Search NASA⌕ Search

SEARCH · Search NASA

Results for “jack”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

High Level Waste Remote Handling Equipment in the Melter Cave Support Handling System at the Hanford Waste Treatment Plant

Cold war plutonium production led to extensive amounts of radioactive waste stored in tanks at the Department of Energy's (DOE) Hanford site. Bechtel National, Inc. is building the largest nuclear Waste Treatment Plant in the world located at the Department of Energy's Hanford site to immobilize the millions of gallons of radioactive waste. The site comprises five main facilities; Pretreatment, High Level Waste vitrification, Low Active Waste vitrification, an Analytical Lab and the Balance of Facilities. The pretreatment facilities will separate the high and low level waste. The high level waste will then proceed to the HLW facility for vitrification. Vitrification is a process of utilizing a melter to mix molten glass with radioactive waste to form a stable product for storage. The melter cave is designated as the High Level Waste Melter Cave Support Handling System (HSH). There are several key processes that occur in the HSH cell that are necessary for vitrification and include: feed preparation, mixing, pouring, cooling and all maintenance and repair of the process equipment. Due to the cell's high level radiation, remote handling equipment provided by PaR Systems, Inc. is required to install and remove all equipment in the HSH cell. The remote handling crane is composed of a bridge and trolley. The trolley supports a telescoping tube set that rigidly deploys a TR 4350 manipulator arm with seven degrees of freedom. A rotating, extending, and retracting slewing hoist is mounted to the bottom of the trolley and is centered about the telescoping tube set. Both the manipulator and slewer are unique to this cell. The slewer can reach into corners and the manipulator's cross pivoting wrist provides better operational dexterity and camera viewing angles at the end of the arm. Since the crane functions will be operated remotely, the entire cell and crane have been modeled with 3-D software. Model simulations have been used to confirm operational and maintenance functional and timing studies throughout the design process. Since no humans can go in or out of the cell, there are several recovery options that have been designed into the system including jack-down wheels for the bridge and trolley, recovery drums for the manipulator hoist, and a wire rope cable cutter for the slewer jib hoist. If the entire crane fails in cell, the large diameter cable reel that provides power, signal, and control to the crane can be used to retrieve the crane from the cell into the crane maintenance area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of anticipatory signal to steam generator pressure control program for 700 MWe Indian pressurized heavy water reactor

700 MWe Indian Pressurized Heavy Water Reactor (IPHWR) is horizontal channel type reactor with partial boiling at channel outlet. Due to boiling, it has a large volume of vapor present in the primary loops. It has two primary loops connected with the help of pressurizer surge line. The pressurizer has a large capacity and is partly filled by liquid and partly by vapor. Large vapor volume improves compressibility of the system. During turbine trip or load rejection, pressure builds up in Steam Generator (SG). This leads to pressurization of Primary Heat Transport System (PHTS). To control pressurization of SG and PHTS, around 70% of the steam generated in SG is dumped into the condenser by opening Condenser Steam Dump Valves (CSDVs) and rest of the steam is released to the atmosphere by opening Atmospheric Steam Discharge Valves (ASDVs) immediately after sensing the event. This is accomplished by adding anticipatory signal to the output of SG pressure controller. Anticipatory signal is proportional to the thermal power of reactor and the proportionality constant is set so that SG pressure controller's output jacks up to ASDV opening range when operating at 100% FP. To simulate this behavior for 700 MWe IPHWR, Primary and secondary heat transport system is modeled. SG pressure control and other process control program have also been modeled to capture overall plant dynamics. Analysis has been carried out with 3-D neutron kinetics coupled thermal hydraulic computer code ATMIKA.T to evaluate the effect of the anticipatory signal on PHT pressure and over all plant dynamics during turbine trip in 700 MWe IPHWR. This paper brings out the results of the analysis with and without considering anticipatory signal in SG pressure control program during turbine trip. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Pipeline Decommissioning Trial AWE Berkshire UK - 13619

This Paper details the implementation of a 'Decommissioning Trial' to assess the feasibility of decommissioning the redundant pipeline operated by AWE located in Berkshire UK. The paper also presents the tool box of decommissioning techniques that were developed during the decommissioning trial. Constructed in the 1950's and operated until 2005, AWE used a pipeline for the authorised discharge of treated effluent. Now redundant, the pipeline is under a care and surveillance regime awaiting decommissioning. The pipeline is some 18.5 km in length and extends from AWE site to the River Thames. Along its route the pipeline passes along and under several major roads, railway lines and rivers as well as travelling through woodland, agricultural land and residential areas. Currently under care and surveillance AWE is considering a number of options for decommissioning the pipeline. One option is to remove the pipeline. In order to assist option evaluation and assess the feasibility of removing the pipeline a decommissioning trial was undertaken and sections of the pipeline were removed within the AWE site. The objectives of the decommissioning trial were to: - Demonstrate to stakeholders that the pipeline can be removed safely, securely and cleanly - Develop a 'tool box' of methods that could be deployed to remove the pipeline - Replicate the conditions and environments encountered along the route of the pipeline The onsite trial was also designed to replicate the physical prevailing conditions and constraints encountered along the remainder of its route i.e. working along a narrow corridor, working in close proximity to roads, working in proximity to above ground and underground services (e.g. Gas, Water, Electricity). By undertaking the decommissioning trial AWE have successfully demonstrated the pipeline can be decommissioned in a safe, secure and clean manor and have developed a tool box of decommissioning techniques. The tool box of includes; - Hot tapping - a method of breaching the pipe while maintaining containment to remove residual liquids, - Crimp and shear - remote crimping, cutting and handling of pipe using the excavator - Pipe jacking - a way of removing pipes avoiding excavations and causing minimal disturbance and disruption. The details of the decommissioning trial design, the techniques employed, their application and effectiveness are discussed and evaluated here in. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Removal of the Plutonium Recycle Test Reactor - 13031

The 309 Facility housed the Plutonium Recycle Test Reactor (PRTR), an operating test reactor in the 300 Area at Hanford, Washington. The reactor first went critical in 1960 and was originally used for experiments under the Hanford Site Plutonium Fuels Utilization Program. The facility was decontaminated and decommissioned in 1988-1989, and the facility was deactivated in 1994. The 309 facility was added to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response actions as established in an Interim Record of Decision (IROD) and Action Memorandum (AM). The IROD directs a remedial action for the 309 facility, associated waste sites, associated underground piping and contaminated soils resulting from past unplanned releases. The AM directs a removal action through physical demolition of the facility, including removal of the reactor. Both CERCLA actions are implemented in accordance with U.S. EPA approved Remedial Action Work Plan, and the Remedial Design Report / Remedial Action Report associated with the Hanford 300-FF-2 Operable Unit. The selected method for remedy was to conventionally demolish above grade structures including the easily distinguished containment vessel dome, remove the PRTR and a minimum of 300 mm (12 in) of shielding as a single 560 Ton unit, and conventionally demolish the below grade structure. Initial sample core drilling in the Bio-Shield for radiological surveys showed evidence that the Bio-Shield was of sound structure. Core drills for the separation process of the PRTR from the 309 structure began at the deck level and revealed substantial thermal degradation of at least the top 1.2 m (4LF) of Bio-Shield structure. The degraded structure combined with the original materials used in the Bio-Shield would not allow for a stable structure to be extracted. The water used in the core drilling process proved to erode the sand mixture of the Bio-Shield leaving the steel aggregate to act as ball bearings against the core drill bit. A redesign is being completed to extract the 309 PRTR and entire Bio-Shield structure together as one monolith weighing 1100 Ton by cutting structural concrete supports. In addition, the PRTR has hundreds of contaminated process tubes and pipes that have to be severed to allow for a uniformly flush fit with a lower lifting frame. Thirty-two 50 mm (2 in) core drills must be connected with thirty-two wire saw cuts to allow for lifting columns to be inserted. Then eight primary saw cuts must be completed to severe the PRTR from the 309 Facility. Once the weight of the PRTR is transferred to the lifting frame, then the PRTR may be lifted out of the facility. The critical lift will be executed using four 450 Ton strand jacks mounted on a 9 m (30 LF) tall mobile lifting frame that will allow the PRTR to be transported by eight 600 mm (24 in) Slide Shoes. The PRTR will then be placed on a twenty-four line, double wide, self powered Goldhofer for transfer to the onsite CERCLA Disposal Cell (ERDF Facility), approximately 33 km (20 miles) away. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mooring structure for ocean wave energy converters

A mooring system for an Ocean Wave Energy Converters (OWEC) includes multiple structural members such as legs and braces that are linearly extendible and connected using mobile joints, each joint providing two degrees of freedom for rotations about the joint. Mobile joints also attach bottom ends of the legs to mooring points. A jacking system can change lengths of the extensible structural members to adjust depth of the OWEC for operation or for storm safety, to lift the OWEC out of the water for maintenance, or to align the OWEC to an incoming wave direction.

Siegel, Stefan G.↗

8th International Special Session on Current Trends in Numerical Simulation for Parallel Engineering Environments

In today's world, the use of parallel programming and architectures is essential for simulating practical problems in engineering and related disciplines. Significant progress in CPU architecture (multi- and many-core CPUs, SMT, transactional memory, virtualization support, shared caches etc.) system scalability, and interconnect technology, continues to provide new opportunities, as well as new challenges for both system architects and software developers. These trends are paralleled by progress in algorithms, simulation techniques, and software integration from multiple disciplines. In its 8th year, ParSim continues to build a bridge between application disciplines and computer science and to help fostering closer cooperations between these fields. Since its successful introduction in 2002, ParSim has established itself as an integral part of the EuroPVM/MPI conference series. In contrast to traditional conferences, emphasis is put on the presentation of up-to-date results with a short turn-around time. We believe that this offers a unique opportunity to present new aspects in this dynamic field and discuss them with a wide, interdisciplinary audience. The EuroPVM/MPI conference series, as one of the prime events in parallel computation, serves as an ideal surrounding for ParSim. This combination enables participants to present and discuss their work within the scope of both the session and the host conference. This year, five papers from authors in five countries were submitted to Par-Sim, and we selected three of them. They cover a range of different application fields including mechanical engineering, material science, and structural engineering simulations. We are confident that this resulted in an attractive special session and that this will be an informal setting for lively discussions as well as for fostering new collaborations. Several people contributed to this event. Thanks go to Jack Dongarra, the EuroPVM/MPI general chair, and to Jan Westerholm, Juha Fagerholm and Jussi Heikonen, the PC chairs, for their encouragement and support to continue the ParSim series at EuroPVM/MPI 2009. We would also like to thank the numerous reviewers, who provided us with their reviews in such a short amount of time (in most cases in just a few days) and thereby helped us to maintain the tight schedule. Last, but certainly not least, we would like to thank all those who took the time to submit papers and hence made this event possible in the first place. We are confident that this session will fulfill its purpose to provide new insights from both the engineering and the computer science side and encourages interdisciplinary exchange of ideas and cooperations, and that this will continue ParSim's tradition at EuroPVM/MPI.

99 GENERAL AND MISCELLANEOUS↗

Hollow Silicon Nanospheres Encapsulated with a Thin Carbon Shell: An Electrochemical Study

In this study we have investigated the electrochemical properties of hollow silicon nanospheres encapsulated with a thin carbon shell, HSi@C, as a potential candidate for lithium-ion battery anodes. Hollow Si nanospheres are formed using a templating method which is followed by carbon coating via carbonization of a pyrrole precursor to form HSi@C. The synthesis conditions and the resulting structure of HSi@C have been studied in detail to obtain the target design of hollow Si nanospheres encapsulated with a carbon shell. The HSi@C obtained exhibits much better electrochemical cycle stability than both micro-and nano-size silicon anodes and deliver a stable specific capacity of 700 mA h g(-1) after 100 cycles at a current density of 2 A g(-1) and 800 mA h g(-1) after 120 cycles at a current density of 1 A g(-1). The superior performance of HSi@C is attributed to the synergistic combination of the nanostructured material, the enhanced conductivity, and the presence of the central void space for Si expansion with little or no change in the volume of the entire HSi@C particle. This study is the first detailed investigation of the synthesis conditions to attain the desired structure of a hollow Si core with a conductive carbon shell. This study also offers guidelines to further enhance the specific capacity of HSi@C anodes in the future. (C) 2016 Elsevier Ltd. All rights reserved.

Anode↗

Experimental Characterization Test of a Grid-Forming Inverter for Microgrid Applications

Standardized experimental testing protocols for grid forming (GFM) inverters to ensure expected operation under both normal and contingency conditions do not exist. Such protocols increase the confidence of system owner/operators that an inverter deployed in a proposed system will engage in typical behaviors to ensure interoperability with other units and ancillary equipment (e.g. protection equipment). This paper presents systematic and comprehensive test protocols to evaluate the performance of GFM inverters under the following operational configurations: islanded operation, heterogeneous islanded operation (parallel with a synchronous generator), grid-connected operation, and transition operation. A commercial GFM inverter is used to verify the test protocols and to understand the inverter's performance and functionalities. In particular, required configuration and tuning of the inverter will be explained in the full paper to enrich the testing protocol.

black start↗

Disturbed subsurface microbial communities follow equivalent trajectories despite different structural starting points.

Microbial community structure, and niche and neutral processes can all influence response to disturbance. Here, we provide experimental evidence for niche versus neutral and founding community effects during a bioremediation-related organic carbon disturbance. Subsurface sediment, partitioned into 22 flow-through columns, was stimulated in situ by the addition of acetate as a carbon and electron donor source. This drove the system into a new transient biogeochemical state characterized by iron reduction and enriched Desulfuromonadales, Comamonadaceae and Bacteroidetes lineages. After approximately 1 month conditions favoured sulfate reduction, and were accompanied by a substantial increase in the relative abundance of Desulfobulbus, Desulfosporosinus, Desulfitobacterium and Desulfotomaculum. Two subsets of four to five columns each were switched from acetate to lactate amendment during either iron (earlier) or sulfate (later) reduction. Hence, subsets had significantly different founding communities. All lactate treatments exhibited lower relative abundances of Desulfotomaculum and Bacteroidetes, enrichments of Clostridiales and Psychrosinus species, and a temporal succession from highly abundant Clostridium sensu stricto to Psychrosinus. Regardless of starting point, lactate-switch communities followed comparable structural trajectories, whereby convergence was evident 9 to 16 days after each switch, and significant after 29 to 34 days of lactate addition. Results imply that neither the founding community nor neutral processes influenced succession following perturbation.

Handley, Kim M↗

Genomic approaches to accelerate American chestnut restoration

More than a century after two introduced pathogens killed billions of American chestnut trees, introgression of resistance alleles from Chinese chestnuts has contributed to the recovery of self-sustaining populations. However, progress has been slow because of the complex genetic architecture of resistance. To better understand blight resistance, we compared reference genomes, gene expression responses, and stem metabolite profiles of the resistant Chinese and susceptible American chestnut species. To accelerate resistance breeding, we conducted large-scale phenotyping and genotyping in hybrids of these species. Simulation and inoculation experiments suggest that significant resistance gains are possible through selectively breeding trees with an average of 70 to 85% American chestnut ancestry. In conclusion, the resources developed in this work are foundational for breeding to create diverse restoration populations with sufficient disease resistance and competitive growth.

Westbrook, Jared W. [The American Chestnut Foundat↗

Review of TEAMER Awards for WEC-Sim Support: Preprint

Testing Expertise and Access for Marine Energy Research (TEAMER) is a U.S. Department of Energy Water Power Technologies Office sponsored program, overseen by the Pacific Ocean Energy Trust, which aims to advance the state of marine energy technologies. The program connects technology developers with experts at U.S. facilities, including numerical modeling and analysis facilities, like WEC-Sim. The WEC-Sim facility is supported by the WEC-Sim development team at Sandia National Laboratories and the National Renewable Energy Laboratory. WEC-Sim (Wave Energy Converter SIMulator) is an open-source software for simulating wave energy converters. WEC-Sim can model the multi-body dynamics of devices comprised of bodies, joints, power take-off systems, and mooring systems. Since TEAMER's first round of support in 2020, there have been eighteen TEAMER awards focused on numerical model development in WEC-Sim. TEAMER awards for WEC-Sim support have modeled a wide range of wave energy converter archetypes, including point absorbers, attenuators, oscillating water columns, and many other novel architectures. A wide variety of studies have been conducted, leading to important insights for TEAMER partners and software improvements for WECSim. This article highlights several successful WEC-Sim TEAMER awards. The awards described herein include TEAMER recipients Ocean Motion Technologies, AquaHarmonics, iProTech, East Carolina University, Virginia Tech, Maiden Wave Energy, and the University of Massachusetts Dartmouth. The awards of these seven partners contain a wide range of investigations and cover the creation of baseline hydrodynamic models, PTO modeling, geometry optimization in both boundary element methods and WECSim, and model tuning and validation.

industry support↗

Exploring the Mineral Composition, Structure, and Function of a Freshwater Bivalve Adhesive

Abstract Etheria elliptica is a freshwater oyster that produces an adhesive that hardens underwater, allowing them to attach to other oysters, rocks, wood, and other natural substrates, producing complex oyster bed communities. Despite the importance of the adhesive in oyster bed formation, little is known about its chemical composition, structure, or mechanical properties. Through a combination of scanning electron microscopy (SEM), x‐ray photoemission electron microscopy (X‐PEEM), infrared (IR) spectroscopy, microhardness testing, and nanoindentation, it is found that the oyster adhesive consists entirely of aragonite nanoparticles that clump together into crystallites of varied shape, size, and orientation. The crystallite clumping density varies from the exterior of the adhesive to the interior, with the adhesive closest to the prismatic layer generally being denser. With this variation in density comes a variation in material properties with the exterior adhesive layer being softer and more flexible and the interior adhesive layer being harder and less elastic, or more similar to the prismatic and nacre shell structures produced by the E. elliptica . The resultant material exhibits varied materials properties, despite similar mineral composition.

Chemistry↗

Fluorogel Elastomers with Tunable Transparency, Elasticity, Shape-Memory, and Antifouling Properties**

Omniphobic fluorogel elastomers were prepared by photocuring perfluorinated acrylates and a perfluoropolyether crosslinker. By tuning either the chemical composition or the temperature that control the crystallinity of the resulting polymer chains, a broad range of optical and mechanical properties of the fluorogel can be achieved. After infusing with fluorinated lubricants, the fluorogels showed excellent resistance to wetting by various liquids and anti-biofouling behavior, while maintaining cytocompatiblity.

36 MATERIALS SCIENCE↗