Search NASA⌕ Search

SEARCH · Search NASA

Results for “Work Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

NASA Small Spacecraft and Distributed Systems: Recent and Upcoming Technology Demonstrations and Development Efforts

NASA’s Small Spacecraft & Distributed Systems (SSDS) program strengthens U.S. ability to conduct unique missions by rapidly developing and demonstrating capabilities for SmallSat exploration, science, and commercial space. In collaboration with NASA Centers, other government agencies, commercial industry, and academia, SSDS advances next generation SmallSat technologies like power, processing, propulsion, communications, autonomous navigation, architectures (swarms), and applications (AI/ML/Edge Computing)—to extend missions beyond LEO into cislunar and planetary space. Various investment mechanisms exist for SSDS to select and fund projects that will ultimately advance NASA’s Moon to Mars Architecture. Presented here are the latest achievements and findings from recently completed SSDS projects, along with updates from ongoing efforts and planned future work. Successful missions like Starling and CAPSTONE continue to demonstrate their capability after several years on-orbit. Advancements in next generation swarm configurations are being implemented by Starling for space traffic monitoring and management applications. Findings from recent SSDS flight projects are discussed: DiskSat, a unique SmallSat platform alternative to canisterized nanosatellites, launched December 2025 and is gathering data; the PTD series of missions concluded in December 2025. Current SSDS efforts are focused on addressing NASA Shortfalls relating to rendezvous and proximity operations, neuromorphic computing, and space situational awareness.

Roger Hunter↗

SR-1 Freedom Thermal Architecture Challenges

The SR-1 Freedom mission aims to demonstrate nuclear electric propulsion (NEP) and deliver the Skyfall helicopter payload to Mars. Repurposing the existing Gateway Power and Propulsion Element (PPE) spacecraft and combining it with a 20 kWe-class nuclear power module (NPM) presents a variety of thermal architecture challenges. These include unprecedented waste heat rejection requirements, integration with a spacecraft bus originally designed for a different mission profile, and novel packaging constraints. This presentation will describe the simplified concept of operations as it relates to on-orbit thermal environments, early-phase architecture trades and supporting analyses, and planned forward work. We will also discuss our strategy for integrated thermal modeling of the complete spacecraft and examples of interface challenges necessitated by this ambitious effort.

Thermal↗

SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

Desimone, Roberto↗

Contingency Planning for Planetary Rovers

There has been considerable work in AI on planning under uncertainty. But this work generally assumes an extremely simple model of action that does not consider continuous time and resources. These assumptions are not reasonable for a Mars rover, which must cope with uncertainty about the duration of tasks, the power required, the data storage necessary, along with its position and orientation. In this paper, we outline an approach to generating contingency plans when the sources of uncertainty involve continuous quantities such as time and resources. The approach involves first constructing a "seed" plan, and then incrementally adding contingent branches to this plan in order to improve utility. The challenge is to figure out the best places to insert contingency branches. This requires an estimate of how much utility could be gained by building a contingent branch at any given place in the seed plan. Computing this utility exactly is intractable, but we outline an approximation method that back propagates utility distributions through a graph structure similar to that of a plan graph.

Dearden, Richard↗

Astrophysics and the Space Station - Executive summary of the NASA Working Group

Current plans for astrophysics experiments using the Space Station are summarized. The planning history is briefly traced; the fundamental roles of the Station as observatory, assembly plant, and service point for free-flying astrophysics platforms are considered; the NASA astrophysics programs are described; the chief outstanding problems are listed; and the need for smaller experiments is stressed. Lists of desired Station performance parameters and charts showing projected completion dates for Station components are provided.

Pellerin, C. J.↗

Lunar e-Library: Putting Space History to Work

As NASA plans and implements the Vision for Space Exploration, managers, engineers, and scientists need historically important information that is readily available and easily accessed. The Lunar e-Library - a searchable collection of 1100 electronic (.PDF) documents - makes it easy to find critical technical data and lessons learned and put space history knowledge in action. The Lunar e-Library, a DVD knowledge database, was developed by NASA to shorten research time and put knowledge at users' fingertips. Funded by NASA's Space Environments and Effects (SEE) Program headquartered at Marshall Space Flight Center (MSFC) and the MSFC Materials and Processes Laboratory, the goal of the Lunar e- Library effort was to identify key lessons learned from Apollo and other lunar programs and missions and to provide technical information from those programs in an easy-to-use format. The SEE Program began distributing the Lunar e-Library knowledge database in 2006. This paper describes the Lunar e-Library development process (including a description of the databases and resources used to acquire the documents) and the contents of the DVD product, demonstrates its usefulness with focused searches, and provides information on how to obtain this free resource.

McMahan, Tracy A.↗

Center Planning and Development Student Engineer

This fall I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning Development (CPD) Directorate. CPD works with commercial companies who are interested using KSCs unique capabilities in spaceflight, spacecraft processing, ground systems and Research Development (RD) projects that fall in line with NASAs mission and goals. CPD is divided into four (4) groups: (1) AD-A, which works on the Master Planning for center, (2) AD-B (where I am), which works on project management and integration, (3) AD-C, which works on partnership development, and (4) AD-T, which works on the RD aspects of partnerships. CPDs main goal is to one day make KSC the worlds largest spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group with employees having a wide knowledge of not only the Space Shuttle, but also that of the Apollo era. Our director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree at ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering drawings from the Apollo and Shuttle eras, to supporting NASA rocket launches (MAVEN), and working on actual agreementsproposals that will be used in the partnership process with multiple partners. Most of the work I have done is sensitive information and cannot be disclosed.

engineering↗

Center Planning and Development Student Engineer at KSC

This summer I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning & Development (CPD) Directorate. CPD works with commercial companies who are interested in using KSC's unique capabilities for spaceflight, spacecraft processing, ground systems and Research & Development (R&D) projects that fall in line with NASA's Mission and Vision. CPD is divided into three (3) groups: (1) AD-A, which works on the Master Planning for the center, (2) AD-B (where I am), which works on project control, management and integration, and (3) AD-C, which works on partnership development. CPD's main goal is to make KSC the world's preeminent multi-user spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group of employees having a wide knowledge of not only the Space Shuttle, but also Expendable Launch Vehicles (ELV). The director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree from ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering documents, weekly notes for CPD and senior management, engineering familiarizations with facilities at KSC, leading a tour for the Embry-Riddle Aeronautical University Career Services office, and working on actual agreements/proposals that will be used in the partnership process with multiple partners, along with other projects. Most of the work I have done is sensitive information and cannot be disclosed.

Engineer↗

13RC and and 3DRT Working Group of IRC: Status and Plans

We summarize recent activities of the International Intercomparison of 3D Radiation Codes (DRC), including development of an open source code, approximation methods for use in cloud dynamical models, and cloud reconstructions from multiple satellite platforms such as MODIS, MISR and ICESat. We also discuss the charter of the newly formed 3DRT Working Group of the International Radiation Commission, which hopes to coordinate and integrate efforts in various 3D application areas, including clouds, sea ice, and vegetation. Finally we describe plans for a special 3D session at the next International Radiation Symposium in Busan Korea, during 23-30 August 2004.

Cahalan, Robert↗

Adjustable Autonomy and Human-Agent Teamwork in Practice: An Interim Report on Space Applications

We give a preliminary perspective on the basic principles and pitfalls of adjustable autonomy and human-centered teamwork. We then summarize the interim results of our study on the problem of work practice modeling and human-agent collaboration in space applications, the development of a broad model of human-agent teamwork grounded in practice, and the integration of the Brahms, KAoS, and NOMADS agent frameworks. We hope our work will benefit those who plan and participate in work activities in a wide variety of space applications, as well as those who are interested in design and execution tools for teams of robots that can function as effective assistants to humans.

Bradshaw, Jeffrey M.↗

Automated Planning for a Deep Space Communications Station

This paper describes the application of Artificial Intelligence planning techniques to the problem of antenna track plan generation for a NASA Deep Space Communications Station. Me described system enables an antenna communications station to automatically respond to a set of tracking goals by correctly configuring the appropriate hardware and software to provide the requested communication services. To perform this task, the Automated Scheduling and Planning Environment (ASPEN) has been applied to automatically produce antenna trucking plans that are tailored to support a set of input goals. In this paper, we describe the antenna automation problem, the ASPEN planning and scheduling system, how ASPEN is used to generate antenna track plans, the results of several technology demonstrations, and future work utilizing dynamic planning technology.

Estlin, Tara↗

Planning and Execution for Front Delineation and Tracking with Multiple Underwater Vehicles

This work describes a planning architecture for a heterogeneous fleet of marine assets as well as a method for detecting and tracking ocean fronts using multiple autonomous underwater vehicles. Multiple vehicles — equally-spaced along the expected frontal boundary — complete near parallel transects orthogonal to the front. Lateral gradients are used to determine the location of the front crossing from each individual vehicle transect by detecting a change in the observed water property. Adaptive control of the vehicles ensure they remain perpendicular to the estimated frontal boundary as it evolves over time. This method was demonstrated in several experiment periods totaling weeks, in and around Monterey Bay, California in May and June of 2017. We discuss the challenges associated with the implementation of the planning system. We show the capability of this method for repeated sampling across a dynamic two-dimensional ocean front using a fleet of three types of platforms: short-range Iver AUVs, Tethys-Class Long-Range AUVs, and Seagliders. This method extends to tracking gradients of different properties using a variety of vehicles.

Chavez, Francisco P.↗

Advanced Signal Processing Methods Applied to Digital Mammography

The work reported here is on the extension of the earlier proposal of the same title, August 1994-June 1996. The report for that work is also being submitted. The work reported there forms the foundation for this work from January 1997 to September 1997. After the earlier work was completed there were a few items that needed to be completed prior to submission of a new and more comprehensive proposal for further research. Those tasks have been completed and two new proposals have been submitted, one to NASA, and one to Health & Human Services WS). The main purpose of this extension was to refine some of the techniques that lead to automatic large scale evaluation of full mammograms. Progress on each of the proposed tasks follows. Task 1: A multiresolution segmentation of background from breast has been developed and tested. The method is based on the different noise characteristics of the two different fields. The breast field has more power in the lower octaves and the off-breast field behaves similar to a wideband process, where more power is in the high frequency octaves. After the two fields are separated by lowpass filtering, a region labeling routine is used to find the largest contiguous region, the breast. Task 2: A wavelet expansion that can decompose the image without zero padding has been developed. The method preserves all properties of the power-of-two wavelet transform and does not add appreciably to computation time or storage. This work is essential for analysis of the full mammogram, as opposed to selecting sections from the full mammogram. Task 3: A clustering method has been developed based on a simple counting mechanism. No ROC analysis has been performed (and was not proposed), so we cannot finally evaluate this work without further support. Task 4: Further testing of the filter reveals that different wavelet bases do yield slightly different qualitative results. We cannot provide quantitative conclusions about this for all possible bases without further support. Task 5: Better modeling does indeed make an improvement in the detection output. After the proposal ended, we came up with some new theoretical explanations that helps in understanding when the D4 filter should be better. This work is currently in the review process. Task 6: N/A. This no longer applies in view of Tasks 4-5. Task 7: Comprehensive plans for further work have been completed. These plans are the subject of two proposals, one to NASA and one to HHS. These proposals represent plans for a complete evaluation of the methods for identifying normal mammograms, augmented with significant further theoretical work.

Stauduhar, Richard P.↗

Design Considerations for Spacecraft Operations During Uncrewed Dormant Phases of Human Exploration Missions

NASA is transforming human spaceflight. The Agency is shifting from an exploration-based program with human activities in low Earth orbit (LEO) and targeted robotic missions in deep space to a more sustainable and integrated pioneering approach. However, pioneering space involves daunting technical challenges of transportation, maintaining health, and enabling crew productivity for long durations in remote, hostile, and alien environments. Subject matter experts from NASA's Human Exploration and Operations Mission Directorate (HEOMD) are currently studying a human exploration campaign that involves deployment of assets for planetary exploration. This study, called the Evolvable Mars Campaign (EMC) study, explores options with solar electric propulsion as a central component of the transportation architecture. This particular in-space transportation option often results in long duration transit to destinations. The EMC study is also investigating deployed human rated systems like landers, habitats, rovers, power systems and ISRU system to the surface of Mars, which also will involve long dormant periods when these systems are staged on the surface. In order to enable the EMC architecture, campaign and element design leads along with system and capability development experts from HEOMD's System Maturation Team (SMT) have identified additional capabilities, systems and operation modes that will sustain these systems especially during these dormant phases of the mission. Dormancy is defined by the absence of crew and relative inactivity of the systems. For EMC missions, dormant periods could range from several months to several years. Two aspects of uncrewed dormant operations are considered herein: (1) the vehicle systems that are placed in a dormant state and (2) the autonomous vehicle systems and robotic capabilities that monitor, maintain, and repair the vehicle and systems. This paper describes the mission stages of dormancy operations, phases of dormant operations, and critical system capabilities that are needed for dormant operations. This paper will compare dormancy operations of past robotic missions to identify lessons that can be applied to planned human exploration missions. Finally, this paper will also identify future work and analysis planned to assess system performance metrics and integrated system operations.

Williams-Byrd, Julie↗

Manned remote work station development article. Volume 3: Development test plan. Appendix A: Manufacturing requirements/schedule

The tests and procedures for the manned remote work station (MRWS) open cherry picker (OCP) development test article (DTA) are described to validate systems requirements and performance specifications. A development test program is outlined to evaluate key design issues and man/machine interfaces when the MRWS OCP is used in a shuttle support role of satellite servicing and in orbit construction of large structures.

Source record↗

Work Package 5: Contingency Management. Mission Planning Requirements Document: Preliminary Version. Revision A

The purpose of this document is to identify the general flight/mission planning requirements for same-day file-and-fly access to the NAS for both civil and military High-Altitude Long Endurance (HALE) Unmanned Aircraft System (UAS). Currently the scope of this document is limited to Step 1, operations above flight level 43,000 feet (FL430). This document describes the current applicable mission planning requirements and procedures for both manned and unmanned aircraft and addresses HALE UAS flight planning considerations in the future National Airspace System (NAS). It also discusses the unique performance and operational capabilities of HALE UAS associated with the Access 5 Project, presents some of the projected performance characteristics and conceptual missions for future systems, and provides detailed analysis of the recommended mission planning elements for operating HALE UAS in the NAS.

Source record↗

Working Group 11F Opening Comments NASA Planning for NASA's Future Ground Systems

These are simple charts for the introductory comments to be made at the start of a panel session at the Ground System Architecture Workshop (GSAW2016). It is not meant as a formal paper, but rather contains information to prompt further discussion of the panel members and audience. The panel topic is: Embracing Change via the Use of Service-Based Frameworks and Products in an Enterprise.

Commonality↗