Search NASA⌕ Search

SEARCH · Search NASA

Results for “coordinated operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Quantity, Revisited: An Object-Oriented Reusable Class

"Quantity", a prototype implementation of an object-oriented class, was developed for two reasons: to help engineers and scientists manipulate the many types of quantities encountered during routine analysis, and to create a reusable software component to for large domain-specific applications. From being used as a stand-alone application to being incorporated into an existing computational mechanics toolkit, "Quantity" appears to be a useful and powerful object. "Quantity" has been designed to maintain the full engineering meaning of values with respect to units and coordinate systems. A value is a scalar, vector, tensor, or matrix, each of which is composed of Value Components, each of which may be an integer, floating point number, fuzzy number, etc., and its associated physical unit. Operations such as coordinate transformation and arithmetic operations are handled by member functions of "Quantity". The prototype has successfully tested such characteristics as maintaining a numeric value, an associated unit, and an annotation. In this paper we further explore the design of "Quantity", with particular attention to coordinate systems.

Funston, Monica Gayle↗

The problem of organization of a coastal coordinating computer center

The fundamental principles of the operation of a coastal coordinating and computing center under conditions of automation are presented. Special attention is devoted to the work of Coastal Computer Center of the Arctic and Antarctic Scientific Research Institute. This center generalizes from data collected in expeditions and also from observations made at polar stations.

Dyubkin, I. A.↗

Representation of viruses in the remediated PDB archive

A new data model for PDB entries of viruses and other biological assemblies with regular noncrystallographic symmetry is described. A new scheme has been devised to represent viruses and other biological assemblies with regular noncrystallographic symmetry in the Protein Data Bank (PDB). The scheme describes existing and anticipated PDB entries of this type using generalized descriptions of deposited and experimental coordinate frames, symmetry and frame transformations. A simplified notation has been adopted to express the symmetry generation of assemblies from deposited coordinates and matrix operations describing the required point, helical or crystallographic symmetry. Complete correct information for building full assemblies, subassemblies and crystal asymmetric units of all virus entries is now available in the remediated PDB archive.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

AMO EXPRESS: A Command and Control Experiment for Crew Autonomy

NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control demonstration of intelligent procedures to automatically initialize a rack onboard the International Space Station (ISS) with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). The autonomous operations concept includes a reduction of the amount of data a crew operator is required to verify during activation or de-activation, as well as integration of procedure execution status and relevant data in a single integrated display. During execution, the auto-procedures provide a step-by-step messaging paradigm and a high level status upon termination. This messaging and high level status is the only data generated for operator display. To enhance situational awareness of the operator, the Web-based Procedure Display (WebPD) provides a novel approach to the issues of procedure display and execution tracking. For this demonstration, the procedure was initiated and monitored from the ground. As the Timeliner sequences executed, their high level execution status was transmitted to ground, for WebPD consumption.

Stetson, Howard K.↗

TPSAS-NF1676L-14864-DND

Objective 1: Develop a research test-bed and database to provide data/proof of concept for Ground Control Station (GCS) NAS operations. Objective 2: Coordinate with standards organizations to develop human factors guidelines for GCS operation in the NAS.

Anna Trujillo↗

TPSAS-NF1676L-14989-DND

Objective 1: Develop a research test-bed and database to provide data/proof of concept for Ground Control Station (GCS) NAS operations. Objective 2: Coordinate with standards organizations to develop human factors guidelines for GCS operation in the NAS. Interest in UAS routine access: 1) Federal government – DHS, NOAA, Commerce, Interior, FBI, DOT 2) Military 3) Local governments – police, fire, port authority 4) Commercial – utilities, news agencies, private security, photographers, hobbyists

Anna Trujillo↗

Coordination and control – limits in standard representations of multi-reservoir operations in hydrological modeling

Abstract. Major multi-reservoir cascades represent a primary mechanism for dealing with hydrologic variability and extremes within institutionally complex river basins worldwide. These coordinated management processes fundamentally reshape water balance dynamics. Yet, multi-reservoir coordination processes have been largely ignored in the increasingly sophisticated representations of reservoir operations within large-scale hydrological models. The aim of this paper is twofold, namely (i) to provide evidence that the common modeling practice of parameterizing each reservoir in a cascade independently from the others is a significant approximation and (ii) to demonstrate potential unintended consequences of this independence approximation when simulating the dynamics of hydrological extremes in complex reservoir cascades. We explore these questions using the Water Balance Model, which features detailed representations of the human infrastructure coupled to the natural processes that shape water balance dynamics. It is applied to the Upper Snake River basin in the western US and its heavily regulated multi-reservoir cascade. We employ a time-varying sensitivity analysis that utilizes the method of Morris factor screening to explicitly track how the dominant release rule parameters evolve both along the cascade and in time according to seasonal high- and low-flow events. This enables us to address aim (i) by demonstrating how the progressive and cumulative dominance of upstream releases significantly dampens the ability of downstream reservoir rules' parameters to influence flow conditions. We address aim (ii) by comparing simulation results with observed reservoir operations during critical low-flow and high-flow events in the basin. Our time-varying parameter sensitivity analysis with the method of Morris clarifies how independent single-reservoir parameterizations and their tacit assumption of independence leads to reservoir release behaviors that generate artificial water shortages and flooding, whereas the observed coordinated cascade operations avoided these outcomes for the same events. To further explore the role of (non-)coordination in the large deviations from the observed operations, we use an offline multi-reservoir water balance model in which adding basic coordination mechanisms drawn from the observed emergency operations is sufficient to correct the deficiencies of the independently parameterized reservoir rules from the hydrological model. These results demonstrate the importance of understanding the state–space context in which reservoir releases occur and where operational coordination plays a crucial role in avoiding or mitigating water-related extremes. Understanding how major infrastructure is coordinated and controlled in major river basins is essential for properly assessing future flood and drought hazards in a changing world.

54 ENVIRONMENTAL SCIENCES↗

Coordinated crew performance in commercial aircraft operations

A specific methodology is proposed for an improved system of coding and analyzing crew member interaction. The complexity and lack of precision of many crew and task variables suggest the usefulness of fuzzy linguistic techniques for modeling and computer simulation of the crew performance process. Other research methodologies and concepts that have promise for increasing the effectiveness of research on crew performance are identified.

Murphy, M. R.↗

Improved Management of the Technical Interfaces Between the Hanford Tank Farm Operator and the Hanford Waste Treatment Plant - 13383

The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two different prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2; - Development of a set of alternatives to the current baseline that involve aspects of direct feed, feed conditioning, and design changes. The One System Technical Organization has served WTP, TOC, and DOE well in managing and resolving issues at the interface. This paper describes the organizational structure used to improve the interface and several examples of technical interface issues that have been successfully addressed by the new organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Component Test Facility (Comtest) Phase 1 Engineering For 760°C (1400°F) Advanced Ultrasupercritical (A-USC) Steam Generator Development

The Babcock & Wilcox Company (B&W) performed a Pre-Front End Engineering Design (Pre-FEED) of an A-USC steam superheater for a proposed component test program achieving 760°C (1400°F) steam temperature. This would lead to follow-on work in a Phase 2 and Phase 3 that would involve detail design, manufacturing, construction and operation of the ComTest. Phase 1 results have provided the engineering data necessary for proceeding to the next phase of ComTest. The steam generator superheater would subsequently supply the steam to an A-USC prototype intermediate pressure steam turbine. The ComTest program is important in that it will place functioning A-USC components in operation and in coordinated boiler and turbine service. It is also important to introduce the power plant operation and maintenance personnel to the level of skills required and provide the first background experience with hands-on training. The project will provide a means to exercise the complete supply chain events required in order to practice and perfect the process for A-USC power plant design, supply, manufacture, construction, commissioning, operation and maintenance. Representative participants will then be able to transfer knowledge and recommendations to the industry. ComTest is conceived in the manner of using a separate standalone plant facility that will not jeopardize the host facility or suffer from conflicting requirements in the host plant’s mission that could sacrifice the nickel alloy components and not achieve the testing goals. ComTest will utilize smaller quantities of the expensive materials and reduce the risk in the first operational practice for A-USC technology in the United States. Components at suitable scale in ComTest provide more assurance before putting them into practice in the full size A-USC demonstration plant.

20 FOSSIL-FUELED POWER PLANTS↗

Power Quality and Stability in a Cluster of Microgrids with Coordinated Power and Energy Management

Distributed Energy Resources (DER) such as photovoltaic (PV) systems and battery energy storage systems (BESS) can be operated collectively as microgrids. Microgrids can be effective in meeting local load requirements as well as in improving the power quality and stability in a modern power distribution system. Multiple microgrids can also be operated in a coordinated manner as a cluster, to improve the resiliency of the power distribution system. In the event of an outage caused by a transmission system failure, the microgrids in a cluster can use their distributed generation capacity and energy storage resources to recover and extend power availability to the critical loads in the system. In this paper, an illustrative cluster of two microgrids based on the IEEE 13-bus model with DERs has been used, to demonstrate the operation of the concept using real-time simulations. Using real-time simulations, capabilities such as switching reconfiguration following faults, identification of optimal DER placement for effective power quality management, and power electronic controller validation have been demonstrated. For the two-microgrid cluster, this paper also presents improvements in load voltage quality and

Chowdhury, Prithwiraj Roy↗

Atmospheric Radiation Measurements Aerosol Intensive Operating Period: Comparison of Aerosol Scattering during Coordinated Flights

In May 2003, a Twin Otter airplane, equipped with instruments for making in situ measurements of aerosol optical properties, was deployed during the Atmospheric Radiation Measurements (ARM) Program s Aerosol Intensive Operational Period in Oklahoma. Several of the Twin Otter flights were flown in formation with an instrumented light aircraft (Cessna 172XP) that makes routine in situ aerosol profile flights over the site. This paper presents comparisons of measured scattering coefficients at 467 nm, 530 nm, and 675 nm between identical commercial nephelometers aboard each aircraft. Overall, the agreement between the two nephelometers decreases with longer wavelength. During the majority of the flights, the Twin Otter flew with a diffuser inlet while the Cessna had a 1 mm impactor, allowing for an estimation of the fine mode fraction aloft. The fine mode fraction aloft was then compared to the results of a ground-based nephelometer. Comparisons are also provided in which both nephelometers operated with identical 1 mm impactors. These scattering coefficient comparisons are favorable at the longer wavelengths (i.e., 530 nm and 675 nm), yet differed by approximately 30% at 467 nm. Mie scattering calculations were performed using size distribution measurements, made during the level flight legs. Results are also presented from Cadenza, a new continuous wave cavity ring-down (CW-CRD) instrument, which compared favorably (i.e., agreed within 2%) with data from other instruments aboard the Twin Otter. With this paper, we highlight the significant implications of coarse mode (larger than 1 mm) aerosol aloft with respect to aerosol optical properties.

Hallar, A. G.↗

UAS Service Supplier Network Performance

This report summarizes the performance of Unmanned Aircraft System (UAS) Service Suppliers (USS) in the Technical Capability Level 4 (TCL4) flight test performed by NASA and its partners in support of the UAS Traffic Management (UTM) concept. TCL4 is the final in a series of TCL demonstrations of a traffic management system for small UAS (sUAS). All demonstrations have been executed in collaboration with industry partners. The [FAA 2018] UTM Concept of Operations document describes UTM as:...the manner in which the FAA will support operations for predominantly sUAS operating in low altitude airspace. UTM utilizes industry’s ability to supply services under FAA’s regulatory authority where these services do not currently exist. It is a community-based traffic management system, where the Operators are responsible for the coordination, execution, and management of operations, with rules of the road established by FAA. UTM is designed to support the demand and expectations for a broad spectrum of operations with ever-increasing complexity and risk. UTM should be considered a collection of services rather than a monolithic application. The following section describes the architecture at a high level. For further insight, the FAA’s concept document [FAA 2018] or NASA’s earlier concept publication [NASA 2016] should be consulted.

Rios, Joseph L.↗

Distribution System Congestion Management - A Survey of Reliable Integration for Aggregated Resources and Microgrids

Rising penetration of consumer-owned Distribution Grid Resources (DGRs), increasingly managed by third party aggregators and enrolled in grid services and wholesale market programs, can create localized congestion in distribution networks. Managing these constraints is challenging due to a persistent coordination and information gap: utilities are accountable for reliability and have network topology and state visibility, while aggregators control the DGR capability needed to relieve congestion. This survey synthesizes congestion management solutions for distribution systems with high DGR penetration, covering both market-based mechanisms (distribution level markets, locational pricing, flexibility auctions) and non-market-based solutions (network reconfiguration, direct DGR control, demand response, curtailment, etc.). The literature is organized across three decision horizons: long term planning, operational planning, and real-time operation. Special attention is devoted to emerging distribution system operator architectures and coordination frameworks spanning transmission system operators, aggregators, and microgrids. Drawing on recent case studies and implementations, we distill best practices, identify key technical and economic barriers, and outline research directions. The evidence points to a shift toward integrated congestion management that combines market signals with technical controls, enabled by improved monitoring, forecasting, and closed loop control capabilities.

Active Distribution Networks (ADN)↗

Design of specially adapted reactive coordinates to economically compute potential and kinetic energy operators including geometry relaxation

Quantum dynamics simulations require prior knowledge of the potential energy surface as well as the kinetic energy operator. Typically, they are evaluated in a low-dimensional subspace of the full configuration space of the molecule as its dimensionality increases proportional to the number of atoms. This entails the challenge to find the most suitable subspace. We present an approach to design specially adapted reactive coordinates spanning this subspace. In addition to the essential geometric changes, these coordinates take into account the relaxation of the non-reactive coordinates without the necessity of performing geometry optimizations at each grid point. The method is demonstrated for an ultrafast photoinduced bond cleavage in a commonly used organic precursor for the generation of electrophiles. The potential energy surfaces for the reaction as well as the Wilson G-matrix as part of the kinetic energy operator are shown for a complex chemical reaction, both including the relaxation of the non-reactive coordinates on equal footing. A microscopic interpretation of the shape of the G-matrix elements allows to analyze the impact of the non-reactive coordinates on the kinetic energy operator. Additionally, we compare quantum dynamics simulations with and without the relaxation of the non-reactive coordinates included in the kinetic energy operator to demonstrate its influence.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The SILEX experiment system operations

The European Space Agency is going to conduct an inter orbit link experiment which will connect a low Earth orbiting satellite and a Geostationary satellite via optical terminals. This experiment has been called SILEX (Semiconductor Inter satellite Link EXperiment). Two payloads will be built. One called PASTEL (PASsager de TELecommunication) will be embarked on the French Earth observation satellite SPOT4. The future European experimental data relay satellite ARTEMIS (Advanced Relay and TEchnology MISsion) will carry the OPALE terminal (Optical PAyload Experiment). The principal characteristic of the mission is a 50 Megabits flow of data transmitted via the optical satellite link. The relay satellite will route the data via its feeder link thus permitting a real time reception in the European region of images taken by the observation satellite. The PASTEL terminal has been designed to cover up to 9 communication sessions per day with an average of 5. The number of daily contact opportunities with the low earth orbiting satellite will be increased and the duration will be much longer than the traditional passes over a ground station. The terminals have an autonomy of 24 hours with respect to ground control. Each terminal will contain its own orbit model and that of its counter terminal for orbit prediction and for precise computation of pointing direction. Due to the very narrow field of view of the communication laser beam, the orbit propagation calculation needs to be done with a very high accuracy. The European Space Agency is responsible for the operation of both terminals. A PASTEL Mission Control System (PMCS) is being developed to control the PASTEL terminal on board SPOT4. The PMCS will interface with the SPOT4 Control Centre for the execution of the PASTEL operations. The PMCS will also interface with the ARTEMIS Mission Control System for the planning and the coordination of the operation. It is the first time that laser technology will be used to support inter-satellite links in Europe. Due to the complexity and experimental character of this new optical technology, the SILEX experiment control facilities will be designed to allow as much operational flexibility as possible.

Demelenne, B.↗

Transactive Energy Communications Interface Standards Landscape

Transactive energy represents distributed, optimal-seeking coordination approaches for managing the operation of large numbers of energy-related devices and systems. The concept assumes intelligent agents interact with other agents on behalf of their owners to balance the supply and demand of energy and coordinate other operation services in an electric system. They do this by exchanging value signals for services in near-term and forward time periods using market mechanisms. The technique is particularly applied to coordination of flexibility in operating distributed energy resources. The integration of large numbers of devices requires that they be able to connect and interoperate easily and reliably. Given the many technologies and solution providers integrating products, communications interfaces based on clear, unambiguous specifications with supporting tests require standardization and adoption by the community of system integrators. This report reviews the state of communications interface standards that show promise for transactive energy approaches to the coordination of distributed energy resources. It reviews promising standards to highlight challenges and gaps. It offers structured comparisons between standards and the features offered by their ecosystems of participants.

24 POWER TRANSMISSION AND DISTRIBUTION↗