Search NASA⌕ Search

SEARCH · Search NASA

Results for “communication delay”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Large File Transfers from Space Using Multiple Ground Terminals and Delay-Tolerant Networking

We use Delay-Tolerant Networking (DTN) to break control loops between space-ground communication links and ground-ground communication links to increase overall file delivery efficiency, as well as to enable large files to be proactively fragmented and received across multiple ground stations. DTN proactive fragmentation and reactive fragmentation were demonstrated from the UK-DMC satellite using two independent ground stations. The files were reassembled at a bundle agent, located at Glenn Research Center in Cleveland Ohio. The first space-based demonstration of this occurred on September 30 and October 1, 2009. This paper details those experiments. Communication, delay-tolerant networking, DTN, satellite, Internet, protocols, bundle, IP, TCP.

Ivancic, William D.↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. The National Aeronautics and Space Administration (NASA) conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km. Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 1–1.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “firstlook” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗

Lunar Terrain Vehicle (LTV) Remote Teleoperation Studies Under Four Lunar Communication Latencies

Remotely operating a lunar rover from Earth while subject to an Earth-Moon time delay of multiple seconds could result in a dangerous state where the roving vehicle is either damaged or lost, thereby potentially compromising an entire mission or series of missions. Providing the right capabilities to the remote operator to manage inherent communication latencies will be important for remote driving to be successful. NASA conducted two studies to investigate the average speed and number of kilometers per day that an operator on Earth could teleoperate a notional Artemis unpressurized rover with minimal remote operator capabilities under 0- and 4-second communication delays (April 2023 study) and 6- and 8-second delays (August 2023 study). A primary goal of these studies was to understand if an Artemis Lunar Terrain Vehicle (LTV) could cover 6 kilometers (km) in 24 hours when operated remotely. During the April 2023 evaluation, eight test operators used an in-house simulation of the lunar surface South Pole to teleoperate a NASA government reference LTV. Each operator received approximately 30 minutes of remote driving familiarization/training prior to their test run. Operators viewed the surrounding terrain via a single, rover mast-mounted, high-resolution camera with pan/tilt/zoom capabilities; continuous communication was provided throughout all testing. In the August 2023 evaluation, remote operators received approximately 3 hours of familiarization training in each latency, and the simulation environment provided remote operators with an operator-selected rate limiter to enable finer sensitivity in the hand controller and a predictive circle function to better assist operators with predicting the path the vehicle could take. All test operators were able to successfully navigate and drive through six different types of terrain and five planned traverse scenarios using natural lighting under all communication delays. Results for average speeds for each communication delay, computed by averaging the data from all test conditions for that latency and all operators, are shown in the table below. The average speed data was then used to derive the total time needed to cover 6 km, 8 km, and 20 km (distances relevant to LTV-SYS071 and -029 requirements). Remote operators drove slower and used the brake more frequently when subject to a communication latency as opposed to no communication latency. Subjective workload assessments revealed that while operating in a latency the overall workload significantly increased when compared to a 0-s delay with mental demand, frustration, and performance being the primary contributing factors. Driving strategies in the 0-s delay did not vary significantly among subjects; however, in the 4-s delay condition, three different driving strategies were identified. In the 6-s and 8-s latency conditions the operator’s use of the cruise control to maintain speed was more apparent. Additionally, over the course of the August study, the operator took advantage of the predictive circle indicator on the navigation display and over 95% of the operator’s navigation used the mast camera 180-degree panning function for ground truthing in terms of boulders and craters. Operators started to define more specific parameters in driving strategies for general operations. This consisted of setting the vehicle into a low-speed cruise mode of approximately 11.5 kph and noticing driving performance of the vehicle seemed to be much harder at slower speeds 0.4–0.8 kph; however, the vehicle was more responsive at speeds of 2.9–3.6 kph. Regardless of communication delay, operators used both the horizontal translation rails and the vehicle fenders as guides to predict a path for the vehicle through heavily concentrated terrain features. Test operators acknowledged that the teleoperations training for this study was substantially less than what an actual LTV remote operator will ultimately receive. They estimated a minimum of 20 to 100 hours spread across multiple days and weeks (e.g., strategies included immersion training over a 3-day period, to a short 8-week starter program) would be needed to get an operator ~ 60% proficient (i.e., able to complete a subset of remote driving tasks), to a yearlong program for full proficiency in remote driving tasks under all terrain types and natural lighting conditions. Remotely operating a vehicle on another planetary body while subject to communication latency is a complex task. Speed, distance covered, time spent driving, time spent navigating, brake usage and rock contacts are all affected by operator workload, driving strategies, workstation ergonomics and training. These studies provided a “first-look” answer to a potential system requirement (namely if a remote operator could cover a given distance in a given amount of time); however, considerable general knowledge was gained to begin to understand what it will take to make a successful lunar rover teleoperator.

LTV↗

Toward Time Synchronization in Delay Tolerant Network based Solar System Internetworking

The expanding presence in space will place an increased dependency on networked communications– a scalable communications infrastructure; that is, the Solar System Internet (SSI). Upcoming developments towards a SSI include NASA’s upcoming LunaNet, or lunar Internet, which provides multi-hop multi-path communications using Delay Tolerant Networking (DTN). DTN has been an active area of research and development, particularly in routing, security, and optimization. DTNs are marked by mobility, disconnection, and a wide variance of latencies (propagation and processing delays). In this paper, we outline progress towards a theory of time synchronization across such a network. An underlying assumption of DTN is that the network is time synchronized already, rather than synchronization being provided as a service. While this is necessary for schedule-based routing, which is necessarily prevalent in DTNs, it is so deeply ingrained as to be built into the primary unit of data in DTNs– the bundle. Indeed, a bundle’s creation timestamp and its time to live (called the lifetime) are based on time, and there are special recommendations for systems that lack accurate clocks. The assumption of time synchronization makes sense when limiting considerations to smaller-scale and more traditional space communication. However, just as end-to-end connectivity cannot be guaranteed in DTNs, neither can access to a reference or authoritative clock. In this more general case, it might be necessary to synchronize over time-varying meshes, and perhaps even to consider relativistic effects. Moreover, by imposing synchronization restrictions in order to sustain a network, the effectiveness of the network to achieve scalability will be necessarily muted. To work towards a time synchronization theory for DTNs, we build upon past successes in modeling DTNs using time-varying graphs and sheaves. This includes error and limitation estimation, which allows one to define domains over which schedule-based routing is possible, up to some threshold sensitivity. Despite the theoretical nature of these results, the approaches taken are also algorithmic, and hence lend themselves to practical implementations. The paper concludes with comparisons of the various methods along with suggestions for future work.

Delay Tolerant Networking↗

Typical teleoperator time delay profiles, phase 2

The results of the second phase of a study on time delays in communications systems applicable to the teleoperator program are presented. Estimates of the maximum time delays that will be encountered and presents time delay profiles are given for (1) ground control to teleoperator in low earth orbit, (2) ground control to teleoperator in geosynchronous orbit, and (3) low earth orbit control to teleoperator in low earth orbit.

Wetherington, R. D.↗

Space Flight Middleware: Remote AMS over DTN for Delay-Tolerant Messaging

This paper describes a technique for implementing scalable, reliable, multi-source multipoint data distribution in space flight communications -- Delay-Tolerant Reliable Multicast (DTRM) -- that is fully supported by the "Remote AMS" (RAMS) protocol of the Asynchronous Message Service (AMS) proposed for standardization within the Consultative Committee for Space Data Systems (CCSDS). The DTRM architecture enables applications to easily "publish" messages that will be reliably and efficiently delivered to an arbitrary number of "subscribing" applications residing anywhere in the space network, whether in the same subnet or in a subnet on a remote planet or vehicle separated by many light minutes of interplanetary space. The architecture comprises multiple levels of protocol, each included for a specific purpose and allocated specific responsibilities: "application AMS" traffic performs end-system data introduction and delivery subject to access control; underlying "remote AMS" directs this application traffic to populations of recipients at remote locations in a multicast distribution tree, enabling the architecture to scale up to large networks; further underlying Delay-Tolerant Networking (DTN) Bundle Protocol (BP) advances RAMS protocol data units through the distribution tree using delay-tolerant storeand- forward methods; and further underlying reliable "convergence-layer" protocols ensure successful data transfer over each segment of the end-to-end route. The result is scalable, reliable, delay-tolerant multi-source multicast that is largely self-configuring.

Disruption Tolerant Networking (DTN)↗

NASA's Desert RATS Science Backroom: Remotely Supporting Planetary Exploration

NASA's Desert Research and Technology Studies (Desert RATS) is a multi-year series of tests designed to exercise planetary surface hardware and operations in conditions where long-distance, multi-day roving is achievable. In recent years, a D-RATS science backroom has conducted science operations and tested specific operational approaches. Approaches from the Apollo, Mars Exploration Rovers and Phoenix missions were merged to become the baseline for these tests. In 2010, six days of lunar-analog traverse operations were conducted during each week of the 2-week test, with three traverse days each week conducted with voice and data communications continuously available, and three traverse days conducted with only two 1-hour communications periods per day. In 2011, a variety of exploration science scenarios that tested operations for a near-earth asteroid using several small exploration vehicles and a single habitat. Communications between the ground and the crew in the field used a 50-second one-way delay, while communications between crewmembers in the exploration vehicles and the habitat were instantaneous. Within these frameworks, the team evaluated integrated science operations management using real-time science operations to oversee daily crew activities, and strategic level evaluations of science data and daily traverse results. Exploration scenarios for Mars may include architectural similarities such as crew in a habitat communicating with crew in a vehicle, but significantly more autonomy will have to be given to the crew rather than step-by-step interaction with a science backroom on Earth.

Cohen, Barbara A.↗

Experiments with an EVA Assistant Robot

Human missions to the Moon or Mars will likely be accompanied by many useful robots that will assist in all aspects of the mission, from construction to maintenance to surface exploration. Such robots might scout terrain, carry tools, take pictures, curate samples, or provide status information during a traverse. At NASA/JSC, the EVA Robotic Assistant (ERA) project has developed a robot testbed for exploring the issues of astronaut-robot interaction. Together with JSC's Advanced Spacesuit Lab, the ERA team has been developing robot capabilities and testing them with space-suited test subjects at planetary surface analog sites. In this paper, we describe the current state of the ERA testbed and two weeks of remote field tests in Arizona in September 2002. A number of teams with a broad range of interests participated in these experiments to explore different aspects of what must be done to develop a program for robotic assistance to surface EVA. Technologies explored in the field experiments included a fuel cell, new mobility platform and manipulator, novel software and communications infrastructure for multi-agent modeling and planning, a mobile science lab, an "InfoPak" for monitoring the spacesuit, and delayed satellite communication to a remote operations team. In this paper, we will describe this latest round of field tests in detail.

Burridge, Robert R.↗

The phantom robot - Predictive displays for teleoperation with time delay

An enhanced teleoperation technique for time-delayed bilateral teleoperator control is discussed. The control technique selected for time delay is based on the use of a high-fidelity graphics phantom robot that is being controlled in real time (without time delay) against the static task image. Thus, the motion of the phantom robot image on the monitor predicts the motion of the real robot. The real robot's motion will follow the phantom robot's motion on the monitor with the communication time delay implied in the task. Real-time high-fidelity graphics simulation of a PUMA arm is generated and overlaid on the actual camera view of the arm. A simple camera calibration technique is used for calibrated graphics overlay. A preliminary experiment is performed with the predictive display by using a very simple tapping task. The results with this simple task indicate that predictive display enhances the human operator's telemanipulation task performance significantly during free motion when there is a long time delay. It appears, however, that either two-view or stereoscopic predictive displays are necessary for general three-dimensional tasks.

Bejczy, Antal K.↗

Ground controlled robotic assembly operations for Space Station Freedom

A number of dextrous robotic systems and associated positioning and transportation devices are available on Space Station Freedom (SSF) to perform assembly tasks that would otherwise need to be performed by extravehicular activity (EVA) crewmembers. The currently planned operating mode for these robotic systems during the assembly phase is teleoperation by intravehicular activity (IVA) crewmembers. While this operating mode is less hazardous and expensive than manned EVA operations, and has insignificant control loop time delays, the amount of IVA time available to support telerobotic operations is much less than the anticipated requirements. Some alternative is needed to allow the robotic systems to perform useful tasks without exhausting the available IVA resources; ground control is one such alternative. The issues associated with ground control of SSF robotic systems to alleviate onboard crew time availability constraints are investigated. Key technical issues include the effect of communication time delays, the need for safe, reliable execution of remote operations, and required modifications to the SSF ground and flight system architecture. Time delay compensation techniques such as predictive displays and world model-based force reflection are addressed and collision detection and avoidance strategies to ensure the safety of the on-orbit crew, Orbiter, and SSF are described. Although more time consuming and difficult than IVA controlled teleoperations or manned EVA, ground controlled telerobotic operations offer significant benefits during the SSF assembly phase, and should be considered in assembly planning activities.

Parrish, Joseph C.↗

Analysis of adaptive algorithms for an integrated communication network

Techniques were examined that trade communication bandwidth for decreased transmission delays. When the network is lightly used, these schemes attempt to use additional network resources to decrease communication delays. As the network utilization rises, the schemes degrade gracefully, still providing service but with minimal use of the network. Because the schemes use a combination of circuit and packet switching, they should respond to variations in the types and amounts of network traffic. Also, a combination of circuit and packet switching to support the widely varying traffic demands imposed on an integrated network was investigated. The packet switched component is best suited to bursty traffic where some delays in delivery are acceptable. The circuit switched component is reserved for traffic that must meet real time constraints. Selected packet routing algorithms that might be used in an integrated network were simulated. An integrated traffic places widely varying workload demands on a network. Adaptive algorithms were identified, ones that respond to both the transient and evolutionary changes that arise in integrated networks. A new algorithm was developed, hybrid weighted routing, that adapts to workload changes.

Reed, Daniel A.↗

Studying impacts of communication system performance on dynamic stability of networked microgrid

The development of smart grid technologies has resulted in increased interdependence between power and communication systems. Many of the operations in the existing power system rely on a stable and secured communication system. For electrically weak systems and time‐critical applications, this reliance can be even greater, where a small degradation in communication performance can degrade system stability. However, despite inter‐dependencies between power and communication systems, only a few studies have investigated the impacts of communication system performance on power system dynamics. This study investigates the dependencies of power system dynamics operations on a communication system performance. First, a detailed, dynamic networked microgrid model is developed in the GridLAB‐D simulation environment, along with a representative multi‐traffic, multi‐channel, multi‐protocol communication system model, developed in the network simulator (ns‐3). Second, a hierarchical engine for large‐scale infrastructure co‐simulation framework is developed to co‐simulate microgrid dynamics, its communication system, and a microgrid control system. The impact of communication system delays on the dynamic stability of networked microgrids is evaluated for the loss of generation using three use‐cases. While the example use‐cases examine microgrid applications and the impact to resiliency, the framework can be applied to all levels of power system operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Consensus-Based Control and Optimization of Power System Inertia

The integration of distributed energy resources (DERs), such as solar, wind, and energy storage systems, into power grids through inverter-based resources reduces power system inertia, leading to faster frequency dynamics and potential grid instability. To address this challenge, this paper proposes a distributed, consensus-based approach for the real-time control and optimization of inertia sources (synchronous generators and/or DERs) during system disturbances, enhancing both system stability and economic performance. The distributed control and optimization approach assumes each inertia source exchanges information solely with its neighbor ones, making it easily scalable to large power grid networks. The impacts of the communication connectivity among the inertia sources as well as their generation capacity limits on the distributed approach are investigated. We also demonstrate the approach’s robustness in scenarios involving communication time delays and packet losses, validating its effectiveness through numerical simulations on a 4-bus test system and a two-area 8-bus test system.

Power system inertia↗

Distributed Inertia Management Under Communication Constraints

This paper presents a framework for distributed inertia management based on consensus algorithm. We propose a methodology to achieve optimal operation of inertia sources such as distributed energy resources (DERs) and synchronous generators in real time. Additionally, we analyze the algorithm under communication constraints and evaluate its robustness under scenarios involving communication time delays and packet losses. The proposed approach is validated via simulations on a 4-node system test feeder, demonstrating its effectiveness and resilience.

Yadav, Ajay [ORNL] (ORCID:000000016111881X)↗

Remotely Manned Systems for operation and exploration in space

A brief overview is presented of Remotely Manned Systems with emphasis on their use as tools for exploration and operation in space. Remotely Manned Systems missions and functions in space are described and classified in relation to other existing or planned space systems. Problem areas of large-scale man-machine systems are identified based on experience in the Surveyor program, the Mariner 9 Mars orbiter project and the Apollo program. The effects of communication time delay on system performance are investigated using the average velocity of a Martian rover as performance indicator. A substantial performance increase can be achieved by providing certain autonomous capabilities to the remote system.

Heer, E.↗

Concepts for robot motion primitives required for space station teleoperations

Ground controlled teleoperations are expected to be used to augment Space Station manned extravehicular activities (EVA) and Intravehicular activities (IVA). However, ground controlled teleoperations will encounter communications time delays of from 3 to 8 secs. Time delays greater than 1 sec have been shown to be detrimental to safe and efficient teleoperations. Therefore, concepts must be developed to overcome the hazards and limitations of time delays when performing teleoperations using robots. The concept for robot motion primitives incorporate force/torque and tactile sensor feedback to implement the degree of autonomy required for interactive, ground controlled telerobotics. Several primitives are studied that augment human initiated actions by providing rapid response interaction with the physical environment of a telerobot. These primitives are detailed. They constitute a level of intelligent sensing and reaction required to augment human actions through autonomous interaction with the physical environment.

Grover, Jeffrey L.↗

Remote servicing of space systems

Space systems are difficult to maintain on orbit. The difficulty arises from the limited ability and availability of the astronaut work force in the hazardous space environment. Remote robotic manipulation can free the astronaut from the hazardous working environment while also increasing the work force. However, remote robotic servicing is not without its own set of problems and limitations, such as communication time delay and unstructured worksites. Tests and test equipment are described which are designed to increase the understanding of the remote servicing problems and to allow development of potential solutions. A half scale satellite mockup was developed for evaluating and improving upon the design of replaceable subsystems, such as batteries and electronic boxes. A servicer system, that includes a six degree of freedom PUMA 560 robot and interchangeable end effectors (tools), was developed to aid in driving out servicer design requirements. The results include the time delay impact on servicing timelines and requirements for the servicer system.

Collins, S. L.↗