Search NASA⌕ Search

SEARCH · Search NASA

Results for “automated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Visual task analysis /VISTA/

Computer system VISTA, automatically plots selective PERT networks in order to develop accurate, standardized scheduling documentation as an essential element to project planning. This automation of plotting networks generates standardized networks due to a priority scheme adopted for calculating paths between events.

Burkes, T.↗

Process development for automated solar cell and module production. Task 4: Automated array assembly

The Unimate robot was programmed for the final 35 cell pattern to be used in the fabrication of the deliverable modules. Mechanical construction of the Automated Lamination Station and Final Assembly Station were completed on schedule. All final wiring and interconnect cables were also completed and the first operational testing began. The final controlling program was written. A local fabricator was contracted to produce the glass reinforced concrete panels to be used for testing and deliverables. A video tape showing all three stations in operation was produced.

Hagerty, J. J.↗

Advanced systems engineering and network planning support

The objective of this task was to take a fresh look at the NASA Space Network Control (SNC) element for the Advanced Tracking and Data Relay Satellite System (ATDRSS) such that it can be made more efficient and responsive to the user by introducing new concepts and technologies appropriate for the 1997 timeframe. In particular, it was desired to investigate the technologies and concepts employed in similar systems that may be applicable to the SNC. The recommendations resulting from this study include resource partitioning, on-line access to subsets of the SN schedule, fluid scheduling, increased use of demand access on the MA service, automating Inter-System Control functions using monitor by exception, increase automation for distributed data management and distributed work management, viewing SN operational control in terms of the OSI Management framework, and the introduction of automated interface management.

Walters, David H.↗

A two-level structure for advanced space power system automation

The tasks to be carried out during the three-year project period are: (1) performing extensive simulation using existing mathematical models to build a specific knowledge base of the operating characteristics of space power systems; (2) carrying out the necessary basic research on hierarchical control structures, real-time quantitative algorithms, and decision-theoretic procedures; (3) developing a two-level automation scheme for fault detection and diagnosis, maintenance and restoration scheduling, and load management; and (4) testing and demonstration. The outlines of the proposed system structure that served as a master plan for this project, work accomplished, concluding remarks, and ideas for future work are also addressed.

Loparo, Kenneth A.↗

The Automated Conflict Resolution System (ACRS)

The Automated Conflict Resolution System (ACRS) is a mission-current scheduling aid that predicts periods of mutual interference when two or more orbiting spacecraft are scheduled to communicate with the same Tracking and Data Relay Satellite (TDRS) at the same time. The mutual interference predicted has the potential to degrade or prevent communications. Thus the ACRS system is a useful tool for aiding in the scheduling of Space Network (SN) communications.

Kaplan, Ted↗

Combined Cycle Engine Large-Scale Inlet for Mode Transition Experiments: System Identification Rack Hardware Design

The System Identification (SysID) Rack is a real-time hardware-in-the-loop data acquisition (DAQ) and control instrument rack that was designed and built to support inlet testing in the NASA Glenn Research Center 10- by 10-Foot Supersonic Wind Tunnel. This instrument rack is used to support experiments on the Combined-Cycle Engine Large-Scale Inlet for Mode Transition Experiment (CCE‒ LIMX). The CCE‒LIMX is a testbed for an integrated dual flow-path inlet configuration with the two flow paths in an over-and-under arrangement such that the high-speed flow path is located below the lowspeed flow path. The CCE‒LIMX includes multiple actuators that are designed to redirect airflow from one flow path to the other; this action is referred to as "inlet mode transition." Multiple phases of experiments have been planned to support research that investigates inlet mode transition: inlet characterization (Phase-1) and system identification (Phase-2). The SysID Rack hardware design met the following requirements to support Phase-1 and Phase-2 experiments: safely and effectively move multiple actuators individually or synchronously; sample and save effector control and position sensor feedback signals; automate control of actuator positioning based on a mode transition schedule; sample and save pressure sensor signals; and perform DAQ and control processes operating at 2.5 KHz. This document describes the hardware components used to build the SysID Rack including their function, specifications, and system interface. Furthermore, provided in this document are a SysID Rack effectors signal list (signal flow); system identification experiment setup; illustrations indicating a typical SysID Rack experiment; and a SysID Rack performance overview for Phase-1 and Phase-2 experiments. The SysID Rack described in this document was a useful tool to meet the project objectives.

Thomas, Randy↗

Using CCSDS Standards to Reduce Mission Costs

NASA's open source Core Flight System (cFS) software framework has been using several Consultative Committee for Space Data Systems (CCSDS) standards since its inception. Recently developed CCSDS standards are now being applied by NASA, ESA and other organizations to streamline and automate aspects of mission development, test, and operations, speeding mission schedules and reducing mission costs. This paper will present the new CCSDS Spacecraft Onboard Interfaces Services (SOIS) Electronic Data Sheet (EDS) standards and show how they are being applied to data interfaces in the cFS software framework, tool chain, and ground systems across a range of missions at NASA. Although NASA is focusing on the cFS, it expected that these technologies are well suited for use in other system architectures and can lower costs for a wide range of both large and small satellites.

Wilmot, Jonathan↗

Terminal Sequencing and Spacing (TSS)

The Federal Aviation Administration's (FAA) Next Generation Air Transportation System (or NextGen) is being designed to support the predicted increases in traffic volume and to increase the capacity, efficiency and safety of the National Airspace System (NAS). The Federal Aviation Administration (FAA) identifies Performance-Based Navigation (PBN) as a key enabling capability of NextGen and is actively publishing PBN procedures at major airports throughout the United States. Standard Terminal Arrival Routes (STARs), procedures, and approaches are designed to facilitate fuel-efficient continuous descent operations. However, their use is limited during periods of high traffic demand due to the complexity of merging multiple streams of aircraft to the same airport. As a result, most arrivals in the Terminal Radar Approach Control (TRACON) area continue to be controlled using radar vectoring and step-down descents, resulting in high workload for controllers and diverting aircraft from efficient PBN trajectories. To address this issue, NASA developed the Terminal Sequencing and Spacing (TSS) system, an advanced arrival management technology that combines time-based scheduling and controller-based precision spacing tools. TSS is a ground-based controller automation tool that facilitates sequencing and merging arrivals on Performance-Based Navigation (PBN) routes, especially during highly congested demand periods. The two main components of TSS are: 1) a scheduler that de-conflicts merging arrivals in the terminal area by computing appropriate arrival times to the runway threshold and upstream terminal merge points, and 2) a set of Controller-Managed Spacing (CMS) decision support tools to efficiently assist schedule conformance. Sixteen high-fidelity human-in-the-loop simulations involving more than five hundred hours of evaluation time, were conducted to mature TSS from proof-of-concept design to a fully functional prototype. Results indicate high controller use and acceptability of the CMS tools as well as improved PBN route conformance (Figure 2). The TSS technology was transferred to the FAA in 2014, and it is targeted for deployment to several busy airports in the U.S. starting in 2018. Potential enhancements to TSS using DataComm will also be presented.

controller-managed spacing↗

Towards the Development of a Multi-Agent Cognitive Networking System for the Lunar Environment

This paper details the development of a multi-agent cognitive system intended to optimize networking performance in the lunar environment. One concept of the future of lunar communication, LunaNet, outlines a complex network of networks. Challenges such as scalability, interoperability, and reliability must first be addressed to successfully fulfill this vision. Machine intelligence can greatly reduce the reliance on human operators and enable efficient operations for tasks such as scheduling and network management. Machine learning, artificial intelligence, and other automated decision-making techniques can be used to allow network nodes to intelligently sense and adapt to changes in the environment such as link disruptions, new nodes joining the network, and support for a diverse range of protocols. Cognitive networking seeks to evolve these technologies into an autonomous system with improved science data return, reliability, and scalability. In this paper, we study four main areas as a means to further develop cognitive networking capabilities: networking protocol development, analysis of wireless data for modeling and simulation, development of algorithms for a multi-agent system, and spectrum sensing technology.

cognitive networking↗

Spectral characterization of the Roman Space Telescope Grism and Prism assemblies

The Roman Space Telescope (RST) Wide Field Instrument (WFI) recently completed its thermal vacuum (TVAC) campaign in Boulder, CO. This campaign, which concludes multiple years of preparation, represented the last opportunity for characterization and verification of the Grism and Prism spectral properties before launch; currently scheduled for late-2026. To this end, a highly-automated series of measurements were performed to acquire images of calibration spectra at many field points. Features that were measured during these efforts include dispersion scale, blue/red bandpass edges, diffraction order radiometry, and ghost images. A summary of the techniques and results for several of these efforts is provided here.

Astronomy↗

Design Principles and Algorithms for Air Traffic Arrival Scheduling

This report presents design principles and algorithms for building a real-time scheduler of arrival aircraft based on a first-come-first-served (FCFS) scheduling protocol. The algorithms provide the conceptual and computational foundation for the Traffic Management Advisor (TMA) of the Center/terminal radar approach control facilities (TRACON) automation system, which comprises a set of decision support tools for managing arrival traffic at major airports in the United States. The primary objective of the scheduler is to assign arrival aircraft to a favorable landing runway and schedule them to land at times that minimize delays. A further objective of the scheduler is to allocate delays between high-altitude airspace far away from the airport and low-altitude airspace near the airport. A method of delay allocation is described that minimizes the average operating cost in the presence of errors in controlling aircraft to a specified landing time. This report is a revision of an earlier paper first presented as part of an Advisory Group for Aerospace Research and Development (AGARD) lecture series in September 1995. The authors, during vigorous discussions over the details of this paper, felt it was important to the air-trafficmanagement (ATM) community to revise and extend the original 1995 paper, providing more detail and clarity and thereby allowing future researchers to understand this foundational work as the basis for the TMA's scheduling algorithms.

Center TRACON↗

Development and Validation of an Automated Simulation Capability in Support of Integrated Demand Management

Integrated Demand Management (IDM) is a near- to mid-term NASA concept that proposes to address mismatches in air traffic system demand and capacity by using strategic flow management capabilities to pre-condition demand into the more tactical Time-Based Flow Management System (TBFM). This paper describes an automated simulation capability to support IDM concept development. The capability closely mimics existing human-in-the-loop (HITL) capabilities, automating both the human components and collaboration between operational systems, and speeding up the real-time aircraft simulations. Such a capability allows for parametric studies that will inform the HITL simulations, identifying breaking points and parameter values at which significant changes in system behavior occur. This paper also describes the initial validation of individual components of the automated simulation capability, and an example application comparing the performance of the IDM concept under two TBFM scheduling paradigms. The results and conclusions from this simulation compare closely to those from previous HITL simulations using similar scenarios, providing an initial validation of the automated simulation capability.

Integrated Demand Management↗

Development of an automated multi-stage modal synthesis system for NASTRAN

A mode synthesis development to be scheduled in the NASTRAN multi-level substructuring system for general dynamics applications is described. The method combines the better features of several state of the art mode synthesis techniques, yet is general enough to provide for any arbitrary combination of boundary degrees of freedom and normal mode boundary conditions. Normal modes or complex eigenvectors may be used in the definition of a structure component which may be combined with other components of any type. Combination structures fabricated from component modes may be processed as normal substructures, including further multi-stage mode synthesis reductions. Included are discussions of the user control of the system and advantages in actual application.

Herting, D. N.↗

How to Compute a Slot Marker - Calculation of Controller Managed Spacing Tools for Efficient Descents with Precision Scheduling

This paper describes the underlying principles and algorithms for computing the primary controller managed spacing (CMS) tools developed at NASA for precisely spacing aircraft along efficient descent paths. The trajectory-based CMS tools include slot markers, delay indications and speed advisories. These tools are one of three core NASA technologies integrated in NASAs ATM technology demonstration-1 (ATD-1) that will operationally demonstrate the feasibility of fuel-efficient, high throughput arrival operations using Automatic Dependent Surveillance Broadcast (ADS-B) and ground-based and airborne NASA technologies for precision scheduling and spacing.

efficient arrivals↗

Test/score/report: Simulation techniques for automating the test process

A Test/Score/Report capability is currently being developed for the Transportable Payload Operations Control Center (TPOCC) Advanced Spacecraft Simulator (TASS) system which will automate testing of the Goddard Space Flight Center (GSFC) Payload Operations Control Center (POCC) and Mission Operations Center (MOC) software in three areas: telemetry decommutation, spacecraft command processing, and spacecraft memory load and dump processing. Automated computer control of the acceptance test process is one of the primary goals of a test team. With the proper simulation tools and user interface, the task of acceptance testing, regression testing, and repeatability of specific test procedures of a ground data system can be a simpler task. Ideally, the goal for complete automation would be to plug the operational deliverable into the simulator, press the start button, execute the test procedure, accumulate and analyze the data, score the results, and report the results to the test team along with a go/no recommendation to the test team. In practice, this may not be possible because of inadequate test tools, pressures of schedules, limited resources, etc. Most tests are accomplished using a certain degree of automation and test procedures that are labor intensive. This paper discusses some simulation techniques that can improve the automation of the test process. The TASS system tests the POCC/MOC software and provides a score based on the test results. The TASS system displays statistics on the success of the POCC/MOC system processing in each of the three areas as well as event messages pertaining to the Test/Score/Report processing. The TASS system also provides formatted reports documenting each step performed during the tests and the results of each step. A prototype of the Test/Score/Report capability is available and currently being used to test some POCC/MOC software deliveries. When this capability is fully operational it should greatly reduce the time necessary to test a POCC/MOC software delivery, as well as improve the quality of the test process.

Hageman, Barbara H.↗

Improving the Operations of the Earth Observing One Mission via Automated Mission Planning

We describe the modeling and reasoning about operations constraints in an automated mission planning system for an earth observing satellite - EO-1. We first discuss the large number of elements that can be naturally represented in an expressive planning and scheduling framework. We then describe a number of constraints that challenge the current state of the art in automated planning systems and discuss how we modeled these constraints as well as discuss tradeoffs in representation versus efficiency. Finally we describe the challenges in efficiently generating operations plans for this mission. These discussions involve lessons learned from an operations model that has been in use since Fall 2004 (called R4) as well as a newer more accurate operations model operational since June 2009 (called R5). We present analysis of the R5 software documenting a significant (greater than 50%) increase in the number of weekly observations scheduled by the EO-1 mission. We also show that the R5 mission planning system produces schedules within 15% of an upper bound on optimal schedules. This operational enhancement has created value of millions of dollars US over the projected remaining lifetime of the EO-1 mission.

Chien, Steve A.↗

Cognitive Engine One: A Cross-Layer Framework for Autonomy in Multi-Provider Space Communications Environments

Spacecraft information needs, along with the communications environments in which data transfers occur, are becoming increasingly dynamic. Earth orbit is served by dozens of ground station and relay satellite providers – each with unique protocols and service capabilities. In this context, we present a system to automate end-to-end space communications across the protocol stack for each of several providers. The proposed system schedules contacts with providers, configures point-to-point RF links, and ensures data is transferred to its destination. Data monitoring and rescheduling provide an automated failover capability in the event of unsuccessful contacts. We verify system performance in a high-fidelity emulation testbed. Results from several scenarios demonstrate favorable system performance across a variety of mission use cases.

space communications↗

Deep space network resource scheduling approach and application

Deep Space Network (DSN) resource scheduling is the process of distributing ground-based facilities to track multiple spacecraft. The Jet Propulsion Laboratory has carried out extensive research to find ways of automating this process in an effort to reduce time and manpower costs. This paper presents a resource-scheduling system entitled PLAN-IT with a description of its design philosophy. The PLAN-IT's current on-line usage and limitations in scheduling the resources of the DSN are discussed, along with potential enhancements for DSN application.

Eggemeyer, William C.↗