Search NASA⌕ Search

SEARCH · Search NASA

Results for “multiplicative faults”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Robot Position Sensor Fault Tolerance

Robot systems in critical applications, such as those in space and nuclear environments, must be able to operate during component failure to complete important tasks. One failure mode that has received little attention is the failure of joint position sensors. Current fault tolerant designs require the addition of directly redundant position sensors which can affect joint design. A new method is proposed that utilizes analytical redundancy to allow for continued operation during joint position sensor failure. Joint torque sensors are used with a virtual passive torque controller to make the robot joint stable without position feedback and improve position tracking performance in the presence of unknown link dynamics and end-effector loading. Two Cartesian accelerometer based methods are proposed to determine the position of the joint. The joint specific position determination method utilizes two triaxial accelerometers attached to the link driven by the joint with the failed position sensor. The joint specific method is not computationally complex and the position error is bounded. The system wide position determination method utilizes accelerometers distributed on different robot links and the end-effector to determine the position of sets of multiple joints. The system wide method requires fewer accelerometers than the joint specific method to make all joint position sensors fault tolerant but is more computationally complex and has lower convergence properties. Experiments were conducted on a laboratory manipulator. Both position determination methods were shown to track the actual position satisfactorily. A controller using the position determination methods and the virtual passive torque controller was able to servo the joints to a desired position during position sensor failure.

Aldridge, Hal A.↗

Evidence for a Single Holocene Paleoseismic Event on the Pajarito Fault, Northern New Mexico

Low-slip rate fault systems tend to be less studied than their high-slip rate counterparts, and paleoseismic techniques used to study them may pose challenges in interpretation that differ from high-slip rate systems. A good example of this is the Pajarito fault system (PFS), a normal fault complex within the Rio Grande rift. Despite numerous previous paleoseismic trenching studies conducted on the PFS between 1990 and 2003, considerable uncertainty remains regarding its Holocene paleoseismic history, particularly for the primary Pajarito fault (PF). To further clarify the PF paleoseismic history, we present data from paleoseismic investigations of 6 trenches at 3 distinct locations along the PF. Though the totality of the age and structural data obtained in this study is complex and not entirely consistent with any one interpretation, a single Holocene paleoearthquake occurring younger than ∼1,600 to 2,300 kcal yr BP is the simplest interpretation. It is possible that the PF records two Holocene events, with a penultimate event 6.9–2.4 kcal yr BP event and the aforementioned most recent event (MRE) between 2.3 and 1.6 kcal yr BP. However, only a single wall of one trench, out of a total of 12 walls in our 6 trenches, provides evidence supporting that interpretation. This study finds evidence of a single late Holocene paleoseismic event on the PF and sparse evidence for 2 Holocene paleoseismic events on the PF and highlights the benefits of logging multiple trench walls to better understand the complexity that results from this low-slip rate, low-deposition-rate fault system.

58 GEOSCIENCES↗

Detection of High-impedance Arcing Faults in Radial Distribution DC Systems

High voltage, low current arcing faults in DC power systems have been researched at the NASA Glenn Research Center in order to develop a method for detecting these 'hidden faults', in-situ, before damage to cables and components from localized heating can occur. A simple arc generator was built and high-speed and low-speed monitoring of the voltage and current waveforms, respectively, has shown that these high impedance faults produce a significant increase in high frequency content in the DC bus voltage and low frequency content in the DC system current. Based on these observations, an algorithm was developed using a high-speed data acquisition system that was able to accurately detect high impedance arcing events induced in a single-line system based on the frequency content of the DC bus voltage or the system current. Next, a multi-line, radial distribution system was researched to see if the arc location could be determined through the voltage information when multiple 'detectors' are present in the system. It was shown that a small, passive LC filter was sufficient to reliably isolate the fault to a single line in a multi-line distribution system. Of course, no modification is necessary if only the current information is used to locate the arc. However, data shows that it might be necessary to monitor both the system current and bus voltage to improve the chances of detecting and locating high impedance arcing faults

Gonzalez, Marcelo C.↗

Power Grid Reliability Estimation via Adaptive Importance Sampling

Electricity production currently generates approximately 25% of greenhouse gas emissions in the USA. Thus, increasing the amount of renewable energy is a key step to carbon neutrality. However, integrating a large amount of fluctuating renewable generation is a significant challenge for power grid operating and planning. Grid reliability, i.e., an ability to meet operational constraints under power fluctuations, is probably the most important of them. In this letter, we propose computationally efficient and accurate methods to estimate the probability of line overflow, i.e., reliability constraints violation, under a known distribution of renewable energy generation. To this end, we investigate an importance sampling approach, a flexible extension of Monte-Carlo methods, which adaptively changes the sampling distribution to generate more samples near the reliability boundary. The approach allows to estimate overload probability in real-time based only on a few dozens of random samples, compared to thousands required by the plain Monte-Carlo. Our study focuses on high voltage direct current power transmission grids with linear reliability constraints on power injections and line currents. Herein, we propose a novel theoretically justified physics-informed adaptive importance sampling algorithm and compare its performance to state-of-the-art methods on multiple IEEE power grid test cases.

power system faults↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced High-Performance Computational Modeling of the Seismic Response of High-Hazard and/or Nuclear Facilities and Critical Infrastructure at the NNSS

New methods for predicting the amplitude and variability of ground shaking from earthquakes (and explosions) are needed for seismic hazard analysis for buildings, nuclear power plants, and critical infrastructure at the NNSS. We are comparing existing 1-D and new 3-D geophysical methods for estimating the shear-wave velocity structure in the upper 30 meters of the ground surface (Vs30), which plays a major role in ground motion amplification and seismic response of buildings. We evaluate the performance of these methodologies at the U1a Complex at the NNSS and develop simple 1-D and high-resolution 3-D Vs30 models. We then emplace these high-resolution models into a background seismic velocity model. We will collaborate with Lawrence Livermore National Laboratory (LLNL) to conduct numerical modeling of the ground shaking at the NNSS using their high-performance computing technology and state-of-the-art ground motion simulation methodology. The primary work that was completed in FY 2019 was to acquire the seismic systems and familiarize staff at the NNSS with their use. We also worked on developing a collection plan with the Device Assembly Facility (DAF) at the NNSS, but due to time constraints and other ongoing projects at the DAF, we had to use U1a as a backup. We were able to coordinate the seismic survey, and we will complete the collection of seismic data in FY 2020. Additionally, during FY 2019, we completed the geologic framework model (GFM) for the U1a Complex and modeled the Yucca fault. LLNL worked with us through FY 2019 to prepare the data files for their modeling software and tested the software for reliability. In FY 2020 we will develop the end-to-end capability so that any facility could easily be modeled and the expected shaking from a local earthquake understood. The work in FY 2020 will include building fault models from the GFM and finalizing the velocity model analysis. The final simulations will be run for multiple rupture models, and final assessments will demonstrate the seismic hazard at the U1a Complex.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Empirical Modeling of Direct Expansion (DX) Cooling System for Multiple Research Use Cases

This study provides a general procedure to generate a direct expansion (DX) cooling coil system for a roof top unit (RTU), which is a typical heating ventilation and air-conditioning (HVAC) system for commercial buildings in the United States. Experimental data from a full-scale unoccupied 2-story commercial building is used for the HVAC modeling. The regression for identifying the model coefficients was carried out with multiple stages, and the results were validated with measured data. The model’s applicability was evaluated with multiple case studies, including a building energy simulation (BES) program validation, model-based predictive control (MPC), and fault diagnostics and detection (FDD).

42 ENGINEERING↗

Designing application software in wide area network settings

Progress in methodologies for developing robust local area network software has not been matched by similar results for wide area settings. The design of application software spanning multiple local area environments is examined. For important classes of applications, simple design techniques are presented that yield fault tolerant wide area programs. An implementation of these techniques as a set of tools for use within the ISIS system is described.

Makpangou, Mesaac↗

Predicted performance of an Integrated Modular Engine system

Space vehicle propulsion systems are traditionally comprised of a cluster of discrete engines, each with its own set of turbopumps, valves, and a thrust chamber. The Integrated Modular Engine (IME) concept proposes a vehicle propulsion system comprised of multiple turbopumps, valves, and thrust chambers which are all interconnected. The IME concept has potential advantages in fault-tolerance, weight, and operational efficiency compared with the traditional clustered engine configuration. The purpose of this study is to examine the steady-state performance of an IME system with various components removed to simulate fault conditions. An IME configuration for a hydrogen/oxygen expander cycle propulsion system with four sets of turbopumps and eight thrust chambers has been modeled using the Rocket Engine Transient Simulator program. The nominal steady-state performance is simulated, as well as turbopump, thrust chamber, and duct failures. The impact of component failures on system performance is discussed in the context of the system's fault tolerant capabilities.

Binder, Michael↗

Predicted performance of an integrated modular engine system

Space vehicle propulsion systems are traditionally comprised of a cluster of discrete engines, each with its own set of turbopumps, valves, and a thrust chamber. The Integrated Modular Engine (IME) concept proposes a vehicle propulsion system comprised of multiple turbopumps, valves, and thrust chambers which are all interconnected. The IME concept has potential advantages in fault-tolerance, weight, and operational efficiency compared with the traditional clustered engine configuration. The purpose of this study is to examine the steady-state performance of an IME system with various components removed to simulate fault conditions. An IME configuration for a hydrogen/oxygen expander cycle propulsion system with four sets of turbopumps and eight thrust chambers has been modeled using the Rocket Engine Transient Simulator (ROCETS) program. The nominal steady-state performance is simulated, as well as turbopump thrust chamber and duct failures. The impact of component failures on system performance is discussed in the context of the system's fault tolerant capabilities.

Binder, Michael↗

Integrated Hardware and Software for No-Loss Computing

When an algorithm is distributed across multiple threads executing on many distinct processors, a loss of one of those threads or processors can potentially result in the total loss of all the incremental results up to that point. When implementation is massively hardware distributed, then the probability of a hardware failure during the course of a long execution is potentially high. Traditionally, this problem has been addressed by establishing checkpoints where the current state of some or part of the execution is saved. Then in the event of a failure, this state information can be used to recompute that point in the execution and resume the computation from that point. A serious problem arises when one distributes a problem across multiple threads and physical processors is that one increases the likelihood of the algorithm failing due to no fault of the scientist but as a result of hardware faults coupled with operating system problems. With good reason, scientists expect their computing tools to serve them and not the other way around. What is novel here is a unique combination of hardware and software that reformulates an application into monolithic structure that can be monitored in real-time and dynamically reconfigured in the event of a failure. This unique reformulation of hardware and software will provide advanced aeronautical technologies to meet the challenges of next-generation systems in aviation, for civilian and scientific purposes, in our atmosphere and in atmospheres of other worlds. In particular, with respect to NASA s manned flight to Mars, this technology addresses the critical requirements for improving safety and increasing reliability of manned spacecraft.

James, Mark↗

LADEE Preparations for Contingency Operations for the Lunar Orbit Insertion Maneuver

The Lunar Atmosphere and Dust Environment Explorer (LADEE) spacecraft was launched on September 6, 2013, and completed its mission on April 17, 2014 with a directed impact to the Lunar Surface. Its primary goals were to examine the lunar atmosphere, measure lunar dust, and to demonstrate high rate laser communications. The LADEE mission was a resounding success, achieving all mission objectives, much of which can be attributed to careful planning and preparation. This paper discusses the specific preparations for fault conditions that could occur during a highly-critical phase of the mission. To get to the Moon, the spacecraft traversed multiple phasing loops around the Earth, and then executed a breaking maneuver to achieve lunar orbit. This Lunar Orbit Insertion (LOI) maneuver was perhaps the most time-critical phase of the entire mission. The LOI maneuver had to occur within a twenty minute window in order to achieve lunar orbit with an acceptable amount of propellant remaining. Missing this window would have likely resulted in a loss of the entire mission. An additional challenge of the maneuver was that spacecraft was out of view for approximately one hour prior to the main thruster burn, with the burn needing to occur within five minutes after coming into view. These conditions resulted in unique challenges for ground operations and the fault management system. Early in the planning stages of the mission, the criticality and challenges of this maneuver were evident to the system designers. The major concern was that any triggering of the on-board fault management system, whether it is in response to a true fault or a false positive, would result in an unacceptable delay to the burn. Therefore the flight software was designed with a flexible fault management system, such that any or all of the fault management responses could be disabled for the lead up and execution of the maneuver. Later, a triage was conducted to develop a list of fault responses, mapped to various parts of the timeline of the maneuver. Some of these contingency responses were solely ground-based if the time to detect, diagnose, and respond were adequate. Other responses were automated on-board if the response time from the ground would have been inadequate. For instance, in order to recover from a system reboot, on-board automation would have automatically reconfigured the spacecraft for the burn and reoriented the spacecraft to the burn attitude.These contingency responses were practiced, over and over, during numerous rehearsals. Although the LOI maneuver was executed without having to use any of these contingencies, the LADEE team was adequately prepared for this highly critical phase of the mission.

Cannon, Howard↗

Crack fault diagnosis of rotating machine in nuclear power plant based on ensemble learning

Crack faults in rotating machines can cause machine shutdown or scrapping, endangering the normal operation and safety of nuclear power plants. Intelligent diagnostic techniques based on machine learning have the potential to diagnose crack faults. However, problems such as scarcity of field fault data and high noise of plant measurements pose challenges to the application of machine learning. Here this study proposes an ensemble learning approach to mitigate the negative impacts of the problems. Ensemble learning is a strategy for combining multiple machine learning models into a composite model. The basic idea of ensemble learning is that even if one model makes a mistake, other models can correct it. Case studies based on bearing and gear system fault experiments show that the proposed ensemble learning models have better diagnostic results than the single model in the presence of noise and small data.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High-Frequency Signature-Based Fault Detection for Future MV Distribution Grids

Increasing penetration levels of inverter based distributed energy resources (DERs) impact the legacy distribution system protection. Inverter based DERs provide approximately 1.2-2 pu fault current. In systems with high penetration of inverter based DERs, it is difficult for over-current based protection schemes to differentiate between normal loading conditions and a fault. Directional, distance, and adaptive forms of protection schemes are also affected by low fault currents. This paper analyzes fault generated traveling wave (TW) based high-frequency signatures in the distribution system. In order to simulate such signatures, frequency-dependent distributed parameter line modeling approach is used in this research work to represent distribution lines and underground cables. Modified IEEE 13-bus medium voltage test system is modeled in electromagnetic transient simulation tool and multiple transient scenarios are simulated in this test system. The results are analyzed to understand the high-frequency signatures that can be used to detect and locate faults under high penetration of DERs.

41 EE - Solar Energy Technologies Office (EE-4S)↗

High-Frequency Signature-Based Fault Detection for Future MV Distribution Grids

Increasing penetration levels of inverter based distributed energy resources (DERs) impact the legacy distribution system protection. Inverter based DERs provide approximately 1.2-2 pu fault current. In systems with high penetration of inverter based DERs, it is difficult for over-current based protection schemes to differentiate between normal loading conditions and a fault. Directional, distance, and adaptive forms of protection schemes are also affected by low fault currents. This paper analyzes fault generated traveling wave (TW) based high-frequency signatures in the distribution system. In order to simulate such signatures, frequency-dependent distributed parameter line modeling approach is used in this research work to represent distribution lines and underground cables. Modified IEEE 13-bus medium voltage test system is modeled in electromagnetic transient simulation tool and multiple transient scenarios are simulated in this test system. The results are analyzed to understand the high-frequency signatures that can be used to detect and locate faults under high penetration of DERs.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Usage of Fault Detection Isolation & Recovery (FDIR) in Constellation (CxP) Launch Operations

This paper will explore the usage of Fault Detection Isolation & Recovery (FDIR) in the Constellation Exploration Program (CxP), in particular Launch Operations at Kennedy Space Center (KSC). NASA's Exploration Technology Development Program (ETDP) is currently funding a project that is developing a prototype FDIR to demonstrate the feasibility of incorporating FDIR into the CxP Ground Operations Launch Control System (LCS). An architecture that supports multiple FDIR tools has been formulated that will support integration into the CxP Ground Operation's Launch Control System (LCS). In addition, tools have been selected that provide fault detection, fault isolation, and anomaly detection along with integration between Flight and Ground elements.

Ferrell, Rob↗

SpotSDC: Revealing the Silent Data Corruption Propagation in High-Performance Computing Systems

We report the trend of rapid technology scaling is expected to make the hardware of high-performance computing (HPC) systems more susceptible to computational errors due to random bit flips. Some bit flips may cause a program to crash or have a minimal effect on the output, but others may lead to silent data corruption (SDC), i.e., undetected yet significant output errors. Classical fault injection analysis methods employ uniform sampling of random bit flips during program execution to derive a statistical resiliency profile. However, summarizing such fault injection result with sufficient detail is difficult, and understanding the behavior of the fault-corrupted program is still a challenge. In this article, we introduce SpotSDC, a visualization system to facilitate the analysis of a program's resilience to SDC. SpotSDC provides multiple perspectives at various levels of detail of the impact on the output relative to where in the source code the flipped bit occurs, which bit is flipped, and when during the execution it happens. SpotSDC also enables users to study the code protection and provide new insights to understand the behavior of a fault-injected program. Based on lessons learned, we demonstrate how what we found can improve the fault injection campaign method.

97 MATHEMATICS AND COMPUTING↗

CarbonSAFE Phase II: Optimizing Alabama’s CO 2 Storage in Shelby County, Alabama (Project OASIS), Milestone M3 - Site Specific Drilling Report

The Phase II Storage Complex Feasibility project, entitled "Optimizing Alabama's CO 2 Storage in Shelby County, Alabama (Project OASIS)," is a part of the DOE/NETL's CarbonSAFE initiative. The Project is managed by the Southern States Energy Board (SSEB), and includes participation from Advanced Resources International, Inc. (ARI), Crescent Resource Innovation, Southern Company, Alabama A&M University, Auburn University, and Oklahoma State University. Project OASIS is working to establish the foundation for a commercial-scale geologic storage complex for CO 2 captured from Plant Gaston (home of the National Carbon Capture Center) and surrounding industrial sources of CO 2 located in Shelby County, Alabama. The Project objectives are: • Demonstrate that the subsurface saline formations at the storage complex can store commercial volumes of CO 2 safely and permanently. • Develop a comprehensive Community Benefits Plan. • Develop the infrastructure framework for a CO 2 storage hub. • Develop a rigorous risk registry and to conduct a comprehensive risk assessment. • Develop a monitoring plan. • Develop a comprehensive site characterization plan to support an Underground Injection Control Class VI Permit in a future Phase III program. • Evaluate the commercial viability of the project. Project OASIS is about 30 miles southeast of Birmingham, Alabama within a geologic province called the Valley and Ridge (Figure 1.1). The Valley and Ridge Province comprises a sequence of Paleozoic carbonate and clastic rocks that underwent structural deformation during the Alleghanian Orogeny. Storage prospects occur in relatively flat lying structural panels located between thrust faults. Available geologic studies related to hydrocarbon exploration suggest that Cambro-Ordovician carbonates and Cambrian clastic units offer multiple potential storage intervals, and that regional confining systems are present, such as the tectonically thickened Floyd-Parkwood Shale. The surface property is owned by a timber and land stewardship company, The Westervelt Company, Inc., who worked with the Project Team to select and prepare adequate sites for geologic assessment. The purpose of drilling the Westover Stratigraphic Test Well #2 was to collect geologic data to model the feasibility of commercial scale CO 2 injection and storage. This includes geological and geophysical evaluations, reservoir engineering analyses, and risk assessments.

20 FOSSIL-FUELED POWER PLANTS↗