Search NASA⌕ Search

SEARCH · Search NASA

Results for “initialization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Initial PIP-II Beam Current Monitor Fault Case Analyses & Beam Position Monitor Linearity Studies in CST Studio Suite

The use of non-invasive sensors & systems to measure particle beam characteristics is a crucial part of modern accelerator control systems due to their ability to return real time beam data while minimizing negative effects on beam quality. To ensure that one can be reasonably confident these sensors will behave as desired upon be-ing implemented within the beamline, simulations pre-dicting the performance of these sensors under beamline conditions can be used as a valuable tool for checking sensor functionality without a physical test bench. This paper details the design, testing, and results of two sensor models developed using CST Studio Suite soft-ware designed to mimic two sensors to be implemented within the PIP-III beamline: an elliptical, large-aperture beam position monitor (BPM) for which vertical & hori-zontal position signal linearity was analyzed, and an AC current transformer (ACCT) beam current monitor (BCM) used to search for potential fault cases within the BCM and beam pipe flange gaps. Special focus is given to the discovery of linearity variations within the BPM and the use of frequency domain techniques in the BCM fault case analyses.

Rouzky, A. R.↗

Initial CRADA Abstract MSTS-2023-01U-JWS01

Abstract for Joint Work Statement MSTS-2023-01U-JWS-01 to investigate creation of synthetic melt glass for nuclear attribution. Work is to be completed under approved CRADA MSTS-2023-01U with UNLV.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

Initial Progress on Tank Bottom Repair for the DOE EM Tank Waste R&D Program - 25089

Several years prior to the Lab23-EM001 Call Announcement, Washington River Protection Solutions (WRPS) had done a review in identifying tank repair feasibility. [1, 2] The most viable methods of repair identified for the Floor of a Primary Tank identified were Grout Stabilization and Polymer Grout. Grout Stabilization was described as a self-leveling grout which fills the entire bottom of the tank and creates a new or false bottom. These types of materials have been used at the Savannah River Site (SRS) to fill and close waste tanks as well as contaminated spaces within decommissioned reactors. No mention was made as to the chemical composition of these Stabilizing Grouts in the review, however, grouts used at SRS for the mentioned applications have always been a cementitious grout material. A thickness of approximately 12 inches was suggested in the review. It was also suggested that an additional polymeric coating could be applied to this fresh and clean grout surface.

BLUE, KAREEN↗

2024-03U-JWS01 - Initial Abstract

Abstract for recently approved CRADA joint work statement 2024-03U-JWS01 with University of Nevada Reno. Publication of abstract at time of approval satisfies requirements of DOE O 483.1B.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗