Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Research and development on waste management for the Fukushima Daiichi NPS by JAEA

Technologies for waste management of Fukushima Daiichi Nuclear Power Station (F1NPS) have been investigated. It is expected that the amount of wastes will be considerable. It is considered that F1NPS wastes were contaminated with radionuclides contained in spent fuel and with activation products, therefore the number of nuclides which needs to be considered in evaluating disposal safety is high. As a result, it is possible that the technologies selected will be different from those of the current wastes from nuclear reactors and fuel cycle facilities. The secondary waste from the accumulated water treatment, contaminated rubble and trees were analyzed, and the data obtained was provided for inventory evaluation. Demand on analytical data is strong, and sampling at the site and analysis have been continued. Storage safety of the secondary waste, especially for zeolite and sludge is under investigation. Investigation on conditioning and disposal was initiated, for survey on existing disposal concept assuming that both inventory and waste classification are uncertain. Different from usual methodology, these research and development activities should be conducted side-by-side.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2013 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through. FY 2013 • Evaluation of new or revised waste streams by special analysis. • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

UNREVIEWED DISPOSAL QUESTION EVALUATION: Disposal of the Sandia National Laboratories Sealed Sources at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation (UDQE) assesses whether the Sandia National Laboratories (SNL) Sealed Sources >100 microcuries (μCi) (ASLA000000030, Revision 1 [SNL 2018]) is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the SNL Sealed Sources waste stream meets all performance objectives of U.S. Department of Energy (DOE) Manual DOE M 435.1-1, Radioactive Waste Management Manual, Chapter IV, Section P (DOE 1999). The SNL Sealed Sources waste stream is recommended for acceptance without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unreviewed Disposal Question Evaluation: Disposal of the West Valley Demonstration Project Contaminated Concrete and General Debris at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation (UDQE) assesses whether the West Valley Demonstration Project (WVDP) Contaminated Concrete and General Debris (WVDP000000013, Revision 12 [WVDP 2017]) is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the WVDP Contaminated Concrete and General Debris waste stream meets all U.S. Department of Energy (DOE) Manual DOE M 435.1-1, Radioactive Waste Management Manual, Chapter IV, Section P performance objectives (DOE 1999). The WVDP Contaminated Concrete and General Debris is recommended for acceptance with the condition that the total radium-226 (226Ra) activity not exceed 8.1E9 becquerels (Bq).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unreviewed Disposal Question Evaluation: Disposal of the Idaho National Laboratory Repackaged Uranium Metal and Oxide at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation assesses whether the Idaho National Laboratory (INL) Repackaged Uranium Metal and Oxide is suitable for shallow land burial at the Area 5 Radioactive Waste Management Site on the Nevada National Security Site. Disposal of the INL Repackaged Uranium Metal and Oxide meets all performance objectives in DOE M 435.1-1, “Radioactive Waste Management Manual,” Chapter IV, Section P. The INL Repackaged Uranium Metal and Oxide waste stream is recommended for acceptance without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2016 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan.The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for federal fiscal year (FY) 2016. This annual summary report presents results and conclusions of the FY 2016 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2016 include the following: Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2016, Evaluation of new or revised waste streams by special analysis, and Development and acceptance of version 4.200 of the Area 5 RWMS GoldSim PA/CA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2016 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2016 PA results, generated with the Area 5 RWMS v4.200 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. All results remain less than 50% of their performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2016. A new Corrective Action Unit (CAU), CAU 576, with corrective action sites near the Area 3 RWMS and Area 5 RWMS was identified in FY 2016. The sites are currently under investigation and not expected to be important sources for the CA. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs’ results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (CAU 97) source, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) source in the Area 5 RWMS CA is planned pending the completion of the CAU 98 Closure Report in FY 2017. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMSs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unreviewed Disposal Question Evaluation: Disposal of the Idaho National Laboratory Repackaged Uranium Metal and Oxide with Polychlorinated Biphenyls at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation assesses whether the Idaho National Laboratory (INL) Repackaged Uranium Metal and Oxide with polychlorinated biphenyls (PCBs) is suitable for shallow land burial at the Area 5 Radioactive Waste Management Site on the Nevada National Security Site. Disposal of the INL Repackaged Uranium Metal and Oxide with PCBs waste stream meets all the performance objectives contained in DOE M 435.1-1, “Radioactive Waste Management Manual,” Chapter IV, Section P. The INL Repackaged Uranium Metal and Oxide with PCBs waste stream is recommended for acceptance without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tracking the sources of polybrominated diphenyl ethers in birds: Foraging in waste management facilities results in higher DecaBDE exposure in males

Differences in feeding ecology are now recognized as major determinants of inter-individual variations in contaminant profiles of free-ranging animals, but exceedingly little attention has been devoted to the role of habitat use. Marked inter-individual variations and high levels of polybrominated diphenyl ethers (PBDEs) (e.g., DecaBDE) have previously been documented in ring-billed gulls (Larus delawarensis) breeding in a colony near Montreal (QC, Canada). However, the environmental sources of these compounds, and thus the reasons causing these large inter-individual variations remain unidentified. In the present study, we used GPS-based telemetry (±5 to 10 m precision) to track ring-billed gulls from this colony to reconstruct their movements at the landscape level. We related habitat use of individual gulls (n=76) to plasma concentrations (ng/g ww) and relative contributions (percentages) to Σ{sub 38}PBDEs of major congeners in the internationally restricted PentaBDE and current-use DecaBDE mixtures. Male gulls that visited waste management facilities (WMFs; i.e., landfills, wastewater treatment plants and related facilities; 25% of all GPS-tracked males) exhibited greater DecaBDE (concentrations and percentages) and lower PentaBDE (percentages) relative to those that did not. In contrast, no such relationships were found in females. Moreover, in males, DecaBDE (concentrations and percentages) increased with percentages of time spent in WMFs (i.e., ~5% of total foraging time), while PentaBDE (percentages) decreased. No relationships between percentages of time spent in other habitats (i.e., urban areas, agriculture fields, and St. Lawrence River) were found in either sex. These findings suggest that animals breeding in the vicinity of WMFs as well as mobile species that only use these sites for short stopovers to forage, could be at risk of enhanced DecaBDE exposure. - Highlights: • The study was conducted on breeding gulls with high levels of flame retardants. • Ring-billed gulls were GPS-tracked to associate habitat use with plasma PBDEs. • Males that visited waste management facilities had greater DecaBDE. • DecaBDE also increased with time spent in waste management facilities in males. • No relationships between habitat use and PBDEs were found in females.

54 ENVIRONMENTAL SCIENCES↗

UNREVIEWED DISPOSAL QUESTION EVALUATION: Disposal of the Oak Ridge National Laboratory General Radioactive Sources at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

This Unreviewed Disposal Question Evaluation (UDQE) assesses whether the Oak Ridge National Laboratory (ORNL) General Radioactive Sources (ORNLSOURCES01, Revision 6 [ORNL 2021]) is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the ORNL General Radioactive Sources meets all performance objectives of DOE Manual DOE M 435.1-1, Radioactive Waste Management Manual, Chapter IV, Section P (DOE 1999). The ORNL General Radioactive Stream is recommended for acceptance......

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste management strategy for cost effective and environmentally friendly NPP decommissioning

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named ndcon to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electronic waste management approaches: An overview

Highlights: ► Human toxicity of hazardous substances in e-waste. ► Environmental impacts of e-waste from disposal processes. ► Life Cycle Assessment (LCA), Material Flow Analysis (MFA), Multi Criteria Analysis (MCA) and Extended Producer Responsibility (EPR) to and solve e-waste problems. ► Key issues relating to tools managing e-waste for sustainable e-waste management. - Abstract: Electronic waste (e-waste) is one of the fastest-growing pollution problems worldwide given the presence if a variety of toxic substances which can contaminate the environment and threaten human health, if disposal protocols are not meticulously managed. This paper presents an overview of toxic substances present in e-waste, their potential environmental and human health impacts together with management strategies currently being used in certain countries. Several tools including Life Cycle Assessment (LCA), Material Flow Analysis (MFA), Multi Criteria Analysis (MCA) and Extended Producer Responsibility (EPR) have been developed to manage e-wastes especially in developed countries. The key to success in terms of e-waste management is to develop eco-design devices, properly collect e-waste, recover and recycle material by safe methods, dispose of e-waste by suitable techniques, forbid the transfer of used electronic devices to developing countries, and raise awareness of the impact of e-waste. No single tool is adequate but together they can complement each other to solve this issue. A national scheme such as EPR is a good policy in solving the growing e-waste problems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sandia National Laboratories California Waste Management Program Annual Report April 2011

The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Waste Management Program. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. This annual program report describes the activities undertaken during the past year, and activities planned in future years to implement the Waste Management (WM) Program, one of six programs that supports environmental management at SNL/CA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses (2012 Annual Summary Report)

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (RD) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and RD activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and RD results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and RD activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term RD efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NNSA-IAEC Science Area V Environmental ISR: Waste Management and Subsurface Science (Final Report FY18-FY20)

In August 2017, the U.S. National Nuclear Security Administration (NNSA) and the Israel Atomic Energy Commission (IAEC) launched a joint waste management program to evaluate the feasibility of siting a radioactive waste repository at intermediate depths in Israel. The bilateral collaboration involves three National Laboratories (LLNL, LANL, and Sandia), and the Nuclear Research Center, Negev, Geological Survey of Israel, and Ben Gurion University in Israel. This research is designed to assist with the evaluation of locations for an intermediate nuclear waste repository in Israel. This final report is a high-level summary of the results from the past three years by the team that worked on the WM-2: Radionuclide colloid-facilitated transport in fractured carbonate rock project for Science Area V, Environmental ISR: Subsurface Science and Waste Management. We have completed all of our tasks and met all of our milestones. MW-2 had three integrated tasks. Task 1 was laboratory experiments investigating colloid transport of radionuclides in natural fractured carbonate rocks from the Avdat formation, Israel. Task 2 was field experiments injecting radionuclide analogues pre-sorbed to clay colloids into fractured carbonate rock, and task 3 was numerical modeling of laboratory and field experimental results to assess the importance of colloids in the migration of relevant radionuclides. This task was incorporated into tasks 1 and 2. A 4 th task was initiated in FY20, to investigate the role of organics in facilitating radionuclide transport under the same conditions explored in task 1 due to the high organic content of the rocks being investigated for the immediate borehole locations. Preliminary results will be summarized here and the work will continue in FY21-23. The overall objective of this research is to evaluate the role of colloids (naturally occurring < 1 micron particles) in facilitating the transport of long-lived radionuclides from a nuclear waste repository situated in fractured carbonate rocks. Currently little data exists on radionuclide transport in carbonate rocks, but this is the main rock type available for siting a repository in Israel. Laboratory experiments were carried out in both Israel and the U.S., field experiments have taken place in Israel, and reactive transport modeling involved LLNL, LANL and Israel partner institutions. LLNL hosted a graduate student, Emily Tran, from Ben Gurion University in FY18 and FY19 and much of the work presented here was part of her PhD research.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Updated Medical Waste Management Plans and Emergency Action Plans for the Lawrence Livermore National Laboratory Main Site

Attached are the updated Medical Waste Management Plans and Emergency Action Plans for Lawrence Livermore National Laboratory’s (LLNL) Biosafety Level 2 (BSL-2) facilities and Biosafety Level 3 (BSL-3) facility. A redline version of each document has also been provided. Minor changes such as facility personnel, contact information, and titles for those that support onsite Biosafety Labs at LLNL have been made to the document. It should be noted that the most recent versions of the Medical Waste Large Quantity Generator Registration Application Form and Medical Waste Management Plan were incorporated and sourced from the Alameda County Department of Environmental Health website.

54 ENVIRONMENTAL SCIENCES↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Industrial Program of Waste Management - Cigeo Project - 13033

The French Planning Act of 28 June 2006 prescribed that a reversible repository in a deep geological formation be chosen as the reference solution for the long-term management of high-level and intermediate-level long-lived radioactive waste. It also entrusted the responsibility of further studies and design of the repository (named Cigeo) upon the French Radioactive Waste Management Agency (Andra), in order for the review of the creation-license application to start in 2015 and, subject to its approval, the commissioning of the repository to take place in 2025. Andra is responsible for siting, designing, implementing, operating the future geological repository, including operational and long term safety and waste acceptance. Nuclear operators (Electricite de France (EDF), AREVA NC, and the French Commission in charge of Atomic Energy and Alternative Energies (CEA) are technically and financially responsible for the waste they generate, with no limit in time. They provide Andra, on one hand, with waste packages related input data, and on the other hand with their long term industrial experiences of high and intermediate-level long-lived radwaste management and nuclear operation. Andra, EDF, AREVA and CEA established a cooperation agreement for strengthening their collaborations in these fields. Within this agreement Andra and the nuclear operators have defined an industrial program for waste management. This program includes the waste inventory to be taken into account for the design of the Cigeo project and the structural hypothesis underlying its phased development. It schedules the delivery of the different categories of waste and defines associated flows. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗