Search NASA⌕ Search

SEARCH · Search NASA

Results for “aircraft scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Trends and individual differences in response to short-haul fight operations

A survey of airline pilots was undertaken to determine normative patterns and individual differences in mood and sleep during short-haul flight operations. The results revealed that over the course of a typical 2-d trip, pilots experience a decline in positive mood, or activity, and an increase in negative mood, or tension. On layovers, pilots report experiencing sleep of shorter duration and poorer quality than at home. These patterns are very similar to those reported by Gander and Graeber and by Gander et al. using high-fidelity sleep and activity monitoring equipment. Examination of the impact of two personality dimensions extracted from the Jenkins Activity Survey measure of the Type A personality, Achievement Striving and Impatience/Irritability, suggested that Impatience/Irritability may serve as a marker of individuals most likely to experience health-related problems on trips. Achievement Striving may serve as a predictor of performance in crew settings.

Aircraft↗

A Comparison of CTAS and Airline Time of Arrival Predictions

A statistically-based comparison of aircraft times of arrival between Center/TRACON Automation System (CTAS) air traffic control scheduling and airline predictions is presented. CTAS is found to provide much improved values, forming the foundation for airline operational improvements, as observed during an airline field trial of a CTAS display.

Heere, Karen R.↗

Streamlining Software Aspects of Certification: Technical Team Report on the First Industry Workshop

To address concerns about time and expense associated with software aspects of certification, the Federal Aviation Administration (FAA) began the Streamlining Software Aspects of Certification (SSAC) program. As part of this program, a Technical Team was established to determine whether the cost and time associated with certifying aircraft can be reduced while maintaining or improving safety, with the intent of impacting the FAA's Flight 2000 program. The Technical Team conducted a workshop to gain a better understanding of the major concerns in industry about software cost and schedule. Over 120 people attended the workshop, including representatives from the FAA,commercial transport and general aviation aircraft manufacturers and suppliers, and procurers and developers of non-airborne systems; and, more than 200 issues about software aspects of certification were recorded. This paper provides an overview of the SSAC program, motivation for the workshop, details of the workshop activities and outcomes, and recommendations for follow-on work.

Hayhurst, Kelly J.↗

A Network Scheduling Model for Distributed Control Simulation

Distributed engine control is a hardware technology that radically alters the architecture for aircraft engine control systems. Of its own accord, it does not change the function of control, rather it seeks to address the implementation issues for weight-constrained vehicles that can limit overall system performance and increase life-cycle cost. However, an inherent feature of this technology, digital communication networks, alters the flow of information between critical elements of the closed-loop control. Whereas control information has been available continuously in conventional centralized control architectures through virtue of analog signaling, moving forward, it will be transmitted digitally in serial fashion over the network(s) in distributed control architectures. An underlying effect is that all of the control information arrives asynchronously and may not be available every loop interval of the controller, therefore it must be scheduled. This paper proposes a methodology for modeling the nominal data flow over these networks and examines the resulting impact for an aero turbine engine system simulation.

distributed control↗

Formal Specification and Parametric Verification of the ICAROUS Distributed Merging Protocol for Autonomous Aircraft Systems

ICAROUS is a software architecture that provides highly assured core software modules for building safety-centric autonomous unmanned aircraft applications. One of its core components is the ICAROUS distributed merging (IDM) protocol, which allows for decentralized merging of autonomous aircrafts through a designated intersection. This report presents initial results on formal specification and parametric verification of the IDM protocol. We present the development of a formal, discrete-time specification of the ICAROUS distributed merging protocol in TLA+. The developed TLA+ specification includes an abstracted model of the physical aircraft dynamics, the consensus machinery for leader election and coordination, and the computation of merging schedules. In addition, we present details on a command line tool we developed verimerge, that utilizes the TLC model checker for doing bounded, parametric verification and allows for plotting of these results in 2D parameter spaces. The tool also provides functionality for visualization of concrete protocol behaviors, to aid debugging and understanding. We present preliminary, bounded time verification results for a finite number of aircraft. Limitations of the current techniques and possible future extensions of this work are also discussed.

ICAROUS↗

Flight-test results using nonlinear control with the F-8C digital fly-by-wire aircraft

The design and operation of the cooperative advanced digital research experiment (CADRE) to develop nonlinear pitch flight control algorithms is described, and the results of an in-flight evaluation using the F-8C digital fly-by-wire (DFBW) research aircraft are presented. The CADRE controller is described, including the initial filter, linear command prefilter, nonlinear command prefilter, and gain scheduling. The variable-integral control-to-optimize response of the controller is considered, and CADRE parameter combinations are addressed. The remotely-augmented-vehicle interface used in the DFBW aircraft experiment is discussed. The distanct-tracking and close-formation tracking evaluation tasks for the aircraft are described along with evaluation configurations, and the test results are presented and discussed. The latter indicate that a nonlinear adaptive controller is a feasible control system technique for the fighter tracking task.

Larson, R. R.↗

Cruise-Efficient Short Takeoff and Landing (CESTOL): Potential Impact on Air Traffic Operations

The National Aeronautics and Space Administration (NASA) is investigating technological and operational concepts for introducing Cruise-Efficient Short Takeoff and Landing (CESTOL) aircraft into a future US National Airspace System (NAS) civil aviation environment. CESTOL is an aircraft design concept for future use to increase capacity and reduce emissions. CESTOL provides very flexible takeoff, climb, descent and landing performance capabilities and a high-speed cruise capability. In support of NASA, this study is a preliminary examination of the potential operational impact of CESTOL on airport and airspace capacity and delay. The study examines operational impacts at a subject site, Newark Liberty Intemational Airport (KEWR), New Jersey. The study extends these KEWR results to estimate potential impacts on NAS-wide network traffic operations due to the introduction of CESTOL at selected major airports. These are the 34 domestic airports identified in the Federal Aviation Administration's Operational Evolution Plan (OEP). The analysis process uses two fast-time simulation tools to separately model local and NAS-wide air traffic operations using predicted flight schedules for a 24-hour study period in 2016. These tools are the Sen sis AvTerminal model and NASA's Airspace Concept Evaluation System (ACES). We use both to simulate conventional-aircraft-only and CESTOL-mixed-with-conventional-aircraft operations. Both tools apply 4-dimension trajectory modeling to simulate individual flight movement. The study applies AvTerminal to model traffic operations and procedures for en route and terminal arrival and departures to and from KEWR. These AvTerminal applications model existing arrival and departure routes and profiles and runway use configurations, with the assumption jet-powered, large-sized civil CESTOL aircraft use a short runway and standard turboprop arrival and departure procedures. With these rules, the conventional jet and CESTOL aircraft are procedurally separated from each other geographically and in altitude during tenninal airspace approach and departure operations, and each use a different arrival runway. AvTeminal implements its unique Focal-point Scheduling Process to sequence, space and delay aircraft to resolve spacing and overtake conflicts among flights in the airspace and airport system serving KEWR. This Process effectively models integrated arrival and departure operations. AvTerminal assesses acceptance rates and delay magnitude and causality at selected locations, including en route outer boundary fixes, tenninal airspace arrival and departure boundary fixes, terminal airspace arrival merge and departure diverge fixes, and runway landing and takeoff runways. The analysis compares the resulting capacity impacts, flight delays and delay sources between CESTOL and conventional KEWR operations. AvTerminal quantitative results showed that CESTOL has significant capability to increase airport arrival acceptance rates (35-40% at KEWR) by taking advantage of otherwise underused airspace and runways where available. The study extrapolates the AvTerminal-derived KEWR peak arrival and departure acceptance rates to estimate capacity parameter values for each of the OEP airports in the ACES modeling of traffic through the entire NAS network. The extrapolations of acceptance rates allow full, partial or no achievement of CESTOL capacity gains at an OEP airport as determined by assessments of the degree to which local procedures allow leveraging of CESTOL capabilities. These assessments consider each OEP airport's runway geometries, runway system configurations, airport and airspace operations, and potential CESTOL traffic loadings. The ACES modeling, simulates airport and airspace spacing constraints imposed by airport runway system, terminal and en route air traffic control and traffic flow management operations using airport acceptance rates representing conventional-aircraft-only and CESTOL-mixed operations. CEOL aircraft are assumed to have Mach 0.8, and alternatively Mach 0.7, cruise speeds to examine compatibility with conventional aircraft operations in common airspace. The ACES results provides estimates of CESTOL delay impact NAS-wide and at OEP airports due to changes in OEP airport acceptance rates and changes in en route airspace potential conflict rates. Preliminary results show meaningful nationwide delay reductions (20%) due to CESTOL operations at 34 major domestic airports.

Couluris, G. J.↗

Air Traffic Management Technology Demostration-1 (ATD-1) Avionics Phase 2 Flight Test and Results

NASA’s first Air Traffic Management Technology Demonstration (ATD-1) subproject successfully completed 19 days of flight test validation in January and February 2017 of an Interval Management (IM) avionics prototype and the procedures used to conduct IM arrival and approach operations. IM is one of the three elements integrated into NASA’s ATD-1 concept of operations with the subproject goal of improving aircraft efficiency and airport throughput during high-density arrival operations. The ATD-1 concept of operations combines advanced arrival scheduling, controller decision support tools, and interval management (IM) avionics to enable merging of multiple, time-based, efficient arrival streams. IM contributes to the operation by calculating speeds that enable an aircraft to precisely achieve a specific time or distance behind another aircraft. When precise spacing intervals can be calculated, achieved, and then maintained during high-density operations, aircraft efficiency should be improved by enabling the aircraft to remain closer to the optimum descent trajectory instead of using vectors and step-down altitudes, and airport throughput should be maintained or improved by each aircraft arriving at the runway threshold closer to the assigned spacing interval. This avionics development and flight test was conducted under a NASA contract by Boeing Research and Technology, with Boeing Commercial Aircraft, Honeywell, United Airlines, and Jeppesen as sub-contractors. The Honeywell built IM avionics were the first ever prototype built based on NASA requirements as well as developing and non-flight tested international IM standards, integrated into two test aircraft, and then flown in real-world conditions at the Grant County International Airport (KMWH). The IM prototype flown in the flight test used data from the Ownship and the assigned lead, or Target, aircraft to calculate the airspeed necessary for the Ownship to achieve the desired spacing. The flight test demonstrated that the IM avionics prototype generally met the IM requirement for spacing accuracy. However, the control laws implemented require further development to reduce the high IM speed command rate and the number of speed reversals observed during the test. Pilots assessed the IM procedure as acceptable, and issues requiring further attention were identified. In summary, the IM avionics prototype showed significant promise in contributing to the goals of improving aircraft efficiency and airport throughput. The flight test results also provided important data to the FAA and the working group developing the follow-on version of the international IM standards.

Baxley, Brian T.↗

Design Considerations for a New Terminal Area Arrival Scheduler

Design of a terminal area arrival scheduler depends on the interrelationship between throughput, delay and controller intervention. The main contribution of this paper is an analysis of the above interdependence for several stochastic behaviors of expected system performance distributions in the aircraft s time of arrival at the meter fix and runway. Results of this analysis serve to guide the scheduler design choices for key control variables. Two types of variables are analyzed, separation buffers and terminal delay margins. The choice for these decision variables was tested using sensitivity analysis. Analysis suggests that it is best to set the separation buffer at the meter fix to its minimum and adjust the runway buffer to attain the desired system performance. Delay margin was found to have the least effect. These results help characterize the variables most influential in the scheduling operations of terminal area arrivals.

Thipphavong, Jane↗

Estimation of Airline Benefits from Avionics Upgrade under Preferential Merge Re-sequence Scheduling

Modernization of the airline fleet avionics is essential to fully enable future technologies and procedures for increasing national airspace system capacity. However in the current national airspace system, system-wide benefits gained by avionics upgrade are not fully directed to aircraft/airlines that upgrade, resulting in slow fleet modernization rate. Preferential merge re-sequence scheduling is a best-equipped-best-served concept designed to incentivize avionics upgrade among airlines by allowing aircraft with new avionics (high-equipped) to be re-sequenced ahead of aircraft without the upgrades (low-equipped) at enroute merge waypoints. The goal of this study is to investigate the potential benefits gained or lost by airlines under a high or low-equipped fleet scenario if preferential merge resequence scheduling is implemented.

air traffic management↗

X-57 Cruise Motor GVT Using Fixed-Base Correction Technique

The National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center (AFRC) completed a modal survey of the X-57 Maxwell aircraft cruise motor system to help inform cruise motor redesign efforts. X-57 Maxwell was an electric propulsion demonstrator aircraft developed by NASA to inform airworthiness standards for electrified-aircraft. The cruise motor system modal survey was completed in spring of 2023 utilizing the fixed-base correction (FBC) ground vibration test (GVT) technique developed by ATA Engineering, to decouple the motor modes from the aircraft modes. Previously during the full aircraft GVT, a detailed modal assessment of the cruise motors was not performed. Owing to the X-57 project’s phase in the aircraft development cycle when the motor redesign effort occurred, the cruise motor GVT could only be performed with the cruise motor system installed on the aircraft, with most of its installation hardware (wiring, baffling, sensors, etc.) attached. An impact hammer was used to provide excitation input at various locations within the tight confines of the cruise motor installation. To better support motor redesign efforts, the FBC methodology was utilized to fix, separate and de-couple the cruise motor modes from aircraft modal response. During the GVT, this required additional impact tap tests on candidate fixed-boundary points for each degree of freedom (DOF) to be fixed. Additional triaxial accelerometers installed at the candidate points were used to compute frequency response functions (FRFs) in X, Y, and Z directions to enable those DOFs to be numerically fixed. Test data was acquired using Hottinger Brüel & Kjær’s LAN-XI data acquisition hardware and BK Connect software. FBC post-test processing was performed using the Structural Modification Using Frequency Response Functions (SMURF) technique with ATA Engineering’s Interface between MATLAB, Analysis, Test (IMAT) software. Utilizing the FBC technique relieved test engineers from having to instrument the entire aircraft to identify and separate aircraft response from cruise motor modes of interest. The FBC technique also permitted structural analysis engineers to omit secondary components from their finite element model (FEM) of the cruise motor system. This FBC modal survey was successful, and the first time NASA AFRC utilized the FBC method on an aircraft rather than a test fixture, and also using an impact hammer rather than multiple shakers allowing significant project schedule and cost savings

Modal Survey↗

Aerial Refueling Process Rescheduling Under Job Related Disruptions

The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on the multiple tankers (machines) to minimize the total weighted tardiness. ARSP assumes that the jobs have different release times and due dates. The ARSP is dynamic environment and unexpected events may occur. In this paper, rescheduling in the aerial refueling process with a time set of jobs will be studied to deal with job related disruptions such as the arrival of new jobs, the departure of an existing job, high deviations in the release times and changes in job priorities. In order to keep the stability and to avoid excessive computation, partial schedule repair algorithm is developed and its preliminary results are presented.

Kaplan, Sezgin↗

Low Emissions Alternative Power (LEAP)

This viewgraph presentation provides organizational plans and a schedule for the development of clean, quiet, and efficient propulsion technology for future aircraft.

Seng, Gary T.↗

The Carrier's Liability for Damage Caused by Delay in International Air Transport

Delay in the air transport occurs when passengers, baggage or cargo do not arrive at their destination at the time indicated in the contract of carriage. The causes of delay in the carriage of passengers are booking errors or double booking, delayed departure of aircraft, incorrect information regarding the time of departure, failure to land at the scheduled destination and changes in flight schedule or addition of extra landing stops. Delay in the carriage of baggage or cargo may have different causes: no reservation, lack of space, failure to load the baggage or cargo at the right place, or to deliver the covering documents at the right place. The Montreal Convention of 1999 Article 19 provides that 'The carrier is liable for damage occasioned by delay in the carriage by air of passengers, baggage or cargo. Nevertheless, the carder shall not be liable for damage occasioned by delay if it proves that it and its servants and agents took all measures that could reasonably be required to avoid the damage or that it was impossible for it or them to take such measures'. The Montreal Convention Article 22 provides liability limits of the carrier in case of delay for passengers and their baggage and for cargo. In the carriage of persons, the liability of the carrier for each passenger is limited to 4,150 SDR. In the carriage of baggage, the liability of the carrier is limited to 1,000 SDR for each passenger unless a special declaration as to the value of the baggage has been made. In the carriage of cargo, the liability of the carrier is limited to 17 SDR per kilogram unless a special declaration as to the value of the cargo has been made. The Montreal Convention Article 19 has shortcomings: it is silent on the duration of the liability for carriage,andit does not make any distinction between persons and good. It does not give any indication concerning the circumstances to be taken into account in cases of delay, and about the length of delay. In conclusion, it is desirable to define the period of carriage with accuracy, and to insert the word 'unreasonable' in Article 19.

Lee, Kang Bin↗

Introduction to Air Traffic Management

The presentation introduces students and faculty to air traffic management with focus on air traffic data for data-science. Starting with the common attributes of transportation systems — highway transportation, air transportation and data transportation, the initial set of slides discuss the purpose of data-science in air traffic management, reasons why air traffic management is challenging, and the multidisciplinary nature of air traffic management research. The history of flight from 1903 — Wright Flyer — to 1987 — formation of the National Air Traffic Controllers Association — is briefly discussed. The national airspace system is described in terms of airports in the U. S., air traffic control facilities (flight service stations, terminal, enroute and system command center), airspace geometry (sectors, airways and navaids), governing regulations and directives, airspace classification (Class A through G), special use airspace, visual flight rules and instrument flight rules. The contents of a flight-plan are described. Weather briefing is discussed. The surveillance equipment used for surface, terminal area and enroute are described, and the aircraft states obtained using the surveillance data are listed. Airline operations control functions — schedule development, flight planning, resource scheduling and flight following — are noted. Next, the roles and responsibilities of air traffic controllers and traffic flow managers are discussed. Separation standards and conflict resolution techniques are outlined. Finally, traffic flow management techniques are reviewed with an illustrative example.

Air Traffic Management↗

Introduction to Air Traffic Management

The presentation introduces students and faculty to air traffic management with focus on air traffic data for data-science. Starting with the common attributes of transportation systems — highway transportation, air transportation and data transportation, the initial set of slides discuss the purpose of data-science in air traffic management, reasons why air traffic management is challenging, and the multidisciplinary nature of air traffic management research. The history of flight from 1903 — Wright Flyer — to 1987 — formation of the National Air Traffic Controllers Association — is briefly discussed. The national airspace system is described in terms of airports in the U. S., air traffic control facilities (flight service stations, terminal, enroute and system command center), airspace geometry (sectors, airways and navaids), governing regulations and directives, airspace classification (Class A through G), special use airspace, visual flight rules and instrument flight rules. The contents of a flight-plan are described. Weather briefing is discussed. The surveillance equipment used for surface, terminal area and enroute are described, and the aircraft states obtained using the surveillance data are listed. Airline operations control functions — schedule development, flight planning, resource scheduling and flight following — are noted. Next, the roles and responsibilities of air traffic controllers and traffic flow managers are discussed. Separation standards and conflict resolution techniques are outlined. Finally, traffic flow management techniques are reviewed with an illustrative example.

Air Traffic Management↗

Improvement to Airport Throughput Using Intelligent Arrival Scheduling and an Expanded Planning Horizon

The first phase of this study investigated the amount of time a flight can be delayed or expedited within the Terminal Airspace using only speed changes. The Arrival Capacity Calculator analysis tool was used to predict the time adjustment envelope for standard descent arrivals and then for CDA arrivals. Results ranged from 0.77 to 5.38 minutes. STAR routes were configured for the ACES simulation, and a validation of the ACC results was conducted comparing the maximum predicted time adjustments to those seen in ACES. The final phase investigated full runway-to-runway trajectories using ACES. The radial distance used by the arrival scheduler was incrementally increased from 50 to 150 nautical miles (nmi). The increased Planning Horizon radii allowed the arrival scheduler to arrange, path stretch, and speed-adjust flights to more fully load the arrival stream. The average throughput for the high volume portion of the day increased from 30 aircraft per runway for the 50 nmi radius to 40 aircraft per runway for the 150 nmi radius for a traffic set representative of high volume 2018. The recommended radius for the arrival scheduler s Planning Horizon was found to be 130 nmi, which allowed more than 95% loading of the arrival stream.

Glaab, Patricia C.↗

X-29A technology demonstrator flight test program overview

An overview of the X-29A functional flight program and concept evaluation program is presented, including some of the unique and different preparations for the first flight. Included are a discussion of the many organizational responsibilities and a description of the program management structure for the test team. Also discussed are preflight ground, flight functional envelope expansion, and flight research test objectives and qualitive results to date for both a limited-envelope flight control system and an expanded-envelope system. The aircraft, including the instrumentation system and measurements, is described. In addition, a discussion is included regarding the use of major support facilities, such as ground and flight simulators, the NASA Western Aeronautical Test Range and mission control center, and the Grumman automated telemetry station. An overview of the associated real-time and postflight batch data processing software approaches is presented. The use of hardware-in-the-loop simulation for independent verification and validation and mission planning and practice is discussed. Also included is a description of the flight-readiness review, the airworthiness and flight safety review, work scheduling, technical briefings, and preflight and postflight crew briefings. The configuration control process used on the X-29A program is described, and its relationship to both simulation and aircraft operations is discussed. An X-29A schedule overview is presented with an outline of a proposed follow-on program.

Sefic, W. J.↗