Search NASA⌕ Search

SEARCH · Search NASA

Results for “federal”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Decarbonization in Climate Resilience Planning

Recent executive orders such as E.O. 14008 require federal agencies to address climate change by enhancing resilience and reducing emissions through decarbonization. Traditionally, federal agencies require their sites to develop preparedness plans, such as continuity of operations plans and/or more comprehensive resilience plans. When climate change is included in these plans, the focus tends to be on climate adaptation solutions such as hardening infrastructure and not on climate mitigation through decarbonization. However, with the ambitious emission reductions targets set out by the federal government, it is essential to provide resources and tools to support energy and water managers in achieving decarbonization goals. To achieve this, there is a need for decarbonization to be incorporated into existing resilience planning processes. We discuss a method of incorporating a decarbonization analysis into an existing resilience planning process to create a holistic framework that considers climate adaptation, climate mitigation, and risk reduction priorities when developing and prioritizing solutions for federal sites. Site managers and decision makers must be aware of potential opportunities and trade-offs in meeting energy and water performance goals, emission reductions goals, and climate adaptation goals when developing technological, operational, or institutional resilience solutions. By combining these processes, energy and water managers can minimize the additional level of effort to ensure that their sites are not only able to withstand climate-related energy and water disruptions, but also contribute to climate mitigation. A holistic approach can help federal agencies serve as a model for incorporating decarbonization strategies into site-level resilience planning for the rest of the nation.

Elliott, Douglas B.↗

FEDFLEET: FY 2020 Fleet Data Submissions Status Update [Slides]

This presentation presents a brief overview of the current status of the collection of federal motor vehicle fleet data for fiscal year (FY) 2020 through the Federal Automotive Statistical Tool (FAST). FAST is a web-based information system sponsored by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program to collect information about the US federal government's fleet of motor vehicles. The presentation covers current status of data collection for FY 2020, the review and feedback process for those submissions, timeline of finalizing the information, and a preliminary high-level overview of the information.

99 GENERAL AND MISCELLANEOUS↗

FedFleet 2024: Fleet Data Quality - Understanding and Improving Your Agency's FAST Fleet Data Quality Metric? [Slides]

This presentation presents an overview of how the team supporting the Federal Automotive Statistical Tool (FAST) project for DOE and GSA view and assess the quality of fleet data submissions from federal agencies. It also discusses ways in which agencies can improve the quality of their fleet data and of their fleet data submissions. FAST is a web-based information system sponsored by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program to collect information about the US federal government's fleet of motor vehicles; FAST is developed, maintained, and supported by DOE's Idaho National Laboratory (INL).

99 GENERAL AND MISCELLANEOUS↗

FAST: Continuing the Focus on Data Quality

This presentation provides an overview of fiscal year 2019 federal motor vehicle fleet data, collected at the individual vehicle level during the fall of 2019, how the the collecting project has reviewed that information for potential quality issues, how the quality of this year's data submission compare to the prior year, and recommendations for federal agencies in their efforts to continue to improve the quality of their submissions. This presentation will be given at the January 2020 FedFleet training event, hosted by the US General Services Administration in Washington, DC. The information is collected through the Federal Automotive Statistical Tool (FAST) project. FAST is a Web-based information system managed by the US Department of Energy, the US General Services Administration, and the Energy Information Administration. FAST is used to collect information about the fleet of motor vehicles used and managed by the Federal government. FAST is developed and maintained by DOE's Idaho National Laboratory (INL).

99 GENERAL AND MISCELLANEOUS↗

FedFleet 2023: FAST - What's New, What's Coming, What's Next?

This presentation presents an overview and demonstration of new capabilities being incorporated into the Federal Automotive Statistical Tool (FAST) to gather information from Federal agencies about electric vehicle supply equipment (EVSE) they are planning to deploy in support of EO 14057 and its implementing instructions. It also includes an overview other related changes being made to FAST over FY 2023 and following years. FAST is a web-based information system sponsored by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program to collect information about the US federal government's fleet of motor vehicles; FAST is developed, maintained, and supported by DOE's Idaho National Laboratory (INL).

99 GENERAL AND MISCELLANEOUS↗

ESPC ESA Webinar Series: ESPC IDIQ Contract Vehicle Overview

This webinar provides instructions and resources for financing distributed energy projects (e.g. on-site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the U.S. Department of Energy (DOE) indefinite-delivery, indefinite-quantity (IDIQ) energy savings performance contract (ESPC) vehicle. The DOE IDIQ ESPC contract vehicle uses a streamlined master contract that allows federal agencies to work with 21 energy service companies holding the current DOE IDIQ ESPC. Topics covered in the webinar include: An overview of the DOE IDIQ contract vehicle; ESA-specific considerations for IDIQ contracts; and Specific use cases. The webinar also provides an overview of the resources available on the Federal Energy Management Program website, such as IDIQ tools and templates. This webinar is the fifth in a series that provides information, best practices, and resources for implementing an ESPC ESA project. ESPC ESAs are a great option for federal sites that are motivated to reduce site costs, have no capital investment funding, and cannot use the U.S. Department of Defense 10 USC 2922a authority for long-term contracting.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Long-term patterns of post-fire harvest diverge among ownerships in the Pacific West, U.S.A.

Abstract Post-fire harvest (PFH) is a forest management practice designed to salvage value from burned timber, mitigate safety hazards from dead trees, reduce long-term fuels, and prepare sites for replanting. Despite public controversy and extensive ecological research, little is known about how much PFH occurs on private and public lands in the U.S. Pacific West, or how practices changed with shifting forest policy and increasing area burned over the last three decades. We mapped PFH across 2.2M burned hectares in California, Oregon, and Washington between 1986-2017 and used time series intervention analysis to compare trends in area, rate (% of burned area harvested), and mean patch size between private (0.5M ha) and federal (1.6M ha) forest land and across a gradient of burn severity. Harvest rates varied by ownership (4.9% federal, 18.6% private, 8.0% overall), and practices evolved and diverged over the study period. PFH area and rate declined across all ownerships in the mid-1990s during a period of reduced fire activity. As area burned increased between the early 2000s and late 2010s, PFH area rebounded and surpassed late-1980s levels, while rates remained relatively low. On federal lands, PFH practices shifted in the early-to-mid 1990s towards lower rates (10.3% to 3.8%) and smaller patches (6.0 to 3.3 ha), following policy changes and increased litigation. PFH rates on federal lands decreased at all levels of burn severity, with the largest decreases (6.2% to 1.2%) in forests with low tree mortality (i.e. fire refugia). Conversely, private PFH rates and mean patch sizes more than doubled in forests burned at very low-to-moderate severity. Our results highlight how PFH practices have shifted with policy, socio-economic pressure, and increasing area burned over 31 years in the Pacific West. A similar area of post-fire harvest is now dispersed over larger fires, with practices diverging substantially between ownerships.

Zuspan, Aaron (ORCID:0000000315833710)↗

Emulation Framework for Distributed Large-Scale Systems Integration

Recent trends in systems engineering include integration of very large-scale systems, which entails significant challenges when they are geographically dispersed. In these scenarios, intelligent integration of distributed large-scale systems requires significant coordination among hardware elements as well as all software components. The approach of integrated systems (both computing platform and experimental equipment) for end-to-end orchestration is called federation. Virtual frameworks can aid in the testing, assessment, and implementation of a functional system of interconnected resources. We present an emulation framework that replicates the software environments of multi-site federations of computing systems and instruments. Our emulation framework allows systems engineers to reduce developmentcost and avoid disruptions to production infrastructure. Our framework was effectively used to develop and test software modules for various tasks including container orchestration and instrument access. For performance assessment, however, the emulated framework is severely limited in providing accurate network and IO measurements at 10 Gbps and higher data rates. The data transfer performance profiles estimated using these emulated measurements are usually inaccurate for high bandwidth and high latency connections, since emulation does not accurately reflect the critical network transport dynamics.We utilize measurements from a physical testbed with hardware network emulators to obtain data transfer profiles that closely match the expected profiles for the emulated federations. We show the effectiveness of our approach by an illustrative example of integrated (federated) multi-site ultra large-scale systems that are connected via high speed wide area networks.

Imam, Neena↗

OpenDSS-wrapper (Distribution System Co-simulator with Distributed Energy Resource Controls)

Electric grid transformation with the proliferation of distributed energy resources (DER), such as solar photovoltaic (PV), wind, advanced energy storage technologies, and electric vehicles, and the growing use of communication technologies in both transmission and distribution systems are increasing the need to capture the interactions among these systems. Advanced modeling, control, and simulation tools that can perform co-simulation of electric power systems with other domains become indispensable to accurately model these interactions. To address this need, we have developed a codebase that integrates an electric power distribution system simulator, DER models, and DER controls. The codebase is based on OpenDSS, a distribution system simulator, and an existing open source co-simulation framework called HELICS. The contribution and uniqueness of the proposed codebase is that it tailors the generic HELICS framework specifically for distribution grid-related applications. The codebase includes an OpenDSS wrapper that controls the simulation, implements advanced DER controls, and extracts power flows, voltages, and other power system element information from the the distribution network modeled in OpenDSS. Sample HELICS federates, including a federate for OpenDSS, are provided that can communicate messages through the HELICS interface. Sample federates can be modified and additional HELICS federates can be added by the user depending on their use case requirements. SEE ALSO: https://github.com/NREL/dss-cosim

Blonsky, Michael↗

Carbon Management Projects (CONNECT) Database and Explorer

Overview The Carbon Management Projects (CONNECT) Toolkit is an online exploratory visualization tool developed by the U.S. Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM) with support from other federal agencies such as the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Transportation (DOT). It provides a single point of access to authoritative information on federal agency investment in a portfolio of research, development, and demonstration (RD&D) projects that have been publicly announced to advance technologies for point source carbon capture, carbon dioxide removal, transport, storage, and conversion, collectively referred to as carbon management. The RD&D programs covered in this tool are authorized by annual congressional appropriations ("Base Program") and the 2021 Infrastructure Investment and Jobs Act (IIJA). The tool also incorporates public information on other federal initiatives, such as the Regional Clean Hydrogen Hubs, and public information released by other government agencies, such as the Environmental Protection Agency's (EPA) and Primacy States’ Underground Injection Control Class VI permits and EPA’s facility level greenhouse gas (GHG) emissions. Developed in a geographic information system, the tool organizes carbon management projects into five groups based on the primary technology that a project aims to advance, each visually represented as a digital layer ("carbon management project layer"). Only federally funded projects are included, which can be awarded projects that are completed or ongoing, or projects that have been selected but are currently under negotiation. Project information can be viewed in the map or in the attribute table below it when turned on. In the map view, each project is displayed at either its host site (for field work), where available, or its performer site (project lead's location, further explained in the table below). Host sites and performer sites are represented in distinct icons. Several reference layers offer additional public information on infrastructural and natural resource environment for carbon management. These reference layers, combined with multiple geographical basemaps, enable users to visualize the carbon management project layers in context. Carbon management project information will be updated monthly based on feedback and information availability. Carbon management project layers Point Source Carbon Capture (PSC) This layer contains DOE-funded projects focused on capturing carbon dioxide (CO2) from power plants or industrial facilities. Carbon Dioxide Removal (CDR) This layer contains DOE-funded projects focused on capturing CO2 from the atmosphere, including direct air capture (DAC) and DAC hubs, direct ocean capture, enhanced mineralization, and biomass carbon removal and storage. For projects with multiple host sites, each of the sites are displayed individually with the project cost and cost sharing information representing the total for the entire project. Carbon Transport This layer contains DOE- and DOT-funded projects focused on CO2 transport. The Transport Research and Development sublayer contains projects that do not involve physical infrastructure; the Proposed Transport Corridor sublayer contains projects for which either a route for the transport infrastructure has been proposed or a general area for the transport infrastructure has been identified. Carbon Storage This layer contains DOE-funded key projects focused on CO2 storage. For projects with multiple field-work sites, each of the sites are displayed individually on the map with the project cost and cost sharing information representing the overall total for the entire project. Carbon Conversion This layer contains DOE-funded projects focused on converting CO2 into economically valuable products. Reference layers The following layers provide additional information in the geographic proximity of carbon management projects. Users should reference the original sources for more details (weblinks provided below and in pop-up windows on the map). Regional Clean Hydrogen Hub and Facility These layers illustrate the approximate areas of the Regional Clean Hydrogen Hubs announced by DOE's Office of Clean Energy Demonstrations (OCED) and the approximate locations of individual facilities that constitute the hubs (see "Where are the H2Hubs located?" on the webpage linked above). EPA Facility Level GHG Emissions (direct emitter) This layer shows direct CO2 emissions from stationary sources in 2022, using data extracted from EPA's Facility Level Information on GreenHouse gases Tool (FLIGHT). Captured and injected CO2 are not deducted from direct emitters’ total emissions. Contact EPA for additional details. Underground Injection Control Class VI permit/permit application This layer shows the locations of CO2 injection wells that are granted or in the process of applying for an Underground Injection Control Class VI permit by EPA or a Primacy State (currently Louisiana, North Dakota, and Wyoming). The URLs for the permits or permit applications are provided in the pop-up windows associated with the well locations. Contact EPA for additional details. Carbon Storage Resource This layer contains information on prospective CO2 storage resources in saline formations and oil and gas reservoirs provided by the National Carbon Sequestration Database and Geographic Information System (NATCARB) spatial database. Contact NETL for additional details. Existing CO2 pipeline This layer shows active CO2 pipelines based on information digitized from the map issued by the Pipeline and Hazardous Materials Safety Administration (PHMSA). Contact PHMSA for additional details.

Carbon Conversion↗

LLNL Semiannual Wastewater Point Source Monitoring Report (July 2020)

In accordance with the Code of Federal Regulations, Title 40, Part 403.12(e), Lawrence Livermore National Laboratory (LLNL) submits a semiannual monitoring report regarding federally regulated wastewater generating processes (categorical processes) that discharge wastewater to the sanitary sewer system. Attachments A-2 and A-3 of the 2019-2020 Wastewater Discharge Permit #1250 granted to LLNL by the City of Livermore Water Resources Division (WRD) also mandate submission of this report. The LLNL Livermore Site is required to monitor identified electrical and electronic components processes (40 CFR Part 469) and metal finishing processes (40 CFR Part 433) semiannually and to submit monitoring reports in January and July of each year. Under authority delegated to enforce compliance with these regulations, the WRD reviews this report. This report provides information on the significant metal-finishing operations and electrical and electronic component operations located at the Livermore Site during the period from December 1, 2019 through May 31, 2020 and includes descriptions of the LLNL regulated (categorical) processes that discharge to the sanitary sewer. Attachments A-2 and A-3 of the 2019-2020 Wastewater Discharge Permit #1250 provide the list of categorical processes and the required self-monitoring program for point-source discharges at LLNL. The monitoring data collected for this report documents compliance with all federal and local pretreatment limits. Compliance certification accompanies this report, as required by federal regulations.

54 ENVIRONMENTAL SCIENCES↗

Messaging for Impact: Behavioral Science-Based Communication Strategies to Advance Energy Efficiency

Currently, five legal authorities require U.S. federal agencies to purchase energy-efficient products. However, compliance with these requirements has consistently been low (~55%). Recent surveys indicate that energy efficiency requirements are not communicated properly within federal agencies and energy-efficiency is not a top priority. In the constantly evolving energy industry, with many solutions for a clean energy future, effective communication methods are vital for widespread adoption of energy efficiency. We have been conducting experiments within the U.S. federal sector that test the effectiveness of messaging strategies developed by using behavioral science principles like loss aversion, framing, and herd behavior. This will identify effective communications methods that encourage energy efficiency adoption. In this study, we measure the effectiveness of different communication strategies by monitoring the web traffic of hyperlinks placed within our digital communications and outreach materials. To determine effective strategies that influence federal buyer behavior, the web traffic from subjects that received the behavioral science-based messaging (treatment group) is compared to that from subjects that received regular messaging (control group) for each of the strategies. This paper provides an overview of the behavioral science principles that we applied, data collection methods, and results of our analysis. Since the lack of effective communication of energy-efficiency policies is also a common problem in the private sector, the messaging strategies developed in this study can be applicable to other large private sector institutions

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Facility Cybersecurity Framework Best Practices

Federal facilities are increasingly adopting automation and connecting to the Internet creating an energy-internet-of-things environment that converges operational technology (OT) and information technology (IT). Today's buildings increasingly weave together networked sensors and cyber and physical systems that enable data to be collected, aggregated, exchanged, stored and monetized in new ways. Building technological advances have created new energy technology, services, markets and value creation opportunities (e.g. transactive energy, two-way grid communications, machine learning, and increased use of renewable and distributed energy resources). But as larger data sets are being exchanged at faster speeds between an increasing number of OT systems, it becomes more difficult to protect the security of the data lifecycle and the physical equipment it interacts with. These challenges are especially difficult to overcome because the economic and environmental gain (interoperability, big data, social networks and ubiquitous information sharing) are driving these prominent trends in the digital age. Often cybersecurity is an afterthought. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) funded the Pacific Northwest National Laboratory (PNNL) to develop various cybersecurity tools, trainings, and reports to aid federal facility managers – and other building owners and operators – in better applying frameworks and lessons learned from the National Institute of Standards and Technology (NIST) Cybersecurity Framework (CSF), risk management framework (RMF), DOE’s cybersecurity capability maturity model (C2M2), and a wide variety of industry best practices and guidance documents (i.e., NIST 800 series, Department of Defense United Facilities Criteria). This set of tools, collectively known as the FEMP Facility-Related Control System Cyber Toolkit (FRCS Cyber Toolkit)2, is focused on cybersecurity concerns from facility-related control systems and other operational technology (OT), such as industrial control systems (ICS). The FRCS Cyber Toolkit can be applied across six of the sixteen critical infrastructure sectors designated by the Department of Homeland Security, including government facilities, healthcare and public health, commercial facilities (e.g., public assembly, offices, lodging), financial services (e.g., banking and insurance), emergency services (e.g., fire and police stations), and information technology. With increasingly converged IT and OT systems, it is crucial to address OT cybersecurity considerations and assess how the seam of these two systems could impact the overall cybersecurity posture of a facility. The objective of this report is to provide an overview of the best possible method to use FRCS Cyber Toolkit (section 2.0) and distilled cybersecurity best practices for the federal facilities to address growing non-linear cyber threats (section 3.0). Recommendations in this document are aggregated from several NIST and other documents (see Appendix A for additional details).

97 MATHEMATICS AND COMPUTING↗

Natural Resources Assessment for the SNS Second Target Station, Oak Ridge, Tennessee

The US Department of Energy’s Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education on the National Environmental Research Park represent potential impacts of federal actions. Moreover, federal actions that affect the quantity and quality of hunting opportunities and deer reduction harvest on the Oak Ridge Wildlife Management Area must be considered whenever other aspects of the human environment (as defined by NEPA) are affected. The Spallation Neutron Source (SNS) is a premiere facility at ORNL that provides advanced capabilities in neutron scattering to promote new discoveries and research opportunities in material sciences, physics, chemistry, biological sciences, and others. A conceptual design for a Second Target Station (STS) has been in consideration for several years. The STS is intended to complement and enhance existing ORNL capabilities, notably research and exploration of complex materials. The proposed STS will involve development of existing natural areas on the ORR, which might contain sensitive resources that require mitigation or avoidance in accordance with existing policies and regulation. This report summarizes current knowledge of natural and cultural resources within the STS project area. At the time of this report, the proposed STS project consisted of an operations area comprising 55.4 acres (22.4 ha) and a total review area for potential construction comprising ~224 acres (90.6 ha). The review area is located primarily within forested natural areas of the ORR with minor development in the form of power-line rights-of-way and secondary/graveled roads (Figure 1). The primary goal was to evaluate potential effects on sensitive resources that might result from development of the STS. In addition to onthe-ground surveys during summer 2009 and fall 2019 to summer 2020 by ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled primarily from a 2013 forest inventory effort for Forest Management Compartment 17 and supplemented with limited ground observations in 2019. The individuals who obtained and compiled the data that are presented here are familiar with and routinely assess sensitive resources on the ORR.

54 ENVIRONMENTAL SCIENCES↗

Sensitive Resources Assessment and Forest Analysis for the Proposed Versatile Test Reactor, Oak Ridge, Tennessee

The US Department of Energy’s (DOE’s) Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre (~13,000-ha) Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park (NERP) and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education also represent potential effects of federal actions on the NERP, and impacts on, e.g., deer harvest, must be considered on the Oak Ridge Wildlife Management Area when other aspects of the human environment are affected. The United States currently has no fast neutron testing capability to support advanced nuclear research and development. The proposed Versatile Test Reactor (VTR) will take advantage of current investments by the US government and private industry in nuclear reactors to expedite the design and construction process, using proven technology to create a world-class scientific infrastructure. The VTR will take advantage of fast neutrons provided by this proven technology, along with a capability to rapidly insert, conduct, and remove state-of-the-art experiments. An advantage of the VTR is that it can support future innovations in experimental capabilities without modifying the facility. The VTR will support progress in a variety of science and technology areas, including testing and qualification of advanced reactor fuels; testing and qualification of innovative structural materials; testing of innovative components and instruments; validation of advanced modeling and simulation tools; and versatility for future technical missions. Through proven technology, the VTR can take advantage of existing reactor designs and operating experience to reduce the risk, cost, and time for design and construction. The top available resources of DOE laboratories, industry, and universities will be used to expedite reactor design and construction toward developing the scientific infrastructure that affords a strong testing capability that can be sustained over many years. This report summarizes current knowledge of natural and cultural resources primarily within the VTR construction area. At the time of this report, the proposed VTR site design includes a construction area of ~150.4 acres (~69.9 ha), which contains an ~51.3-acre (~20.8-ha) operations area, located within forested natural areas of the ORR. The primary goal of the work presented here was to evaluate potential effects on sensitive resources that might result from development and construction activities associated with VTR. In addition to on-the-ground surveys during spring and summer 2020 by the ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled from a 2011 forest inventory and supplemented with limited ground observations in 2020. The individuals who obtained and compiled the data presented here are familiar with and routinely assess sensitive resources on the ORR. Anyone who references this report must consider that the timing of surveys did not permit a complete delineation of the resources that will be affected. If the VTR project proceeds, additional surveys will be required to account for the seasonal patterns of various threatened and endangered species. Data deficiencies and potential resources that likely went undetected are indicated where possible. Accordingly, this report should facilitate more environmentally sound decisions during planning and 2 development of the VTR site, provide a foundation for further assessment of sensitive and cultural resources, and help project managers better address regulatory guidance and DOE policies on sustainable development in compliance with, for example, the US Endangered Species Act (ESA), Migratory Bird Treaty Act (MBTA), Tennessee Rare Plant Protection and Conservation Act of 1985, Tennessee Nongame and Endangered or Threatened Wildlife Species Conservation Act of 1974, several federal and state regulations regarding aquatic resource protection, and site-specific policies as outlined in various ORR management plans developed by ORNL and TWRA for DOE.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Non-Technical Barriers to Geothermal Development in California and Nevada [Slides]

This presentation presents the findings of our study, including an analysis of federal, state, and local geothermal regulatory and permitting processes, case studies analyzing site-specific attributes that may impact project development at four selected geothermal project sites, an analysis of cost and timeline implications for geothermal project development, and the results of a qualitative study focused on inter-agency coordination and collaboration efforts between federal, state, and/or local agencies for geothermal projects located in California and Nevada. Our analysis found that development timelines may be impacted by multiple federal and state environmental review processes and duplicative permitting requirements as well as coordination efforts between numerous federal, state, and local agencies involved in issuing authorizations and permits necessary for project development. In addition, projects in California and Nevada may face site-specific environmental challenges due to the presence of sensitive resources (e.g., biological species and species habitat, cultural resources) that may result in project construction delays. Our study results also indicate that protracted geothermal development timelines caused by delays in acquiring necessary permits and environmental reviews may result in loss of generated electricity revenue and additional financing costs, which may increase economic uncertainty associated with project development. Through our qualitative analysis, we found that utilization of best practices, including tiering to existing environmental review documents and developing memoranda of understanding, which clearly delineate agency roles and responsibilities may reduce overall project timelines, costs, and uncertainties associated with geothermal project development in California and Nevada.

15 GEOTHERMAL ENERGY↗

Using National-Scale Data to Inform Coal Power Plant Redevelopment and Coal Community Revitalization Planning

In the United States, individual coal plants have high variation in their construction and operation. Coal plants commonly have multiple units, with different commissioning ages, operational position, and maintenance conditions – even multiple fuels. These units may be in changing states of utilization, with variation in productivity depending on economic contexts. Coal plants themselves may be temporarily offline, mothballed, retired, or decommissioned due to owner/operator portfolios or market conditions, and the current posture of the plant may be difficult to ascertain without local news sources (Tarekegne et al. 2021). Anticipated dates of plant closures are prospectively represented to regulators and to the Energy Information Administration (EIA), but may also experience uncertainty due to the engineering, environmental, economic and social complexity of closing a very large power plant. As noted in this report, closure of the first unit to the last within a single plant may span more than 20 years. Yet tracking and predicting the position of our nation’s coal fleets on a national scale is deeply important. In developing a case for federal datasets and an approach to building and curating these data, this report identified that data must have high fidelity at the plant-level to be meaningful in aggregate. Plant-scale detail is also a match for its application: national priorities in federal investment range from economic revitalization for coal plant communities to maintaining reliable electric grid operations. This document is organized into a statistical review of coal plant retirements, past and prospective, in the United States; trends in the relationship between closures and existing federal investment programs for community revitalization; and potential methods for accelerating site redevelopment through advanced geospatial analysis based on federal data.

01 COAL, LIGNITE, AND PEAT↗