Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Parametric Mass Reliability Study

The International Space Station (ISS) systems are designed based upon having redundant systems with replaceable orbital replacement units (ORUs). These ORUs are designed to be swapped out fairly quickly, but some are very large, and some are made up of many components. When an ORU fails, it is replaced on orbit with a spare; the failed unit is sometimes returned to Earth to be serviced and re-launched. Such a system is not feasible for a 500+ day long-duration mission beyond low Earth orbit. The components that make up these ORUs have mixed reliabilities. Components that make up the most mass-such as computer housings, pump casings, and the silicon board of PCBs-typically are the most reliable. Meanwhile components that tend to fail the earliest-such as seals or gaskets-typically have a small mass. To better understand the problem, my project is to create a parametric model that relates both the mass of ORUs to reliability, as well as the mass of ORU subcomponents to reliability.

Holt, James P.↗

A Robotically Assembled and Serviced Science Station for Earth Observations

In this paper we present the overall architecture of a ”Science Station”, a robotically assembled and serviced persistent platform that can host multiple payloads for Earth observations. Recent decadal survey findings motivate the need to have spatial and temporal concurrency in measurements from multiple instruments. We have architected the science station to simultaneously host up to twelve Earth Venture class instruments at a time. These instruments can be replaced by newer instruments periodically to take advantage of evolving science needs and technology capabilities. The Science Station can also concurrently host science, commercial, defense and other national interest payloads. The Science Station may provide a cost-effective paradigm by mitigating some of the risks and costs associated with multiple free-flyers that may otherwise be needed for the various instruments. It leverages emergent and existent technologies in robotic assembly and servicing, lower cost commercial launch vehicles, secondary launch vehicles, and rendezvous and proximity operations. In this paper, we report the findings of a survey we conducted on the desired performance of the Science Station from various instrument hosting perspectives. We report the various trade studies that we conducted to developed a feasible architecture that meets the goals of the Science Station while also meeting the constraints of a space system. We also report the various considerations in the configuration, thermal system, pointing system, overall concept of operations, and the robotic system of the Science Station architecture. The paper then describes a testbed activity we are undertaking to evaluate the supervised autonomy robotics needed for the Science Station as well as to conduct a riskreduction demonstration of the end-to-end robotics behaviors.

Mukherjee, Rudranarayan↗

Starting up an Enterprise-Wide Project Management Office

An enterprise-wide Project Management Office (PMO) can be successfully launched and institutionalized using effective organization strategies, methods, and techniques. This paper provides a step-by-step process for starting up an enterprise-wide PMO using proven techniques to ensure that the new organization receives executive management support and aligns with the larger enterprise’s business strategies and objectives. This paper discusses different types of PMOs that are appropriate, depending upon an organization’s structure and business objectives. This paper further provides the reader with an understanding of how to deal with start-up and implementation challenges that are common in multi-business unit organizations; how to launch PMO programs and services and gain stakeholder acceptance; how to monitor, measure, and report PMO implementation progress and effectivenss; and how to apply accepted management assurance and oversight methodologies to verify and validate the effectiveness of developed processes and programs and continuously improve both the processes and implementation.

Andrews, Thomas D.↗

In-Use Fleet Evaluation of Fast-Charge Battery Electric Transit Buses

With support from the U.S. Department of Energy's Vehicle Technologies Office, the National Renewable Energy Laboratory (NREL) conducts real-world performance evaluations of advanced medium- and heavy-duty fleet vehicles. Evaluation results can help vehicle manufacturers fine-tune their designs and assist fleet managers in selecting fuel-efficient, low-emission vehicles that meet their economic and operational goals. In 2015, NREL launched an in-service evaluation of 12 battery electric buses (BEBs) compared to conventional compressed natural gas (CNG) buses operated by Foothill Transit in West Covina, California. The study aims to improve understanding of the overall usage and effectiveness of fast-charge BEBs and associated charging infrastructure in transit operation. To date, NREL researchers have analyzed more than 148,000 km of in-use operational data, including driving and charging events. Foothill Transit purchased the BEBs with grant funding from the Federal Transit Administration's Transit Investments for Greenhouse Gas and Energy Reduction Program.

33 ADVANCED PROPULSION SYSTEMS↗

Environmental Exposure Conditions for Teflon FEP on the Hubble Space Telescope Investigated

The Hubble Space Telescope (HST) was launched into low Earth orbit on April 24,1990. During the first servicing mission in December 1993 (3.6 years after launch), multilayer insulation (MLI) blankets were retrieved from the two magnetic sensing systems located on the light shield. Retrieval of one of the solar arrays during this mission also provided MLI blanket material from the solar array drive arm. These MLI materials were analyzed in ground-based facilities, and results indicate that the space-facing outer layer of the MLI, aluminized Teflon FEP (DuPont; fluorinated ethylene propylene), was beginning to degrade. Close inspection of the FEP revealed through-the-thickness cracks in areas with the highest solar exposure and stress concentration. During the second servicing mission in February 1997 (6.8 years after launch), astronauts observed and documented severe cracking in the outer layer of the MLI blankets on both the solar-facing and anti-solar-facing surfaces. During this second mission, some material from the outer layer of the light shield MLI was retrieved and subsequently analyzed in ground-based facilities. After the second servicing mission, a Failure Review Board was convened by NASA Goddard Space Flight Center to address the MLI degradation problem on HST. Members of the Electro-Physics Branch of the NASA Glenn Research Center at Lewis Field participated on this board. To determine possible degradation mechanisms, board researchers needed to consider all environmental constituents to which the FEP MLI surfaces were exposed. On the basis of measurements, models, and predictions, environmental exposure conditions for FEP surfaces on HST were estimated for various time periods from launch in 1990 through 2010, the planned end-of-life for HST. The table summarizes these data including the number and temperature ranges of thermal cycles; equivalent Sun hours; fluence and absorbed radiation dose from solar event x rays; fluence and absorbed dose from solar wind protons and electrons trapped in Earth s magnetic field; fluence of plasma electrons and protons; and atomic oxygen fluence.

Dever, Joyce A.↗

On-demand Command and Control of ASTERIA with Cloud-based Ground Station Services

ASTERIA (Arcsecond Space Telescope Enabling Research in Astrophysics) was a 6-unit CubeSat technology demonstration mission that deployed from the International Space Station on November 20th, 2017. After successfully completing its 90-day primary mission that demonstrated arcsecond-level line-of-sight pointing and focal plane thermal stability for exoplanet detection, it entered an extended mission performing onboard software demonstrations to mature technology both in space and on the ground. One of the technologies was a completely cloud-based ground system leveraging Amazon Web Services (AWS) Ground Station service. Announced in December 2018 and launched in May 2019, AWS Ground Station is a fully managed ground station service that aims to reduce the overhead associated with developing and maintaining ground system infrastructure throughout the mission lifecycle. AWS Ground Station makes available the suite of features required for any ground system in support of low-Earth orbit (LEO) and medium-Earth Orbit (MEO) satellite operations on-demand and without setting up or maintaining long-term contracts. Charges are incurred on a per-minute basis for antenna usage during scheduled tracks. Support is available for S-band uplink and downlink, along with X-band narrowband and wideband downlink. Missions that use the service may reserve tracks with any licensed AWS Ground Station antennas located across each service region and have direct access to any AWS services in support of mission operations. The cloud-based architecture built around the AWS Ground Station service greatly enhanced ASTERIA mission operations by enabling end-to-end pass automation, on-demand contact scheduling and contingency planning, along with more efficient data downlink through station availability and station-tostation handovers. It incorporated open-source software, particularly NASA's AMMOS Instrument Toolkit (AIT) and Open Mission Control Technologies (OpenMCT), along with the AWS application programming interfaces (API) to the Ground Station, Elastic Compute Cloud (EC2) and Simple Storage Service (S3) services. After showcasing operability in August 2019, the team continued using and improving this novel ground system architecture until the end of mission in December 2019. This paper describes the cloud-based ground system, how it was designed, tested, and evaluated with an inorbit spacecraft, the operational capabilities that it enabled, along with lessons learned and recommendations for future missions.

Fesq, Lorraine↗

Satellite services system analysis study. Volume 3: Service equipment requirements

Service equipment mission requirements are discussed. On-orbit operations, satellite classes, and reference missions are included. Service equipment usage and requirements are considered. Equipment identification methodology is discussed. Service equipment usage is analyzed, including initial launch, revisit, Earth return, and orbital storage. A summary of service requirements and equipment is presented, including service equipment status, even interaction, satellite features, and observations.

Source record↗

The manned transportation system study - Defining human pathways into space

The Manned Transportation System (MTS) Study, conducted by a NASA-Industry Team (NIT), has developed substantiating data for subsequent NASA decisions on the “right” set of manned transportation elements needed for human access to space. It also provides the framework for detailed definition of those manned transportation elements. Including the next manned transportation system, to be developed. Process and product are presented to inform the aerospace community and subject our approach and conclusions to peer review, NASA/JSC lead the NIT, with participation from KSC, LaRC, MSFC, and NASA/Headquarters, along with six aerospace contractor (Boeing, General Dynamics, Lockheed Martin Marietta, McDonnell Douglas, and Rockwell). Each major milestone was archived through team consensus. Our mission model was derived from the FY90 Civil Needs Data Base (CNDB) and included flight assignments for Department of Defense (DOD) missions. Identifying and defining architecture evaluation criteria, i.e. attributes, specified the amount and type of data needed for each concept under consideration. Several architectures, each beginning with today’s transportation systems, were defined using representative systems to explore our future options and address specific questions currently being debated. Our solutions are a function of the level of space activity the nation chooses to follow. However, they all emphasize affordability, safety, routineness, and reliability. Finally, key issues associated with our current business practices were challenged and the impact associated with those practices quantified.

NASA Langley Research Center↗

NASA Propulsion Investments for Exploration and Science

The National Aeronautics and Space Administration (NASA) invests in chemical and electric propulsion systems to achieve future mission objectives for both human exploration and robotic science. Propulsion system requirements for human missions are derived from the exploration architecture being implemented in the Constellation Program. The Constellation Program first develops a system consisting of the Ares I launch vehicle and Orion spacecraft to access the Space Station, then builds on this initial system with the heavy-lift Ares V launch vehicle, Earth departure stage, and lunar module to enable missions to the lunar surface. A variety of chemical engines for all mission phases including primary propulsion, reaction control, abort, lunar ascent, and lunar descent are under development or are in early risk reduction to meet the specific requirements of the Ares I and V launch vehicles, Orion crew and service modules, and Altair lunar module. Exploration propulsion systems draw from Apollo, space shuttle, and commercial heritage and are applied across the Constellation architecture vehicles. Selection of these launch systems and engines is driven by numerous factors including development cost, existing infrastructure, operations cost, and reliability. Incorporation of green systems for sustained operations and extensibility into future systems is an additional consideration for system design. Science missions will directly benefit from the development of Constellation launch systems, and are making advancements in electric and chemical propulsion systems for challenging deep space, rendezvous, and sample return missions. Both Hall effect and ion electric propulsion systems are in development or qualification to address the range of NASA s Heliophysics, Planetary Science, and Astrophysics mission requirements. These address the spectrum of potential requirements from cost-capped missions to enabling challenging high delta-v, long-life missions. Additionally, a high specific impulse chemical engine is in development that will add additional capability to performance-demanding space science missions. In summary, the paper provides a survey of current NASA development and risk reduction propulsion investments for exploration and science.

Smith, Bryan K.↗

PrismTech Data Distribution Service Java API Evaluation

My internship duties with Launch Control Systems required me to start performance testing of an Object Management Group's (OMG) Data Distribution Service (DDS) specification implementation by PrismTech Limited through the Java programming language application programming interface (API). DDS is a networking middleware for Real-Time Data Distribution. The performance testing involves latency, redundant publishers, extended duration, redundant failover, and read performance. Time constraints allowed only for a data throughput test. I have designed the testing applications to perform all performance tests when time is allowed. Performance evaluation data such as megabits per second and central processing unit (CPU) time consumption were not easily attainable through the Java programming language; they required new methods and classes created in the test applications. Evaluation of this product showed the rate that data can be sent across the network. Performance rates are better on Linux platforms than AIX and Sun platforms. Compared to previous C++ programming language API, the performance evaluation also shows the language differences for the implementation. The Java API of the DDS has a lower throughput performance than the C++ API.

Riggs, Cortney↗

Atmospheric Infrared Sounder Version 7 Near-Real-Time Product and Imagery Released by NASA GES DISC

The NASA Goddard Earth Sciences Data and Information Services Center (GES DISC) has been the home of data processing, archive, and distribution services for data from the Atmospheric Infrared Sounder (AIRS) mission since its launch in 2002. The GES DISC provides service to both AIRS routine and Near Real-Time (NRT) products. The AIRS NRT products are an important element in the Land, Atmosphere Near real-time Capability for EOS (LANCE). In collaboration with AIRS Project, the GES DISC has just released products from the Version 7 algorithm. The new version algorithm provides significant improvements over the previous version. The most substantial advances are: improved consistency between day and night water vapor; improved total column ozone and temperature; improved infrared-only (IR-only) retrievals, especially in high latitude regions; an improved Stochastic Cloud Clearing Neural Network used as a first guess at the initial value in the iterative retrieval process; and removal of ambiguity in surface classification in the IR-only retrieval algorithm. In addition, the GES DISC produces AIRS NRT imagery. The AIRS NRT imagery are generated by mosaicking and mapping the available AIRS 6-minute retrieval granules to a global projection. The images are constantly refreshed when new granules are produced. The AIRS NRT Viewer and LANCE Worldview provide visualization services to online users for AIRS NRT imagery. The data products used to generate this imagery include atmospheric temperature, humidity, precipitation, cloud, Dust Score, CO, and SO2. In this presentation, we will demonstrate visualization of the AIRS NRT imagery from the new Version 7, and demonstrate some improvements over the previous version. Progress on improving the AIRS NRT imagery, a collaboration project with the AIRS Applications Development Team at NASA Jet Propulsion Laboratory (JPL), will also be presented.

Feng Ding↗

Implementation of Field-Oriented Control in Joint Actuator Electronics for Satellite-Servicing Robotics

NASA’s OSAM-1 (On-orbit Servicing, Assembly, and Manufacturing 1) is a robotic spacecraft designed to extend the life of a satellite. Launching in 2026, the OSAM-1 servicer will use a robotic arm to grasp, refuel, and relocate Landsat 7. In order to accomplish the various servicing operations, including the critical auto-grapple capturing operation, the robot arm uses active compliance and visual servo control loops. These sophisticated control algorithms are enabled by the high performance Joint Control Boards (JCBs). At the core of the robot arm control architecture, the JCBs employ field-oriented control (FOC) to accurately commutate and efficiently control joint actuator torque. FOC offers numerous benefits over other current control methods, allowing the JCBs to achieve the high bandwidth and performance required by the outer control loops. As an added benefit, a torque feed-forward term allows the FOC loop to simulate microgravity actuator performance during ground testing. In this paper, a FOC implementation for space robotics applications and an end-to-end actuator calibration process are discussed.

Sam Zhao↗

The Flexible Lunar Architecture for Exploration (FLARE): Designed for the Artemis-3 Moon 2024 Mission and Beyond

The Flexible Lunar Architecture for Exploration (FLARE) is a concept to deliver four crew to the lunar surface for 7 to 14 days and then return them safely to Earth by 2024. This meets NASA’s internal 2024 lunar landing deadline directed by President Trump (Trump, 2017) and the “5-year” goal set forth by Vice President Pence (Pence, 2019). FLARE is an alternative to NASA’s Human Landing System reference architecture from the Design Analysis Cycle (DAC) #2 (NASA, 2019b). The minimum FLARE concept uses one Space Launch System launch, one Orion, one European Service Module (ESM), and one human lander to deliver four crew to the Moon for a minimum surface duration of 7 days and return them to Earth. FLARE adds a new capability, called the SpaceTug, based upon the mature and successful United Launch Alliance “Common” Centaur Upper Stage vehicle, with modifications. In FLARE, the SpaceTug provides propulsion needed to return the Orion+ESM from the Moon to Earth. The SpaceTug also provides propulsion to deliver the human lander Descent Element (DE) and Ascent Element (AE) separately to lunar orbit. The Orion+ESM then completes a rendezvous with the mated DE+AE in lunar orbit. FLARE also offers optional phases to the Moon 2024 mission. The SpaceTug can also deliver components of the planned Gateway - including the Power and Propulsion Element and the Habitation and Logistics Outpost - to lunar orbit; however, the planned FLARE destination is a Low Lunar Frozen Polar Orbit unlike the NASA DAC2 plan for a Near Rectilinear Halo Orbit. FLARE also provides an option to deliver precursor equipment - including a habitation module, crew mobility devices and an In-Situ Resource Utilization demonstration - to the lunar surface for enhanced crew exploration and science with the extended 14-day surface mission.

Commercial Launch Vehicles (CLV)↗

Artemis Innovative Assembly and Integration Operations of the Launch Abort Systemat KSC

This paper describes the Artemis program assembly and integration approach that enables affordable and low risk processing operations for the Launch Abort System at KSC. NASA is currently developing the Artemis 1 spacecraft to meet the test objectives of an uncrewed orbital mission to the moon and return to earth in 2021. The Artemis Orion spacecraft consists of a Crew Module (CM), a Service Module (SM), and a Launch Abort System (LAS) to safely transport a crew of 4 to the moon and return to earth. The LAS enables the CM to have an abort capability for the crew during the launch phase of the mission from the launch pad throughout the ascent phase. The LAS includes motor elements for abort, attitude control, and stage separation is assembled at the Launch Abort System Facility (LASF) adjacent to the CM/SM (CSM) assembly operations in the Neil Armstrong Operations and Checkout Building (O&C) at KSC. The LAS integration to the CSM is completed in the LASF and the completed Artemis spacecraft is integrated to the Space Launch System (SLS) in the Vehicle Assembly Building (VAB) at KSC. A significant LAS development flight test milestone was recently completed in 2019 for the Ascent Abort (AA-2) flight test at Cape Canaveral Air Force Station where a high-altitude abort test was successfully achieved using a Peacekeeper booster stage exercising all of the LAS systems including propulsion, avionics, and pyrotechnics demonstrating he LAS readiness for crewed flight. The first operational flight of the LAS will be for the Artemis 2 mission which is the first crewed mission for the Orion program planned in 2023.

William J Koenig↗

Orbital Maneuvering Vehicle (OMV) remote servicing kit

With the design and development of the Orbital Maneuvering Vehicle (OMV) progressing toward an early 1990 initial operating capability (IOC), a new era in remote space operations will evolve. The logical progression to OMV front end kits would make available in situ satellite servicing, repair, and consummables resupply to the satellite community. Several conceptual design study efforts are defining representative kits (propellant tanks, debris recovery, module servicers); additional focus must also be placed on an efficient combination module servicer and consummables resupply kit. A remote servicer kit of this type would be designed to perform many of the early maintenance/resupply tasks in both nominal and high inclination orbits. The kit would have the capability to exchange Orbital Replacement Units (ORUs), exchange propellant tanks, and/or connect fluid transfer umbilicals. Necessary transportation system functions/support could be provided by interfaces with the OMV, Shuttle (STS), or Expendable Launch Vehicle (ELV). Specific remote servicer kit designs, as well as ground and flight demonstrations of servicer technology are necessary to prepare for the potential overwhelming need. Ground test plans should adhere to the component/system/breadboard test philosophy to assure maximum capability of one-g testing. The flight demonstration(s) would most likely be a short duration, Shuttle-bay experiment to validate servicer components requiring a micro-g environment.

Brown, Norman S.↗

Autonomous rendezvous and docking: A commercial approach to on-orbit technology validation

SpARC, in conjunction with its corporate affiliates, is planning an on-orbit validation of autonomous rendezvous and docking (ARD) technology. The emphasis in this program is to utilize existing technology and commercially available components wherever possible. The primary subsystems to be validated by this demonstration include GPS receivers for navigation, a video-based sensor for proximity operations, a fluid connector mechanism to demonstrate fluid resupply capability, and a compliant, single-point docking mechanism. The focus for this initial experiment will be ELV based and will make use of two residual Commercial Experiment Transporter (COMET) service modules. The first COMET spacecraft will be launched in late 1992 and will serve as the target vehicle. After the second COMET spacecraft has been launched in late 1994, the ARD demonstration will take place. The service module from the second COMET will serve as the chase vehicle.

Tchoryk, Peter, Jr.↗

Ares I-X Flight Test Vehicle: Stack 5 Modal Test

Ares I-X was the first flight test vehicle used in the development of NASA's Ares I crew launch vehicle. The Ares I-X used a 4-segment reusable solid rocket booster from the Space Shuttle heritage with mass simulators for the 5th segment, upper stage, crew module and launch abort system. Three modal tests were defined to verify the dynamic finite element model of the Ares I-X flight test vehicle. Test configurations included two partial stacks and the full Ares I-X flight test vehicle on the Mobile Launcher Platform. This report focuses on the first modal test that was performed on the top section of the vehicle referred to as Stack 5, which consisted of the spacecraft adapter, service module, crew module and launch abort system simulators. This report describes the test requirements, constraints, pre-test analysis, test operations and data analysis for the Ares I-X Stack 5 modal test.

Buehrle, Ralph D.↗

COMET service module capillary pumped loop thermal control system test results

The COMmercial Experiment Transporter (COMET) is a satellite that will be launched aboard the Conestoga rocket. The COMET Service Module is designed, integrated and tested by Defense Systems Incorporated for Westinghouse Commercial Space. The Capillary Pumped Loop (CPL) was integrated into the Service Module by OAO Corporation for Defense Systems Incorporated. The Service Module's primary function is to carry payloads to space, providing them with utilities such as tightly controlled thermal environment, electrical power, attitude control, data management, and communications while in orbit. This paper presents the results of functional and performance testings of the CPL Thermal Control System (TCS) for the COMET Service Module.

Yun, James Seokgeun↗