Search NASA⌕ Search

SEARCH · Search NASA

Results for “building services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Controlling Infrastructure Costs: Right-Sizing the Mission Control Facility

Johnson Space Center's Mission Control Center is a space vehicle, space program agnostic facility. The current operational design is essentially identical to the original facility architecture that was developed and deployed in the mid-90's. In an effort to streamline the support costs of the mission critical facility, the Mission Operations Division (MOD) of Johnson Space Center (JSC) has sponsored an exploratory project to evaluate and inject current state-of-the-practice Information Technology (IT) tools, processes and technology into legacy operations. The general push in the IT industry has been trending towards a data-centric computer infrastructure for the past several years. Organizations facing challenges with facility operations costs are turning to creative solutions combining hardware consolidation, virtualization and remote access to meet and exceed performance, security, and availability requirements. The Operations Technology Facility (OTF) organization at the Johnson Space Center has been chartered to build and evaluate a parallel Mission Control infrastructure, replacing the existing, thick-client distributed computing model and network architecture with a data center model utilizing virtualization to provide the MCC Infrastructure as a Service. The OTF will design a replacement architecture for the Mission Control Facility, leveraging hardware consolidation through the use of blade servers, increasing utilization rates for compute platforms through virtualization while expanding connectivity options through the deployment of secure remote access. The architecture demonstrates the maturity of the technologies generally available in industry today and the ability to successfully abstract the tightly coupled relationship between thick-client software and legacy hardware into a hardware agnostic "Infrastructure as a Service" capability that can scale to meet future requirements of new space programs and spacecraft. This paper discusses the benefits and difficulties that a migration to cloud-based computing philosophies has uncovered when compared to the legacy Mission Control Center architecture. The team consists of system and software engineers with extensive experience with the MCC infrastructure and software currently used to support the International Space Station (ISS) and Space Shuttle program (SSP).

Martin, Keith↗

Design of a Mechanical NaK Pump for Fission Space Power

Alkali liquid metal cooled fission reactor concepts are under development for spaceflight power requirements. One such concept utilizes a sodium-potassium eutectic (NaK) as the primary loop working fluid, which has specific pumping requirements. Traditionally, electromagnetic linear induction pumps have been used to provide the required flow and pressure head conditions for NaK systems but they can be limited in performance, efficiency, and number of available vendors. The objective of the project was to develop a mechanical NaK centrifugal pump that takes advantages of technology advances not available in previous liquid metal mechanical pump designs. This paper details the design, build, and performance test of a mechanical NaK pump developed at NASA Marshall Space Flight Center. The pump was designed to meet reactor cooling requirements using commercially available components modified for high temperature NaK service.

Mireles, Omar R.↗

Architecture Options for Navigation in Cislunar Space for Human Landing System Vehicles

As part of architecture studies and insight analysis focused on requirements development into Human Landing System lunar architecture designs, multiple studies are underway to understand the sensitivities and options for achieving high precision landing on the lunar surface. The baseline approach utilizes a combination of multiple sensors to capture autonomous state observations of the lander with respect to the lunar surface. These systems are typically constrained in terms of operational altitudes by parameters such as onboard map size, camera focus, or sensor transmitted power (for altimeter observations). While these sensor suites do enable high precision landing, they are typically very complex and expensive. For a human-rated vehicle, fault detection algorithms are needed in addition to redundant sensors drive additional design complexity. Conversely, for these early missions, mass performance is key, so extended analysis is required to identify numbers of sensors, their ideal placement, and integration algorithms. A key part of this analysis is to help identify key sensor suites and options to help alleviate this design tension. An alternate approach is to take advantage and build out in-situ assets to allow for GPS-like navigation within the lunar regime through the use of navigation references or beacons. This can be achieved through the integration of navigation services into potential relays and pre-placed lunar surface assets. This research focuses on the capability of this infrastructure to support navigation in all areas of cislunar space such as: approach to the moon, in orbit around the moon, and ascent/descent operations to the surface. An augmented state linear covariance analysis (LinCov) and navigation state covariance analysis (NavCov) tools were used to assess a variety of navigation reference locations and how they can support vehicle operations through both understanding of state uncertainties and trajectory dispersions. This research helps to supplement existing studies focused on communication link analysis by providing additional insight into specific vehicle operational scenarios that are tied closely to potential Human Landing System scenarios. Key aspect of this analysis focus on the sensitivity to state knowledge of the references, the accuracy of inter-asset measurements, and placement in support of the various scenarios.

Evan J Anzalone↗

Interoperable End-To-End Space Communications Architecture Using CCSDS Building Blocks

End-to-end space communication architectures must connect system elements that may be in space, on the ground in mission operations centers, or are shared assets such as ground communications stations. End-to-end connectivity involves space communications over RF links, but also cross support services, terrestrial network circuits, and a variety of application layer protocols for commanding, telemetry, and mission operations. CCSDS has developed a large suite of interoperable, and cross-supportable, protocols for these purposes. Each of these defines a specific “layer” of functionality, such as: RF modulation, space link error coding, cross support frame delivery, or network layer routing. CCSDS has recently published a Space Communication Cross Support Architecture Requirements Document (SCCS-ARD) that describes how many of these standards fit together and how they are intended to be used. This paper provides an overview of this document, presented so as to explain the concepts so that others may use them. These concepts will be described from several key viewpoints.

Shames, Peter M.↗

Interoperable End-To-End Space Communications Architectures Using CCSDS Building Blocks

End-to-end space communication architectures must connect system elements that may be in space, on the ground in mission operations centers, or are shared assets such as ground communications stations. End-to-end connectivity involves space communications over RF links, but also cross support services, terrestrial network circuits, and a variety of application layer protocols for commanding, telemetry, and mission operations. CCSDS has developed a large suite of interoperable, and cross-supportable, protocols for these purposes. Each of these defines a specific “layer” of functionality, such as: RF modulation, space link error coding, cross support frame delivery, or network layer routing. CCSDS has recently published a Space Communication Cross Support Architecture Requirements Document (SCCS-ARD) that describes how many of these standards fit together and how they are intended to be used. This paper provides an overview of this document, presented so as to explain the concepts so that others may use them. These concepts will be described from several key viewpoints.

Shames, Peter M.↗

Artemis I: Test Flight Buys Down Risk for Humanity's Return to the Moon

The Artemis program successfully demonstrated its foundational deep space human transportation system during the Artemis I test flight in late 2022. This bold mission put the Artemis program on a course to accomplish increasingly complex missions to return humans to the Moon and to prepare for Mars and other destinations. The Artemis I uncrewed mission tested the Space Launch System (SLS) rocket and the Orion spacecraft using the ground processing, launch and recovery services provided by the Exploration Ground Systems (EGS) program at the Kennedy Space Center (KSC). The Artemis team accomplished key mission priorities that deliberately bought down risk for upcoming crewed missions as part of a build-up flight test strategy. The Artemis I mission priorities were 1) demonstrate Orion heatshield at lunar re-entry conditions; 2) operate systems in flight environment; and 3) retrieve the spacecraft. The successful performance and demonstration of these primary mission objectives from lift-off thru orbital insertion, translunar injection, outbound transit towards the Moon, entry into lunar orbit, coast in the lunar Distant Retrograde Orbit (DRO), exit from lunar orbit, transit back to Earth, atmospheric re-entry, descent, splashdown and recovery successfully showed that NASA has a foundational deep space transportation capability in place for human class missions. In addition to the primary mission objectives, a set of scientific payloads, approved Flight Test Objectives (FTOs) and Development Flight Test Objectives (DFTOs) were incorporated into the nominal mission plan and were designated as secondary, or priority 4, and were considered “bonus objectives” in terms of crewed flight risk buydown. During the mission, the team found itself in a position where it was comfortable achieving even more content than originally planned. As a result, DFTOs were added during the mission to further buy down risk to later crewed test flights. This paper presents an overview of the Artemis I test flight, including mission priorities and key test objectives, the launch campaign and as-flown mission profile, test objectives accomplished over the course of the 25.5- day mission, and implications to the crewed Artemis II and later test flight missions.

Artemis↗

Lunar Communications Services with Emphasis on Commercialization

In mid-2020 Lockheed Marin Space (LM) and NASA’s Jet Propulsion Laboratory (JPL) formed a working group to study and address the need for a lunar communications network to service a growing lunar economy, beginning with the initial crewed and robotic mission needs in 2024. Multiple commercial relay architectures were studied and evaluated for platform requirements, communications capabilities, and commercial business viability in a growing ecosystem. The evolution of communications needs around the Moon were mapped to infrastructure build out. Trade studies were performed to evaluate reliability and lifetime requirements, and the viability of various data protocols. Mission concepts and operations plans were developed for both initial mission support and future autonomous network support. This work has led to Lockheed Martin and JPL to evaluate a single dedicated relay satellite in a frozen lunar orbit, with simultaneous coverage of the far-side and south pole landing sites for over 10 hours per day as a first step towards a comprehensive solution to lunar connectivity. This first satellite is compatible with an ESPA Grande launch volume and would be capable of launching on a rideshare into a variety of orbits and trajectories. The satellite is equipped with both high- and low-rate communications relay payloads with software-defined radios and a delay/disruption tolerant networking protocol. The system is designed to service initial and future mission needs in a commercialized manner, enabling a new class of missions to the Moon. The relay satellite leverages prior spacecraft platform work with on-orbit heritage in a lunar environment expected by 2023.

Davarian, Faramaz↗

Interim Groundwater Monitoring Report, Revision 0, Fluid Servicing Road Area, Solid Waste Management Unit (SWMU)s 037 and 102, Kennedy Space Center, Florida

This Interim Groundwater Monitoring (IGWM) Report presents the findings from the IGWM events, completed between December 2022 and June 2023, at the Fluid Servicing Road Area (FSRA), Kennedy Space Center (KSC), Florida. KSC is located on the northern portion of Merritt Island, between the Indian and Banana Rivers in Brevard County, Florida. The IGWM program is implemented at sites where active remediation is not occurring. The IGWM events at the Propellants Support Building Area (PSBA; Solid Waste Management Unit [SWMU] 102) included the collection of eight groundwater monitoring well samples and 107 direct-push technology (DPT) samples. The DPT samples were collected for the Five-Year supplemental plume monitoring event. Additionally, 27 wells were sampled as part of the December 2022 IGWM event at the Former Drum Storage Area (FDSA), SWMU 037. This IGWM Report was prepared by HydroGeoLogic, Inc. (HGL) for the National Aeronautics and Space Administration (NASA) under Task Order 4 of Indefinite Delivery Indefinite Quantity Contract 80KSC019D0012/80KSC019F0090.

FDSA↗

The ORBCOMM data communications system

The ORBCOMM system is designed to provide low-cost, two-way data communications for mobile and remote users. The communications system is ideally configured for low data rate applications where communicating devices are geographically dispersed and two-way communications through terrestrial means is cumbersome and not cost effective. The remote terminals use VHF frequencies which allow for the use of very small, low-cost terminals. ORBCOMM has entered into joint development agreements with several large manufacturers of both consumer and industrial electronics to design and build the remote terminals. Based on prototype work, the estimated retail cost of these units will range from $50 to $400 depending on the complexity of the design. Starting in the fall of 1993, ORBCOMM will begin service with a demonstration network consisting of two operating satellites. By the end of 1994, a full operating network of 26 satellites, four Gateway Earth Stations, and a Network Control Center will be in place. The full constellation will provide full coverage of the entire world with greater than 94 percent communications availability for the continental U.S. This paper describes the ORBCOMM system, the technology used in its implementation, and its applications.

Schoen, David C.↗

Research and Technology 1997

NASA Lewis Research Center is responsible for developing and transferring critical technologies that address national priorities in aeropropulsion and space applications in partnership with U.S. industries, universities, and Government institutions. As NASA s designated Lead Center for Aeropropulsion, our role is to develop, verify, and transfer aeropropulsion technologies to U.S. industry. As NASA s designated Center of Excellence in Turbomachinery, our role is to develop new and innovative turbomachinery technology to improve the reliability, performance, efficiency and affordability, capacity, and environmental compatibility of future aerospace vehicles. We also maintain a science and technology development role in aeropropulsion, communications, space power and onboard propulsion, and microgravity fluid physics and combustion. We are committed to enabling non-aerospace U.S. industries to benefit directly from the technologies developed through our programs to maximize the benefit to the Nation and the return on each taxpayer s investment. In addition, we are aggressively pursuing continuous improvement in our management and business practices and striving for diversity in our workforce as together we push the edge of technology in space and aeronautics. The Lewis Research Center is a unique facility located in an important geographical area, the southwest corner of Cleveland, Ohio. Situated on 350 acres of land adjacent to the Cleveland Hopkins International Airport, Lewis comprises more than 140 buildings that include 24 major facilities and over 500 specialized research and test facilities. Additional facilities are located at Plum Brook Station, which is about 50 miles west of Cleveland. Over 3700 people staff Lewis, including civil service employees and support service contractors. Over half of them are scientists and engineers, who plan, conduct or oversee, and report on our research tasks and projects. They are assisted by technical specialists, skilled workers, and an administrative staff. Our end product is knowledge. This report is designed to help us make this knowledge fully available to potential users the aircraft engine industry, the energy industry, the automotive industry, the aerospace industry, and others. It is organized so that a broad cross section of the community can readily use it. Each article begins with a short introductory paragraph that should prove to be a valuable tool for the layperson. These articles summarize the progress made during the year in various technical areas and portray the technical and administrative support associated with Lewis technology programs. We hope that the information is useful to all. If additional information is desired, readers are encouraged to contact the researchers identified in the articles and to visit Lewis on the World Wide Web (http://www.lerc.nasa.gov/). This document is available on the World Wide Web (http://www.lerc.nasa.gov/WWW/RT).

Source record↗

New Compressor Added to Glenn's 450- psig Combustion Air System

In September 1999, the Central Process Systems Engineering Branch and the Maintenance and the Central Process Systems Operations Branch, released for service a new high pressure compressor to supplement the 450-psig Combustion Air System at the NASA Glenn Research Center at Lewis Field. The new compressor, designated C-18, is located in Glenn s Central Air Equipment Building and is remotely operated from the Central Control Building. C-18 can provide 40 pounds per second (pps) of airflow at pressure to our research customers. This capability augments our existing system capacity (compressors C 4 at 38 pps and C-5 at 32 pps), which is generated from Glenn's Engine Research Building. The C-18 compressor was originally part of Glenn's 21-Inch Hypersonic Tunnel, which was transferred from the Jet Propulsion Laboratory to Glenn in the mid-1980's. With the investment of construction of facilities funding, the compressor was modified, new mechanical and electrical support equipment were purchased, and the unit was installed in the basement of the Central Air Equipment Building. After several weeks of checkout and troubleshooting, the new compressor was ready for long-term, reliable operations. With a total of 110 pps in airflow now available, Glenn is well positioned to support the high-pressure air test requirements of our research customers.

Swan, Jeffrey A.↗

Evaluation of an Active Clearance Control System Concept

Reducing blade tip clearances through active tip clearance control in the high pressure turbine can lead to significant reductions in emissions and specific fuel consumption as well as dramatic improvements in operating efficiency and increased service life. Current engines employ scheduled cooling of the outer case flanges to reduce high pressure turbine tip clearances during cruise conditions. These systems have relatively slow response and do not use clearance measurement, thereby forcing cold build clearances to set the minimum clearances at extreme operating conditions (e.g., takeoff, reburst) and not allowing cruise clearances to be minimized due to the possibility of throttle transients (e.g., step change in altitude). In an effort to improve upon current thermal methods, a first generation mechanically-actuated active clearance control (ACC) system has been designed and fabricated. The system utilizes independent actuators, a segmented shroud structure, and clearance measurement feedback to provide fast and precise active clearance control throughout engine operation. Ambient temperature performance tests of this first generation ACC system assessed individual seal component leakage rates and both static and dynamic overall system leakage rates. The ability of the nine electric stepper motors to control the position of the seal carriers in both open- and closed-loop control modes for single and multiple cycles was investigated. The ability of the system to follow simulated engine clearance transients in closed-loop mode showed the system was able to track clearances to within a tight tolerance (0.001 in. error).

Steinetz, Bruce M.↗

Evaluation of an Active Clearance Control System Concept

Reducing blade tip clearances through active tip clearance control in the high pressure turbine can lead to significant reductions in emissions and specific fuel consumption as well as dramatic improvements in operating efficiency and increased service life. Current engines employ scheduled cooling of the outer case flanges to reduce high pressure turbine tip clearances during cruise conditions. These systems have relatively slow response and do not use clearance measurement, thereby forcing cold build clearances to set the minimum clearances at extreme operating conditions (e.g., takeoff, reburst) and not allowing cruise clearances to be minimized due to the possibility of throttle transients (e.g., step change in altitude). In an effort to improve upon current thermal methods, a first generation mechanically-actuated active clearance control (ACC) system has been designed and fabricated. The system utilizes independent actuators, a segmented shroud structure, and clearance measurement feedback to provide fast and precise active clearance control throughout engine operation. Ambient temperature performance tests of this first generation ACC system assessed individual seal component leakage rates and both static and dynamic overall system leakage rates. The ability of the nine electric stepper motors to control the position of the seal carriers in both open- and closed-loop control modes for single and multiple cycles was investigated. The ability of the system to follow simulated engine clearance transients in closed-loop mode showed the system was able to track clearances to within a tight tolerance ( 0.001 in. error).

Steinetz, Bruce M.↗

The "Programmatics" of the ISS Crewmembers' Twelve Month Mission

The mission duration for crewmembers' stay on the International Space Station (ISS) has historically been approximately six months, consistent with the service life of the Soyuz spacecraft that delivers and returns the crewmembers previous. Exploration missions beyond low Earth orbit are expected to require crew durations of a year or more. The ISS Partners have agreed to begin building an experience base of longer crew durations, and have selected two crewmembers to serve on ISS for approximately twelve months, beginning in the Spring of 2015. The preparations for the one NASA and one Roscosmos crewmember require many new considerations for the ISS Program and its Partnership - "programmatic" considerations that are separate from crew health concerns. Since the long-duration crew's Soyuz will need to be replaced halfway through their stay, crew rotation, handover and the Soyuz docking port plan are affected. There is also an opportunity for two short-duration crewmembers to fly during the Soyuz exchange. It is desirable to minimize additional training required of the prime and backup crewmembers; normal crew rotations have a Soyuz crew train as the backup crew, then train as the prime crew. Ground teams will adjust their traditional support to ISS crewmembers, including communication of long-term plans, onboard training, and logistics support. The lessons learned during the preparation and execution of the 12-month mission will support improvements in future ISS long-duration missions and exploration missions.

Hasbrook, Pete↗

Microsystems Fabrication Laboratory-New Class 100 Cleanroom Completed and Certified

A new Microsystems Fabrication Laboratory (MFL), a Class 100 cleanroom fabrication facility, was completed and certified in 2002 at the NASA Glenn Research Center. This facility, to be used by Glenn's Instrumentation and Controls Division, was designed and built as part of the NASA Construction of Facilities Program. The design, construction, and certification phases were managed by personnel from Glenn s Facilities and Test Engineering Division. Because of time constraints and the need for specialized cleanroom expertise, this 1000 ft2 laboratory was completed using a design-build procurement. Facility Planning & Resources (Pittsburgh, PA) was selected as the prime contractor and provided the architectural design and project management. A major subcontractor, AdvanceTEC, LLC (Richmond, VA), provided the mechanical and electrical design and performed the construction services. Throughout this fast-track project, Facilities and Test Engineering Division personnel provided overall project management and worked closely with the contractors to ensure that the customers needs were addressed and that the impact of the project implementation was minimized.

Borato, Frances M.↗

Unique Education and Workforce Development for NASA Engineers

NASA engineers are some of the world's best-educated graduates, responsible for technically complex, highly significant scientific programs. Even though these professionals are highly proficient in traditional analytical competencies, there is a unique opportunity to offer continuing education that further enhances their overall scientific minds. With a goal of maintaining the Agency's passionate, "best in class" engineering workforce, the NASA Academy of Program/Project & Engineering Leadership (APPEL) provides educational resources encouraging foundational learning, professional development, and knowledge sharing. NASA APPEL is currently partnering with the scientific community's most respected subject matter experts to expand its engineering curriculum beyond the analytics and specialized subsystems in the areas of: understanding NASA's overall vision and its fundamental basis, and the Agency initiatives supporting them; sharing NASA's vast reservoir of engineering experience, wisdom, and lessons learned; and innovatively designing hardware for manufacturability, assembly, and servicing. It takes collaboration and innovation to educate an organization that possesses such a rich and important history~and a future that is of great global interest. NASA APPEL strives to intellectually nurture the Agency's technical professionals, build its capacity for future performance, and exemplify its core values~alJ to better enable NASA to meet its strategic vision~and beyond.

Forsgren, Roger C.↗

Finding Atmospheric Composition (AC) Metadata

The Atmospheric Composition Portal (ACP) is an aggregator and curator of information related to remotely sensed atmospheric composition data and analysis. It uses existing tools and technologies and, where needed, enhances those capabilities to provide interoperable access, tools, and contextual guidance for scientists and value-adding organizations using remotely sensed atmospheric composition data. The initial focus is on Essential Climate Variables identified by the Global Climate Observing System CH4, CO, CO2, NO2, O3, SO2 and aerosols. This poster addresses our efforts in building the ACP Data Table, an interface to help discover and understand remotely sensed data that are related to atmospheric composition science and applications. We harvested GCMD, CWIC, GEOSS metadata catalogs using machine to machine technologies - OpenSearch, Web Services. We also manually investigated the plethora of CEOS data providers portals and other catalogs where that data might be aggregated. This poster is our experience of the excellence, variety, and challenges we encountered.Conclusions:1.The significant benefits that the major catalogs provide are their machine to machine tools like OpenSearch and Web Services rather than any GUI usability improvements due to the large amount of data in their catalog.2.There is a trend at the large catalogs towards simulating small data provider portals through advanced services. 3.Populating metadata catalogs using ISO19115 is too complex for users to do in a consistent way, difficult to parse visually or with XML libraries, and too complex for Java XML binders like CASTOR.4.The ability to search for Ids first and then for data (GCMD and ECHO) is better for machine to machine operations rather than the timeouts experienced when returning the entire metadata entry at once. 5.Metadata harvest and export activities between the major catalogs has led to a significant amount of duplication. (This is currently being addressed) 6.Most (if not all) Earth science atmospheric composition data providers store a reference to their data at GCMD.

metadata search↗

Fostering Open Science Inclusiveness for Interdisciplinary Users of Earth Observations

The term Open Science is subject to a variety of interpretations because of a key (and useful) ambiguity in the meaning of “Open”. Open in the sense of Transparency enables more trust in science research by making the details of the scientific process visible and accessible to anyone. “Open” in the sense of Inclusiveness enables more scientists from other disciplines to participate in research in a given discipline, thus producing more interdisciplinary research. Data Systems can play a major role in enabling Open (Inclusive) Science by making it easier for users from other disciplines to work with data within a given discipline. This is challenging for Earth Observation datasets, most of which are the product of advanced instrumentation and sophisticated, specialized variable retrieval algorithms and code. Serving the “extra-disciplinary”communities begins with simple things, like accessible, readable data documentation with adequate scaffolding. But just as important is provisioning Analysis-Ready data that does not require expert pre-processing. Disciplines also often have dominant toolsets, such as R in the biomass community or GIS in many applications communities. Ensuring that EO data are easy to use in the tools favored in other communities will enable more interdisciplinary research. Ideally, interdisciplinary research also benefits from scientists with different domain expertise. Platforms and frameworks that facilitate frictionless collaboration with discipline experts, together with capacity building efforts in those external disciplines also improve the inclusiveness aspect of Open Science. In short, Open Science is at root a way of thinking about how users from diverse discipline can best access and use data and services from a particular discipline.

Christopher Lynnes↗