meet an RES of 20% energy. This model is referred to as the 'High-Wind Transfer' model with several different scenarios represented. The development of the High-Wind Transfer model not only included identification and allocation of SPP wind to individual SERC BAs, but also included the evaluation of various methods to allow the model to export the SPP wind to SERC without developing an actual transmission plan to support the transfers. (4) Analysis of hourly-resolution simulation results of several different High-Wind Transfer model scenarios for the year 2022 to determine balancing costs and potential benefits of collaboration among SPP and SERC BAs to provide the required balancing.

17 WIND ENERGY↗

Evaluating the Grid Impact of Oregon Offshore Wind

This analysis used high resolution offshore wind data and a detailed production cost model of the Western Interconnection to explore the value and operational impact of integrating offshore wind along Oregon's coastline. Leveraging local technical stakeholder expertise and input, we determined a set of scenarios to explore. These scenarios varied offshore wind penetrations and explored the differences of integrating offshore wind in the current grid and a potential future grid. This allowed us to determine how changes to the rest of the system and increasing penetrations of offshore wind affected our findings. We identified a number of key findings from the analysis, including that 2.6 GW of nameplate capacity offshore wind could be integrated into the Oregon power system with minimal curtailment due to transmission congestion or other factors. The range of system value provided by offshore wind ranges between $\$$65/MWh and $\$$85/MWh across the various scenarios considered. We also examined the influence offshore wind had on the trans-Cascade power flow, where we determined a strong correlation between offshore wind generation and reduction in flow across the Cascades. Finally, we also determined that offshore wind could serve between 84 - 93% of Coastal Oregon loads depending on the scenario.

17 WIND ENERGY↗

Overview of the Integrated Adaptive Wing Technology Maturation Wind-Tunnel Test Objectives

The Integrated Adaptive Wing Technology Maturation wind-tunnel test is the culmination of a cooperative effort between NASA and Boeing to develop control techniques that can improve the performance and safety of higher aspect ratio flexible transport aircraft. The wind-tunnel test article, to be tested at the NASA Langley Research Center Transonic Dynamics Tunnel, is a semispan model of a modern transport configuration with an aspect ratio 13.5 wing based on the NASA Common Research Model. Multiobjective control laws have been developed targeting drag optimization, maneuver load alleviation, gust load alleviation, and modal suppression. In this paper, the integrated model design, active control system, and sensor suite will be presented, and pretest modeling and characterization activities will be described. A summary of the planned wind-tunnel test entries will provide an overview of the experimental approach and expected outcomes.

wind-tunnel↗

Overview of the Integrated Adaptive Wing Technology Maturation Wind-Tunnel Test Objectives

The Integrated Adaptive Wing Technology Maturation wind-tunnel test is the culmination of a cooperative effort between NASA and Boeing to develop control techniques that can improve the performance and safety of higher aspect ratio flexible transport aircraft. The wind-tunnel test article, to be tested at the NASA Langley Research Center Transonic Dynamics Tunnel, is a semispan model of a modern transport configuration based on the NASA Common Research Model with an aspect ratio 13.5 wing. Multiobjective control laws have been developed targeting drag optimization, maneuver load alleviation, gust load alleviation, and active flutter suppression. In this paper, the integrated model design, active control system, and sensor suite will be presented, and pretest modeling and characterization activities will be described. A summary of the planned wind-tunnel test entries will provide an overview of the experimental approach and expected outcomes.

wind-tunnel↗

Chapter 2: Preface: Wind Power Myths Debunked

Wind power use has grown significantly in recent years. As power system planners, investors, and other stakeholders evaluate the development of wind power plants, many questions about wind power plant operational characteristics have arisen. These questions range from asking whether wind power plants require storage, to how fast can wind power plants' output fall to zero. Recent experience in operating power systems with increasing levels of wind power, along with a significant body of analysis, has provided answers to many of these questions. In this chapter, we discuss many of these key questions and answers drawing on international experience and analysis of wind power plant operations.

17 WIND ENERGY↗

Rolling Optimization of Transmission Network Recovery and Load Restoration Considering Hybrid Wind-Storage System and Cold Load Pickup

A common solution to deal with the stochasticity introduced by fast-ramping wind power integration is to equip wind farms (WFs) with energy storage systems (ESSs) to formulate hybrid WF-ESSs. In addition to leveling off wind power fluctuations during normal operations, a hybrid WF-ESS can be a flexible power source to accumulate the power system restoration. In this paper, we propose a rolling optimization model for transmission network recovery and load restoration considering the contributions of WF-ESSs. The proposed model is formulated as a mixed integer linear programming problem that simultaneously optimizes the amount and location of restorable load blocks as well as the restoration lines. The cold load pickup features of interrupted loads considering the outage duration are modeled in detail. A chance-constrained method is employed to deal with the uncertainty of wind power, and a rolling horizon-based framework is adopted to reduce the influence of forecast error. Case studies are conducted on both New England 39-bus system and part of a provincial power system in China. The results show that the load restoration process can be significantly accelerated by employing the proposed method and contributions of hybrid WF-ESSs to power system restoration are validated.

chance-constrained optimization↗

A World-Class University-Industry Consortium for Wind Energy Research, Education, and Workforce Development (Final Technical Report)

During the two-year project period, the consortium members have developed control algorithms for enhancing the reliability of wind turbine components. The consortium members have developed advanced operation and planning tools for accommodating the high penetration of variable wind energy. The consortium members have developed extensive education and research programs for educating the stakeholders on critical issues related to the wind energy research and development. In summary, The Consortium procured one utility-grade wind unit and two small wind units. Specifically, the Consortium procured a 1.5MW GE wind unit by working with the world leading wind energy developer, Invenergy, which is headquartered in Chicago, in September 2010.