Search NASA⌕ Search

SEARCH · Search NASA

Results for “heating and current drive”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

292 records · Page 17

Wide-Bandgap Semiconductor Amplifiers for Fusion Plasma Heating and Control

This paper discusses power electronics developed under the ARPA-E GAMOW program to support nuclear fusion power production. The goal of this project was to develop and assess the potential for wide-bandgap (WBG) semiconductor devices in power electronics to enable high-efficiency and high-voltage solid-state systems for fusion plasma generation, heating, and control. The power electronics use an architecture in which multiple high-power boards can be combined to produce megawatt-level power, where using multiple boards provides high reliability. Two main areas of power electronics boards are developed in this project for fusion plasma heating and control applications: (1) pulse generation and control and (2) radiofrequency generation. The first area is for boards capable of driving high-voltage millisecond pulses at high duty cycles. The envisioned application of these pulses is in plasma control of magnetohydrodynamic instabilities, plasma position, and edge-localized modes. Pulse-width modulation allows for the implementation of a wide variety of linear and nonlinear control systems. The boards developed for this project could actuate control coils based on digital input signals and can be parallelized to provide megawatts of output power. The design of the pulse generator is a low-side load switch. A load switch was designed and constructed that utilized 2-kV-rated field-effect transistor (FET)-based cascodes developed by Qorvo under this project to perform initial testing of these cascodes. The second area is being implemented using class E amplifiers with WBG devices and a reactance steering network to handle inductive or capacitive plasma loads. Applications include ion cyclotron resonance heating (ICRH) and high-harmonic fast-wave (HHFW) heating. A class E reactance steering network is demonstrated in modeling and experiment with a resistive-inductive load that models an inductively-coupled plasma. Power combining of boards with class E reactance steering networks is also simulated and demonstrated experimentally, to enable scaling up to high power. Modeling of high-power-density cooling and remaining useful life is conducted to enable reliable, effectively cooled high-power electronics for fusion applications.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Scoping Study for Fast Flux Testing in the Advanced Test Reactor

The value of fast spectrum reactors remains prominent in the nuclear technology portfolio. The performance of these reactors can be maximized with advancements in nuclear fuel technologies, but development of these technologies is currently held back by lack of fast spectrum test reactors available to the United States. Spectral modification of experiment positions in the thermal spectrum Advanced Test Reactor (ATR) has long been used to support fast reactor fuel development, but these methods have not been progressed to their full potential. This study investigated the use of concentric rings of aluminum-clad fuel plates in ATR flux traps and thermal neutron absorbing filters to increase fast neutron flux on test specimens. This concept was termed the Boosted Energy Advanced Spectrum Test (BEAST). This approach will enable irradiation of advanced fuel designs in prototypic-length fuel pins and representative flux environment to support post irradiation exams, enable transient testing, and produce the type of data that will permit lead test assembly irradiations in true Sodium Fast Reactors (SFRs) when they become available. Neutronic predictions were performed to investigate BEAST design options and thermal hydraulic models were produced to ensure feasibility of BEAST. Two versions were considered based on the geometric limitations of ATR’s small and large flux traps. The small version was found to be preferable due to slightly higher fast flux and fast-to-thermal neutron ratio. Perhaps more influentially, the small flux trap option was also preferred to avoid conflict with ongoing very high temperature reactor fuel irradiation programs in ATR’s large northeast flux trap. The small flux trap option provided less than half the test volume of the large version, but still had adequate volume for seven SFR pins in cross section which could be stacked two-high in ATR’s 1.2m long core to accommodate up to 14 EBR-II size pins. The preference for the small flux trap configuration should be revisited if additional collaborative test programs emerge with the need to irradiate a significant volume of additional specimens. Calculations were performed regarding a lithium deuteride ring to convert thermal neutrons into 14 MeV fusion neutrons. At the time this report was written these calculations were partially complete and it remains to be seen whether the concept would be worth including in BEAST. Given the preference for the small flux trap option, which does not afford enough room for the 14 MeV ring, it was concluded to defer future work on the lithium deuteride ring. This decision could be revisited if fusion material research programs emerge for collaborative testing in BEAST. A cadmium-lined specimen holder design was found to be adequate in filtering thermal neutrons and preferred over other neutron absorbers based on past experience with cadmium baskets. It was acknowledged that cadmium-bearing hardware would become depleted and need to be replaced occasionally, which appeared feasible from a mechanical design perspective. Neutronic studies investigated different enrichment levels in the booster fuel using uranium-molybdenum alloy dispersion fuel which has performed well in past ATR irradiations. Both options were able to drive fuel pins to SFR-like fission heating rates. The high enriched booster fuel option outperformed the low enriched option by ~20% on key metrics including fast flux and fast-to-thermal ratio, but the low enriched option was favored in order to broaden options for potential fuel suppliers. The preferred BEAST design options including cadmium filter with low enriched booster fuel in the small flux trap configuration was predicted to achieve 6.2E14 n/cm2sec fast flux (>0.1 MeV) with a fast-to-thermal ratio of 44.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

High-Performance Low-Cobalt Cathode Materials for Li-ion Batteries

The layer-structured Li[Ni x Co y Mn 1-x-y ]O 2 (NCM) cathode materials have been the best choice for increasing electric vehicle driving distance per charge. The high Ni layered oxide represents successfully commercialized NCM cathodes (such as NCM622 and NCA) in lithium-ion batteries (LIBs) for EV applications due to their high energy density and acceptable cycling stability. However, the price of cobalt, the key element within LIBs for stability, has nearly tripled over the past few years due to increased demand from the cell phone industry. As mentioned in the DOE Funding Opportunity Announcement, the current materials shortage will also cause speculation for a future global shortage. Therefore, to meet the requirement and sustainability of the next-generation long-range and low-cost EVs, developing cathode materials with low-Co content to achieve higher energy density and lower cost is both essential and urgent. The overarching objective of this work is to develop stabilized NCM cathode materials with low Co content (namely LiNi x Co y Mn 1-x-y O 2 , y ≤ 0.04) to meet DOE’s goal of reducing Co loading below 50 mg Wh -1 while maintaining energy density greater than 600 Wh kg -1 based on cathode material. Via various dopings and coatings scalable methods, we explored and enhanced the cycling performance of low-cobalt cathodes. The final obtained NCM cathodes paired with graphite anode aim to deliver batteries with a high initial specific energy density of over 240 Wh kg -1 and a low capacity fading rate of less than 20% in 1000 cycles under a C/3 discharge rate. To accomplish this goal, a multidisciplinary team with several co-investigators has been formed from three organizations: The Pennsylvania State University (PSU), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL). The PI and co-investigators are Dr. Donghai Wang (PI) from PSU with expertise in the synthesis of nanostructured materials and manipulation of interfacial properties of electrochemically active materials, Dr. Jagjit Nanda, with substantial knowledge of and expertise in state-of-the-art cathodes from ORNL, Dr. Chao-Yang Wang with significant experience in advanced cell design and fabrication and cell diagnostics from PSU, and Dr. Chongmin Wang with world-wide known expertise of advance atomic scale characterization of electrode materials from PNNL. Furthermore, this project will leverage and synergistically work with the current DOE-funded programs on battery materials at PSU and ORNL and electrode materials characterization at PNNL. During this funded period, we have accomplished milestones stated as follows: • Scale up production of LiFePO 4 (LFP) coated NCM811 with a production of 300g/batch. Fifteen (≥2 Ah) pouch cells with LFP-coated NCM811 cathode are delivered. Self-evaluated pouch cells in PSU show superior over 80% capacity retention performance even after 1500 cycles at C/3 rate. • Various cations (Al, Ti, Zr, and Mo) substitute cobalt in low-cobalt partially and Co-free cathodes. Their effects on crystal structure and electrochemical behavior are explored. • Phosphate compounds as coating materials represent promising surface protection precursors for low-cobalt cathode materials. Therefore, several metal phosphates were selected for improving the NMC cycling performance and are regarded as effective approaches for a scalable and practical surface protection method. • Production of NCM92, where Nickel content is 92% among transition metals, is scaled up from synthesis to coating and heat treatment procedures. Fifteen 2.7Ah pouch cells with Ti-doped NCM92 cathodes and industrial graphite anode are delivered to Idaho National Lab for testing.

25 ENERGY STORAGE↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗