Search NASA⌕ Search

SEARCH · Search NASA

Results for “installed power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

HFIR High Power HEU Neutronics Analyses

Department of Energy National Nuclear Security Administration Office of Material Management and Minimization’s mission includes the conversion of civilian research reactors from highly enriched uranium (HEU) to low-enriched uranium (LEU) fuel. Analyses have shown that the Oak Ridge National Laboratory High Flux Isotope Reactor (HFIR) will need to operate at 95 MW for the LEU silicide dispersion fuel designs to match key performance metrics obtained with HEU fuel at 85 MW. To prove safe operation of HFIR after installation of plant modifications to increase power, a high power HEU test cycle was proposed. Neutronics model updates and reactor physics analyses are performed to support the development of safety design reports for the high power (HP) HEU test cycle. Reactor physics metrics evaluated herein include fuel depletion, actinide production, cycle length, fission rate density distributions, axial power peaking factors, and reactor kinetic parameters. These reactor physics analyses support the development of future LEU safety design reports by providing key input for future HP HEU HFIR thermal hydraulics and reactor transient safety analyses.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluation of high-voltage, high-power, solid-state remote power controllers for amps

The Electrical Power Branch at Marshall Space Flight Center has a Power System Development Facility where various power circuit breadboards are tested and evaluated. This project relates to the evaluation of a particular remote power controller (RPC) energizing high power loads. The Facility equipment permits the thorough testing and evaluation of high-voltage, high-power solid-state remote power controllers. The purpose is to evaluate a Type E, 30 Ampere, 200 V dc remote power controller. Three phases of the RPC evaluation are presented. The RPC is evaluated within a low-voltage, low-power circuit to check its operational capability. The RPC is then evaluated while performing switch/circuit breaker functions within a 200 V dc, 30 Ampere power circuit. The final effort of the project relates to the recommended procedures for installing these RPC's into the existing Autonomously Managed Power System (AMPS) breadboard/test facility at MSFC.

Callis, Charles P.↗

Master State Distributed Estimator (masde)

The MSE technology provides a distributed state estimation scheme for power utilities by making it a real time dynamic system, versus the static snapshot method used today. This will allow utilities to verify power grid readings and identify false data on the communication network. The prevailing method of estimation takes all the data from the system into a single load flow equation at the utilities command center. This becomes a large algorithm that is very time consuming to solve, providing the engineers only snap shots of the system. The MFD distributes an algorithm to devises that are already installed at various locations on the power grid. This allows for much faster computer times because the algorithms contain magnitudes less data. When each distributed estimator completes its calculation, it sends the results back to the master device to check against all other distributed estimators.

Reen, DylanW.↗

Systems Analysis of Biomass and Coal Co-firing Power Plants with Deep Carbon Capture Toward Net-zero Emissions

Achieving a net-zero emission economy in the United States requires integrating diverse low-carbon and negative-emission technologies into the existing fossil fuel-dominant power fleet. Potential technologies from the low-carbon portfolio include renewable power, fossil power with carbon capture and storage (CCS), bioenergy with CCS (BECCS), and direct air capture (DAC). Renewable power is a clean energy source but has to pair with costly battery storage to provide dispatchable electricity. Fossil power with CCS offers dispatchable electricity yet still relies on DAC to offset residual emissions, even when deploying deep CCS with more than 90% CO2 capture. Coal-biomass co-firing with CCS, a subset of BECCS, is a reliable energy production technology that can be retrofitted from existing electricity generation units (EGUs). Power plant retrofit maximizes the use of the current U.S. coal power fleet without the need for large-scale deployment of new renewable power, battery storage, or DAC. Retrofitting coal-biomass co-firing with deep CCS in EGUs is a promising option, but not a universal solution. Biomass co-firing at a power plant introduces economic challenges and indirectly poses pressure on land and water resources. Meanwhile, retrofitting deep CCS affects plant efficiency and raises electricity generation costs. Overall, the technical feasibility and economic viability of plant retrofits vary across EGUs, as they are contingent upon the regional availability of biomass, unit-specific characteristics, site-specific fuel supply costs, and adjacent CO2 storage potential. Government incentives like 45Q can improve the retrofit viability, though the impact requires further quantification. A comprehensive analysis at the unit level is essential to address the question regarding the fate of the U.S. coal-fired electricity generation fleet toward the net-zero emission goal. This study conducts a systematic techno-economic-environmental assessment of EGUs to identify the viability of biomass co-firing and deep CCS retrofits in the U.S. coal-fired power fleet. Specifically, it characterizes the techno-economic performance of deep carbon capture, estimates life cycle greenhouse gas (GHG) emissions, and conducts a fleet-level assessment on retrofit viability. The key objectives are (1) to estimate the unit-specific performance and retrofitted cost under various biomass co-firing levels and CO2 capture rates; (2) to determine the possibility of reaching net-zero emission at the fleet level; (3) to quantify the cumulative capacities that are suitable for plant retrofits under current and future biomass supply scenarios; and (4) to improve the understanding of policy impacts on such retrofits to help the power sector’s transition to a net-zero economy. Techno-economic Model of Deep Carbon Capture. This study develops the performance and economic models for Monoethanolamine-based post-combustion CO2 capture at 95–99% capture rates. The process is simulated in Aspen Plus, analyzing the performance of carbon capture technology by varying the plant sizes, solvent lean loading, CO2 concentrations, and flue gas inlet temperature. Based on the key inputs and output parameters of CO2 capture, a reduced-order performance model of deep carbon capture is formulated. In addition, an engineering-economic model integrating the performance metrics is developed to estimate the capital as well as operation and maintenance (O&M) costs. Capital cost estimations follow the framework of the Integrated Environmental Control Model (IECM) and incorporate data regressions from three technical reports by IECM, the National Energy Technology Laboratory (NETL), and the National Renewable Energy Laboratory. The O&M cost estimation utilizes the actual inventory consumption rate and labor requirements. Both performance and cost models are embedded into IECM v13.0-beta, a fossil-fuel power plant modeling tool. Life Cycle Assessment of Power Plants. This study estimates the GHG emissions of power plants through life cycle assessment (LCA). The LCA scope includes fuel supply, combustion-based power generation, and CO2 transport and storage. The fuel-based life cycle module is designed following the framework of the NETL Unit Process Library and CO2U LCA Guidance Toolkit. The module is then incorporated into IECM v13.0-beta. The process-based LCA is applied to estimate the GHG emissions of coal and biomass supply, coal- and coal-biomass co-firing power plant operation, as well as CO2 pipeline transport and geographical sequestration. An uncertainty analysis is conducted to quantify the variability and uncertainty associated with the LCA using the Latin Hypercube Sampling (LHS) method. Fleet-level Assessment. This study evaluates the technical and economic feasibility of selected coal-fired EGUs, examines the role of tax credits in retrofit viability, and assesses the competitiveness of retrofitted units against other low-carbon options. Unit screening identifies EGUs for the study, focusing on new, efficient baseload units with air pollution controls. The power plant databases are then established to organize unit-specific information on performance and operating conditions from the relevant public databases. Biomass for co-firing retrofits is selected based on home and neighboring county availability, ensuring sustained operation with at least a 5% co-firing level. The CO2 storage site is determined by state-level storage potential, with ArcGIS Pro and NETL CO2 Saline Storage Cost Model used to identify the optimal balance between the nearest transport distances and affordable storage costs. The latest IECM v13.0-beta is then employed to configure and evaluate the eligible EGUs with or without the deployment of deep CCS and biomass co-firing. A supply curve is established to illustrate the cumulative installed capacity suitable for retrofits at different cost levels. A sensitivity analysis on tax credits for carbon sequestration is performed. Finally, a unit-level cost comparison is conducted among retrofitted plants, renewable power with battery storage, and abated fossil fuels with DAC. Expected Results. This study evaluates the technical, economic, and environmental metrics of each EGU across an array of CO2 capture rates and biomass co-firing level scenarios. Unit-level comparisons will identify critical factors influencing technical performance. The supply curves with and without tax incentives will provide insights into the impact of tax credits on biomass co-firing and CCS deployment. The cost comparisons with renewables and DAC-retrofit will assess the competitiveness of the retrofitted units. Life cycle emissions from each unit will be assessed to identify the scenarios under which net-zero emissions can be achieved. These analyses are expected to determine the total coal-fired capacity suitable for serving as a low-carbon energy source with or without tax incentives. The study results are novel in identifying optimal unit-specific strategies for producing carbon-neutral power, whether through retrofitting EGUs with deep CCS, biomass co-firing, DAC, or installing renewable power with battery. The findings will provide insight into nationwide efforts to ensure reliable, affordable, and low-carbon electricity. It also will inform investment decisions and policies in the deployment of deep carbon capture and negative emission technologies for a net-zero energy future.

Biomass Co-firing↗

Reduction of JT8D powered aircraft noise by engine refanning

The technical feasibility is described of substantially reducing the noise levels of existing JT8D powered aircraft by retrofitting the existing fleet with quieter refan engines and new acoustically treated nacelles. No major technical problems exist that preclude the development and installation of refanned engines on aircraft currently powered by the JT8D engine. The refan concept is technically feasible and provides calculated noise reductions of from 7 to 8 EPNdb for the B727-200 aircraft and from 10 to 12 EPNdb for the DC-9-32 aircraft at the FAR Part 36 measuring stations. These noise levels are lower than both the FAR Part 36 noise standards and the noise levels of the wide-body DC-10-10. Corresponding reductions in the 90 EPNdb footprint area are estimated to vary from about 70 percent for the DC-9 to about 80 percent for the B727.

Stitt, L. E.↗

STS-109 Flight Day 6 Highlights

On the sixth flight day of the STS-109 mission, the crewmembers of the Columbia Orbiter (Commander Scott Altman, Pilot Duane Carey, Payload Commander John Grunsfeld, and Mission Specialists Nancy Currie, James Newman, Richard Linnehan, and Michael Massimino) are shown in selected footage of their servicing mission to the Hubble Space Telescope (HST). The third of five extravehicular activities (EVA) is performed in which Linnehan and Grunsfeld replaced the HST's Power Control Unit (PCU). The astronauts' egress from the Orbiter was delayed after water was found in Grunsfeld's suit. The removal of the old unit was particularly difficult, given the difficulty of demating the PCU's 36 connectors encumbered by the heavy gloves of the astronaut's suit. During this space walk, the HST was powered down to a completely dormant state for the first time since its launch in 1990. Following the successful installation of the new PCU, the HST's power was restarted by engineers at the Goddard Space Flight Center (GSFC). There had been some concern about the telescope's possible failure to restart, but everything went smoothly.

Source record↗

Flight Performance Maneuver Planning for NASA’s X-57 “Maxwell” Flight Demonstrator – Part 2: Power-On Effects

Distributed Electric Propulsion technology as envisioned for NASA’s X-57 “Maxwell” flight demonstrator concept was designed to increase high-speed cruise efficiency compared to a combustion-powered general aviation baseline. A portion of this increased efficiency was due to beneficial aero-propulsive interaction inherent to the distributed propulsion architecture. The measure of the increase in efficiency between a conventional and distributed propulsion wing was to be determined by comparing flight test data from the electrically powered, conventional wing X-57 Mod II configuration to data obtained from the electrically powered, distributed propulsion wing X-57 Mod III/IV configuration. Flight test maneuvers that accommodate errors in instrumentation and the flight test environment were previously developed to establish the power-off drag characteristics for all X-57 configurations. In this paper, test points and maneuvers are evaluated to establish the installed and gross thrust that build upon the power-off drag estimates. Analysis of the proposed power-on maneuvers shows that the selected test points and measurement techniques could generate installed thrust estimates within 3-7% (at the 50% confidence level) of the actual values if each maneuver is conducted over a time period of 40 seconds.

Nicholas K Borer↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

Champion, Mark↗

Combined Heat and Power Technology Fact Sheet Series: Thermal Energy Storage

This fact sheet provides an overview of thermal energy storage (TES) technologies, which heat or cool a storage medium and, when needed, deliver the stored thermal energy to meet heating or cooling needs. TES systems are used in commercial buildings, industrial processes, and district energy installations to deliver stored thermal energy during peak demand periods, thereby reducing peak energy use. TES systems are often integrated with electric or absorption chillers to reduce peak electricity costs and, in the case of new construction, to reduce capital costs by optimizing chiller size. TES technologies can support sites that have either renewable or fossil power generation, including combined heat and power (CHP) installations. With CHP, TES can help optimize equipment size by reducing the required peak CHP thermal capacity and increasing annual CHP usage. TES can also provide turbine inlet cooling for gas turbines used in CHP applications, which increases power production in hot ambient conditions.

Combined Heat and Power, CHP, Thermal Energy, Tech↗

Reduction of JT8D powered aircraft noise by engine refanning

The purpose of the Refan Program is to establish the technical feasibility of substantially reducing the noise levels of existing JT8D powered aircraft. This would be accomplished by retrofitting the existing fleet with quieter refan engines and new acoustically treated nacelles. No major technical problems exist that preclude the development and installation of refanned engines on aircraft currently powered by the JT8D engine. The refan concept is technically feasible and provides calculated noise reductions of from 7 to 8 EPNdB for the B727-200 aircraft and from 10 to 12 EPNdB for the DC-9-32 aircraft at the FAR Part 36 measuring stations. Corresponding reductions in the 90 EPNdB footprint area are estimated to vary from about 70 percent for the DC-9 to about 80 percent for the B727.

Stitt, L. E.↗

Convertible Gas-Turbine Engines

Convertible engine aircraft gas-turbine is two engines in one. Produces turbofan thrust, turboshaft power, or any combined thrust and shaftpower continously while operating up to full speed. Used to power vertical/short-takeoff-and-landing (V/STOL) airplanes and advanced high-speed rotorcraft. Rotorcraft shows use of convertible engines rather than separate engines for rotor power and forward thrust affords advantages in installation and save 16 percent in fuel and 20 percent in direct operating costs. Engine used for propulsion of new high-speed rotorcraft that needs both thrust and shaft power. Also used to cross-couple fans of two-engine V/STOL aircraft.

Abdalla, K. L.↗

High-power dual-directional coupler

Water-cooled coupler installed in S-band polarization diversity (SPD) cone is used to calibrate receiving-station relay. Coupler operates without arcing at 400 kw and permits accurate calibration of entire system below antenna feed horn. Device has good directivity, contributes less than 0.01 K to system noise temperature, and eliminates saturation of ground station and spacecraft receivers during high-power operation.

Otoshi, T. Y.↗

Integrating in situ environmental covariates in an American lobster catch model to improve impact assessment

The installation and operation of floating offshore wind power is an integral component of societal transition to renewable energy generation where fixed bottom offshore wind is not possible. However, it will cause unique ecosystem changes. To disentangle the effects of offshore wind installations from the concurrent effects of climate change and the fishing practices on commercially significant resources, we must develop detailed characterizations of the resources before development occurs. In the Gulf of Maine, American lobster is the most commercially and culturally important fishery. At the time of writing, this is the largest fishery by value in North America. Our understanding of baseline localized parameters (such as catch per trap at the spatial scale of individual turbines) should be informed by relationships to environmental, biological, and survey-specific functional drivers of catch. A more mechanistic understanding of catch will allow for strategic adjustments to Post- Deployment fishery responses and ultimately, the development of research- and commercial-scale floating offshore wind development. Here, we used survey data from the New England Aqua Ventus Pre-Construction Commercial Trapping Survey to develop Generalized Additive Models describing seasonal catch per trap for legal and sublegal lobsters. We found fall catch to be nearly twice that of spring. Bottom temperature dynamics could be used to predict catch, and the Fall survey was associated with a warmer temperature regime. By using analytical tools that incorporate environmental heterogeneity, we developed monitoring methods from preconstruction baseline data that will be applicable over the post-construction operating period of an offshore wind farm.

BACI↗

Development and Bench-Scale Testing of a Novel Biphasic Solvent-Enabled Absorption Process for Post-Combustion Carbon Capture (Final Technical Report)

A new class of biphasic solvents was developed, and the concept of the enabled carbon dioxide (CO 2 ) absorption process was tested for post-combustion carbon capture in our previous lab-scale research. The primary goals of this project were to advance the development of the novel biphasic CO 2 absorption process (BiCAP) and validate its technical advantages by testing the integrated technology at a 40 kWe bench-scale with actual coal-derived flue gas in a power plant environment. The project was led by the University of Illinois at Urban-Champaign (UIUC), and Trimeric Corporation served as a sub-awardee providing support in basic design and techno-economic studies. To achieve the project goals and objectives, solvent management studies, process modeling and optimization, bench-scale equipment design, construction and testing, and technical, economic and environmental assessments have been conducted. The two top-performing biphasic solvents developed in our previous research were used in this project. Biphasic solvent emissions and control were investigated in the laboratory. The emissions of the biphasic solvents from the absorber were comparable to or lower than the reference 30 wt% monoethanolamine (MEA) solution, while they could be more effectively removed in the water wash column. Lab-scale testing of solvent degradation reclamation has revealed that vacuum distillation was feasible for biphasic solvent reclamation. Aspen Plus models were used to optimize the BiCAP, and a CO 2 stripping configuration introducing a secondary cold solvent feed to the stripper was identified to be the most energy efficient. A 40 kWe bench-scale, integrated BiCAP system was successfully designed, fabricated, and installed at the UIUC’s Abbott Power Plant. Parametric testing with synthetic flue gas has demonstrated that the two biphasic solvents required a more than 40% lower heat duty for CO 2 desorption as compared to the reference MEA tested on the same bench-scale skid. Slipstream testing with actual coal flue gas for a total of 31 days in two test campaigns has further demonstrated stable operation of the bench-scale skid. During the first campaign targeting 90% CO 2 removal, the heat duty averaged at 2,183 MJ/tonne of CO 2 captured and during the second campaign targeting 95% removal, the heat duty averaged at 2,450 MJ/tonne of CO 2 captured. A techno-economic analysis has revealed that for integration of the BiCAP into a 650-MWe pulverized coal-fired power plant, the parasitic power loss was reduced by ~20%, and the cost of CO 2 capture was reduced by ~21% ($36.3/tonne on a December 2018 dollar basis) compared to the U.S. Department of Energy (DOE)’s baseline Case B12B. As progression from this bench-scale development effort, a new project “Engineering-Scale Testing of the Biphasic Solvent Based CO 2 Absorption Capture Technology at a Covanta Waste-to-Energy Facility” was awarded by the DOE, launched in February 2023, to allow the team to further test the technology and demonstrate its technical and economic advantages at a pilot scale.

20 FOSSIL-FUELED POWER PLANTS↗

Economically Viable Intermediate to Long Duration Hydrogen Energy Storage Solutions for Fossil Fueled Assets

This report was prepared as an account of work sponsored by the Office of Fossil Energy and Carbon Management of U.S. Department of Energy under Funding Opportunity Announcement Number DE-FOA-0002332 “Energy Storage for Fossil Power Generation”. The work aimed to explore and advance an innovative hydrogen energy storage system – the synergistically integrated hydrogen energy storage system (SIHES) – that has the following characteristics: • Compatible with existing or new coal and gas fuel electricity generation units, • best suited for intermediate to long duration energy storage, from 12 hours to weeks even months, and • capable of storing energy at the utility scale – hundreds of MWh to GWh energy storage with power output level in tens to hundreds of MW. Preliminary front-end engineering design (Pre-FEED) studies was carried out to develop and refine a site-specific SIHES as peaking power generation units (so named as HyPeaker) as the first market entry point, to demonstrate both the technical feasibility and the economic viability to integrate the HyPeaker “within the fence” of a fossil power plant. This specific site was TVA’s Johnsonville Combustion Turbine Plant. The HyPeaker was designed and engineered to integrate with a 60MW aeroderivative gas turbine unit already available at TVA’s Johnsonville site. This site-specific HyPeaker consists of an alkaline electrolyzer to produce hydrogen from CO 2 free electricity sources, an innovative low-cost high-pressure hydrogen storage system (Big-Ton) and the aero gas turbine to generate electricity using blend of hydrogen and natural gas. A holistic system level technoeconomic analysis tool specific to HyPeaker was developed to optimize the engineering design of the Johnsonville site-specific HyPeaker for cost and performance. The optimal design and specification of the Johnsonville site-specific HyPeaker are the following: • Alkaline electrolyzer: 3MW • Big-Ton storage vessel: 11,000kg H 2 at 3000psi. • 4-stage diaphragm hydrogen compressor: 55kg-H 2 /hr from 150psi to 3000psi. The HyPeaker is designed to provide sufficient hydrogen for 90% continuous operation of the HyPeaker. All major components have design life of 30 years. The capex of HyPeaker is estimated at $\$$7.1M. This included $\$$1.5M for the electrolyzer, $\$$5.6M for the storage vessel and compressor. The cost of aero gas turbine was included as it is already available at the site. Key findings are: • HyPeaker can be designed, manufactured, installed and integrated with the fossil power plants, with sub-systems and components commercially available on the market today, even when it is scaled up to an order of magnitude larger than the one at the Johnsonville site. HyPeaker is a technologically viable solution to cover a wide range of energy storage duration needs, from daily peaking operation to seasonal shifting for fossil fueled assets. • The cost advantage of SCCV based Big-Ton H 2 storage vessel made it possible to “oversize” the H 2 storage subsystem to achieve overall system level cost optimization. The benefits are two-fold. First, it allows to significantly reduce the capacity and cost of electrolyzer by spreading H 2 production over a much longer period of time when the fuel cost for electricity production is low. Second, it allows to balance the hydrogen production and usage shift over weeks to months to meet the peak demands. As such, the capital cost of HyPeaker system using the Big-Ton was less than half of the cost of a system with today’s steel tube based H 2 storage system. The HyPeaker has even better cost advantage Li-ion battery based energy storage system. The estimated capital cost of Li-Ion battery system would be at $\$$38M, under the same projected 20-year electricity generation profile of the Johnsonville site. This is over 5 times more expensive than the HyPeaker system. • Since industry scale energy storage systems do not have 100% energy conversion and storage efficiency, energy storage systems using fossil fuel generated electricity would increase the CO 2 emission. This is particularly the case for HyPeaker due to its low round trip efficiency. Therefore, a more sensible solution would be to the excessive or curtailed electricity from CO 2 emission free sources such as solar farms, wind farms or nuclear power plants, to produce hydrogen, and integrate them with the HyPeaker. Electricity from TVA’s nuclear power plants was used for the Johnsonville HyPeaker. • The economic viability of HyPeaker is expected to be further improved when global supply chains are taken into consideration. For the same Johnsonville site specific HyPeaker, the capex would be reduced to ~$\$$3.6M from ~$\$$7.1M, and the added LCOE is reduced to ~$\$$85/MWh. With the bipartisan Infrastructure Investment and Jobs Act, the cost of domestically produced HyPeaker sub-systems would be at the level of today’s global suppliers. Since the peaking units generally operate at peak usage period, thereby demanding higher price, the projected $\$$85/MWh LCOE would be within the realm of financial viability for utility operators.

08 HYDROGEN↗

Use of Machine Learning on PMU Data for Transmission System Fault Analysis

Synchrophasor technology has been used for monitoring, control, and protection of bulk power system for over 10 years. Deployment of phasor measurement units (PMUs) in the USA power system has surpassed 3000 units installed in the transmission substations as stand-alone intelligent electronic devices (IEDs) or as a software add-on to other devices such as digital protective relays (DPRs) or digital fault recorders (DFRs). By now, thousands of terabytes of PMU data may have been captured and stored by various transmission system operators (TSOs) and independent system operators (ISOs). This creates an opportunity to deploy advanced machine learning (ML) techniques to detect and classify faults recorded by PMUs automatically to be used by the system operators for rapid, critical decision-making when manual analysis of the past or unfolding events is not feasible. In this paper we offer a brief background on how the automated fault analysis may be done using DPR and/or DFR data, and compare some of the legacy approaches to the new ML approaches in the context of the system-wide PMU recordings. We then offer insights from developing practical ML solutions that have been applied on field recordings captured by close to 450 PMUs from all three US interconnections (Western, Eastern and ERCOT) over two years (2016-2017). We identify and illustrate ML challenges we addressed: inaccurate data, data with scarce and temporally imprecise fault labels, data recorded by PMUs sparsely located at substations resulting in the fault records taken afar from the ends of the faulted lines, data containing only positive sequence values, and data taken at different voltage levels. We then illustrate the ML model results for fault analysis under different application scenarios. The novelty of this study is not only in the design, implementation, and performance analysis of the ML algorithms, but also in the use of advanced fault modelling and simulation approaches to improve the training results when developing supervised ML models for fault detection and classification. Extensive simulations of faults were conducted on a 14-bus power system to create a training dataset with over 1400 accurately labelled faults. This dataset was applied to enhance the accuracy of fault detection and classification of machine learning-based models trained with small number of labelled faults in large datasets recorded in the grid interconnections ranging from 5,000 to 70,000 buses.

Synchrophasors, Machine Learning, Fault Analysis, ↗

Draft Prototype Microreactor Transportation Safety Program

Microreactors are compact reactors capable of producing less than 50 megawatts of electrical energy. Typically, these reactors are factory-fabricated and designed to be easily transportable by truck, rail, vessel, or air. Microreactor designs often assume that the unit can be transported containing either unirradiated or irradiated fuel. The interest in microreactors is driven by several factors, including the need to generate power on at remote locations, at military installations, at facilities such as data centers, and in areas recovering from natural disasters. The U.S. Department of Defense is actively pursuing the microreactor concept to meet the increasing energy demands of military operations that require portable and dense power sources. Commercial vendors are also exploring microreactor concepts. The report Microreactor Transportation Emergency Planning Challenges (Maheras et al. 2024) outlined the emergency planning challenges associated with the transportation of microreactors by road, rail, and by barge/ship. The successful commercial deployment and redeployment of microreactors will also require the development of microreactor transportation safety programs. The elements in these safety programs are not specific to microreactors; however, the transport of microreactors may pose unique challenges in these areas. This report builds on the report Microreactor Transportation Emergency Planning Challenges (Maheras et al. 2024) and develops the elements of a prototype microreactor transportation safety program that describes the elements that should be contained vendor-developed microreactor transportation safety programs, identifying the unique elements associated with microreactor transport. This will provide vendors and their transportation contractors a basis for their transportation planning and will accelerate the commercial deployment and redeployment of microreactors by identifying those issues unique to microreactor transport. The emphasis of this report is on highway transport of microreactors. This is based on a U.S. Nuclear Regulatory Commission transportation package approval strategy of crawl-walk-run, where transport by highway is evaluated first (Coles et al. 2021, 2024, Maheras et al. 2021), then other surface modes (rail and barge/ship), and finally air transport. Evaluation of maritime transport of microreactors was recently initiated (Rigato et al. 2024, Maheras et al. 2025). The report first discusses microreactors in general and microreactor transportation safety program planning assumptions. The report then provides a description of the transportation safety planning process and provides an extensive discussion of the elements of transportation safety programs. Specific elements examined included transportation roles and responsibilities, transportation planning, transportation mode and route selection, carrier selection, transportation packaging, advance notification of shipments, public information and communications, emergency response plans and procedures, inspections, security, safe parking, shipment tracking, weather and road conditions, medical preparedness, training and exercises, and program evaluation. The report then identifies the unique elements of a transportation safety program associated with microreactor transport. These unique elements were in the areas of: the unusual nature of microreactor designs, compensatory measures, increased radiation dose rates in the vicinity of microreactors, transportation package approval versus 10 CFR 50.59, and the use of a risk-informed transportation package approval process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗