Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Trade Study: Storing NASA HDF5/netCDF-4 Data in the Amazon Cloud and Retrieving Data Via Hyrax Server Data Server

This study explored three candidate architectures with different types of objects and access paths for serving NASA Earth Science HDF5 data via Hyrax running on Amazon Web Services (AWS). We studied the cost and performance for each architecture using several representative Use-Cases. The objectives of the study were: Conduct a trade study to identify one or more high performance integrated solutions for storing and retrieving NASA HDF5 and netCDF4 data in a cloud (web object store) environment. The target environment is Amazon Web Services (AWS) Simple Storage Service (S3). Conduct needed level of software development to properly evaluate solutions in the trade study and to obtain required benchmarking metrics for input into government decision of potential follow-on prototyping. Develop a cloud cost model for the preferred data storage solution (or solutions) that accounts for different granulation and aggregation schemes as well as cost and performance trades.We will describe the three architectures and the use cases along with performance results and recommendations for further work.

AWS cost↗

Cost of saving natural gas through efficiency programs funded by utility customers: 2012–2017

This study estimates the cost of saving a therm of natural gas from energy efficiency programs funded by utility customers during the period 2012 to 2017. Berkeley Lab researchers compiled and analyzed efficiency program data reported by investor-owned utilities and other program administrators in a dozen states representative of the four U.S. Census regions — Arkansas, California, Connecticut, Iowa, Massachusetts, Michigan, Minnesota, New Jersey, New York, Oklahoma, Rhode Island and Utah. Depending on the year, the dataset accounts for about 50 percent to 70 percent of annual national spending on natural gas efficiency programs. The estimated cost of saving natural gas during the study period is $0.40 per therm. The analysis also includes estimates of the program administrator cost of saved energy for three core sectors for natural gas: commercial and industrial, residential, and low-income households. It aggregates these sectors to provide regional and national values. Our metrics include savings-weighted averages, unweighted medians, and interquartile ranges (25th and 75th percentiles) of the levelized program administrator cost of saving gas, in constant 2017 dollars. In addition, the study analyzes cost trends during the study period, finding that average program costs trended downward. The U.S. Department of Energy’s Building Technologies Office supported this work.

03 NATURAL GAS↗

Advanced Instrumentation Testbed (AIT) - antiNeutrino Experiment One (NEO) (Q1 FY2021)

In anticipation of the planned June 2021 design review, conceptual design, costing, and documentation efforts continued. The quarter was highlighted by the completion of three significant milestones: 1) 50% conceptual design and costing of the AIT facility, 2) bottom-up cost estimates for NEO, and 3) parametric NEO performance estimates (via the Big Trade Study). Because cost estimates exceed available funding levels, the project team started (late Dec 2020) a value engineering/pivot exercise to align costs with available funds. This exercise is anticipated to consume the project team for most of Q2. The end-result expectation (of the exercise) is a programmatically feasible and scientifically relevant AIT-NEO conceptual design that is aligned with available funds.

42 ENGINEERING↗

Trends and Heterogeneity in Electric Vehicle Economics: A French Case Study

The total cost of ownership of electric vehicles depends on both the behavior and economic context of the driver as well as the level of government support offered for electrified vehicles. In this work, we study both of these effects as they shift private vehicle costs and emissions benefits, focused on a case study of the faculty and staff commuters to the Cite Scientifique campus of the University of Lille. The modeling approach considers the net costs and emissions from switching each driver from an internal combustion engine vehicle to three electrified options: a hybrid electric, a plug-in hybrid, and a pure battery electric. Increasing government support or technology-induced cost declines of electric vehicles both improve the economics of electrified options and shift more drivers towards battery electrics as the preferred alternative to thermal vehicles.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Ares I and Ares V First Stage - Powering Exploration

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.

Priskos, Alex S.↗

New Approaches in Reusable Booster System Life Cycle Cost Modeling

This paper presents the results of a 2012 life cycle cost (LCC) study of hybrid Reusable Booster Systems (RBS) conducted by NASA Kennedy Space Center (KSC) and the Air Force Research Laboratory (AFRL). The work included the creation of a new cost estimating model and an LCC analysis, building on past work where applicable, but emphasizing the integration of new approaches in life cycle cost estimation. Specifically, the inclusion of industry processes/practices and indirect costs were a new and significant part of the analysis. The focus of LCC estimation has traditionally been from the perspective of technology, design characteristics, and related factors such as reliability. Technology has informed the cost related support to decision makers interested in risk and budget insight. This traditional emphasis on technology occurs even though it is well established that complex aerospace systems costs are mostly about indirect costs, with likely only partial influence in these indirect costs being due to the more visible technology products. Organizational considerations, processes/practices, and indirect costs are traditionally derived ("wrapped") only by relationship to tangible product characteristics. This traditional approach works well as long as it is understood that no significant changes, and by relation no significant improvements, are being pursued in the area of either the government acquisition or industry?s indirect costs. In this sense then, most launch systems cost models ignore most costs. The alternative was implemented in this LCC study, whereby the approach considered technology and process/practices in balance, with as much detail for one as the other. This RBS LCC study has avoided point-designs, for now, instead emphasizing exploring the trade-space of potential technology advances joined with potential process/practice advances. Given the range of decisions, and all their combinations, it was necessary to create a model of the original model and use genetic algorithms to explore results. A strong business case occurs when viable paths are identified for an affordable up-front investment, and these paths can credibly achieve affordable, responsive operations, characterized by smaller direct touch labor efforts at the wing level from flight to flight. The results supporting this approach, its potential, and its conclusions are presented here.

Zapata, Edgar↗

New Approaches in Reuseable Booster System Life Cycle Cost Modeling

This paper presents the results of a 2012 life cycle cost (LCC) study of hybrid Reusable Booster Systems (RBS) conducted by NASA Kennedy Space Center (KSC) and the Air Force Research Laboratory (AFRL). The work included the creation of a new cost estimating model and an LCC analysis, building on past work where applicable, but emphasizing the integration of new approaches in life cycle cost estimation. Specifically, the inclusion of industry processes/practices and indirect costs were a new and significant part of the analysis. The focus of LCC estimation has traditionally been from the perspective of technology, design characteristics, and related factors such as reliability. Technology has informed the cost related support to decision makers interested in risk and budget insight. This traditional emphasis on technology occurs even though it is well established that complex aerospace systems costs are mostly about indirect costs, with likely only partial influence in these indirect costs being due to the more visible technology products. Organizational considerations, processes/practices, and indirect costs are traditionally derived ("wrapped") only by relationship to tangible product characteristics. This traditional approach works well as long as it is understood that no significant changes, and by relation no significant improvements, are being pursued in the area of either the government acquisition or industry?s indirect costs. In this sense then, most launch systems cost models ignore most costs. The alternative was implemented in this LCC study, whereby the approach considered technology and process/practices in balance, with as much detail for one as the other. This RBS LCC study has avoided point-designs, for now, instead emphasizing exploring the trade-space of potential technology advances joined with potential process/practice advances. Given the range of decisions, and all their combinations, it was necessary to create a model of the original model and use genetic algorithms to explore results. A strong business case occurs when viable paths are identified for an affordable up-front investment, and these paths can credibly achieve affordable, responsive operations, characterized by smaller direct touch labor efforts at the wing level from flight to flight. The results supporting this approach, its potential, and its conclusions are presented here.

Zapata, Edgar↗

Micro-sensors for in-situ meteorological measurements

Improved in-situ meteorological measurements are needed for monitoring the weather and climate of the terrestrial and Martian atmospheres. We have initiated a program to assess the feasibility and utility of micro-sensors for precise in-situ meteorological measurements in these environments. Sensors are being developed for measuring pressure, temperature, wind velocity, humidity, and aerosol amounts. Silicon micro-machining and large scale integration technologies are being used to make sensors that are small, rugged, lightweight, and require very little power. Our long-term goal is to develop very accurate miniaturized sensors that can be incorporated into complete instrument packages or 'micro weather stations,' and deployed on a variety of platforms. If conventional commercially available silicon production techniques can be used to fabricate these sensor packages, it will eventually be possible to mass-produce them at low cost. For studies of the Earth's troposphere and stratosphere, they could be deployed on aircraft, dropsondes, radiosondes, or autonomous surface stations at remote sites. Improved sensor accuracy and reduced sensor cost are the primary challenges for these applications. For studies of the Martian atmosphere, these sensor packages could be incorporated into the small entry probes and surface landers that are being planned for the Mars Environmental SURvey (MESUR) Mission. That decade-long program will deploy a global network of small stations on the Martian surface for monitoring meteorological and geological processes. Low mass, low power, durability, large dynamic range and calibration stability are the principal challenges for this application. Our progress on each of these sensor types is presented.

Crisp, David↗

Dynamic remapping of parallel computations with varying resource demands

A large class of computational problems is characterized by frequent synchronization, and computational requirements which change as a function of time. When such a problem must be solved on a message passing multiprocessor machine, the combination of these characteristics lead to system performance which decreases in time. Performance can be improved with periodic redistribution of computational load; however, redistribution can exact a sometimes large delay cost. We study the issue of deciding when to invoke a global load remapping mechanism. Such a decision policy must effectively weigh the costs of remapping against the performance benefits. We treat this problem by constructing two analytic models which exhibit stochastically decreasing performance. One model is quite tractable; we are able to describe the optimal remapping algorithm, and the optimal decision policy governing when to invoke that algorithm. However, computational complexity prohibits the use of the optimal remapping decision policy. We then study the performance of a general remapping policy on both analytic models. This policy attempts to minimize a statistic W(n) which measures the system degradation (including the cost of remapping) per computation step over a period of n steps. We show that as a function of time, the expected value of W(n) has at most one minimum, and that when this minimum exists it defines the optimal fixed-interval remapping policy. Our decision policy appeals to this result by remapping when it estimates that W(n) is minimized. Our performance data suggests that this policy effectively finds the natural frequency of remapping. We also use the analytic models to express the relationship between performance and remapping cost, number of processors, and the computation's stochastic activity.

Nicol, D. M.↗

Near-term Horizontal Launch for Flexible Operations: Results of the DARPA/NASA Horizontal Launch Study

Horizontal launch has been investigated for 60 years by over 130 different studies. During this time only one concept, Pegasus, has ever been in operation. The attractiveness of horizontal launch is the capability to provide a "mobile launch pad" that can use existing aircraft runways, cruise above weather, loiter for mission instructions, and provide precise placement for orbital intercept, rendezvous, or reconnaissance. A jointly sponsored study by DARPA and NASA, completed in 2011, explored the trade space of horizontal launch system concepts which included an exhaustive literature review of the past 70 years. The Horizontal Launch Study identified potential near- and mid-term concepts capable of delivering 15,000 lb payloads to a 28.5 due East inclination, 100 nautical-mile low-Earth orbit. Results are presented for a range of near-term system concepts selected for their availability and relatively low design, development, test, and evaluation (DDT&E) costs. This study identified a viable low-cost development path forward to make a robust and resilient horizontal launch capability a reality.

Bartolotta, Paul A.↗

Task 28: Web Accessible APIs in the Cloud Trade Study

This study explored three candidate architectures for serving NASA Earth Science Hierarchical Data Format Version 5 (HDF5) data via Hyrax running on Amazon Web Services (AWS). We studied the cost and performance for each architecture using several representative Use-Cases. The objectives of the project are: Conduct a trade study to identify one or more high performance integrated solutions for storing and retrieving NASA HDF5 and Network Common Data Format Version 4 (netCDF4) data in a cloud (web object store) environment. The target environment is Amazon Web Services (AWS) Simple Storage Service (S3).Conduct needed level of software development to properly evaluate solutions in the trade study and to obtain required benchmarking metrics for input into government decision of potential follow-on prototyping. Develop a cloud cost model for the preferred data storage solution (or solutions) that accounts for different granulation and aggregation schemes as well as cost and performance trades.

cost model↗

Evaluation of Composite Structures Technologies for Application to NASA's Vision for Space Exploration (CoSTS)

A trade study was conducted to determine the suitability of composite structures for weight and life cycle cost savings in primary and secondary structural systems for crew exploration vehicles, crew and cargo launch vehicles, landers, rovers, and habitats. The results of the trade study were used to identify and rank order composite material technologies that can have a near-term impact on a broad range of exploration mission applications. This report recommends technologies that should be developed to enable usage of composites on Vision for Space Exploration vehicles towards mass and life-cycle cost savings.

Deo, Ravi↗

Software forecasting as it is really done: A study of JPL software engineers

This paper presents a summary of the results to date of a Jet Propulsion Laboratory internally funded research task to study the costing process and parameters used by internally recognized software cost estimating experts. Protocol Analysis and Markov process modeling were used to capture software engineer's forecasting mental models. While there is significant variation between the mental models that were studied, it was nevertheless possible to identify a core set of cost forecasting activities, and it was also found that the mental models cluster around three forecasting techniques. Further partitioning of the mental models revealed clustering of activities, that is very suggestive of a forecasting lifecycle. The different forecasting methods identified were based on the use of multiple-decomposition steps or multiple forecasting steps. The multiple forecasting steps involved either forecasting software size or an additional effort forecast. Virtually no subject used risk reduction steps in combination. The results of the analysis include: the identification of a core set of well defined costing activities, a proposed software forecasting life cycle, and the identification of several basic software forecasting mental models. The paper concludes with a discussion of the implications of the results for current individual and institutional practices.

Griesel, Martha Ann↗

Nuclear air cushion vehicles

The state-of-the-art of the still-conceptual nuclear air cushion vehicle, particularly the nuclear powerplant is identified. Using mission studies and cost estimates, some of the advantages of nuclear power for large air cushion vehicles are described. The technology studies on mobile nuclear powerplants and conceptual ACV systems/missions studies are summarized.

Anderson, J. L.↗

Continued investigation of solid propulsion economics. Task 1B: Large solid rocket motor case fabrication methods - Supplement process complexity factor cost technique

This supplement to Task lB-Large Solid Rocket Motor Case Fabrication Methods supplies additional supporting cost data and discusses in detail the methodology that was applied to the task. For the case elements studied, the cost was found to be directly proportional to the Process Complexity Factor (PCF). The PCF was obtained for each element by identifying unit processes that are common to the elements and their alternative manufacturing routes, by assigning a weight to each unit process, and by summing the weighted counts. In three instances of actual manufacture, the actual cost per pound equaled the cost estimate based on PCF per pound, but this supplement, recognizes that the methodology is of limited, rather than general, application.

Baird, J.↗