Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbital operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Payload specialist station study. Volume 2, part 1: Preliminary design document

The details of six tasks of the payload Specialist Station study are discussed: (1) derive payload control and display requirements; (2) perform functional analyses; (3) perform system synthesis; (4) perform trade studies; (5) perform preliminary design; and (6) provide data format. Functional analysis diagrams were developed for the study payloads. These diagrams presented the payload's functional activities flow based on the six mission phases established. These phases are: (1) launch, ascent, orbit insertion; (2) on-orbit checkout and activation; (3) on-orbit operation; (4) deployment/retrieval; (5) on-orbit deactivation; and (6) descent, landing, post-landing. To perform system synthesis the widest variety of available hardware and software, as individual pieces of equipment and as systems, was investigated. The intent was to synthesize a complete AFD system or systems which could accommodate the range of requirements identified for the study missions.

Source record↗

A theoretical prediction of the attitude dynamics due to aerodynamic effects on the reusable reentry satellite

As part of the preliminary mission analysis of the Reusable Reentry Satellite (RRS) (planned for launching in the early to mid-1990s), the on-orbit attitude dynamics of the RRS were analyzed to quantify various parameters that would affect the attitude dynamics of the vehicle. The analysis simulated the attitude dynamics of the RRS due to aerodynamic forces coupled with the motion of the satellite moving around the orbit, estimated the levels of induced angular rates due to external disturbance torques while in orbit, and established the limits of operational orbit altitudes. The results show that, for a typical 60-day mission, orbit altitudes above 350 km are necessary to prevent undesirable orbit decay, with about 200 km as the lower limit. It was also found that, in order to maintain a pointing attitude toward the sun within an acceptable angular deviation for periods exceeding 8 hrs, it is necessary to orbit at an altitude above 600 km.

Wercinski, P. F.↗

Sunrise/sunset thermal shock disturbance analysis and simulation for the TOPEX satellite

It is shown here that during normal on-orbit operations the TOPEX low-earth orbiting satellite is subjected to an impulsive disturbance torque caused by rapid heating of its solar array when entering and exiting the earth's shadow. Error budgets and simulation results are used to demonstrate that this sunrise/sunset torque disturbance is the dominant Normal Mission Mode (NMM) attitude error source. The detailed thermomechanical modeling, analysis, and simulation of this torque is described, and the predicted on-orbit performance of the NMM attitude control system in the face of the sunrise/sunset disturbance is presented. The disturbance results in temporary attitude perturbations that exceed NMM pointing requirements. However, they are below the maximum allowable pointing error which would cause the radar altimeter to break lock.

Dennehy, C. J.↗

Space Station fluid management logistics

Viewgraphs and discussion on space station fluid management logistics are presented. Topics covered include: fluid management logistics - issues for Space Station Freedom evolution; current fluid logistics approach; evolution of Space Station Freedom fluid resupply; launch vehicle evolution; ELV logistics system approach; logistics carrier configuration; expendable fluid/propellant carrier description; fluid carrier design concept; logistics carrier orbital operations; carrier operations at space station; summary/status of orbital fluid transfer techniques; Soviet progress tanker system; and Soviet propellant resupply system observations.

Dominick, Sam M.↗

Reentry analysis for low Earth orbiting spacecraft

As a result of recent National Aeronautics and Space Administration (NASA) Management Instruction (NMI), NASA spacecraft programs must limit orbital debris by design and/or by operational procedures. To fulfill this requirement, spacecraft may be required to be removed from their operational orbit after mission completion. Spacecraft disposal by atmospheric reentry is a means to accomplish this task. To assess the risk to man, an analysis must be done to determine which parts of the spacecraft are likely to survive a reentry of the Earth's atmosphere and where those parts will land. These issues are currently being examined for the Earth Observing System (EOS-AM1). The Johnson Space Center (JSC) Aeroscience Branch, supported by the Lockheed Engineering and Sciences Co., has developed a tool which permits the analysis of the thermal effects of reentry on individual spacecraft components to determine which components are expected to survive reentry. This paper presents an examination of the burnup and reentry of EOS-AM1 and describes a method for other spacecraft to use in analyzing similar reentry issues.

Newman, Lauri Kraft↗

Human Mars Mission: Launch Window from Earth Orbit

The determination of orbital window characteristics is of major importance in the analysis of human interplanetary missions and systems. The orbital launch window characteristics are directly involved in the selection of mission trajectories, the development of orbit operational concepts, and the design of orbital launch systems. The orbital launch window problem arises because of the dynamic nature of the relative geometry between outgoing (departure) asymptote of the hyperbolic escape trajectory and the earth parking orbit. The orientation of the escape hyperbola asymptotic relative to the earth is a function of time. The required hyperbola energy level also varies with time. In addition, the inertial orientation of the parking orbit is a function of time because of the perturbations caused by the Earth's oblateness. Thus, a coplanar injection onto the escape hyperbola can be made only at a point in time when the outgoing escape asymptote is contained by the plane of parking orbit. Even though this condition may be planned as a nominal situation, it will not generally represent the more probable injection geometry. The general case of an escape injection maneuver performed at a time other than the coplanar time will involve both a path angle and plane change and, therefore, a delta V penalty. Usually, because of the delta V penalty the actual departure injection window is smaller in duration than that determined by energy requirement alone. This report contains the formulation, characteristics, and test cases for five different launch window modes for Earth orbit. These modes are: 1) One impulsive maneuver from a Highly Elliptical Orbit (HEO); 2) Two impulsive maneuvers from a Highly Elliptical Orbit (HEO); 3) One impulsive maneuver from a Low Earth Orbit (LEO); 4) Two impulsive maneuvers form LEO; and 5) Three impulsive maneuvers form LEO. The formulation of these five different launch window modes provides a rapid means of generating realistic parametric data for space exploration studies. Also the formulation provides vector and geometrical data sufficient for use as a good starting point in detail trajectory analysis based on calculus of variations, steepest descent, or parameter optimization program techniques.

Young, Archie↗

Human Mars Mission: Launch Window from Earth Orbit

The determination of orbital window characteristics is of major importance in the analysis of human interplanetary missions and systems. The orbital launch window characteristics are directly involved in the selection of mission trajectories, the development of orbit operational concepts, and the design of orbital launch systems. The orbital launch window problem arises because of the dynamic nature of the relative geometry between outgoing (departure) asymptote of the hyperbolic escape trajectory and the earth parking orbit. The orientation of the escape hyperbola asymptotic relative to earth is a function of time. The required hyperbola energy level also varies with time. In addition, the inertial orientation of the parking orbit is a function of time because of the perturbations caused by the Earth's oblateness. Thus, a coplanar injection onto the escape hyperbola can be made only at a point in time when the outgoing escape asymptote is contained by the plane of parking orbit. Even though this condition may be planned as a nominal situation, it will not generally represent the more probable injection geometry. The general case of an escape injection maneuver performed at a time other than the coplanar time will involve both a path angle and plane change and, therefore, a DELTA V penalty. Usually, because of the DELTA V penalty the actual departure injection window is smaller in duration than that determined by energy requirement alone. This report contains the formulation, characteristics, and test cases for five different launch window modes for Earth orbit. These modes are: (1) One impulsive maneuver from a Highly Elliptical Orbit (HEO) (2) Two impulsive maneuvers from a Highly Elliptical Orbit (HEO) (3) One impulsive maneuver from a Low Earth Orbit (LEO) (4) Two impulsive maneuvers from LEO (5) Three impulsive maneuvers from LEO.

Young, Archie↗

Human Exploration Missions Study Launch Window from Earth Orbit

The determination of orbital launch window characteristics is of major importance in the analysis of human interplanetary missions and systems. The orbital launch window characteristics are directly involved in the selection of mission trajectories, the development of orbit operational concepts, and the design of orbital launch systems. The orbital launch window problem arises because of the dynamic nature of the relative geometry between outgoing (departure) asymptote of the hyperbolic escape trajectory and the earth parking orbit. The orientation of the escape hyperbola asymptotic relative to earth is a function of time. The required hyperbola energy level also varies with time. In addition, the inertial orientation of the parking orbit is a function of time because of the perturbations caused by the Earth's oblateness. Thus, a coplanar injection onto the escape hyperbola can be made only at a point in time when the outgoing escape asymptote is contained by the plane of parking orbit. Even though this condition may be planned as a nominal situation, it will not generally represent the more probable injection geometry. The general case of an escape injection maneuver performed at a time other than the coplanar time will involve both a path angle and plane change and, therefore, a Delta(V) penalty. Usually, because of the Delta(V) penalty the actual departure injection window is smaller in duration than that determined by energy requirement alone. This report contains the formulation, characteristics, and test cases for five different launch window modes for Earth orbit. These modes are: (1) One impulsive maneuver from a Low Earth Orbit (LEO), (2) Two impulsive maneuvers from LEO, (3) Three impulsive maneuvers from LEO, (4) One impulsive maneuvers from a Highly Elliptical Orbit (HEO), (5) Two impulsive maneuvers from a Highly Elliptical Orbit (HEO) The formulation of these five different launch window modes provides a rapid means of generating realistic parametric data for space exploration studies. Also the formulation provides vector and geometrical data sufficient for use as a good starting point in detail trajectory analysis based on calculus of variations, steepest descent, or parameter optimization program techniques.

Young, Archie↗

Prototype test article verification of the Space Station Freedom active thermal control system microgravity performance

To verify the on-orbit operation of the Space Station Freedom (SSF) two-phase external Active Thermal Control System (ATCS), a test and verification program will be performed prior to flight. The first system level test of the ATCS is the Prototype Test Article (PTA) test that will be performed in early 1994. All ATCS loops will be represented by prototypical components and the line sizes and lengths will be representative of the flight system. In this paper, the SSF ATCS and a portion of its verification process are described. The PTA design and the analytical methods that were used to quantify the gravity effects on PTA operation are detailed. Finally, the gravity effects are listed, and the applicability of the 1-g PTA test results to the validation of on-orbit ATCS operation is discussed.

Chen, I. Y.↗

Developing a Medical System Concept of Operations for Level of Care IV: Long-Duration Lunar Orbital and Surface Operations

A goal of the Human Research Program (HRP) Exploration Medical Capability (ExMC) Element Systems Engineering (SE) team is to define the technical system needed to support crew medical system capabilities for future exploration missions, including a mission with lunar orbital and long duration surface operations. The medical system concept of operations (ConOps) is the starting point of creating a foundation for a medical system that meets Level of Care IV requirements, as defined by NASA’s space flight human-system standards. This ConOps illustrates how NASA can provide a Level of Care IV medical system for crews within the various cis-lunar orbit and lunar surface habitat environments. The use case scenarios included in this ConOps illustrate required medical system capabilities for Level of Care IV and enable the ExMC SE team to develop integrated medical system requirements and identify capabilities required to meet those requirements. This discussion will focus on how this concept of operations was constructed – by utilizing the lessons learned from ExMC’s existing Short-Duration Lunar Orbit Medical System Concept of Operations, by employing Model-Based Systems Engineering, and by collaborating with stakeholders in order to ensure the necessary assumptions were made.

M. Kaetzer↗

An Overview of MODIS Calibration and Characterization and Lessons Learned

The Moderate Resolution Imaging Spectroradiometer (MODIS) is a key instrument for NASA's EOS missions. Two nearly identical copies have flown on the Terra and Aqua spacecraft for more than 9 years and 6 years since their launch in December 1999 and May 2002, respectively. MODIS observations and associated data products have been widely used by the science community and users worldwide for studies of Earth's system of land, oceans, and atmosphere. MODIS was developed based on the desire of the science community to extend and enhance heritage sensors' data records. It was designed with enhancements made over its heritage sensors in terms of its spectral, spatial, and radiometric characteristics. It is a cross-track scanning radiometer, that uses a two-sided scan mirror, collecting data in 36 spectral bands covering spectral regions of visible (VIS), near-infrared (NIR), short-wave infrared (SWIR), mid-wave infrared (MWIR), and long-wave infrared (LWIR). The VIS, NIR, and SWIR bands (bands 1-19 and 26), which make measurements of daytime surface reflected radiances, are referred to as the reflective solar bands (RSB). The MWIR and LWIR bands (20-25 and 27-36), which measure both the daytime and nighttime scene emissive radiances, are thus referred to as the thermal emissive bands (TEB). In this paper, we provide an overview of MODIS instrument calibration and characterization methodologies, activities, and results from pre-launch to post launch, with emphasis on the lessons learned from its design to on-orbit operation. Currently, both instruments are operated normally and all the on-orbit calibration activities are performed on a regular basis with some at slightly reduced frequencies. The TEB responses have been extremely stable with less than 0.3% change per year. For the RSB, the changes are wavelength and scan angle dependent with the largest changes in the VIS spectral bands. As both Terra and Aqua MODIS continue to operate beyond their prime missions, constant effort is still needed to maintain instrument and calibration and data product quality. This paper shows that the lessons from Terra MODIS design, test, and operation, have greatly benefitted Aqua MODIS. Because of this, Aqua MODIS overall performance is better than Terra MODIS. It is not surprising that lessons from MODIS calibration and characterization, from methodologies to on-orbit implementation, have also provided valuable information for the design and development of future earth observing missions/sensors, such as VHRS on the NPP and NPOESS, ABI on GOES-R, OLI on LDCM, and the reflective solar sensor on CLARREO.

Xiong, Xiaxiong↗

The real-time operations of the Space Shuttle Orbiter during rendezvous and proximity operations

The Space Shuttle Orbiter is the only U.S. spacecraft in operation today that routinely performs an orbital rendezvous with another spacecraft. The trajectory planning and training of both flight crews and ground operations personnel required to achieve a 100 percent success rate is considerable. The preflight planning and training can be reduced through very simple design considerations of a new space vehicle.

Dougherty, Andrew↗

Autonomous Formation Flying from Ground to Flight

The cost of on-orbit operations remains a significant and increasingly visible concern in the support of satellite missions. Headway has been made in automating some ground operations; however, increased mission complexity and more precise orbital constraints have compelled continuing human involvement in mission design and maneuver planning operations. AI Solutions, Inc. in cooperation with the National Aeronautics and Space Administration's (NASA) Goddard Space Flight Center (GSFC) has tackled these more complex problems through the development of AutoCon as a tool for an automated solution. NASA is using AutoCon to automate the maneuver planning for the Earth Orbiter-1 (EO-1) mission. AutoCon was developed originally as a ground system tool. The EO-1 mission will be using a scaled version of AutoCon on-board the EO-1 satellite to command orbit adjustment maneuvers. The flight version of AutoCon plans maneuvers based on formation flying algorithms developed by GSFC, JPL, and other industry partners. In its fully autonomous mode, an AutoCon planned maneuver will be executed on-board the satellite without intervention from the ground. This paper describes how AutoCon automates maneuver planning for the formation flying constraints of the EO-1 mission. AutoCon was modified in a number of ways to automate the maneuver planning on-board the satellite. This paper describes how the interface and functionality of AutoCon were modified to support the on-board system. A significant component of this modification was the implementation of a data smoother, based on a Kalman filter, that ensures that the spacecraft states estimated by an on-board GPS receiver are as accurate as possible for maneuver planning. This paper also presents the methodology use to scale the AutoCon functionality to fit and execute on the flight hardware. This paper also presents the modes built that allow the incremental phasing in of autonomy. New technologies for autonomous operations are usually received with significant, and probably appropriate trepidation. A number of safeguards have been designed in both AutoCon and the interfacing systems to alleviate the potential of mission-impacting anomalies from the on-board autonomous system. This paper describes the error checking, input data integrity validation and limits set on maneuvers in AutoCon and the on-board system.

Chapman, Keith B.↗

Autonomous Formation Flying from the Ground to Flight

The cost of on-orbit operations remains a significant and increasingly visible concern in the support of satellite missions. Headway has been made in automating some ground operations; however, increased mission complexity and more precise orbital constraints have compelled continuing human involvement in mission design and maneuver planning operations. AI Solutions, Inc. in cooperation with the National Aeronautics and Space Administration's (NASA) Goddard Space Flight Center (GSFC) has tackled these more complex problems through the development of AutoCon(TM) as a tool for an automated solution. NASA is using AutoCon(TM) to automate the maneuver planning for the Earth Orbiter-1 (EO-1) mission. AutoCon(TM) was developed originally as a ground system tool. The EO-1 mission will be using a scaled version of AutoCon(TM) on-board the EO-1 satellite to command orbit adjustment maneuvers. The flight version of AutoCon(TM) plans maneuvers based on formation flying algorithms developed by GSFC, JPL, and other industry partners. In its fully autonomous mode, an AutoCon(TM) planned maneuver will be executed on-board the satellite without intervention from the ground. This paper describes how AutoCon(TM) automates maneuver planning for the formation flying constraints of the EO-1 mission. AutoCon(TM) was modified in a number of ways to automate the maneuver planning on-board the satellite. This paper describes how the interface and functionality of AutoCon(TM) were modified to support the on-board system. A significant component of this modification was the implementation of a data smoother, based on a Kalman filter, that ensures that the spacecraft states estimated by an on-board GPS receiver are as accurate as possible for maneuver planning. This paper also presents the methodology used to scale the AutoCon(TM) functionality to fit and execute on the flight hardware. This paper also presents the modes built into the system that allow the incremental phasing in of autonomy. New technologies for autonomous operations are usually received with significant, and probably appropriate, trepidation. A number of safeguards have been designed in both AutoCon(TM) and the interfacing systems to alleviate the potential of mission-impacting anomalies from the on-board autonomous system. This paper describes the error checking, input data integrity validation, and limits set on maneuvers in AutoCon(TM) and the on-board system.

Chapman, Keith B.↗

Nuclear reactor power for a space-based radar. SP-100 project

A space-based radar mission and spacecraft, using a 300 kWe nuclear reactor power system, has been examined, with emphasis on aspects affecting the power system. The radar antenna is a horizontal planar array, 32 X 64 m. The orbit is at 61 deg, 1088 km. The mass of the antenna with support structure is 42,000 kg; of the nuclear reactor power system, 8,300 kg; of the whole spacecraft about 51,000 kg, necessitating multiple launches and orbital assembly. The assembly orbit is at 57 deg, 400 km, high enough to provide the orbital lifetime needed for orbital assembly. The selected scenario uses six Shuttle launches to bring the spacecraft and a Centaur G upper-stage vehicle to assembly orbit. After assembly, the Centaur places the spacecraft in operational orbit, where it is deployed on radio command, the power system started, and the spacecraft becomes operational. Electric propulsion is an alternative and allows deployment in assembly orbit, but introduces a question of nuclear safety.

Bloomfield, Harvey↗

Pioneer Venus Orbiter Ultraviolet Spectrometer: Operations and Data Analysis

The Pioneer Venus spacecraft orbited Venus 5,055 times between 4th December 1978 and 6th October 1992, before entering Venus' atmosphere and burning up on the latter date. On 255 of these orbits, science operations were suspended because of superior conjunction (Venus' proximity to the Sun as seen from Earth). Of the remaining 4800 orbits, about 85% yielded good-quality OUVS science data; 15% were lost to various problems, including loss of uplink (commands) to and downlink (data) from the spacecraft, errors in commanding OUVS, and one or other of the two instrument anomalies mentioned below.

Stewart, A. I. F.↗

A science perspective of the Space Station

On-orbit scientific research involving the presence of humans has been hampered during Shuttle flights due to the brevity of the missions and the limited power supplies and data management facilities. The solutions to these limitations are the Space Station and extended duration Orbiter, the latter offering 2.5 weeks on-orbit operations. The Space Station configuration is to include polar orbiting and co-orbiting unmanned platforms serviced, initially, by the Shuttle. The longer duration operations on the Space Station will permit lowering the amount of on-the-ground training in favor of on-orbit experience, thereby enhancing the flexibility of experimental opportunities and expanding the breadth of investigations. The goal of all the developments is to furnish groundside experimenters access to space, along with minimized adaptation of experimental procedures to exploit the space environment.

Black, D. C.↗

Mariner Mars 1971 project. Volume 3: Mission operations system implementation and standard mission flight operations

The Mariner Mars 1971 mission which was another step in the continuing program of planetary exploration in search of evidence of exobiological activity, information on the origin and evolution of the solar system, and basic science data related to the study of planetary physics, geology, planetology, and cosmology is reported. The mission plan was designed for two spacecraft, each performing a separate but complementary mission. However, a single mission plan was actually used for Mariner 9 because of failure of the launch vehicle for the first spacecraft. The implementation is described, of the Mission Operations System, including organization, training, and data processing development and operations, and Mariner 9 spacecraft cruise and orbital operations through completion of the standard mission from launch to solar occultation in April 1972 are discussed.

Source record↗