Search NASA⌕ Search

SEARCH · Search NASA

Results for “planning and development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 307 records · Page 17

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is a concept which uses a nuclear reactor to heat a propellant to high temperatures without combustion and can achieve significantly greater specific impulse than chemical engines. NTP has been considered many times for human and cargo missions beyond low earth orbit. A lot of development and technical maturation of NTP components took place during the Rover/NERVA program of the 60's and early 70's. Other NTP programs and studies followed attempting to further mature the NTP concept and identify a champion customer willing to devote the funds and support the development schedule to a demonstration mission. Budgetary constraints require the use of an affordable development and qualification strategy that takes into account all the previous work performed on NTP to construct an existing database, and include lessons learned and past guidelines followed. Current guidelines and standards NASA uses for human rating chemical rocket engines is referenced. The long lead items for NTP development involve the fuel elements of the reactor and ground testing the engine system, subsystem, and components. Other considerations which greatly impact the development plans includes the National Space Policy, National Environmental Policy Act, Presidential Directive/National Security Council Memorandum #25 (Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and Launch of Nuclear Systems into Space), and Safeguards and Security. Ground testing will utilize non-nuclear test capabilities to help down select components and subsystems before testing in a nuclear environment to save time and cost. Existing test facilities with minor modifications will be considered to the maximum extent practical. New facilities will be designed to meet minimum requirements. Engine and test facility requirements are based on the driving mission requirements with added factors of safety for better assurance and reliability. Emphasis will be placed on small engines, since the smaller the NTP engine, the easier it is to transport, assemble/disassemble, and filter the exhaust during tests. A new ground test concept using underground bore holes (modeled after the underground nuclear test program) to filter the NTP engine exhaust is being considered. The NTP engine system design, development, test, and evaluation plan includes many engine components and subsystems, which are very similar to those used in chemical engines, and can be developed in conjunction with them Other less mature NTP engine components and subsystems (e.g., reactor) will be thoroughly analyzed and tested to acceptable levels recommended by the referenced standards and guidelines. The affordable development strategy also considers a prototype flight test, as a final step in the development process. Preliminary development schedule estimates show that an aggressive development schedule (without much margin) will be required to be flight ready for a 2033 human mission to Mars.

Gerrish, Harold P., Jr.↗

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is a concept which uses a nuclear reactor to heat a propellant to high temperatures without combustion and can achieve significantly greater specific impulse than chemical engines. NTP has been considered many times for human and cargo missions beyond low earth orbit. A lot of development and technical maturation of NTP components took place during the Rover/NERVA program of the 60's and early 70's. Other NTP programs and studies followed attempting to further mature the NTP concept and identify a champion customer willing to devote the funds and support the development schedule to a demonstration mission. Budgetary constraints require the use of an affordable development and qualification strategy that takes into account all the previous work performed on NTP to construct an existing database, and include lessons learned and past guidelines followed. Current guidelines and standards NASA uses for human rating chemical rocket engines is referenced. The long lead items for NTP development involve the fuel elements of the reactor and ground testing the engine system, subsystem, and components. Other considerations which greatly impact the development plans includes the National Space Policy, National Environmental Policy Act, Presidential Directive/National Security Council Memorandum #25 (Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and Launch of Nuclear Systems into Space), and Safeguards and Security. Ground testing will utilize non-nuclear test capabilities to help down select components and subsystems before testing in a nuclear environment to save time and cost. Existing test facilities with minor modifications will be considered to the maximum extent practical. New facilities will be designed to meet minimum requirements. Engine and test facility requirements are based on the driving mission requirements with added factors of safety for better assurance and reliability. Emphasis will be placed on small engines, since the smaller the NTP engine, the easier it is to transport, assemble/disassemble, and filter the exhaust during tests. A new ground test concept using underground bore holes (modeled after the underground nuclear test program) to filter the NTP engine exhaust is being considered. The NTP engine system design, development, test, and evaluation plan includes many engine components and subsystems, which are very similar to those used in chemical engines, and can be developed in conjunction with them Other less mature NTP engine components and subsystems (e.g., reactor) will be thoroughly analyzed and tested to acceptable levels recommended by the referenced standards and guidelines. The affordable development strategy also considers a prototype flight test, as a final step in the development process. Preliminary development schedule estimates show that an aggressive development schedule (without much margin) will be required to be flight ready for a 2033 human mission to Mars.

Gerrish, Harold P., Jr.↗

Collaborative Mission Design at NASA Langley Research Center

NASA Langley Research Center (LaRC) has developed and tested two facilities dedicated to increasing efficiency in key mission design processes, including payload design, mission planning, and implementation plan development, among others. The Integrated Design Center (IDC) is a state-of-the-art concurrent design facility which allows scientists and spaceflight engineers to produce project designs and mission plans in a real-time collaborative environment, using industry-standard physics-based development tools and the latest communication technology. The Mission Simulation Lab (MiSL), a virtual reality (VR) facility focused on payload and project design, permits engineers to quickly translate their design and modeling output into enhanced three-dimensional models and then examine them in a realistic full-scale virtual environment. The authors were responsible for envisioning both facilities and turning those visions into fully operational mission design resources at LaRC with multiple advanced capabilities and applications. In addition, the authors have created a synergistic interface between these two facilities. This combined functionality is the Interactive Design and Simulation Center (IDSC), a meta-facility which offers project teams a powerful array of highly advanced tools, permitting them to rapidly produce project designs while maintaining the integrity of the input from every discipline expert on the project. The concept-to-flight mission support provided by IDSC has shown improved inter- and intra-team communication and a reduction in the resources required for proposal development, requirements definition, and design effort.

Gough, Kerry M.↗

Tackling Grand Challenges in Wind Energy through a Socio-Technical Perspective

Wind power has an important role to play in tackling climate change. Key challenges in wind energy science and innovation must be overcome to increase the penetration and capability of this technology. However, the success of these efforts heavily depends on how society engages with the development of wind power infrastructure. Consequently, grand challenges exist in both technical and social domains, yet little research has made substantial efforts in connecting them. Here we review the social science and humanities literature on wind energy to illustrate the social dimensions of previously identified technical challenges. We suggest that a socio-technical lens enables an interdisciplinary approach to overcome the prevalent tendency of silo thinking in wind energy research and use it to explore socio-technical grand challenges related to the design, planning, development, operational and end-of-life phases of wind energy. Finally, we provide an outlook for research, practice and innovation, including an interdisciplinary and socio-technical research agenda for wind energy science, renewable energy developments and science policy in general.

end-of-life↗

Capabilities, Design, Construction and Commissioning of New Vibration, Acoustic, and Electromagnetic Capabilities Added to the World's Largest Thermal Vacuum Chamber at NASA's Space Power Facility

NASA s human space exploration plans developed under the Exploration System Architecture Studies in 2005 included a Crew Exploration Vehicle launched on an Ares I launch vehicle. The mass of the Crew Exploration Vehicle and trajectory of the Ares I coupled with the need to be able to abort across a large percentage of the trajectory generated unprecedented testing requirements. A future lunar lander added to projected test requirements. In 2006, the basic test plan for Orion was developed. It included several types of environment tests typical of spacecraft development programs. These included thermal-vacuum, electromagnetic interference, mechanical vibration, and acoustic tests. Because of the size of the vehicle and unprecedented acoustics, NASA conducted an extensive assessment of options for testing, and as result, chose to augment the Space Power Facility at NASA Plum Brook Station, of the John H. Glenn Research Center to provide the needed test capabilities. The augmentation included designing and building the World s highest mass capable vibration table, the highest power large acoustic chamber, and adaptation of the existing World s largest thermal vacuum chamber as a reverberant electromagnetic interference test chamber. These augmentations were accomplished from 2007 through early 2011. Acceptance testing began in Spring 2011 and will be completed in the Fall of 2011. This paper provides an overview of the capabilities, design, construction and acceptance of this extraordinary facility.

Motil, Susan M.↗

Strategy for exploration of the outer planets: 1986-1996

Over the past decade COMPLEX has published three strategy reports which, taken together, encompass the entire planetary system and recommend a coherent program of planetary exploration. The highest priority for outer planet exploration during the next decade is intensive study of Saturn (the planet, satellites, rings, and magnetosphere) as a system. The Committee additionally recommends that NASA engage in the following supporting activities: increased support of laboratory and theoretical studies; pursuit of earth-based and earth-orbital observations; commitment to continued operation of productive spacecraft; implementation of the instrument development plan as appropriate for the outer solar system; studies of deep atmospheric probes; development of penetrators or other hard landers; development of radiation-hardened spacecraft; and development of low-thrust propulsion systems. Longer-term objectives include exploration and intensive study of: the Uranus and Neptune systems; planetology of the Galilean satellites and Titan; and the inner Jovian system.

Source record↗

SRB/SLEEC (Solid Rocket Booster/Shingle Lap Extendible Exit Cone) feasibility study, volume 1

A preliminary design and analysis was completed for a SLEEC (Shingle Lap Extendible Exit Cone) which could be incorporated on the Space Transportation System (STS) Solid Rocket Booster (SRB). Studies were completed which predicted weights and performance increases and development plans were prepared for the full-scale bench and static test of SLEEC. In conjunction with the design studies, a series of supporting analyses were performed to assure the validity and feasibility of performance, fabrication, cost, and reliability for the selected design. The feasibility and required amounts of bench, static firing, and flight tests considered necessary for the successful incorporation of SLEEC on the Shuttle SRBs were determined. Preliminary plans were completed which define both a follow on study effort and a development program.

Baker, William H., Jr.↗

On-orbit Servicing, Assembly, and Manufacturing (OSAM) State of Play, 2021 Edition

This document compiles and organizes the current state of OSAM missions, capabilities, and developments. Understanding where the set of capabilities currently stand will help mission designers incorporate OSAM technologies into their concepts, create the starting point for technology development plans and roadmaps, and provide technologists a survey of the field they are developing. The authors recognize that this capability is broad and that they are unlikely to have captured everything that has been or is being done in the area on the first attempt. As a result, a new version of the OSAM State of Play will be released periodically (perhaps annually).

OSAM↗

In-space Servicing, Assembly, and Manufacturing (ISAM) State of Play 2022 Edition

The future of spaceflight will yield increasingly more ambitious missions to support civil, national security, and commercial space sectors. Achieving these ambitious missions is not feasible using the traditional paradigm of launching an integrated, fully functioning system on a single launch vehicle. For example, science and human exploration missions will desire payloads that are larger than any foreseeable launch vehicle fairing, national security missions will require persistent assets that are mobile and resilient, and commercial space missions will require cost-effective ways to update to the latest technology on orbit. In-space Servicing, Assembly, and Manufacturing (ISAM) can vastly expand the performance, availability, and lifetime of space systems compared to the traditional paradigm of launching an asset with no intent to ever touch it again. ISAM capabilities foster an ecosystem that changes the space operations paradigm, creating the foundation for sustainable exploration and serving as a multiplier for other capabilities like space logistics, power generation, and reusability. Previous achievements in ISAM have enabled ambitious human and robotic space missions. NASA’s International Space Station (ISS) operations and maintenance, servicing missions of the Hubble Space Telescope (HST), and Northrop Grumman’s Mission Extension Vehicle (MEV) demonstrate the dramatic operational missions that can be achieved using ISAM capabilities. Many current and upcoming flight demonstrations are advancing areas that will enable the next generation of civil, national security, and commercial space missions. This document describes the current state of ISAM missions, capabilities, and developments. Compiling and organizing the available ISAM capabilities will help mission designers incorporate ISAM technologies into their concepts, create the starting point for technology development plans and roadmaps, and provide technologists a survey of the field they are developing. This document divides the ISAM capabilities into 11 capability areas that describe the functions or activities that would be performed in space using ISAM. This version of the ISAM State of Play is part of a continuing journey to encourage the use of ISAM capabilities in space. Compiling and organizing the current state of ISAM provides a simple resource for those working in the ISAM ecosystem to ensure that the advancements being made build upon the investments of the past. The state of play is ever changing as new capabilities are developed, and this document will be periodically updated to ensure that it is relevant to those who need it in the future.

ISAM↗

NASA science utilization plans for the Space Station

The Mir-1 and International Space Station Alpha capabilities present the science community with unique long duration platforms to conduct a wide range of scientific research in the microgravity and life sciences as well as in the observational sciences, NASA is developing plans to use the capabilities of Mir and Space Station as they emerge during the development of the orbital program. In both cases the planned science utilization programs take advantage of the volume, crew, power, microgravity and logistics resupply unique to each phase. The paper will present these utilization plans in the context of an evolving scientific program.

manned↗

The development of a Flight Test Engineer's Workstation for the Automated Flight Test Management System

The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.

Tartt, David M.↗

MOSCATO Solver Development and Integration Plan

During FY21, we conducted ongoing development work for the MOSCATO (Molten Salt Chemistry and Transport) solver. The code development work primarily consisted of transitioning capabilities from the original version of the solver, which was written in OpenFOAM, into Nek5000. In doing so, a fast, highly parallelizable solver was created that is capable of complex chemistry and corrosion simulations for engineering-scale molten salt systems. The Nek5000 version of MOSCATO is now fully featured and capable of higher-fidelity simulations than were previously possible. Demonstration cases including a thermal convection loop have been simulated to test these new capabilities. Although capable of large-scale simulations, MOSCATO is not well-suited to parametric studies of complete reactor geometries. These types of simulations are instead better handled by reduced-order modeling codes such as ORNL’s Mole code. Reduced-order simulation tools like Mole, however, are dependent on high fidelity correlations to account for complex, coupled three-dimensional phenomena that they do not directly simulate. Tools such as MOSCATO must therefore be used to create these correlations, as suitable empirical relationships are not available for most molten salt systems. Toward that end, we used the Nek-derived version of MOSCATO to create new mass transfer correlations for three relevant cases including tubular, tube bank, and subchannel geometries. These new correlations are more accurate than any existing ones and can be readily integrated into any reduced-order modeling tools that are targeting full-scale MSR simulations.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DOE Environmental Management and Newport News Nuclear BWXT Briefing - LANL’s Campus Master Plan [Slides]

Triad proposed a robust integrated planning effort during the bidding process and began this effort soon after the LANL contract transition. Within months of Triad commencing this planning process, NA-LA delivered a Contracting Officer (CO) letter requiring: (1) Area Development Plan for the Pajarito Corridor delivered by end of FY19 (completed), and (2) The Campus Master Plan (CMP) to be delivered by end of FY21 (completed).

42 ENGINEERING↗

Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin (Final Technical Report)

This is the Final Technical Report for the project "Chemically Enabled CO 2 -Enhanced Oil Recovery in Multi-Porosity, Hydrothermally Altered Carbonates in the Southern Michigan Basin." Over the course of six years of collaboration between Battelle and project partners, all stated objectives of the program have been completed, including full geological characterization of the TBR trend (See companion report for Task2), laboratory and modeling experiments to determine the optimum composition and design of CO 2 -EOR operations in the TBR trend, execution of a field test of chemically-enhanced CO 2 in a TBR well, and integration of the data and learnings gathered during these efforts into a full-trend development plan. Detailed reporting on these activities, their outcomes, and implications for trend-wide development is provided in the report. This report and encompassed data will provide TBR field operators with detailed information on what worked, what did not work, and how to proceed with production optimization of their TBR assets using chemically-enhanced CO 2 -EOR. CO 2 -EOR is a relatively well understood and broadly implemented strategy for increasing incremental production across the oil and gas industry, but its application has been primarily focused on reservoirs with limited heterogeneity. The intention of this project was show first that the same physical mechanisms that improve recovery factors in homogeneous reservoirs (namely wettability alteration, viscosity alteration, oil swelling, and mobility control) are at play in heterogeneous reservoirs. This was proven by the project’s laboratory studies and dynamic simulations, with the potential exception of mobility control, which needs further study. The second intention was to demonstrate via direct field testing that CO 2 -EOR can work in a strongly heterogeneous reservoir. While the field test strategy implemented during this project did not succeed in producing oil, data gathered during the test sheds light on what may work for field operators who try chemically-enhanced CO 2 -EOR within their own reservoirs, significantly reducing the level of uncertainty carried by first-of-a-kind commercial efforts that could (and should) follow this test. Simultaneously, the project has identified several large-volume ethanol plants and other sources of CO 2 emissions in the region and provided a handrail that CO 2 emitters and field operators can leverage to capture, transport, and inject that CO 2 into their fields. This project has also shown that, in many cases, the economics of CO 2 -EOR in the TBR are attractive. And finally, by completing a project of this scope in the southern Michigan Basin, the project has contributed to the knowledge base and operational experience of field operators, state regulatory agencies, local service companies, and state universities, with CO 2 -EOR projects which should allow follow-on projects to proceed safely and efficiently.

02 PETROLEUM↗

Empire. a study of early manned interplanetary missions final report, may 26 - nov. 25, 1962

This report summarizes the investigations and results of the EMPIRE Study Program undertaken by Aeronutronic Division of Ford Motor Company for the Future Projects Office, Marshall Space Flight Center, under Contract NAS8-5025. The dual planet flyby missions of the Crocco and Symmetric trajectory classes are discussed. The Crocco mission with an August 1971 launch window requires an interplanetary injection velocity increment of i0.i km/sec, has a return velocity of 13.5 km/sec, and takes approximately 400 days. The Symmetric mission with a July 1970 launch window has an injection velocity increment of 5.3 km/sec, a return velocity of 15.8 km/sec, and takes approximately 630 days. Additional results of the trajectory studies and abort trajectories are reported. The guidance and navigation subsystem, midcourse corrections, and planetary approach corrections are discussed. A detailed analysis of the reentry phase of EMPIRE includes consideration of an Apollo-type, a Drag Brake, and a lifting-type reentry vehicle to return the six-man crew at mission completion or in an aborted condition. The High L/D reentry vehicle is used in the missions considered. The various technological areas required for design criteria are developed and several spacecraft designs are considered. The all chemical propulsion Crocco system is discarded due to weight, complexity, and cost. The nuclear injected Crocco is treated in a similar manner. The lower energy injection for the Symmetric Mission leads to the feasibility of a nuclear injected vehicle with an Earth orbit weight of about 180,000 kilograms (400,000 pounds) before interplanetary transit. In addition, two chemical symmetric vehicles are treated. Conservative radiation exposures are derived, for the 630 day mission, of less than 200 REM and a polyethelene radiation shelter is designed. Scientific aspects of the missions are discussed. Mission Success Probabilities are presented for the various missions considered and for Saturn C-5, Nova, and Super-Nova Earth launch vehicles in light of possible development. The need for acceleration of nuclear rocket engine developments and auxiliary power developments is indicated. Definition of a larger nuclear engine of the order of 200,000 pounds thrust and about 800 seconds burning time or 50,000 pound thrust and 3600 seconds burning time is indicated for the Symmetric Mission in 1970 (energy requirements are higher in 1972 and for later launch due to the less favorable position of Mars)_ Immediate development of this advanced nuclear propulsion capability is recommended. A Development Plan and Funding Schedule is given for the 1970 launch window pinpointing the critical development areas and indicating a total program cost of $12.6 billion independent of other programmed R&D costs. In conclusion, technological feasibility for an early manned dual planet Mars-Venus flyby is believed to be demonstrated in this study. Several areas of accelerated development and experimental confirmation of theory are pinpointed. The necessary funding and development of Nova or orbital operations capability with Saturn C-5's is required. The 1970 launch window appears to offer the least expensive Symmetric Mission for several years into the 1980's.

F. P. Dixon↗

Developing industrial participation in space - An approach for NASA

Maximizing industrial utilization of NASA's Space Transportation System (STS) requires the identification of potential STS users, determination of user needs, and initiation of integrated technical/market development efforts. With the involvement of potential end-users, R&D must be funded to demonstrate STS capabilities in technologies which have industrial potential. An integrated user development plan for NASA is discussed, emphasizing major activities and functional relationships in a user development program. Opportunities for private industry are noted. Results presented are those developed in support of a recent NASA contract intended as an initial step in the implementation by NASA of a user development program for the STS.

Madigan, J. A.↗

Extraterrestrial resources: Implications from terrestrial experience

Terrestrial mining experience indicates that the overwhelming criterion of a potentially economic deposit is its recoverable concentration of the desired mineral or element. Recovery can be based on contrast in physical and/or chemical properties, but processes based on physical properties are typically less expensive. As several processes generally are used in sequence, they have a profound effect on extraction costs. These criteria will also apply to extraterrestrial resources. Although the extreme cost of access to space makes even ordinary materials extremely valuable, this inaccessibility also makes capital and maintenance costs extremely high. The following four development stages will apply, especially with the additional unknowns of an extraterrestrial environment: (1) Exploration for the highest grade of the mineral or element desired (because the extraction plant must be simple, cheap, and rugged to minimize capital and maintenance costs, high grade is extremely important); (2) Laboratory testing of various physical and/or chemical separation techniques on the possible ore to determine if the material can indeed be recovered economically; (3) a pilot plant test, in which a large sample is dug from the deposit to determine excavation rates, power requirements, and equipment wear. (This sample is then run through a pilot mill designed on the basis of the laboratory testing. Pilot plant testing must be carried out at increasing scales, but several trials are generally necessary at each scale before the size of operations can be increased. Moreover, pilot testing is necessary for each new mineral deposit); and (4) Last is the full-scale mine and plant start-up. (New problems invariably occur at this point, but they can be kept to a minimum if the pilot plant tests were realistic). If such a development plan is followed rigorously, major cost overruns, with their potentially disastrous effects on resource developments, can be avoided.

Kuck, David L.↗

Cryogenic Fluid Storage Technology Development: Recent and Planned Efforts at NASA

Recent technology development work conducted at NASA in the area of Cryogenic Fluid Management (CFM) storage is highlighted, including summary results, key impacts, and ongoing efforts. Thermodynamic vent system (TVS) ground test results are shown for hydrogen, methane, and oxygen. Joule-Thomson (J-T) device tests related to clogging in hydrogen are summarized, along with the absence of clogging in oxygen and methane tests. Confirmation of analytical relations and bonding techniques for broad area cooling (BAC) concepts based on tube-to-tank tests are presented. Results of two-phase lumped-parameter computational fluid dynamic (CFD) models are highlighted, including validation of the model with hydrogen self pressurization test data. These models were used to simulate Altair representative methane and oxygen tanks subjected to 210 days of lunar surface storage. Engineering analysis tools being developed to support system level trades and vehicle propulsion system designs are also cited. Finally, prioritized technology development risks identified for Constellation cryogenic propulsion systems are presented, and future efforts to address those risks are discussed.

Moran, Matthew E.↗