Reduced Organic Outgassing in the NASA Osiris-Rex and Hayabusa2 Curation Facility by Careful Selection and Implementation of Cleanroom Construction Materials

In October 2021, NASA Johnson Space Center (JSC) Astromaterials Acquisition and Cu-ration Office in JSC bldg. 31 completed construction and commissioning of the OSIRIS-REx and Hayabusa2cleanroom laboratory suites along with new precision cleaning and advanced curation laboratories: •OSIRIS-REx Curation Cleanroom: ISO Class 5•Hayabusa2 Curation Cleanroom: ISO Class 5•Final Precision Cleaning Cleanroom: ISO Class 5•Advanced Precision Cleaning Cleanroom: ISO Class 6•PreClean Precision Cleaning Cleanroom: ISO Class 6•Advanced Curation Cleanroom: ISO Class 7The new curation facilities are designed for initial receiving, basic characterization, curation processing, and preliminary examination of carbonaceous asteroidal material. The facilities are also designed to enable long-term pristine sample storage to preserve the scientific integrity of each sample to enable decades of future re-search by the international science community. The scientific study of organics in general is critical for both missions. The OSIRIS-REx mission executed a stringent contamination control plan [1] where all sample hardware at time of sample acquisition would be at Level 100 A/2 per IEST-STD-CC1246D (non-volatile residue (NVR) < 500 ng/cm2). In addition, the mission imposed a requirement of <180 ng/cm2 for amino acids (and hydrazine) [1]. Given these mission requirements, long-term storage preservation requirements, and information from the Organic Contamination Baseline Study at JSC [2], the JSC Curation team decided to carefully select cleanroom construction materials that would not hinder the scientific search for amino acids and the study of organics in the samples [3].

astromaterials curation↗

The History of Venting (part I)

Venting techniques and design are an important implementation strategy for observatory and payload contamination control, and yet venting analysis has seen a topsey turvey history, at lease from the perspective of the simple Layman trying to design a black box. Additionally, designing the vent has competing controls from Safety and EMIEMC. In the days of Shuttle, Safety placed liens against the vents of blankets, boxes, and large structural items principally to protect cargo bay vents but also from a flammability perspective. What continues to elude the Designer Community is a stable, simple way of designing vents for black boxes that satisfies everybody. But we continue to try.

Contamination Control↗

Clean assembly and integration techniques for the Hubble Space Telescope High Fidelity Mechanical Simulator

A mechanical simulator of the Hubble Space Telescope (HST) Aft Shroud was built to perform verification testing of the Servicing Mission Scientific Instruments (SI's) and to provide a facility for astronaut training. All assembly, integration, and test activities occurred under the guidance of a contamination control plan, and all work was reviewed by a contamination engineer prior to implementation. An integrated approach was followed in which materials selection, manufacturing, assembly, subsystem integration, and end product use were considered and controlled to ensure that the use of the High Fidelity Mechanical Simulator (HFMS) as a verification tool would not contaminate mission critical hardware. Surfaces were cleaned throughout manufacturing, assembly, and integration, and reverification was performed following major activities. Direct surface sampling was the preferred method of verification, but access and material constraints led to the use of indirect methods as well. Although surface geometries and coatings often made contamination verification difficult, final contamination sampling and monitoring demonstrated the ability to maintain a class M5.5 environment with surface levels less than 400B inside the HFMS.

Hughes, David W.↗

Establishing Cleaning Methods For Cleanroom And Safety Suits At Remote Sites With Available Resources

The James Webb Space Telescope (JWST) spent considerable time in multiple clean facilities during its launch campaign at the Centre Spatial Guyanais (CSG) in French Guiana. Throughout this time, it was imperative that personnel wear approved cleanroom or safety suits when working in proximity to the JWST observatory. This proved to be challenging for two reasons: 1) A large quantity of NASA cleanroom suits needed to be shipped to CSG to account for the heavy volume of NASA and ESA personnel requiring access to the clean facilities. It became evident that shipping clean suits from the US to CSG in a timely fashion during the launch campaign would be challenging. Consequently, a backup plan needed to be established to avoid running out. 2) For safety purposes, Self-Contained Atmospheric Protection Ensemble (SCAPE) and Splash suits were required for hazardous operations. Neither type of suit was cleanroom compatible; therefore, a viable cleaning process needed to be developed to ensure both types of suits met JWST’s approved cleanliness standards. The NASA Contamination Control (CC) team partnered with CSG’s S5E cleanroom and suit processing team. The teams were able to make modifications to the S5E facility to create a NASA approved makeshift clean environment where NASA cleanroom suits and CSG Splash suits were inspected, folded, and bagged for cleanroom use once they were washed and dried. Since SCAPE suits could not be cleaned using conventional methods, a procedure was developed to clean and inspect the suits by the CC team in a temporary clean environment prior to fueling.

James Webb Space Telescope↗

Establishing Cleaning Methods for Cleanroom and Safety Suits at Remote Sites with Available Resources

"The James Webb Space Telescope (JWST) spent considerable time in multiple clean facilities during its launch campaign at the Centre Spatial Guyanais (CSG) in French Guiana. Throughout this time, it was imperative that personnel wear approved cleanroom or safety suits when working in proximity to the JWST observatory. This proved to be challenging for two reasons: 1) A large quantity of NASA cleanroom suits needed to be shipped to CSG to account for the heavy volume of NASA and ESA personnel requiring access to the clean facilities. It became evident that shipping clean suits from the US to CSG in a timely fashion during the launch campaign would be challenging. Consequently, a backup plan needed to be established to avoid running out. 2) For safety purposes, Self-Contained Atmospheric Protection Ensemble (SCAPE) and Splash suits were required for hazardous operations. Neither type of suit was cleanroom compatible; therefore, a viable cleaning process needed to be developed to ensure both types of suits met JWST’s approved cleanliness standards. The NASA Contamination Control (CC) team partnered with CSG’s S5E cleanroom and suit processing team. The teams were able to make modifications to the S5E facility to create a NASA approved makeshift clean environment where NASA cleanroom suits and CSG Splash suits were inspected, folded, and bagged for cleanroom use once they were washed and dried. Since SCAPE suits could not be cleaned using conventional methods, a procedure was developed to clean and inspect the suits by the CC team in a temporary clean environment prior to fueling. "

James Webb Space Telescope↗

Lessons Learned From the Construction of a Portable Cleanroom for NASA OSIRIS-REx Mission Deintegration

NASA Johnson Space Center (JSC) Infrastructure and Astromaterials Acquisition & Curation Office completed construction and commissioning of the OSIRIS-REx (OREx) Deintegration portable cleanroom at the Utah Test and Training Range (UTTR). The new portable cleanroom was designed to receive the OREx sample return capsule from the landing point on the range to an ISO7 environment. Scientists used the portable clean-room to deintegrate the sample canister from the sample return capsule. Once separated, the sample canister was put in a container under nitrogen purge for transportation to B31 at the Johnson Space Center for astromaterial sample extraction, preliminary analysis, and long-term curation. The portable cleanroom was built by a subcontractor at their facility and then deconstructed to be transported to the remote location at UTTR. Since construction was completed in a remote location all tools and materials had to be transported from contractor site in Dallas, TX. The cleanroom was constructed within an existing facility, which provided conditioned air, electric power, and protection from the elements. Careful coordination was required between the host facility, cleanroom contractor, mission scientists, and JSC facilities and curation personnel. An existing anteroom at JSC was transported to UTTR and added to the portable cleanroom after there was concern about contamination without one for personnel entry/exit. The scientific study of organics is critical for the mission, so a stringent contamination control plan was implemented for low organics. Given these mission requirements the cleanroom construction materials were carefully selected to not hinder the scientific search for amino acids and the study of organics in the samples. The same cleanroom contractor that built the long-term astromaterial curation cleanroom back at JSC Houston, TX was selected to build the portable cleanroom and instructed to use the same materials. The cleanroom had double doors to open and allow the sample return capsule to fit into the cleanroom on its stand and be transferred to a clean stand already in the cleanroom. The portable cleanroom successfully completed its mission and the sample canister was safely deintegrated and transported to JSC under nitrogen purge.

astromaterials curation↗

Portable Cleanroom for NASA OSIRIS-REx Mission Deintegration

NASA Johnson Space Center (JSC) Infrastructure and Astromaterials Acquisition & Curation Office completed construction and commissioning of the OSIRIS-REx (OREx) Deintegration portable cleanroom at the Utah Test and Training Range (UTTR). The new portable cleanroom was designed to receive the OREx sample return capsule from the landing point on the range to an ISO7 environment. Scientists used the portable clean-room to deintegrate the sample canister from the sample return capsule. Once separated, the sample canister was put in a container under nitrogen purge for transportation to B31 at the Johnson Space Center for astromaterial sample extraction, preliminary analysis, and long-term curation. The portable cleanroom was built by a subcontractor at their facility and then deconstructed to be transported to the remote location at UTTR. Since construction was completed in a remote location all tools and materials had to be transported from contractor site in Dallas, TX. The cleanroom was constructed within an existing facility, which provided conditioned air, electric power, and protection from the elements. Careful coordination was required between the host facility, cleanroom contractor, mission scientists, and JSC facilities and curation personnel. An existing anteroom at JSC was transported to UTTR and added to the portable cleanroom after there was concern about contamination without one for personnel entry/exit. The scientific study of organics is critical for the mission, so a stringent contamination control plan was implemented for low organics. Given these mission requirements the cleanroom construction materials were carefully selected to not hinder the scientific search for amino acids and the study of organics in the samples. The same cleanroom contractor that built the long-term astromaterial curation cleanroom back at JSC Houston, TX was selected to build the portable cleanroom and instructed to use the same materials. The cleanroom had double doors to open and allow the sample return capsule to fit into the cleanroom on its stand and be transferred to a clean stand already in the cleanroom. The portable cleanroom successfully completed its mission and the sample canister was safely deintegrated and transported to JSC under nitrogen purge.

astromaterials curation↗

Lessons Learned From Designing and Building Low Organic Outgassing Cleanrooms for NASA OSIRIS-REx and Hayabusa2 Curation Facility

NASA Johnson Space Center Astromaterials Acquisition and Curation Office completed construction and commissioning of the OSIRIS-REx and Hayabusa2 cleanroom laboratory suites along with new precision cleaning and advanced curation laboratories consisting of ISO Class 5, 6, and 7 cleanrooms. The new curation facilities are designed for initial receiving, basic characterization, curation processing, and preliminary examination of carbonaceous asteroidal material. The facilities are also designed to enable long-term pristine sample storage to preserve the scientific integrity of each sample to enable future research by the international science community. The scientific study of organics is critical for both missions. The OSIRIS-REx mission instituted a stringent contamination control plan for low organics. Given these mission requirements and long-term storage preservation requirements, cleanroom construction materials were carefully selected to not hinder the scientific search for amino acids and the study of organics in the samples. Cleanroom candidate construction materials were researched for the HVAC system, floors, walls, ceiling, and plenum areas. The team chose several candidate materials that were further tested for their specific outgassing characteristics using ASTM E-595 per ASTM E-2312. The information gained provided the foundation for the final design selection of the cleanroom materials. While material selection is important before and during the facility design phase, the construction phase is where these choices are implemented by the prime construction contractor through final product and material submittals. These submittals are the last check point and changes are often submitted due to engineering/construction conflicts, especially when renovating an existing building. Any new material or equipment/product change must be identified and scrutinized for low particulate shedding and outgassing properties. In some cases, quick testing of new material is required, and compromises must be made in real-time. Careful selection and implementation of cleanroom materials significantly reduced organic and inorganic contamination beyond normal cleanroom baselines.

astromaterials curation↗

Lessons Learned From Designing and Building Low Organic Outgassing Cleanrooms for NASA OSIRIS-REx and Hayabusa2 Curation Facility

NASA Johnson Space Center Astromaterials Acquisition and Curation Office completed construction and commissioning of the OSIRIS-REx and Hayabusa2 cleanroom laboratory suites along with new precision cleaning and advanced curation laboratories consisting of ISO Class 5, 6, and 7 cleanrooms. The new curation facilities are designed for initial receiving, basic characterization, curation processing, and preliminary examination of carbonaceous asteroidal material. The facilities are also designed to enable long-term pristine sample storage to preserve the scientific integrity of each sample to enable future research by the international science community. The scientific study of organics is critical for both missions. The OSIRIS-REx mission instituted a stringent contamination control plan for low organics. Given these mission requirements and long-term storage preservation requirements, cleanroom construction materials were carefully selected to not hinder the scientific search for amino acids and the study of organics in the samples. Cleanroom candidate construction materials were researched for the HVAC system, floors, walls, ceiling, and plenum areas. The team chose several candidate materials that were further tested for their specific outgassing characteristics using ASTM E-595 per ASTM E-2312. The information gained provided the foundation for the final design selection of the cleanroom materials. While material selection is important before and during the facility design phase, the construction phase is where these choices are implemented by the prime construction contractor through final product and material submittals. These submittals are the last check point and changes are often submitted due to engineering/construction conflicts, especially when renovating an existing building. Any new material or equipment/product change must be identified and scrutinized for low particulate shedding and outgassing properties. In some cases, quick testing of new material is required, and compromises must be made in real-time. Careful selection and implementation of cleanroom materials significantly reduced organic and inorganic contamination beyond normal cleanroom baselines.

astromaterials curation↗

U.S. planetary protection program - Implementation highlights

The implementation of the United States planetary protection program, intended to prevent the contamination of the celestial bodies in the solar system during their exploration, in recent interplanetary projects is reviewed. The shift in planetary protection policy from that of absolute sterilization to a probabilistic approach is noted. Attention is then given to the use of microbiological assay, organic materials inventory, microbial burden reduction, contamination control, trajectory biasing and the analysis and identification of contaminating processes for purposed of planetary protection for the Pioneer 10 and 11, Viking and Voyager projects. The success of these measures, as demonstrated by the prevention of accidental planetary impact and the failure to detect terrestrial organisms by the Viking life detection experiments, is pointed out.

Barengoltz, J.↗

Sustainability of the Catalytic Activity of a Silica-Titania Composite (STC) for Long-Term Indoor Air Quality Control

TiO2-assisted photocatalytic oxidation (PCO) is an emerging technology for indoor air quality control and is also being evaluated as an alternative trace contaminant control technology for crew habitats in space exploration. Though there exists a vast range of literature on the development of photocatalysts and associated reactor systems, including catalyst performance and performance-influencing factors, the critical question of whether photocatalysts can sustain their initial catalytic activity over an extended period of operation has not been adequately addressed. For a catalyst to effectively serve as an air quality control product, it must be rugged enough to withstand exposure to a multitude of low concentration volatile organic compounds (VOCs) over long periods of time with minimal loss of activity. The objective of this study was to determine the functional lifetime of a promising photocatalyst - the silica-titania composite (STC) from Sol Gel Solutions, LLC in a real-world scenario. A bench-scale STC-packed annular reactor under continuous irradiation by a UV-A fluorescent black-light blue lamp ((lambda)max = 365 nm) was exposed to laboratory air continuously at an apparent contact time of 0.27 sand challenged with a known concentration of ethanol periodically to assess any changes in catalytic activity. Laboratory air was also episodically spiked with halocarbons (e.g., octafluoropropane), organosulfur compounds (e.g., sulfur hexafluoride), and organosilicons (e.g., siloxanes) to simulate accidental releases or leaks of such VOCs. Total organic carbon (TOC) loading and contaminant profiles of the laboratory air were also monitored. Changes in STC photocatalytic performance were evaluated using the ethanol mineralization rate, mineralization efficiency, and oxidation intermediate (acetaldehyde) formation. Results provide insights to any potential catalyst poisoning by trace halocarbons and organosulfur compounds.

Coutts, Janelle L.↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Some recent developments in spacecraft environmental control/life support subsystems

The subsystems considered include a flash evaporator for heat rejection, a regenerable carbon dioxide and humidity control subsystem, an iodinating subsystem for potable water, a cabin contaminant control subsystem, and a wet oxidation subsystem for processing spacecraft wastes. The flash evaporator discussed is a simple unit which efficiently controls life support system temperatures over a wide range of heat loads. For certain advanced spacecraft applications the control of cabin carbon dioxide and humidity can be successfully achieved by a regenerable solid amine subsystem.

Gillen, R. J.↗

Space Shuttle contamination overview

Consideration is given to particle and gaseous contamination associated with Shuttle payload orbital delivery. An approach to control contamination is discussed which consists of analytical environment assessment, vehicle design optimization, and flight environment measurement. The analytical assessment of orbital contamination source characteristics and their effects on the Shuttle orbital environment has resulted in vehicle design changes and a detailed understanding of system operational flexibility. Verification of resulting Shuttle contamination performance will be made by the Induced Environment Contamination Monitor.

Leger, L.↗

Advanced Catalysts for the Ambient Temperature Oxidation of Carbon Monoxide and Formaldehyde

The primary applications for ambient temperature carbon monoxide (CO) oxidation catalysts include emergency breathing masks and confined volume life support systems, such as those employed on the Shuttle. While Hopcalite is typically used in emergency breathing masks for terrestrial applications, in the 1970s, NASA selected a 2% platinum (Pt) on carbon for use on the Shuttle since it is more active and also more tolerant to water vapor. In the last 10-15 years there have been significant advances in ambient temperature CO oxidation catalysts. Langley Research Center developed a monolithic catalyst for ambient temperature CO oxidation operating under stoichiometric conditions for closed loop carbon dioxide (CO2) laser applications which is also advertised as having the potential to oxidize formaldehyde (HCHO) at ambient temperatures. In the last decade it has been discovered that appropriate sized nano-particles of gold are highly active for CO oxidation, even at sub-ambient temperatures, and as a result there has been a wealth of data reported in the literature relating to ambient/low temperature CO oxidation. In the shorter term missions where CO concentrations are typically controlled via ambient temperature oxidation catalysts, formaldehyde is also a contaminant of concern, and requires specially treated carbons such as Calgon Formasorb as untreated activated carbon has effectively no HCHO capacity. This paper examines the activity of some of the newer ambient temperature CO and formaldehyde (HCHO) oxidation catalysts, and measures the performance of the catalysts relative to the NASA baseline Ambient Temperature Catalytic Oxidizer (ATCO) catalyst at conditions of interest for closed loop trace contaminant control systems.

Nalette, Tim↗

Evaluation of Contamination Inspection and Analysis Methods through Modeling System Performance

Contamination is usually identified as a risk on the risk register for sensitive space systems hardware. Despite detailed, time-consuming, and costly contamination control efforts during assembly, integration, and test of space systems, contaminants are still found during visual inspections of hardware. Improved methods are needed to gather information during systems integration to catch potential contamination issues earlier and manage contamination risks better. This research explores evaluation of contamination inspection and analysis methods to determine optical system sensitivity to minimum detectable molecular contamination levels based on IEST-STD-CC1246E non-volatile residue (NVR) cleanliness levels. Potential future degradation of the system is modeled given chosen modules representative of optical elements in an optical system, minimum detectable molecular contamination levels for a chosen inspection and analysis method, and determining the effect of contamination on the system. By modeling system performance based on when molecular contamination is detected during systems integration and at what cleanliness level, the decision maker can perform trades amongst different inspection and analysis methods and determine if a planned method is adequate to meet system requirements and manage contamination risk.

Seasly, Elaine↗